3GPP Specification Change Requests

Back to numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 22.078

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
0000 - B Rel-6 6.5.0 - Support of User-to-User Information (UUI) in CAMEL SP-25 SP-040689 withdrawn Nortel Net - - - 2004-07-08 TEI6 no CR number on cover sheet 2004-09-15
0001 - F R99 3.0.0 3.1.0 CAMEL control of packet switched MO SMS SP-05 SP-99443 approved s1 S1#04 S1-99268 Agreed 1999-10-09 CAMEL3 - -
0002 - C R99 3.0.0 3.1.0 CAMEL control of packet switched MO SMS SP-05 SP-99443 approved s1 S1#04 S1-99272 Agreed 1999-10-09 CAMEL3 - -
0003 - C R99 3.0.0 3.1.0 CSE related overload control SP-05 SP-99443 approved s1 S1#04 S1-99290 Agreed 1999-10-09 CAMEL3 - -
0004 - F R99 3.0.0 3.1.0 Clarify the serving network behaviour when instructions from the CSE are received. SP-05 SP-99443 approved s1 S1#04 S1-99333 Agreed 1999-10-09 CAMEL3 - -
0005 - C R99 3.0.0 3.1.0 Inclusion of Service Key in Mobility Management event notifications + editorial modifications SP-05 SP-99443 approved s1 S1#04 S1-99338 Agreed 1999-10-09 CAMEL3 - -
0006 - F R99 3.0.0 3.1.0 Clarification the behaviour when network provided dialled services are used. SP-05 SP-99443 approved s1 S1#04 S1-99339 Agreed 1999-10-09 CAMEL3 - -
0007 - F R99 3.0.0 3.1.0 Correct the unsuccessful call establishment procedure for MT calls SP-05 SP-99443 approved s1 S1#04 S1-99341 Agreed 1999-10-09 CAMEL3 - -
0008 - F R99 3.0.0 3.1.0 GSM 02.78 Clean-up of CAMEL phase information SP-05 SP-99443 approved s1 S1#04 S1-99342 Agreed 1999-10-09 CAMEL3 - -
0009 - F R99 3.0.0 3.1.0 Clarification on the type of number used by mobile stations. SP-05 SP-99443 approved s1 S1#04 S1-99345 Agreed 1999-10-09 CAMEL3 - -
0010 - D R99 3.0.0 3.1.0 Editorial update of references for GSM/3GPP use. SP-05 SP-99443 approved s1 S1#05 S1-99590 Agreed 1999-10-09 CAMEL3 - -
0011 - B R99 3.0.0 3.1.0 CAMEL3 interworking with GPRS; Change of position SP-05 SP-99443 approved s1 S1#05 S1-99594 Agreed 1999-10-09 CAMEL3 - -
0012 - C R99 3.0.0 3.1.0 CAMEL3 DTMF Mid-Call corrections and clarifications SP-05 SP-99443 approved s1 S1#05 S1-99596 Agreed 1999-10-09 CAMEL3 - -
0013 - F R99 3.0.0 3.1.0 CAMEL3 clean-up of IPLMN and VPLMN references SP-05 SP-99443 approved s1 S1#05 S1-99597 Agreed 1999-10-09 CAMEL3 - -
0014 - C R99 3.0.0 3.1.0 Defining successful SM submission to SMSC as EDP (CAMEL3) SP-05 SP-99443 approved s1 S1#05 S1-99598 Agreed 1999-10-09 CAMEL3 - -
0015 - F R99 3.0.0 3.1.0 Interworking with SAT and MExE ! SP-05 SP-99443 approved s1 S1#05 S1-99673 Agreed 1999-10-09 CAMEL3 - -
0016 - F R99 3.0.0 3.1.0 Correction Annex A.2; Information sent by the CSE SP-05 SP-99443 approved s1 S1#05 S1-99675 Agreed 1999-10-09 CAMEL3 - -
