3GPP Specification Change Requests

Back to numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 23.402

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0001 - F Rel-8 8.0.0 - GTP-PMIP roaming - - - - S2-62 S2-080073 withdrawn 2008-01-17 SAES Withdrawn 2008-01-17
0002 - C Rel-8 8.0.0 - IP address allocation and protocol configuration using DHCP - - - - S2-62 S2-080078 revised 2008-01-17 SAES Revised in S2-080771 2008-01-17
0002 1 C Rel-8 8.0.0 8.1.0 IP address allocation and protocol configuration using DHCP SP-39 SP-080167 approved S2 S2-62 S2-080771 agreed 2008-01-17 SAES Approved at S2#62, revised at S2#63 in S2-081464, but not handled 2008-01-17
0002 2 C Rel-8 8.0.0 - IP address allocation and protocol configuration using DHCP - - - - S2-63 S2-081464 noted 2008-02-08 SAES Not Handled 2008-02-08
0003 - C Rel-8 8.0.0 - Serving GW relocation when PMIP is used at S5/S8 - - - - S2-62 S2-080091 revised 2008-01-17 SAES Revised in S2-080810 2008-01-17
0003 1 C Rel-8 8.0.0 - Serving GW relocation when PMIP is used at S5/S8 - - - - S2-62 S2-080810 noted 2008-01-17 SAES Approved, but covered by CR0098 at S2-63 2008-01-17
0004 - C Rel-8 8.0.0 - Interactions between HSS and AAA in call flows non-3GPP access - - - - S2-62 S2-080094 noted 2008-01-17 SAES Not Handled at S2#62. 2008-01-17
0005 - C Rel-8 8.0.0 - Support for sending Access type information across PMIP based interfaces: S5/S8/S2a/S2b - - - - S2-62 S2-080096 noted 2008-01-17 SAES Noted 2008-01-17
0006 - C Rel-8 8.0.0 - PDN GW selection for multiple PDN connections with S2a - - - - S2-62 S2-080097 revised 2008-01-17 SAES Approved at S2#62, but revised again S2#63 in S2-081457 2008-01-17
0006 1 C Rel-8 8.0.0 8.1.0 PDN GW selection for multiple PDN connections with S2a SP-39 SP-080122 approved S2 S2-63 S2-081457 agreed 2008-02-08 SAES Block Approved 2008-02-08
0007 - C Rel-8 8.0.0 - Activation of additional PDN connection for PMIP-based S5/S8 - - - - S2-62 S2-080098 revised 2008-01-17 SAES Revised in S2-080806 2008-01-17
0007 1 C Rel-8 8.0.0 - Activation of additional PDN connection for PMIP-based S5/S8 - - - - S2-62 S2-080806 revised 2008-01-17 SAES Approved at S2#62, but revised again S2#63 in S2-081152 2008-01-17
0007 2 C Rel-8 8.0.0 - Activation of additional PDN connection for PMIP-based S5/S8 - - - - S2-63 S2-081152 revised 2008-02-04 SAES Revised in S2-081912 2008-02-04
0007 3 C Rel-8 8.0.0 8.1.0 Activation of additional PDN connection for PMIP-based S5/S8 SP-39 SP-080122 approved S2 S2-63 S2-081912 agreed 2008-02-21 SAES Approved 2008-02-21
0008 - B Rel-8 8.0.0 - User Identity to HSS resolution - - - - S2-62 S2-080118 noted 2008-01-17 SAES Not Handled at S2#62. 2008-01-17
0009 - B Rel-8 8.0.0 - Network Controlled Handovers with Mobile WiMAX - - - - S2-62 S2-080129 revised 2008-01-17 SAES Revised in S2-080782 2008-01-17
0009 1 B Rel-8 8.0.0 - Network Controlled Handovers with Mobile WiMAX - - - - S2-62 S2-080782 noted 2008-01-17 SAES Noted 2008-01-17
