The 5G Standard

3GPP TDocs (written contributions) at meeting

Meeting: SP-39 - 2008-03-10 to 2008-03-13, Puerto Vallarta

meeting id: SP-39 (click id for more info on this meeting)

Click on the Tdoc to open its file.

TDoc Title Source Remarks
SP‑080001 Draft agenda for TSG SA meeting #39 TSG SA Chairman Approved
SP‑080002 Draft report of TSG SA Meeting #38 TSG SA Secretary Approved
SP‑080003 TSG S4 Status Report at TSG-SA#39 SA WG4 Chairman Noted
SP‑080004 New WID on “Requirements and Test methods for Wideband Terminals” SA WG4 Approved
SP‑080005 CRs TS 26.114 on "Various Corrections for IMS Multimedia Telephony; Media Handling and Interaction (MTSI-MHI)" (Release 7) SA WG4 Approved
SP‑080006 CR TS 26.230 on Bug fix to baudot_tonemod function in baudot_functions.c for Cellular text telephone modem; Transmitter bit exact C-code (Release 7) SA WG4 Approved
SP‑080007 CRs TS 26.234 on "Various Corrections for Packet Switched Streaming Service (Enhancements) (PSSe)" (Release 6 and Release 7) SA WG4 Approved
SP‑080008 CR TS 26.235 on "Scope clarifications and editorial changes for IMS-Codec" (Release 7) SA WG4 Approved
SP‑080009 CR TS 26.236 on "Correction of RTP usage for audio for PS conversational multimedia applications for IMS-Codec" (Release 7) SA WG4 Approved
SP‑080010 CRs TS 26.346 on "Various Corrections for MBMS & MBMS User Service Extensions (MBMSUSE)" (Release 6 and Release 7) SA WG4 Approved
SP‑080011 CR TS 43.050 on "Correction of wrong references" (Release 7) SA WG4 Approved
SP‑080012 LS (from SA WG4) regarding 3GPP progress on eCall SA WG4 Noted
SP‑080013 WiMAX Forum Correspondence. Re: LS on EPC Interworking with WiMAX access networks WiMAX Forum NWG Noted
SP‑080014 WiMAX Forum Correspondence. Re: WiMAX Forum Multimedia Session Continuity Requirements Release 2.0 version 1.0.0 WiMAX Forum SPWG Chair Noted
SP‑080015 LS (from TSG GERAN) on the introduction of A interface user plane over IP TSG GERAN Noted
SP‑080016 Correspondence from ATIS PTSC: RE: Development of Common IMS Standards ATIS PTSC Noted
SP‑080017 LS (from CT WG1) on PNE Networks CT WG1 Noted
SP‑080018 LS from ITU-T SG19: Request for information for draft new Recommendation Q.1741.5 (referencing of 3GPP Release 7) ITU-T SG19 Noted
SP‑080019 LS (from TSG RAN) to TSG SA on the documents to be considered for the Revision 8 of Recommendation ITU-R M.1457 TSG RAN Noted
SP‑080020 LS (from ETSI TISPAN) on requirement on Overlap Signalling ETSI TISPAN Noted
SP‑080021 Reply LS (from SA WG1) on requirements for overlap signaling SA WG1 Noted
SP‑080022 LS (from SA WG1) on Transfer of Common IMS document to 3GPP SA WG1 regarding published Rel-1 documents SA WG1 Noted
SP‑080023 LS (from SA WG1) on Enhancing the SMS Default alphabet in TS 23.038 to include national characters not currently in the Default Alphabet. SA WG1 Noted
SP‑080024 LS (from SA WG1) on approval of Recommendation Q.1762/Y.2802 SA WG1 Noted
SP‑080025 Status Report from SA WG1 to TSG SA#39 SA WG1 Chairman Noted
SP‑080026 Stage 1 CRs on (NSP-CR) - Network Selection Enhancements SA WG1 Approved
SP‑080027 Stage 1 CRs on CR 22.273: Editorial corrections to align to the TISPAN text SA WG1 Revised in SP-080191
SP‑080028 Stage 1 CR on TCRT: Removal of requirement on sending SMS to non established group calls SA WG1 Approved
SP‑080029 Stage 1 CRs on (CAT) - Customised Alerting Tone SA WG1 Approved
SP‑080030 Stage 1 CR on charging requirement for multi-phase services SA WG1 Noted
SP‑080031 Stage 1 CRs on (CIMS8-TIS) - Service and Capability for Core IMS - inclusion of TISPAN requirements SA WG1 Approved (Except CR0066R1)
SP‑080032 Stage 1 CRs on (Edata) - eCall Data Transfer SA WG1 Approved
SP‑080033 Stage 1 CR on (EVA) - Enhancements to VGCS Applications SA WG1 Approved
SP‑080034 Stage 1 CRs on Home(e)NB SA WG1 Approved
SP‑080035 Stage 1 CR on HNB/HeNB - Closed Subscriber Group (CSG) requirements for UTRA and E-UTRA SA WG1 Noted