0017 - F R99 3.0.0 3.1.0 Corrections to CAMEL interworking with GPRS SP-05 SP-99443 approved s1 S1#05 S1-99677 Agreed 1999-10-09 CAMEL3 - -
0018 - C R99 3.0.0 3.1.0 Short Message Submission Handling SP-05 SP-99443 approved s1 S1#05 S1-99681 Agreed 1999-10-09 CAMEL3 - -
0019 - C R99 3.0.0 3.1.0 Removing the restriction on the total number of trigger criteria. SP-05 SP-99443 approved s1 S1#05 S1-99684 Agreed 1999-10-09 CAMEL3 - -
0020 - C R99 3.0.0 3.1.0 Removing the 40-octet restriction of free format data SP-05 SP-99443 approved s1 S1#05 S1-99686 Agreed 1999-10-09 CAMEL3 - -
0021 - C R99 3.0.0 3.1.0 Defining Successful SM submission and Unsuccessful SM submission as EDP-N and EDP-R. SP-05 SP-99443 approved s1 S1#05 S1-99689 Agreed 1999-10-09 CAMEL3 - -
0022 - C R99 3.0.0 3.1.0 CAMEL3 corrections to new Trigger Detection Points (TDP) SP-05 SP-99443 approved s1 S1#05 S1-99770 Agreed 1999-10-09 CAMEL3 - -
0023 - C R99 3.0.0 3.1.0 Description of CAMEL Subscription Information SP-05 SP-99443 approved s1 S1#05 S1-99771 Agreed 1999-10-09 CAMEL3 - -
0024 - F R99 3.0.0 3.1.0 CAMEL3 corrections and clarifications to dialled services (subscribed & serving network) SP-05 SP-99443 approved s1 S1#05 S1-99773 Agreed 1999-10-09 CAMEL3 - -
0025 - D R99 3.0.0 3.1.0 Charging clarifications for MO-SMS SP-05 SP-99443 approved s1 S1#05 S1-99774 Agreed 1999-10-09 CAMEL3 - -
0026 - B R99 3.0.0 3.1.0 CAMEL3 Call Forwarding and new TDP interworking SP-05 SP-99443 approved s1 S1#05 S1-99775 Agreed 1999-10-09 CAMEL3 - -
0027 - C R99 3.0.0 3.1.0 Support For MSP Phase 2 SP-05 SP-99443 approved s1 S1#05 S1-99776 Agreed 1999-10-09 CAMEL3 - -
0028 - B R99 3.0.0 3.1.0 Addition of CCBS to the SS Invocation Notification SP-05 SP-99443 approved s1 S1#05 S1-99777 Agreed 1999-10-09 CAMEL3 - -
0029 - F R99 3.0.0 3.1.0 Clarification the behaviour when network provided dialled services are used SP-05 SP-99443 approved s1 S1#05 S1-99772 Agreed 1999-10-10 CAMEL3 - -
0030 1 B R99 3.1.0 3.2.0 CSE ability to change CLI PI for an MO call SP-06 SP-99526 approved S1 S1-06 S1-991048 agreed 1999-12-09 - - -
0031 - B R99 3.1.0 3.2.0 Enhancement of the capabilities of dialled services SP-06 SP-99526 approved S1 S1-06 S1-991035 agreed 1999-12-08 - - -
0032 1 F R99 3.2.0 3.3.0 Call gapping / congestion control in HPLMN only SP-07 SP-000062 approved S1 S1-07 S1-000095 Agreed 2000-02-04 - - -
0033 - F R99 3.2.0 3.3.0 In-band user interaction for dialled services in CAMEL ph3 SP-07 SP-000062 approved S1 S1-07 S1-000065 Agreed 2000-03-08 - - -
0034 - F R99 3.2.0 3.3.0 Correction of GPRS session description SP-07 SP-000062 approved S1 S1-07 S1-000159 Agreed 2000-03-08 - - -
0035 - F R99 3.2.0 3.3.0 Reduced scope of CAMEL Phase 3 in release 99 SP-07 SP-000062 approved S1 S1-07 S1-000167 Agreed 2000-03-09 - - -
