26.267 0001 rev 1 Correction of the required number of transmitted ACK messages
26.267 0002 rev 1 Integration of higher-layer acknowledgement message
26.267 0003 rev 1 Integration of IVS-initiated signalling option
26.267 0004 rev 3 IVS transmitter termination correction
26.267 0005 rev 1 Correction to text in clause 4.3
26.267 0006 Detector for handling PCM sample inversion in the network
26.267 0007 Detector for handling PCM sample inversion in the network
26.267 0008 Feedback signal modifications to increase robustness in the presence of network echo cancellers
26.267 0009 Feedback signal modifications to increase robustness in the presence of network echo cancellers
26.267 0010 Correction of synchronization procedures in the eCall in-band modem
26.267 0011 rev 1 Correction of synchronization procedures in the eCall in-band modem
26.267 0012 rev 1 State machine corrections in the eCall in-band modem
26.267 0013 rev 1 State machine corrections in the eCall in-band modem
26.267 0014 Correction of downlink message encoding table
26.267 0015 Correction of downlink message encoding table
26.267 0016 Clarification of START, LLACKs, and HLACKs messages
26.268 0001 rev 1 Correction of a mismatch with 3GPP TS 26.267 concerning synchronization
26.268 0002 rev 1 Correction concerning modulator initialization
26.268 0003 rev 1 Correction of a mismatch with 3GPP TS 26.267 concerning ACK transmission
26.268 0004 rev 1 Extension of eCall test setup to allow conformance testing of ACK messages
26.268 0005 rev 2 Separation of IVS and PSAP transmitter and receiver functions in the C-code
26.268 0006 rev 1 Integration of higher-layer acknowledgement message
26.268 0007 Integration of IVS-initiated signalling option
26.268 0008 Parameter change in eCall test setup
26.268 0009 Update of receiver-transmitter interfaces for conformance testing
26.268 0010 Corrections and bugfixes of the eCall source code
26.268 0011 rev 1 Correction of ACK detection conditions
26.268 0012 rev 1 Correction of ACK detection conditions
26.268 0013 rev 1 Detector for handling PCM sample inversion in the network
26.268 0014 rev 1 Detector for handling PCM sample inversion in the network
26.268 0015 rev 1 Feedback signal modifications to increase robustness in the presence of network echo cancellers
26.268 0016 rev 1 Feedback signal modifications to increase robustness in the presence of network echo cancellers
26.268 0017 Correction of some errors in the eCall reference code
26.268 0018 Correction of some errors in the eCall reference code
26.268 0019 Update of eCall test framework software to handle new in-band modem features
26.268 0020 Update of eCall test framework software to handle new in-band modem features
26.268 0021 Correction of synchronization procedures in the eCall in-band modem
26.268 0022 rev 1 Correction of synchronization procedures in the eCall in-band modem
26.268 0023 State machine corrections in the eCall in-band modem
26.268 0024 rev 1 State machine corrections in the eCall in-band modem
26.268 0025 Correction of the inversion detector
26.268 0026 rev 1 Correction of the inversion detector
26.268 0027 Correction of synchronization algorithm for the eCall in-band modem
26.268 0028 Correction of synchronization algorithm for the eCall in-band modem
26.268 0029 Correction of signal inversion operation and callback message event set
26.268 0030 Correction of signal inversion operation and callback message event set
26.269 0001 Introduction of HL-ACK test cases
26.269 0002 rev 3 Introduction of test cases for IVS-initiated signalling
26.269 0003 rev 1 Clarification of conformance testing requirements and correction of a figure
26.269 0004 Update of conformance testing reference sequences
26.269 0005 Update of conformance testing reference sequences
26.269 0006 Correction of eCall conformance test sequences
26.269 0006 rev 1 Correction of eCall conformance test sequences
26.269 0007 rev 1 Correction of eCall conformance test sequences
26.269 0007 rev 2 Correction of eCall conformance test sequences
26.269 0008 rev 1
26.969 0001 rev 2 Editorial corrections and clarifications of characterization test results
26.969 0002 rev 2 Update of characterization test results to latest eCall reference code version
26.969 0003 rev 2 Update of characterization test results to latest eCall reference code version
26.969 0004 rev 2

page generated from database: 2024-04-22 07:58:53

Get news. Get knowledge. Get involved
Get news.
Get knowledge.
Get involved.
Image
The 5G Standard
3GPP General Enquiries:
info@3gpp.org 


Connect:

Quick Links