SP‑080036 Stage 1 CRs on (ICE) - Storage and easy access of ICE information on USIM SA WG1 Approved
SP‑080037 Stage 1 CR on ETSI TISPAN OSA transfer to 3GPP CT5 SA WG1 Approved
SP‑080038 Stage 1 CRs on (MESSIW) - Service-Level Interworking for Messaging Services SA WG1 Approved
SP‑080039 Stage 1 CR on (ICSRA) - IMS Centralized Service Control SA WG1 Approved
SP‑080040 Stage 1 CRs on (IPInterc) - IP Interconnect SA WG1 Approved
SP‑080041 Stage 1 corrections to TEI-8 items SA WG1 Approved
SP‑080042 Stage 1 CRs on (SAES) - 3GPP System Architecture Evolution Specification - Evolved Packet System (non RAN aspects) SA WG1 Approved
SP‑080043 Stage 1 CRs on (TEI8) - Technical Enhancements and Improvements SA WG1 Approved
SP‑080044 CR 22.173 Stage 1 for Flexible Alerting (FA) Service SA WG1 Approved
SP‑080045 Stage 1 CRs on Any other Studies (new proposed SIDs here) SA WG1 Approved
SP‑080046 Stage 1 CR on Correcting a reference in VAS4SMS TR 22.942 SA WG1 Approved
SP‑080047 VAS4SMS TS 22.142 v.2.0.0 and cover page SA WG1 Approved
SP‑080048 ETWS TS 22.168v.2.0.0 SA WG1 Revised in SP-080185
SP‑080049 PWS TR 22.968v.2.0.0 SA WG1 Approved
SP‑080050 ICS TR 22.892 and Cover Page SA WG1 Approved
SP‑080051 Enhancements to Multimedia Priority Service (TS 22.153) SA WG1 Approved
SP‑080052 3GPP2 Input to Common IMS SA WG1 Noted
SP‑080053 Charging for multi-phases services SA WG1 Approved
SP‑080054 Study on support of a Public Warning System SA WG1 Approved
SP‑080055 Status report of SA WG5 SA WG5 Chairman Noted
SP‑080056 R6/7 CRs on OAM&P (OAM-NIM) SA WG5 CR5, 6, 7 Approved. CR8 revised in SP-080204
SP‑080057 R7 CRs on Charging Management (CH7) SA WG5 Revised in SP-080190
SP‑080058 R7/8 CRs on OAM&P (OAM7, OAM7-NIM, OAM7-PM, OAM7-Trace) SA WG5 Approved
SP‑080059 R8 CRs on IBCF Charging (IMSTSS) SA WG5 Approved
SP‑080060 R8 CRs on EPC Charging (EPC-CH) SA WG5 Approved
SP‑080061 New WID on EPC Performance measurements SA WG5 Approved
SP‑080062 New WID on E-UTRAN Performance measurements SA WG5 Approved
SP‑080063 New WID Key Performance Indicators (KPIs) for E-UTRAN SA WG5 Approved
SP‑080064 New BB-level WID on Management of Self-Organizing Networks (SON) SA WG5 Approved
SP‑080065 New WT-level WID on Self-Establishment of eNBs SA WG5 Approved
SP‑080066 New WT-level WID on SON Automatic Neighbour Relation (ANR) Management SA WG5 Approved
SP‑080067 New WT-level WID on SON Self-Optimization & Self-Healing handling SA WG5 Approved
SP‑080068 New WID Alignment with eTOM and NGNM SA WG5 Approved
SP‑080069 R8 CRs on OAM&P (OAM8) SA WG5 Approved
SP‑080070 TS 32.153-100 Telecommunication management; Integration Reference Point (IRP) technology specific templates, rules and guidelines - for SA Information SA WG5 Noted
SP‑080071 TS 32.121-200 Telecommunication management; Advanced Alarm Management (AAM) Integration Reference Point (IRP); Requirements - for SA Approval SA WG5 Approved
SP‑080072 TS 32.122-200 Telecommunication management; Advanced Alarm Management (AAM) Integration Reference Point (IRP); Information Service - for SA Approval SA WG5 Approved
SP‑080073 TS 32.123-100 Telecommunication management; Advanced Alarm Management (AAM) Integration Reference Point (IRP); CORBA Solution Set - for SA Information SA WG5 Noted
SP‑080074 R8 CRs on Charging Management (CH8) SA WG5 Approved
SP‑080075 TR 32.819-100 Telecommunications management; Element management layer - Operation System Function (E-OSF) definition - for SA Information SA WG5 Noted
SP‑080076 New WID on Study of Self-healing of SON (OAM8-Studies) SA WG5 Approved
SP‑080077 22.011 CR0109R3: HNB/HeNB - Closed Subscriber Group (CSG) requirements for UTRA and E-UTRA (Rel-8) Alcatel-Lucent, Nokia Siemens Networks, Motorola, RIM, T-Mobile, Vodafone Revised in SP-080188
SP‑080078 CR ro 21.801: Correction of ambiguous text MCC (JMM) Approved
SP‑080079 CR to 21.900: Clarification of version nomenclature MCC (JMM) Approved