0010 - C Rel-8 8.0.0 - Clarification about the AAA-initiated UE De-registration Notification procedure and Information Storage on the HSS. - - - - S2-62 S2-080132 noted 2008-01-17 SAES Not Handled at S2#62. 2008-01-17
0011 - C Rel-8 8.0.0 - Attach Type for 3GPP accesses. - - - - S2-62 S2-080136 revised 2008-01-17 SAES Not Handled at S2#62. Revised at S2#63 in S2-081059 2008-01-17
0011 1 C Rel-8 8.0.0 - Attach Type for 3GPP accesses. - - - - S2-63 S2-081059 revised 2008-01-31 SAES Revised in S2-081672 2008-01-17
0011 2 C Rel-8 8.0.0 - Attach Type for 3GPP accesses - - - - S2-63 S2-081672 revised 2008-02-21 SAES Revised in S2-081715 2008-02-21
0011 3 C Rel-8 8.0.0 - Attach Type for 3GPP accesses - - - - S2-63 S2-081715 revised 2008-02-21 SAES Revised in S2-081920 2008-02-21
0011 4 C Rel-8 8.0.0 - Attach Type for 3GPP accesses - - - - S2-63 S2-081920 noted 2008-02-21 SAES Merged into S2-081922 2008-02-21
0012 - C Rel-8 8.0.0 - Attach Type for Non-3GPP accesses - - - - S2-62 S2-080137 revised 2008-01-17 SAES Not Handled at S2#62. Revised at S2#63 in S2-081060 2008-01-17
0012 1 C Rel-8 8.0.0 - Attach Type for Non-3GPP accesses - - - - S2-63 S2-081060 revised 2008-01-31 SAES Revised in S2-081716 2008-01-17
0012 2 C Rel-8 8.0.0 - Attach Type for Non-3GPP accesses - - - - S2-63 S2-081716 revised 2008-02-21 SAES Revised in S2-081923 2008-02-21
0012 3 C Rel-8 8.0.0 8.1.0 Attach Type for Non-3GPP accesses SP-39 SP-080122 approved S2 S2-63 S2-081923 agreed 2008-02-21 SAES Approved 2008-02-21
0013 - B Rel-8 8.0.0 - Bearer release control during handover from E-UTRAN to HRPD - - - - S2-62 S2-080158 revised 2008-01-17 SAES Revised in S2-080794 2008-01-17
0013 1 B Rel-8 8.0.0 - Bearer release control during handover from E-UTRAN to HRPD - - - - S2-62 S2-080794 noted 2008-01-17 SAES Noted 2008-01-17
0013 2 C Rel-8 8.1.1 - Bearer release control during handover from 3GPP to non3GPP - - - - S2-64 S2-082227 noted 2008-04-02 SAES Noted 2008-04-02
0014 - B Rel-8 8.0.0 - Optimization handover from HRPD to E-UTRAN - - - - S2-62 S2-080160 noted 2008-01-17 SAES Noted 2008-01-17
0015 - B Rel-8 8.0.0 - Optimized Idle Mode Handover from HRPD to E-UTRAN - - - - S2-62 S2-080162 revised 2008-01-17 SAES Revised in parallel session in S2-080757 2008-01-17
0015 1 B Rel-8 8.0.0 8.1.0 Optimized Idle Mode Handover from HRPD to E-UTRAN SP-39 SP-080121 approved S2 S2-62 S2-080757 agreed 2008-01-17 SAES Approved 2008-01-17
0016 - B Rel-8 8.0.0 - Modification on S8/S2 Chained Attach Procedure - - - - S2-62 S2-080172 revised 2008-01-17 SAES Not Handled at S2#62. Revised at S2#63 in S2-081075 2008-01-17
0016 1 B Rel-8 8.0.0 - Modification on S8/S2 Chained Attach Procedure - - - - S2-63 S2-081075 revised 2008-01-31 SAES Revised in S2-081882 2008-01-17
0016 2 B Rel-8 8.0.0 - PDN GW address retrieval in S-GW Chained Case - - - - S2-63 S2-081882 revised 2008-02-21 SAES Revised in S2-081924 2008-02-21
0016 3 B Rel-8 8.0.0 8.1.0 PDN GW address retrieval in S-GW Chained Case SP-39 SP-080121 approved S2 S2-63 S2-081924 agreed 2008-02-21 SAES Approved 2008-02-21