0036 - F R99 3.2.0 3.3.0 Correction of announcement capabilties SP-07 SP-000123 approved Alcatel S1-07,SP07 S1-000158 EmailRejected 2000-03-09 - - -
0037 - F R99 3.3.0 3.4.0 Correction to the reduced scope of CAMEL Phase 3 in release 99 – enhancements to call forwarding SP-08 SP-000198 approved S1 S1-08 S1-000232 Agreed 2000-04-05 - - -
0038 - F R99 3.3.0 3.4.0 Correction to the reduced scope of CAMEL Phase 3 in release 99 – deletion of MexE / SAT free format data parameter in Annex A.1 SP-08 SP-000198 approved S1 S1-08 S1-000247 Agreed 2000-04-05 - - -
0039 - F R99 3.3.0 3.4.0 Correction to description of subscriber dialled services SP-08 SP-000198 approved S1 S1-08 S1-000251 Agreed 2000-04-05 - - -
0040 - F R99 3.3.0 3.4.0 Clarification for conditional triggering for subscribed dialled services SP-08 SP-000198 approved S1 S1-08 S1-000252 Agreed 2000-04-05 - - -
0041 - F R99 3.3.0 3.4.0 Removal of NPI from conditional triggering SP-08 SP-000198 approved S1 S1-08 S1-000255 Agreed 2000-04-05 - Category changed from C to F -
0042 - F R99 3.3.0 3.4.0 Corrections to Interactions with Supplementary Services SP-08 SP-000198 approved S1 ad hoc S1-000395 Email 2000-05-11 - Category changed from D to F -
0043 - F R99 3.3.0 3.4.0 Removal of question marks from the A.1 information flow table SP-08 SP-000198 approved S1 ad hoc S1-000396 Email 2000-05-11 - Category changed from D to F -
0044 - F R99 3.3.0 3.4.0 Definition of Geodetic Information SP-08 SP-000198 approved S1 ad hoc S1-000402 Email 2000-05-11 - Category changed from D to F -
0045 - F R99 3.3.0 3.4.0 Distinction between initial and subsequent service events SP-08 SP-000198 approved S1 ad hoc S1-000403 Email 2000-05-11 - Category changed from D to F -
0046 - F R99 3.3.0 3.4.0 Update of CAMEL roaming issues (section 16) SP-08 SP-000198 approved S1 ad hoc S1-000404 Email 2000-05-11 - Category changed from D to F -
0047 - F R99 3.3.0 3.4.0 Removal of Editor’s notes and corrections to Annex 1 SP-08 SP-000198 approved S1 ad hoc S1-000390 Email 2000-05-11 - Category changed from D to F -
0048 2 F R99 3.3.0 3.4.0 CR to 22.078 R99 on Corrections to CAMEL interworking with GPRS re3 SP-08 SP-000198 approved Ericsson - S1-000445 Email 2000-06-06 - Category changed from D to F -
0049 - F R99 3.4.1 3.5.0 Removal of user interaction at answer DPs (Release 99) SP-09 SP-000374 approved S1 S1-09 S1-000506 Agreed 2000-07-17 - - -
0050 - D Rel-4 3.4.1 4.0.0 Change of MExE name SP-09 SP-000381 approved S1 S1-09 S1-000638 Agreed 2000-07-20 - - -
0051 - C Rel-5 3.4.1 - Proposed CR to 22.078 Section 6 for IP Telephony in CAMEL Phase 4 SP-09 SP-000425 withdrawn S1 S1-09 S1-000507 Agreed 2000-07-17 - - -
