TSG#35 Highlights

| TSG CT | TSG SA | TSG RAN | TSG GERAN

Previous Highlights: TSG#34 | TSG#33 | TSG#32 | TSG#31 | TSG#30 | TSG#29 | TSG#28 | TSG#27 | TSG#26 | TSG#25 | TSG#24 | TSG#23 | TSG#22
TSG#21 | TSG#20 | TSG#19TSG#16 | TSG#15


Welcome!

Welcome to the latest edition of TSG Highlights! The aim is to provide you with a concise summary of the decisions and actions of the most recent 3GPP Technical Specification Group meetings held in September2006 in Palm Springs, USA.

3GPP has four  TSGs: CT (Core Networks and Terminals); RAN (Radio Access Network); SA (Services and Systems Aspects) and GERAN (GSM EDGE Radio Access Network). 

Please note, these summaries do not constitute formal, approved reports of the meetings – they are opinions only and also may not be complete. They are offered for guidance only.

TSG CT (Core Network and Terminals)

The meeting was held in Lemesos, Cyprus from 7 to 9 of March 2007.

 Overview of CT#35

 

CT WGs were busy before, now even busier than before. CT WG1 breaks the record in number of documents in every meeting. The meeting calendar is already full. Parallel session are needed but all documents are handled. CT WG4 is treating more documents than before, additional meetings are scheduled and parallel session are needed to cover all documents, CT WG3, CT WG5 and CT WG6 meet once in each plenary period. CT WG5 has joint meetings with Parlay group and ETSI OSA. CT WG5 did make an interim TS update for March 2007. CT WG6 is co-located with the other CT WGs when possible.

 

Release 1999 Overview:

Release 4 Overview:

Release 5 Overview:

 

Release-6 Overview

 

Release-7 Overview

 

7.2   Rel-7 Hot topics

Rel‑7 WIs completed in CT #35:

Rel‑7 exception sheets:

Revised Rel‑7 WIDs:

New Rel‑7 WIDs:

New Rel‑8 WIDs:

Back to top

TSG-RAN (Radio Access Network)

Executive Summary

TSG RAN meeting #35 took place in Lemesos, Cyprus. The meeting started at 9:00 on Tuesday 06th March 2007 and finished on the Friday 09th March 2007. 129 participants attended the meeting and 268 documents were submitted.
 

Change Requests

 

The approved Change Requests (CRs) to TSG RAN specifications are summarized in the following table and figure:

 

Release

WG1

WG2

WG3

WG4

WG5

TSG RAN

Total

Release 99

0

1

0

2

42

0

45

Rel-4 CRs (Rel-4 excluding Cat A)

0

1 (0)

0

4 (2)

9

0

14 (11)

Rel-5 CRs (Rel-5 excluding Cat A)

0

3 (2)

1

4 (0)

27

0

35 (30)

Rel-6 CRs (Rel-6 excluding Cat A)

3 (3)

16 (13)

12 (11)

6 (2)

121

0

158 (150)

Rel-7 CRs (Rel-7 excluding Cat A)

37 (34)

53 (37)

55 (43)

11 (5)

25

2

183 (146)

Total CRs (Total excluding Cat A)

40 (37)

74 (53)

68 (55)

25 (11)

224

2 (2)

462 (382)


 

 

 

 

 

 

 

(Number of approved CRs. Corresponding CRs to later releases excluded).

 

In RAN WG1/WG2/WG3/WG4, Release 7 Change Requests were mainly dedicated to the introduction of 1.28 Mcps TDD Enhanced Uplink, MIMO and continuous connectivity for packet data users, and TEI7. Some of the Release 6 Change Requests deal with MBMS corrections.


Incoming Liaisons

Liaison Statements from CT (and RAN WG4) were received on the subject of New High Speed Protocol for the UICC. RAN WG4 will pursue investigation on this.

 One LS on LS on GERAN – LTE interworking was received from GERAN, following the earlier workshop (10-11 January 2007) on the subject. Scenarios are pursued and inputs from network operators is welcome. 

Liaison Statements fro SA1 and SA4 were received on Service Requirement for MBMS LTE, indicating switching time requirements. This will be further investigated by the RAN WGs.

