Previous Highlights:
Welcome to the latest edition of TSG Highlights! The aim is to provide you
with a concise summary of the decisions and actions of the most recent 3GPP
Technical Specification Group meetings.
In the period of April 2006 (PCG #16) to November 2006 (PCG #17) TSG GERAN held
4
plenary meetings: GERAN #29 (San Josι del Cabo, Mexico), GERAN #30 (Lisbon,
Portugal), GERAN #31 (Denver, CO, USA), GERAN#32 (Budapest, Hungary).
Please note, these summaries do not constitute formal, approved reports of the meetings they are opinions only and also may not be complete. They are offered for guidance only.
GERAN #29 (San Josι del Cabo, Mexico):
506 Documents addressed
200 Change Requests approved
98 Delegates
GERAN #30 (Lisbon, Portugal):
528 Documents addressed
164 Change Requests approved
102 Delegates
GERAN #31 (Denver, CO, USA):
403 Documents addressed
114 Change Requests approved
97 Delegates
GERAN #32 (Budapest, Hungary):
567 Documents addressed
208 Change Requests approved
113 Delegates
The report from the ERM/MSG GSM OBA group was
presented.
Two documents are under development within the group:
- a Harmonized
Standard
- a Technical
Specification
Completion of work foreseen by February 2007
GERAN / LTE Interworking
TS 45.005 relaxations : a proposal to relax some of TS 45.005 specifications
on BTS intermodulation, spurious emissions and blocking requirements was
made
to allow the introduction of BTS GSM multicarrier transceivers. GERAN#32
reviewed a discussion paper and CRs to TS 45.005 and TS 51.021, but it was
decided
further investigation on the proposal is needed
PS Conversational : CRs TS 43.064 (Stage 2), TS 44.060 (Stage 3) approved
Flexible Timeslot Assignment : the concept of Flexible Timeslot Assignment was agreed, but the corresponding CRs have been postponed
DTM Handover : Critical PS indication work is ongoing
MBMS : a CR has been approved introducing the MBMS session update procedure in TS 43.246 Rel-7.
EGPRS : a CR to TS 45.008 Rel-7 was approved, clarifying that EGPRS MSs have
to report MEAN_BEP and CV_BEP both on data blocks and control blocks
(provided
the TFI is present in the RLC/MAC control block header
A-GPS Minimum Performance requirement : CR to TS 44.014 approved on addition of Reset MS Positioning Stored Information command
VGCS enhancements to support VGCS Applications : CRs to TS 44.018 and TS 48.008 approved
Global Navigation Satellite System (GNSS) : agreement reached on the
structure of data to be used for the introduction of A-GNSS, i.e.
Baseline CR TS 44.031 approved
CRs TS 49.031 tabled but more work needed
Further work will now continue from the baseline established.
GAN : PS Handover Rel-7 CRs to TS 43.318 (GAN Stage 2) and TS 43.129 (PS HO Stage 2) introducing the GAN PS HandOver have been approved
GAN Enhancements :
WID for GAN Enhancements approved at GERAN #32
TSG GERAN Ad-Hoc meeting planned to progress the work (08 09 January,
2007, at Sophia Antipolis, France)
MS RX Diversity (MSRD, DARP Phase II) :
CR to TS 45.005 Rel-7 introducing DARP Phase II requirements approved;
another CR to TS 45.005 needed to clarify the legacy requirements of DARP
Phase II terminals
DARP Phase II will be introduced as a release independent feature and a CR
to TS 45.015 will be provided
A draft CR to TS 24.008 Rel-7 introducing the DARP Phase II capability
indicator has been endorsed and liased to 3GPP CT WG1.
Dual Carrier in the Downlink (DC) :
CR to TS 45.002 Rel-7 has been approved introducing the DL dual carrier
multislot classes; corresponding draft CR to TS 24.008 Rel-7 has been
endorsed
and liaised to 3GPP CT WG1
A proposal for allowing assignment of dual carrier on uplink irrespective
of dual carrier assignment in the downlink was presented; further evaluation
is needed
Discussion paper highlighting possible state/assignment transitions due to
DC assignments was presented; Companies are invited to provide comments
offline
Higher Uplink Performance for GERAN Evolution (HUGE) :
A number of Stage 2 working assumptions have been proposed and have been
accepted as "pre-working assumptions"
It has been proposed to use training sequences with better cross
correlation properties for higher order modulations, this will be further
investigated
It has also been proposed to include QPSK with increased symbol rate in
the HUGE concept, if it is confirmed that it improves performances at the
cell edge
Preliminary investigations on link performance and interference impact on
voice quality of HUGE have been presented
Latency Reductions :
CR to TS 43.064 Rel-7 introducing R-TTI approved
Fast Ack/Nack merits of a SSN-based approach and a time-based approach for
the DL ack/nacks were presented, a proposal for new coding schemes with
and
without bitmap was made, and link level performance results were shown
Simulation results presented for VoIP, showed that the SSN-based approach
works for VoIP but that the time-based approach also worked (better) for
VoIP.
It was concluded that the SSN-based approach should be used, both
uplink and downlink, while it is still to be decided if the time-based
approach will be introduced
(as an option) for UL ack/nack
General areas of work :
MS Conformance Testing DARP Phase II
Clean up of not needed PICS/PIXIT statements from 51.010-1
A-GPS Minimum Performance
Repeated FACCH and SACCH
Enhanced Power Control
Cell Notification
Variable Bitmap
T-GSM 810
Completed areas of work :
Wideband AMR
Dual Mode Terminals :
CR to TS 51.010-2 updating applicability statements classifying those test
cases redundant for a dual mode terminal
GPRS :
Test Cases extended to cover GEA2/GEA3; it is expected that these test
cases will be included in the certification criteria for GEA2/GEA3 work item
initiated in GCF.
GAN :
IP SEC certificates: originally WG3 proposed that Testing Certificates be
developed and maintained by 3GPP for GAN conformance testing; after review,
WG3 has agreed to use self-signed certificate for GAN testing. The
certificate will only be valid in test mode (statement to be added in TS
44.014), private and public parts of the certificate will be added in an
annex to TS 51.010.
GPRS and EDGE :
corrections to the existing test cases to align with Stage 3
GAN GERAN (Completed)
Enhanced Measurement Report (Completed)
8PSK AMR HR (Completed)
GSM 710 (Completed)
TSG GERAN #33 12 16 February 2007 Korea
TSG GERAN #34 14 18 May 2007 China
TSG GERAN #35 27 31 August 2007 Ireland
TSG GERAN #36 12 16 November 2007 USA
TSG
GERAN #37 11 15 February 2008 TBD