0052 - C Rel-5 3.4.1 - Proposed CR to 22.078 Section 1 for IP Telephony in CAMEL Phase 4 SP-09 SP-000425 withdrawn S1 S1-09 S1-000508 Agreed 2000-07-17 - - -
0053 - C Rel-5 3.4.1 - Proposed CR to 22.078 Section 4 for IP Telephony in CAMEL Phase 4 SP-09 SP-000425 withdrawn S1 S1-09 S1-000509 Agreed 2000-07-17 - - -
0054 - B Rel-5 3.4.1 5.0.0 Introduction of MT SMS interworking with CAMEL4 SP-09 SP-000425 approved S1 S1-09 S1-000510 Agreed 2000-07-17 - - -
0055 - C Rel-5 3.4.1 - Proposed CR to 22.078 Section 3 for IP Telephony in CAMEL Phase 4 SP-09 SP-000425 withdrawn S1 S1-09 S1-000511 Agreed 2000-07-17 - - -
0056 - C Rel-5 3.4.1 5.0.0 Removal of tags associated with previous releases of CAMEL SP-09 SP-000425 approved S1 S1-09 S1-000512 Agreed 2000-07-20 - - -
0057 - B Rel-5 3.4.1 - Introduction of IPT for CAMEL4 SP-09 SP-000425 withdrawn S1 S1-09 - - 2000-07-17 - - -
0058 - B Rel-5 3.4.1 5.0.0 Inclusion of Mid call event SP-09 SP-000425 approved S1 S1-09 S1-000514 Agreed 2000-07-11 - - -
0059 - B Rel-5 3.4.1 5.0.0 Inclusion of flexible tone injection SP-09 SP-000425 approved S1 S1-09 S1-000515 Agreed 2000-07-11 - - -
0060 - F R99 3.4.1 3.5.0 GPRS AC/ACR alignment of shared data volume control (Stage 1 vs. 2) SP-09 SP-000374 approved S1 S1-09 S1-000540 Agreed 2000-07-20 - - -
0061 - C Rel-5 3.4.1 5.0.0 GPRS AC/ACR alignment of shared data volume control (Stage 1 vs. 2) SP-09 SP-000425 approved S1 S1-09 S1-000417 Agreed 2000-05-11 - - -
0062 1 F R99 3.4.1 - Alignment with stage 2 & 3, and editorial clarification SP-09 SP-000457 postponed Vodafone - - Not seen by SA1 2000-09-11 - Comments to I Park (Vodafone) -
0062 3 F R99 3.4.1 - Alignment with stage 2 & 3, and editorial clarification SP-10 SP-000538 withdrawn S1 S1-10 S1-000751 Agreed 2000-11-17 CAMEL3 - -
0062 4 F R99 3.5.0 - Alignment with stage 2 & 3, and editorial clarification SP-10 SP-000688 revised S1 S1-10 S1-000751 Agreed 2000-12-13 CAMEL3 Rev to remove editor's notes -
0062 5 F R99 3.5.0 3.6.0 Alignment with stage 2 & 3, and editorial clarification SP-10 SP-000698 approved S1 S1-10 S1-000751 Agreed 2000-12-11 CAMEL3 Rev to remove editor's notes. Revised to SP-000688. -
0063 - B Rel-5 5.0.0 5.1.0 Introduction of Call Party Handling SP-10 SP-000698 approved S1 S1-10 S1-000752 Agreed 2000-11-17 CAMEL4 - -
0064 - B Rel-5 3.4.1 5.0.0 Transport of Charging Information to the Home Network SP-09 SP-000425 approved S1 S1-09 S1-000596 Agreed 2000-07-01 - - -
0065 - F R99 3.5.0 3.6.0 Introduction of GGSN Address SP-10 SP-000537 approved S1 S1-10 S1-000855 Agreed 2000-11-27 CAMEL3 - -
0066 - A Rel-4 4.0.0 4.1.0 Introduction of GGSN Address SP-10 SP-000537 approved S1 S1-10 S1-000856 Agreed 2000-11-17 CAMEL3 - -
0067 - A Rel-5 5.0.0 5.1.0 Introduction of GGSN Address SP-10 SP-000537 approved S1 S1-10 S1-000857 Agreed 2000-11-17 CAMEL3 - -
0068 - B Rel-5 5.0.0 5.1.0 Enhancement to the Mid Call event to include out band information SP-10 SP-000545 approved S1 S1-10 S1-000783 Agreed 2000-11-17 CAMEL4-MCP - -
0071 - A R99 3.5.0 3.6.0 Support of CAMEL Phase 1 and 2 SP-10 SP-000536 approved S1 S1-10 S1-000810 Agreed 2000-11-17 - - -
0072 - F R99 3.4.1 - Removal of Volume charging for GPRS Session SP-10 SP-000538 withdrawn S1 S1-10 S1-000750 Agreed 2000-11-17 CAMEL3 - -
0072 1 F R99 3.5.0 3.6.0 Removal of Volume charging for GPRS Session SP-10 SP-000698 approved S1 S1-10 S1-000750 Agreed 2000-12-11 CAMEL3 - -
0073 - C Rel-5 5.0.0 5.1.0 Criteria for the Mid-Call event detection point SP-10 SP-000545 approved S1 S1-10 S1-000754 Agreed 2000-11-17 CAMEL4-MCP - -
0074 - B Rel-5 5.0.0 - Introduction of IP multimedia sessions control in CAMEL Phase 4 SP-10 SP-000658 withdrawn S1 S1-10 S1-000753 Agreed 2000-11-17 CAMEL4 - -
0075 2 F R99 3.6.0 3.7.0 Remedy for incorrect implementation of CR 22.078-062r5 SP-11 SP-010045 approved S1 S1-11 S1-010104 Agreed 2001-02-06 CAMEL3 0 -
0076 1 F R99 3.6.0 3.7.0 Support of previous phases of CAMEL SP-11 SP-010046 approved S1 S1-11 S1-010107 Agreed 2001-02-06 CAMEL3 0 -
0077 2 A Rel-4 4.1.0 4.2.0 Support of previous phases of CAMEL SP-11 SP-010046 approved S1 S1-11 S1-010108 Agreed 2001-02-06 CAMEL3 0 -
0078 3 F Rel-5 5.1.0 5.2.0 Support of previous phases of CAMEL SP-11 SP-010046 approved S1 S1-11 S1-010242 Agreed 2001-02-09 CAMEL4 0 -
0079 3 F Rel-4 4.1.0 4.2.0 Alignment with stage 2 & 3, and some editorial corrections SP-11 SP-010045 approved S1 S1-11 S1-010105 Agreed 2001-02-06 CAMEL3 0 -
0080 1 A Rel-5 5.1.0 5.2.0 Alignment with stage 2 & 3, and some editorial corrections SP-11 SP-010045 approved S1 S1-11 S1-010106 Agreed 2001-02-06 CAMEL3 0 -
0081 2 C Rel-5 5.1.0 5.2.0 Clarification on Call Party Handling requirements SP-11 SP-010051 approved S1 S1-11 S1-010123 Agreed 2001-02-06 CAMEL4 0 -
0082 - B Rel-5 5.1.0 5.2.0 Enhancements to mobility management reporting SP-11 SP-010051 approved S1 S1-11 S1-010119 Agreed 2001-02-06 CAMEL4 0 -
0083 2 F Rel-5 5.1.0 5.2.0 Corrections of Call Barring interaction for CSE created call / new party SP-11 SP-010051 approved S1 S1-11 S1-010121 Agreed 2001-02-06 CAMEL4 0 -
0084 1 D Rel-5 5.1.0 5.2.0 Changing of naming for SMS-CSI SP-11 SP-010051 approved S1 S1-11 S1-010120 Agreed 2001-02-06 CAMEL4 0 -
0085 3 F R99 3.6.0 3.7.0 Corrections of congestion control procedure SP-11 SP-010050 approved S1 S1-11 S1-010188 Agreed 2001-02-06 CAMEL3 0 -
0086 3 A Rel-4 4.1.0 4.2.0 Corrections of congestion control procedure SP-11 SP-010050 approved S1 S1-11 S1-010189 Agreed 2001-02-06 CAMEL3 0 -
0087 2 B Rel-5 5.1.0 5.2.0 Transport of Charging Information from serving PLMN to the CSE SP-11