 An LS from SA5 on working relationship for production of SAE/LTE O&M Specifications was discussed, a joint meeting mat be organised between SA5 and RAN3.

 

ITU-R Issues

The main outcome of the work in conjunction with ITU-R ad-hoc is the approval of the documents relevant to the submission towards ITU-R WP8F of revision 7 of Rec. M.1457. In particular, LTE Stage 2 description and relevant specification were included in the submission paper.

In addition, a new update submission toward revision 8 of Rec. M.1457 was approved, with the inclusion of new Work Items approved at this meeting.

 

Release 7 Work Items and Study Items

Work Items completed at this meeting:

            ROHC Performance Conformance: Test Aspects

            1.28 Mcps TDD Enhanced Uplink: Physical Layer

            1.28 Mcps TDD Enhanced Uplink: Layer 2 and 3 Protocol Aspects

            1.28 Mcps TDD Enhanced Uplink: UTRAN Iub/Iur Protocol Aspects

            MIMO - Physical layer

            MIMO - Layer 2,3 aspects

            MIMO - Iub/Iur Protocol Aspects

            Interface to Control Tower Mounted Amplifiers (TMAs) – (however extension provided for SA5 part)

            Continuous connectivity for packet data users.

Work Items still open for which an exception form for inclusion in the Rel-7 was provided at this meeting:

            UE Antenna Performance Evaluation Method and Requirements

            Inclusion of Uplink TDOA UE positioning method in the UTRAN specifications

            Global Navigation Satellite System (GNSS) in UTRAN

            MIMO - RF Radio Transmission/Reception, System Performance Requirements and     Conformance Testing

            1.28 Mcps TDD Enhanced Uplink - RF Radio Transmission/ Reception, System           Performance Requirements and Conformance Testing

            64QAM for HSDPA

            Higher Order Modulation in HSUPA

            MBMS FDD Physical Layer Enhancements

            MBMS TDD Physical layer Enhancements

            L2 support for high data rates

            Enhanced CELL_FACH state in FDD

            TEI7 (for one more cycle - no exception form provided).

 

Long Term Evolution

 

RAN WG1 stage 2 work was almost completed, RAN WG2 and RAN WG3 have some remaining issues to be covered in the Stage 2 specification. This radio Stage 2 specification TS 36.300 was approved and placed under change control. TTCN3 will be used for the validation testing side (RAN WG5). RAN WG3 will further discuss the issue of Tamper resistant notion with SA3 (e.g. at the RAN WG3 Kobe meeting in May 2007).

 

Project management - Elections

Results of the elections are: 

Chairman by acclamation:

Mr Francois Courau, Alcatel-Lucent, Organisational Partner ETSI.

Vice-Chairmen by acclamation:

Mr HyeonWoo Lee, Samsung, TTA.

Mr Takehiro Nakamura-san, NTT DoCoMo, ARIB.

Mr Don Zelmer, Cingular/AT&T, ATIS.

 

New Work Items and Study Items

New Work Items:

            Conformance test aspects – 64QAM for HSDPA (FDD)

            Conformance test aspects – Improved L2 support for high data rates

            Conformance test aspects – Multiple Input Multiple Output antennas (MIMO) for         FDD

            Conformance test aspects – Introduction of 16QAM in HSUPA (FDD)

            Conformance test aspects – Continuous connectivity for packet data users

            UMTS in 1500 MHz Bands

            UMTS in 700 MHz Bands

            UMTS in 2300 MHz Bands

            MBMS LCR TDD physical layer enhancements

            Further Improved Minimum Performance Requirements for HSDPA UE (FDD) -          Two-Branch Interference Cancellation

            Creation approved in principle: Conformance test aspects - Enhanced Cell_FACH        State in FDD

New Study Item:

            3G Home NodeB.

 A RAN Workshop will be held on the Monday 28th May 2007 (the Monday before RAN-36) in Busan, on the subject of radio mobility with non-3GPP radio technologies, in order to clarify the scope of proposed the Study Item in RP-070133.

 The Study Item on HSPA evolution was kept open, next plenary will assess if a new Work Item is needed (see RP-070258).

 

Back to top

TSG-SA (Service and System Aspects)

TSG SA#35 (15-16 March, Lemesos, Cyprus)

Dear Colleagues,

Please find below my summary of major decisions from SA#35.  It serves to highlight key agreements reached during the meeting and forms the basis of the summary of the SA meeting on the 3GPP web site. 

