3GPP Specification Change Requests

Back to numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 23.060

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0000 - - - - - CR 23.060-xxx Introduction of NACC for Inter BSC Cell Change (Rel 5) GP-05 GP-011063 - Ericsson G1-5 GP-011063 NA 2001-06-01 - - -
0001 - - R99 3.0.0 3.1.0 APN and GGSN selection SDL diagrams SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0002 - F R99 3.0.0 3.1.0 Ga interface to the GPRS Logical Architecture diagram etc. SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0003 - F R99 3.0.0 - modification info is not piggybacked SP-05 NP-99260 noted S2 - N1-99857 Agreed 1999-08-19 GPRS - -
0003 - F R99 3.0.0 3.1.0 Modification information is not piggybacked SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0004 1 B R99 3.0.0 3.1.0 MM states in UMTS SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0005 2 B R99 3.0.0 3.1.0 Introduction of Iu Release procedure SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0006 1 B R99 3.0.0 3.1.0 Addition of APN parameter in Network-requested PDP context activation procedures SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0007 1 B R99 3.0.0 3.1.0 Introduction of Service Request procedure SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0008 2 - R99 3.0.0 3.1.0 Introduction of LOCATION REPORTING SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0009 - B R99 3.0.0 3.1.0 MS and GSN Initiated PDP Context Modification SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0010 - B R99 3.0.0 3.1.0 Introduction of EGPRS SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0013 2 B R99 3.1.0 3.2.0 Traffic Flow Templates (TFT) for packet filtering SP-06 SP-99548 approved S2 S2-09 S2-99B75 agreed 1999-12-16 - - -
0014 2 B R99 3.0.0 3.1.0 Mobile terminated packet transfer to UE in PMM-Idle state SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0015 2 A R99 3.0.0 3.1.0 Clarification on multiplexing of several NSAPIS onto one LLC SAPI SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0016 - - R99 3.0.0 3.1.0 PDP Context Deactivation during an activation SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0017 1 F R99 3.1.0 3.2.0 Removal of BB Protocol SP-06 SP-99548 approved S2 S2-09 S2-99B01 agreed 1999-12-16 - - -
0018 2 - R99 3.0.0 3.1.0 CR for ch 1 and 4 SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0019 1 - R99 3.0.0 3.1.0 CR for ch 2 and 3 SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0020 1 - R99 3.0.0 3.1.0 CR for ch 5 SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0021 1 - R99 3.0.0 3.1.0 CR for ch 9 SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0022 1 - R99 3.0.0 3.1.0 CR for ch 7 and 8 SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0023 1 - R99 3.0.0 3.1.0 CR for ch 13 SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0024 1 - R99 3.0.0 3.1.0 CR for ch 14 SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0025 - C R99 3.0.0 3.1.0 Extension of PDP type IP to support e.g. End-to-End DHCP or Mobile IP SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0027 1 B R99 3.0.0 3.1.0 Addition of Paging Co-ordination for UMTS SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0028 - B R99 3.0.0 3.1.0 Modification of the definition and the usage of network operation mode SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0029 1 B R99 3.0.0 3.1.0 Restructuring of specification and clean-up of vocabulary SP-05 SP-99497 approved S2 - - - 1999-10-22 - agreed via corresponsance after SA #5 -
0030 1 - R99 3.0.0 3.1.0 Authentication and security keys agreement for support of GSM-UMTS Interoperability SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0031 1 - R99 3.0.0 3.1.0 Introduction of UMTS security SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0032 - - R99 3.0.0 3.1.0 CR for ch 11 SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0033 1 - R99 3.0.0 3.1.0 CR for ch 12 SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0034 1 - R99 3.0.0 - Procedures for volume-based charging SP-05 SP-99398 rejected S2 - - - 1999-10-11 - - -