0017 - F Rel-8 8.0.0 - Correction of Initial Attach Procedure with DSMIPv6 on S2c in Trusted Non-3GPP IP Access - - - - S2-62 S2-080173 revised 2008-01-17 SAES Not Handled at S2#62. Revised at S2#63 in S2-081076 2008-01-17
0017 1 F Rel-8 8.0.0 - Correction of Initial Attach Procedure with DSMIPv6 on S2c in Trusted Non-3GPP IP Access - - - - S2-63 S2-081076 noted 2008-01-31 SAES Noted 2008-01-17
0018 - F Rel-8 8.0.0 - Clarification on S-GW selection when Handover - - - - S2-62 S2-080174 revised 2008-01-17 SAES Revised in S2-080785 2008-01-17
0018 1 F Rel-8 8.0.0 8.1.0 Clarification on S-GW selection when Handover SP-39 SP-080124 approved S2 S2-62 S2-080785 agreed 2008-01-17 SAES Approved 2008-01-17
0019 - B Rel-8 8.0.0 - Handover flows between non-3GPP and 3GPP with chained S2/S8b - - - - S2-62 S2-080175 revised 2008-01-17 SAES Revised in S2-080786 2008-01-17
0019 1 B Rel-8 8.0.0 - Handover flows between non-3GPP and 3GPP with chained S2/S8b - - - - S2-62 S2-080786 revised 2008-01-17 SAES Noted at S2#62. Revised at S2#63 in S2-081078 2008-01-17
0019 2 B Rel-8 8.0.0 - Handover flows between non-3GPP and 3GPP with chained S2/S8b - - - - S2-63 S2-081078 noted 2008-01-31 SAES Not Handled 2008-01-17
0020 - C Rel-8 8.0.0 - IPMS indication in non-3GPP access network - - - - S2-62 S2-080176 noted 2008-01-17 SAES Not Handled 2008-01-17
0023 - F Rel-8 8.0.0 - Correction of UE-initiated Connectivity to Additional PDN procedure - - - - S2-62 S2-080179 noted 2008-01-17 SAES Approved, but covered by CR0105R2 2008-01-17
0025 - F Rel-8 8.0.0 - Correction of PCC related message name - - - - S2-62 S2-080181 noted 2008-01-17 SAES Approved at S2-62, Merged into CR0111 at S2-63 2008-01-17
0026 - C Rel-8 8.0.0 - Modification on GW Selection Function for Non-3GPP Access - - - - S2-62 S2-080183 noted 2008-01-17 SAES Not Handled 2008-01-17
0027 - B Rel-8 8.0.0 - Principles of multiple PDN support in 23.402 - - - - S2-62 S2-080184 revised 2008-01-17 SAES Revised in S2-080813 2008-01-17
0027 1 B Rel-8 8.0.0 - Principles of multiple PDN support in 23.402 - - - - S2-62 S2-080813 revised 2008-01-17 SAES Revised in S2-080936 2008-01-17
0027 2 B Rel-8 8.0.0 - Principles of multiple PDN support in 23.402 - - - - S2-62 S2-080936 revised 2008-01-17 SAES Revised in S2-080971 2008-01-17
0027 3 B Rel-8 8.0.0 8.1.0 Principles of multiple PDN support in 23.402 SP-39 SP-080121 approved S2 S2-62 S2-080971 agreed 2008-01-17 SAES Approved 2008-01-17
0028 - C Rel-8 8.0.0 - ePDG Function Clarification - - - - S2-62 S2-080185 revised 2008-01-17 SAES Revised in S2-080814 2008-01-17
0028 1 F Rel-8 8.0.0 8.1.0 ePDG Function Clarification SP-39 SP-080124 approved S2 S2-62 S2-080814 agreed 2008-01-17 SAES Approved 2008-01-17
0029 - F Rel-8 8.0.0 - Correction in S2c reference point definition - - - - S2-62 S2-080195 noted 2008-01-17 SAES Not Handled at S2#62. 2008-01-17
0030 - F Rel-8 8.0.0 - Clarification on Access Authentication - - - - S2-62 S2-080223 revised 2008-01-17 SAES Revised in S2-080802 2008-01-17