Rel­7 was functionally frozen at SA#35.  This means that functional modifications may only be made to Features with agreed exceptions. The work is expected to be completed in June 2007 for the majority of the Rel­7 Features. Any items still not completed in June 2007 will require Rel­7 exception sheets which will be considered at the June 2007 TSG meetings (August 2007 for TSG GERAN Features).  All WGs are requested to review the set of specifications proposed for automatic upgrading to Rel 7 (SP-070189) and bring to the attention of the MCC any specifications that should not be upgraded.

A large number of Rel 7 exception requests were considered during the meeting.  Almost all exceptions were granted.  Exceptions were granted until June 2007 (August 2007 in the case of GERAN) even though in some cases longer exceptions were requested.  In a few cases longer exceptions were granted if the remaining work was related to performance characterization or testing as these are expected to complete after the core specifications are finished.  Exceptions were not granted for two studies: the SA3 Access Security Review and the SA5 Study on Common Profile Storage Framework.  These were moved to Rel 8 on the rationale that any required normative work be done in Rel 8.  It was clarified during the meeting that Personal Network Management is a Rel 8 work item.

Furthermore, it was tentatively agreed that the target for stage 1 freezing for Rel 8 would be December 2007.  SA1 is asked to provide input before the final decision on a target is made.

Elections were held for SA leadership.  Mr. Stephen Hayes was re-elected as SA chair for a second term.    Ms. Yuhong Huang and Mr. Armin Toepfer were relected for second terms as SA vice chairs.  Mr. Ki Young Kim was elected to fill the SA vice chair position vacated by Nick Sampson.

Some other specific decisions by the SA plenary were:

 
Several issues related to working procedures were discussed:

The following new TSs were approved: TS 26.114 MTSI – Media Handling and Interaction (SP-070110), and a large number of O&M TS’s in the 32.xxx series (SP-070052, SP-070053, SP-070056, SP-070057, SP-070058, SP-070059, SP-070060, SP-070061, SP-070063, SP-070070, SP-070071, SP-070072, SP-070073).

The following new TRs were approved: 22.868 Machine to Machine Communications (SP-070136), 22.980 Network Composition (SP-070137), 26.944 End to End Multimedia Services Performance Metrics (SP-070015), 32.810 Study of IRP Information Model (SP-070075), 32.812 Itf-N Implementation Conformance Statement Template (SP-050074), 32.814 UTRAN and GERAN Key Performance Indicators (SP-070050), 33.905 Trust Requirements for Open Platforms (SP-070165).

Several new work items (WIDs) were approved: Registration in Densely Populated Areas (SP-070133), IMS Enhancements for Cable Client Types and Deployment Models (SP-070105), IMS Interworking in Support of Cable Regulatory Requirements (SP-070107), Lawful Interception in 3GPP Rel 8 (SP-070238), Online Charging Correlation (SP-070077).

Several WIDs were updated: Enhancements to EVGC (SP-070113) – to remove requirement for speech encryption for VGCS, Improvements to VGCS (SP-070167) – to remove the requirement for parallel use of GPRS, Support of Customized Alerting Tone (SP-070122) – revised completion dates, Services Alignment (SP-070126) – to include migration aspects.

Several new study items (SIDs) were approved: Study of Mobility between 3GPP-WLAN Interworking and 3GPP Systems (SP-070106) NOTE: to be reviewed in June, Study on Charging Aspects of 3GPP SAE (SP-070174).

Several SIDs were updated: IMS Centralized Study (SP-070239) – to include SA1 aspects, SAE Study (SP-070163) – to include SA3 aspects.

Following the closure of SA#35 a seminar was held celebrating the decisions taken in Madeira in 1987 (20 years ago).  Those decisions were key decisions for defining GSM.  The seminar provided a chance for reminiscing, but also provided a perspective on the key role of standards in GSM and the evolving GSM story.   We are part of that story.

Stephen Hayes
3GPP TSG-SA Chair
Ericsson Inc.
Tel: +1 817-491-4015
Fax: +1 817-977-8920
Mobile: +1 469 360 8500
mailto:stephen.hayes@ericsson.com

Back to top