0036 1 - R99 3.0.0 3.1.0 CR to chapters 6.6 SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0037 1 - R99 3.0.0 3.1.0 Interactions between 3G-SGSN and MSC/VLR for UMTS SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0038 3 - R99 3.0.0 3.1.0 Location Management and attach procedure for UMTS SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0040 - - R99 3.0.0 3.1.0 Handling of lost of coverage for UMTS SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0041 2 - R99 3.0.0 3.1.0 Mobility Management states and state transitions for UMTS SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0042 1 - R99 3.0.0 3.1.0 Introduction of UMTS MS classes SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0043 2 B R99 3.1.0 3.2.0 GPRS QoS Parameters SP-06 SP-99548 approved S2 S2-09 S2-99B72 agreed 1999-12-16 - - -
0044 2 - R99 3.0.0 3.1.0 UMTS/GPRS handover SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0045 1 - R99 3.0.0 3.1.0 GTP sequence number SP-05 SP-99398 approved S2 - - - 1999-10-11 - - -
0046 3 B R99 3.1.0 3.2.0 Addition of the sections of NSAPI, RB identity, RAB ID for UMTS and of TEID SP-06 SP-99548 approved S2 S2-09 S2-99C32 agreed 1999-12-16 - - -
0047 1 B R99 3.1.0 3.2.0 MS Initiated TFT modification, addition and deletion SP-06 SP-99548 approved S2 S2-09 S2-99B76 agreed 1999-12-16 - - -
0048 1 B R99 3.1.0 3.2.0 interaction points for GPRS/CAMEL interwork SP-06 SP-99548 approved S2 S2-09 S2-99B83 agreed 1999-12-16 - - -
0049 1 B R99 3.1.0 3.2.0 Description of Mobility Agents in Mobile IP SP-06 SP-99548 approved S2 S2-09 S2-99B90 agreed 1999-12-16 - - -
0051 - F R99 3.1.0 3.2.0 No (P-)TMSI in Complete messages SP-06 SP-99548 approved S2 S2-09 S2-99B06 agreed 1999-12-16 - - -
0052 2 B R99 3.2.1 3.3.0 QoS Related Updates SP-07 SP-000086 approved S2 S2_11/12 S2-000209 agreed 2000-03-17 - - -
0053 3 B R99 3.1.0 3.2.0 Releases 97, 98 and 99 interactions SP-06 SP-99548 approved S2 S2-09 S2-99E73 agreed 1999-12-16 - - -
0055 1 C R99 3.1.0 3.2.0 Clarification of MM procedures in PMM-IDLE for common UMTS/GSM RA SP-06 SP-99548 approved S2 S2-09 S2-99B95 agreed 1999-12-16 - - -
0058 8 C R99 3.0.0 3.1.0 Involvement of BSS in QoS provisioning SP-05 SP-99398 approved S2 - - - 1999-10-11 - incorrectly marked A085 -
0059 1 B R99 3.0.0 3.1.0 Parallel handling of multiple user application flows SP-05 SP-99398 approved S2 - - - 1999-10-11 - incorrectly marked A164 -
0059 1 D R99 3.1.0 3.2.0 UMTS <-> GPRS Intersystem change (handover) SP-06 SP-99548 approved S2 S2-10 S2-99E65 agreed 1999-12-16 - - -
0060 2 B R99 3.1.0 3.2.0 UMTS-GPRS Intersystem Handover SP-06 SP-99548 approved S2 S2-09 S2-99C30 agreed 1999-12-16 - - -
0061 1 F R99 3.1.0 3.2.0 N2 would like to ask S1 and S2 advice on how to handle the UMTS PS domain to GPRS handover from a service aspects point of view, in view of SP-06 SP-99548 approved S2 S2-10 S2-99E78 agreed 1999-12-16 - - -
0065 5 B R99 3.2.1 3.3.0 Radio bearer release and PDP context interaction SP-07 SP-000135 approved S2 S2_11/12 S2-000609 agreed 2000-03-17 - - -
0066 1 B R99 3.1.0 3.2.0 Improving charging efficiency - conditionally agreed SP-06 SP-99548 approved S2 S2-10 S2-99E09 agreed 1999-12-16 - - -
0067 2 B R99 3.1.0 3.2.0 Subscriber and equipment trace for PS domain SP-06 SP-99548 approved S2 S2-10 S2-99F51 agreed 1999-12-16 - - -
0068 - B Rel-5 - - External Network Assisted Cell Change (NACC) in GERAN R5 - - - S2 S2-21 S2-013486 Revised. 2001-12-16 GERAN_Improvements_2 - -
0068 1 F R99 3.1.0 3.2.0 BSS QoS involvement improvements SP-06 SP-99548 approved S2 S2-10 S2-99E22 agreed 1999-12-16 - - -
0069 - F R99 3.1.0 3.2.0 GPRS Mobile Stations classes SP-06 SP-99548 approved S2 S2-10 S2-99D75 agreed 1999-12-16 - - -
0070 1 F R99 3.1.0 3.2.0 Usage of TI in the secondary PDP context activation procedure -CA SP-06 SP-99548 approved S2 S2-10 S2-99E10 agreed 1999-12-16 - - -