0030 1 F Rel-8 8.0.0 8.1.0 Clarification on Access Authentication SP-39 SP-080167 approved S2 S2-62 S2-080802 agreed 2008-01-17 SAES Approved at S2#62, revised at S2#63 in S2-081218, but not handled 2008-01-17
0030 2 F Rel-8 8.0.0 - Clarification on Access Authentication - - - - S2-63 S2-081218 noted 2008-02-06 SAES-non_3GPP Not Handled 2008-02-06
0031 - F Rel-8 8.0.0 - Relation of DSMIPv6 and 3GPP access - - - - S2-62 S2-080224 revised 2008-01-17 SAES Revised in S2-080791 2008-01-17
0031 1 F Rel-8 8.0.0 - Relation of DSMIPv6 and 3GPP access - - - - S2-62 S2-080791 revised 2008-01-17 SAES Revised in S2-080804 2008-01-17
0031 2 F Rel-8 8.0.0 - Relation of DSMIPv6 and 3GPP access - - - - S2-62 S2-080804 revised 2008-01-17 SAES Revised in S2-080926 2008-01-17
0031 3 F Rel-8 8.0.0 8.1.0 Relation of DSMIPv6 and 3GPP access SP-39 SP-080124 approved S2 S2-62 S2-080926 agreed 2008-01-17 SAES Approved 2008-01-17
0032 - F Rel-8 8.0.0 - WiMAX interworking concept alignment with TSG SA#38 agreement - - - - S2-62 S2-080225 noted 2008-01-17 SAES Noted 2008-01-17
0033 - F Rel-8 8.0.0 - IP Address Allocation and parameter configuration in case of S2c - - - - S2-62 S2-080251 noted 2008-01-17 SAES Not Handled at S2#62. 2008-01-17
0034 - F Rel-8 8.0.0 - Cleanup of S2c Detach for trusted non-3GPP Accesses - - - - S2-62 S2-080252 noted 2008-01-17 SAES Not Handled at S2#62. 2008-01-17
0035 - C Rel-8 8.0.0 - S2c Detach for Untrusted non-3GPP Accesses - - - - S2-62 S2-080253 noted 2008-01-17 SAES Not Handled at S2#62. 2008-01-17
0036 - F Rel-8 8.0.0 - Removal of editor's note for IP Mobility Management Selection during initial attach to a Non-3GPP Access - - - - S2-62 S2-080254 withdrawn 2008-01-17 SAES Withdrawn 2008-01-17
0037 - F Rel-8 8.0.0 - APN in the handovers with PMIPV6 on S2a and S2b - - - - S2-62 S2-080265 noted 2008-01-17 SAES Not Handled at S2#62. 2008-01-17
0038 - F Rel-8 8.0.0 - PDN GW function - - - - S2-62 S2-080266 revised 2008-01-17 SAES Revised in S2-080815 2008-01-17
0038 1 F Rel-8 8.0.0 - PDN GW function - - - - S2-62 S2-080815 revised 2008-01-17 SAES Revised in S2-080973 2008-01-17
0038 2 F Rel-8 8.0.0 - PDN GW function - - - - S2-62 S2-080973 revised 2008-01-17 SAES Approved at S2-62, revised at S2-63 in S2-081642 2008-01-17
0038 3 F Rel-8 8.0.0 - PDN GW function - - - - S2-63 S2-081642 noted 2008-02-12 SAES Not Handled 2008-01-17
0038 4 F Rel-8 8.1.1 - The PDN GW function - - - - S2-64 S2-082411 revised 2008-04-01 SAES Revised in parallel session in S2-082918 2008-04-01
0038 5 F Rel-8 8.1.1 8.2.0 The PDN GW function SP-40 SP-080387 approved S2 S2-64 S2-082918 agreed 2008-04-09 SAES Approved 2008-04-09
0039 - F Rel-8 8.0.0 - Network Discovery and Selection and ePDG selection - - - - S2-62 S2-080267 revised 2008-01-17 SAES Not Handled at S2#62. resubmitted at S2-63 in S2-081256 2008-01-17
0039 1 F Rel-8 8.0.0 - Network Discovery and Selection and ePDG selection - - - - S2-63 S2-081256 revised 2008-02-06 SAES-non_3GPP Revised in S2-081708 2008-02-06
0039 2 F Rel-8 8.0.0 - Network Discovery and Selection and ePDG selection - - - - S2-63 S2-081708 revised 2008-02-21 SAES-non_3GPP Revised in S2-081914 2008-02-21
0039 3 F Rel-8 8.0.0 - Network Discovery and Selection and ePDG selection - - - - S2-63 S2-081914 revised 2008-02-21 SAES-non_3GPP Revised in S2-081980 2008-02-21
0039 4 F Rel-8 8.0.0 8.1.0 Network Discovery and Selection and ePDG selection SP-39 SP-080124 approved S2 S2-63 S2-081980 agreed 2008-02-21 SAES Approved 2008-02-21
0040 - F Rel-8 8.0.0 - PMIP-S5/S8 Parameters in S10 and S11 Messages - - - - S2-62 S2-080277 revised 2008-01-17 SAES Revised in S2-080871 2008-01-17
0040 1 F Rel-8 8.0.0 - PMIP-S5/S8 Parameters in S10 and S11 Messages - - - - S2-62 S2-080871 withdrawn 2008-01-17 SAES Approved but withdrawn by MCC as it is a CR to 23.401 and has incorrect CR number 2008-01-17
0041 - F Rel-8 8.0.0 - Modification of Handover and Tracking Area Update Procedures for PMIP-based S5/S8 Interface - - - - S2-62 S2-080279 revised 2008-01-17 SAES Revised in S2-080816 2008-01-17
0041 1 F Rel-8 8.0.0 - Modification of Handover and Tracking Area Update Procedures for PMIP-based S5/S8 Interface - - - - S2-62 S2-080816 noted 2008-01-17 SAES Approved, but covered by CR0098 at S2-63 2008-01-17
0042 - F Rel-8 8.0.0 - Adding IEs related to PMIP-S5/S8 in information storage table - - - - S2-62 S2-080281 noted 2008-01-17 SAES Not Handled at S2#62. 2008-01-17
0043 - F Rel-8 8.0.0 - Timing of PCC and PMIP Signalling at Handover - - - - S2-62 S2-080283 revised 2008-01-17 SAES Revised in S2-080783 2008-01-17
0043 1 F Rel-8 8.0.0 - Timing of PCC and PMIP Signalling at Handover - - - - S2-62 S2-080783 revised 2008-01-17 SAES Revised in S2-080927 2008-01-17
0043 2 F Rel-8 8.0.0 8.1.0 Timing of PCC and PMIP Signalling at Handover SP-39 SP-080122 approved S2 S2-62 S2-080927 agreed 2008-01-17 SAES Approved 2008-01-17
0044 - C Rel-8 8.0.0 - Principles and Protocol Stack for S103 Interface - - - - S2-62 S2-080284 revised 2008-01-17 SAES Revised in parallel session in S2-080752 2008-01-17
0044 1 C Rel-8 8.0.0 - Principles and Protocol Stack for S103 Interface - - - - S2-62 S2-080752 revised 2008-01-17 SAES Revised in S2-080941 2008-01-17
0044 2 C Rel-8 8.0.0 8.1.0 Principles and Protocol Stack for S103 Interface SP-39 SP-080122 approved S2 S2-62 S2-080941 agreed 2008-01-17 SAES Approved 2008-01-17
0045 - C Rel-8 8.0.0 - Dedicated Bearer Activation at Attach for PMIP-S5/S8 - - - - S2-62 S2-080285 revised 2008-01-17 SAES Revised in S2-080872 2008-01-17
0045 1 F Rel-8 8.0.0 8.1.0 Dedicated Bearer Activation at Attach for PMIP-S5/S8 SP-39 SP-080124 approved S2 S2-62 S2-080872 agreed 2008-01-17 SAES Approved 2008-01-17
0046 - C Rel-8 8.0.0 - DHCP Relay Functionality in S-GW - - - - S2-62 S2-080291 noted 2008-01-17 SAES Not Handled at S2#62. 2008-01-17
0047 - C Rel-8 8.0.0 - Conveying Static IP address from SGW to PGW during Initial Attach - - - - S2-62