SP‑080080 Reaction to LS from ITU-T: Request for information for draft new Recommendation Q.1741.5 (referencing of 3GPP Release 7) MCC (JMM) Noted
SP‑080081 Support Team Report MCC (JMM) Noted
SP‑080082 Specs status at end of SA meeting MCC (JMM) Noted
SP‑080083 LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS ON THE SCHEDULE FOR UPDATING RECOMMENDATION ITU-R M.1457 TO REVISION 9 ITU-R WP5D Noted
SP‑080084 3GPP2 Correspondence: RE: Common IMS Requirements 3GPP2 TSG-S Noted
SP‑080085 LS (from SA WG2) on Renaming SAE Interfaces SA WG2 Noted
SP‑080086 LS response on Core Network Centric Intra Domain Connection of RAN Nodes to Multiple CN Nodes SA WG2 Noted
SP‑080087 WiMAX Forum Correspondence. Re: WiMAX Forum Multimedia Session Continuity Requirements Release 2.0 version 1.0.0 WiMAX Forum SPWG Chair Noted. Response in SP-080212
SP‑080088 Report of TSG GERAN activities to TSG SA #39 TSG GERAN Chairman Noted
SP‑080089 Report of SA WG2 activities to TSG SA #39 SA WG2 Chairman Noted
SP‑080090 New WID: System enhancements for the use of IMS services through local breakout SA WG2 Approved: BB under SAES
SP‑080091 Updated Study WID: System enhancements for the use of IMS services in local breakout and optimal routing of media SA WG2 Approved
SP‑080092 New WID: IMS Service Continuity SA WG2 Approved
SP‑080093 New WID: MBMS support in EPS for E-UTRAN SA WG2 Noted (returned to SA WG2)
SP‑080094 New Study WID: Intra Domain Connection of RAN Nodes to Multiple CN Nodes SA WG2 Approved
SP‑080095 Updated WID: IMS System enhancements for corporate network access SA WG2 Approved SA1 Chair to report this to SA1
SP‑080096 New WID: 3GPP2 Input to Common IMS SA WG2 Revised
SP‑080097 New WID: CS Fallback in EPS (TS also sent to TSG SA for information) SA WG2 Approved
SP‑080098 TS 23.272, Version 1.0.0: Circuit Switched Fallback in Evolved Packet System; Stage 2 Specification (Release 8) - For Information SA WG2 Presentation Cover sheet revised in SP-080165
SP‑080099 TS 23.216, Version 1.0.0: Single Radio Voice Call Continuity (SRVCC); Stage 2 (Release 8) - For Information SA WG2 Noted
SP‑080100 TR 23.893, Version 1.2.1: Feasibility Study on Multimedia Session Continuity; Stage 2 (Release 8) - For Information SA WG2 Noted
SP‑080101 TR 23.811, Version 2.0.0: Service Level Interworking for Messaging Services; Stage 2 (Release 8) - For Approval SA WG2 Approved
SP‑080102 TR 23.892, Version 2.0.0: IP Multimedia System (IMS) centralized services (Release 8) - For Approval SA WG2 Approved
SP‑080103 1 CR to 23.060: GGSN selection based on subscription information (TEI8, Rel-8) SA WG2 Approved
SP‑080104 1 CR to 23.141: Update to the Presence Spec in support of the Common IMS (IMS_Common, Rel-8) SA WG2 Approved
SP‑080105 2 CRs to 23.167 (EMC1, Rel-7) SA WG2 Approved
SP‑080106 2 CRs to 23.203: Clarification for PCRF initiated IP-CAN session termination (PCC, Rel-7, Rel-8) SA WG2 Approved
SP‑080107 10 CRs to 23.203 (SAES, Rel-8) SA WG2 Approved
SP‑080108 2 CRs to 23.204: Correction to Reference (TEI7, Rel-7, Rel-8) SA WG2 Approved
SP‑080109 9 CRs to 23.204 (MESSIW-St2, Rel-8) SA WG2 Approved
SP‑080110 1 CR to 23.221: Any IP version support (TEI8, Rel-8) SA WG2 Approved
SP‑080111 2 CRs to 23.228: Cleanup of incorrect P-CSCF behaviour (EMC1, Rel-7, Rel-8) SA WG2 Approved
SP‑080112 1 CR to 23.228: Cleanup of incorrect P-CSCF interaction (TEI7, Rel-7) SA WG2 Approved
SP‑080113 4 CRs to 23.228: (TEI8, Rel-8) SA WG2 Approved
SP‑080114 5 CRs to 23.228: (IMS_Common, Rel-8) SA WG2 CR0772 revised in SP-080206, CR0783 revised in SP-080207
SP‑080115 7 Category B CRs to 23.401 (SAES, Rel-8) SA WG2 Approved
SP‑080116 18 Category C CRs to 23.401 (SAES, Rel-8) SA WG2 Approved
SP‑080117 1 Category D CR to 23.401: The editorial modification for attach procedure (SAES, Rel-8) SA WG2 Approved
SP‑080118 15 Category F CRs to 23.401 (SAES, Rel-8) SA WG2 Approved
SP‑080119 15 Category F CRs to 23.401 (SAES, