
Results of second 3GPP Chairman's survey
Description
The second 3GPP Chairman's survey was conducted between May and June 2001.
The survey was comprised of the 6 questions listed below and included an area
where detailed comments could be provided.
The results of the Chairman's Satisfaction Survey demonstrate an overall
satisfaction of 8.15 on a scale
of 10.
Results
A total of 59 questionnaires were dispatched to Chairmen and Vice Chairmen
and by the closing date, 41 replies (69.5%) had been received. This represents a
considerable increase over the previous survey where a response rate of 48% had
been achieved. A detailed breakdown of the results received is given in the linked
table.
The overall results of the survey are as follows:
Graph 1 shows the scores received classed by question (highest, lowest,
average).

Graphs 2 to 6 show the results from each Technical Specification Group
(TSG) and Working Groups (WGs) classed by question. For each question, the
averaged score is given.





Analysis
The response to this survey represents an increase over the response to the
previous survey (69,5% against 48%). The overall satisfaction rating has risen
from 7.93 to 8.15.
A large number of detailed comments were provided and these will form the
basis of improvement actions within MCC.
In general the 3GPP Chairmen seem satisfied with the service provided by MCC
although areas for improvement have been clearly identified.
Summary of detailed comments which require followup actions to be taken
|
Subject
|
Comments
|
Actions
|
|
Website
|
- Structure
Difficulties in finding specifications, especially the most recent
ones, meeting reports, AdHoc documents, contact details of meeting
delegates
- Layout
- Too much text and arrays of specification numbers
- Separate the general information for beginners/newcomers and the
information for the experience 3GPP delegates
- Links
Some links missing between the different contents of the web pages
- Search Engine
Need to have a Search Engine to search for documents
|
A Web Action Team was created. An E-mail was sent to the
Leader's List in order to get their suggestions, requirements. A new
website will be published soon with improved Search Engine
|
|
Support
|
- Harmonization
Different working practices in TSGs and even WGs within the same TSG
- Coordination
- Some issues in the WGs need to be solved quickly with the help of
other WGs
- Checking the rules of standardization and report to the WGs
- Distribution of Liaisons Statements to and from different groups
- Knowledge
General knowledge of procedures to be increased and spread to
delegates
- Structure of FTP site
- Directory structure of the FTP site concerning the specifications
is overwhelmed
- Quantity
- Insufficient number of staff for implementation of CRs into
specifications
- Quality
CRs
- Lack of proper database facilities for CR and specification
tracking (far too complicated)
- Too many CR implementation errors
- CR status is not provided in a consistent and easy to access
manner. Quality and checking is not good enough
Documentation
- Too many late documents arriving at beginning or during the
meeting
- More accuracy related to the formalities and when checking the
documents
- Specification delivery is very slow
- Reports from WG level meetings have some room for improvement
- Some invitation comes a little bit late
|
Brainstorming sessions have been put in place
and tasks have been allocated within MCC |
- For faster access and offline studies DVD archives would be
appreciated
|
This service will be available
|
- Periodic hiccups with the 3GPP ftp server when downloading a batch
of documents
- Closing of the servers/e-mails during French bank holidays
|
This is being investigated by the IT department
|
|
Meeting organization
|
- Electronic subscription: unregister function does not work, no
confirmation about successful confirmation
|
On-going
|
- Selection of meeting venue, no direct flight from major cities
|
Beyond direct control of MCC |
- Audio quality in main amphitheater of ETSI premises
|
New microphones have been
installed |
Summary of positive comments received which require no followup
action
- The web pages are always a big help in finding the right documents
- TSG Secretary work for Quality/Quantity/Speed
- Close co-operation between the MCC expert and the
chairman/vice-chairmen during the meeting
- CR implementation is rapid and specifications are provided in a
timely manner
- The documentation services are excellent
- Server is vastly improved in access speed and ease of finding info
- The help with wireless LAN is excellent
- The secretarial support to each of the TSG’s is outstanding
- Overall helpfullness of each of the personnel both during the
meetings and when in Sophia
- Reminder of registration and hotel reservation for TSG meeting
- Meeting registration is particularly easy and good
- Quick response to our registrations and questions on the reflector
|