3GPP Specification detail

Back to numbering scheme page

Back to series index


3GPP TR  22.953  (click spec number to see fileserver directory for this spec)

Multimedia priority service feasibility study

.

TSG / WG responsible: S1  (click TSG/WG to see its home page)

Work item which gave rise to this spec:  PRIOR-MM  (click WI code to see Work Item details in the Work Plan)

Work items which may have impacted this spec:  click here

2007-02-06: also applicable to GERAN based systems.

Rapporteur: GARRAHAN, James

Specification required for: GERAN-based systems and UTRAN- and E-UTRAN-based systems

In the table below ...

... click meeting number for meeting details;

... click spec version number to download that version;

... click SDO publication reference to download SDO transposed document.

Release Freeze meeting Freeze date remarks SDO publications
Rel-7 SP-35 2007-03-15 SP-30: target for completion = SP-33. . ETSI
  event

version

available

remarks click ref to download
  S1-23

0.1.0

-

-
  S1-25

0.2.0

-

S1-040592 -
  S1-25

0.3.0

2004-09-27

S1-040698 -
  draft

0.5.0

-

-
  draft

0.6.0

-

-
  draft

0.7.0

-

-
  draft

0.8.0

2006-01-04

-
  SP-31

1.0.0

2006-03-20

SP-060039 -
  SP-32

2.0.0

2006-06-12

SP-060328 - Cover sheet showed Rel-8 but document showed Rel-7 and the associated WI (PRIOR-MM) is Rel-7. -
  SP-32

7.0.0

2006-06-23

-
  SP-33

7.1.0

2006-10-04

DTR/TSGS-0122953v710

Change Requests for this spec: click here.

Genealogy of this spec:

antecedent(s) this spec descendant(s)
(no antecedents) 22.953 22.153

page generated from database: 2008-05-07 10:13:51