0071 - D R99 3.1.0 3.2.0 Logical Link Management Functions for GPRS SP-06 SP-99548 approved S2 S2-10 S2-99D77 agreed 1999-12-16 - - -
0072 - D R99 3.1.0 3.2.0 Packet Domain Core Network Nodes SP-06 SP-99548 approved S2 S2-10 S2-99D78 agreed 1999-12-16 - - -
0073 - D R99 3.1.0 3.2.0 User Plane for UMTS SP-06 SP-99548 approved S2 S2-10 S2-99D79 agreed 1999-12-16 - - -
0074 - D R99 3.1.0 3.2.0 UTRAN Registration Area Identity and Cell Identity - CHECK SP-06 SP-99548 approved S2 S2-10 S2-99D89 agreed 1999-12-16 - - -
0075 2 F R99 3.1.0 3.2.0 Unnecessary of cell identity and cell identity age in 3G-SGSN MM context SP-06 SP-99548 approved S2 S2-10 S2-99F28 agreed 1999-12-16 - - -
0076 - F R99 3.1.0 3.2.0 Deletion of TFT in 3G-SGSN PDP context SP-06 SP-99548 approved S2 S2-10 S2-99D91 agreed 1999-12-16 - - -
0077 - F R99 3.1.0 3.2.0 The number of RNC RAB contexts in a RNC context SP-06 SP-99548 approved S2 S2-10 S2-99D92 agreed 1999-12-16 - - -
0078 1 B R99 3.1.0 3.2.0 The usage of reordering required parameter SP-06 SP-99548 approved S2 S2-10 S2-99E67 agreed 1999-12-16 - - -
0079 1 B R99 3.1.0 3.2.0 Information storage in USIM SP-06 SP-99548 approved S2 S2-10 S2-99E68 agreed 1999-12-16 - - -
0080 2 D R99 3.2.1 3.3.0 GPRS Interworking With CAMEL SP-07 SP-000086 approved S2 S2_11/12 S2-000229 agreed 2000-03-17 - - -
0081 - F R99 3.1.0 3.2.0 CS paging response SP-06 SP-99548 approved S2 S2-10 S2-99E54 agreed 1999-12-16 - - -
0082 - B R99 3.1.0 3.2.0 SMS support in 3G-SGSN SP-06 SP-99548 approved S2 S2-10 S2-99E55 agreed 1999-12-16 - - -
0083 2 F R99 3.1.0 3.2.0 Usage of secondary PDP context activation procedure SP-06 SP-99548 approved S2 S2-10 S2-99F30 agreed 1999-12-16 - - -
0085 - B R99 3.2.1 3.3.0 Storage of Aggregated BSS QoS Profile in the SGSN SP-07 SP-000086 approved S2 S2_11/12 S2-000013 agreed 2000-03-17 - - -
0086 - C R99 3.2.1 3.3.0 Modification to selective routing area update procedure SP-07 SP-000086 approved S2 S2_11/12 S2-000028 agreed 2000-03-17 - - -
0088 1 B R99 3.2.1 3.3.0 QoS delay budget in CN and RAN. SP-07 SP-000086 approved S2 S2_11/12 S2-000292 agreed 2000-03-17 - - -
0089 1 B R99 3.2.1 3.3.0 Release of RABs Without PDP Context Modification SP-07 SP-000086 approved S2 S2_11/12 S2-000293 agreed 2000-03-17 - - -
0090 - F R99 3.2.1 3.3.0 NSAPI as RAB identifier for packet SP-07 SP-000086 approved S2 S2_11/12 S2-000251 agreed 2000-03-17 - - -
0091 - F R99 3.2.1 3.3.0 Correction to GPRS/CAMEL interworking. SP-07 SP-000086 approved S2 S2_11/12 S2-000035 agreed 2000-03-17 - - -
0092 - B R99 3.2.1 3.3.0 IP Multicast support in GPRS. SP-07 SP-000086 approved S2 S2_11/12 S2-000036 agreed 2000-03-17 - - -
0094 - F R99 3.2.1 3.3.0 Removal of the description of the cell reselection algorithm from 23.60 SP-07 SP-000086 approved S2 S2_11/12 S2-000047 agreed 2000-03-17 - - -
0096 - B R99 3.2.1 3.3.0 Removal of PDP Type X.25 support SP-07 SP-000086 approved S2 S2_11/12 S2-000100 agreed 2000-03-17 - - -
0097 1 F R99 3.2.1 3.3.0 AAL5 description SP-07 SP-000086 approved S2 S2_11/12 S2-000221 agreed 2000-03-17 - - -
0098 - B R99 3.2.1 3.3.0 Removal of Anonymous Access support SP-07 SP-000086 approved S2 S2_11/12 S2-000102 agreed 2000-03-17 - - -
0099 - B R99 3.2.1 3.3.0 Removal of TCP support in the packet domain PLMN backbone network SP-07 SP-000086 approved S2 S2_11/12 S2-000103 agreed 2000-03-17 - - -
0100 1 F R99 3.2.1 3.3.0 IPv6 as optional Iu and Gn protocol SP-07 SP-000086 approved S2 S2_11/12 S2-000215 agreed 2000-03-17 - - -
0101 1 F R99 3.2.1 3.3.0 Common GPRS and UMTS PS attach procedure SP-07 SP-000086 approved S2 S2_11/12 S2-000216 agreed 2000-03-17 - - -
0102 3 F R99 3.2.1 3.3.0 Classmark handling SP-07 SP-000135 approved S2 S2_11/12 S2-000621 agreed 2000-03-17 - - -
0103 1 F R99 3.2.1 3.3.0 UMTS Authentication SP-07 SP-000086 approved S2 S2_11/12 S2-000219 agreed 2000-03-17 - - -
0104 3 F R99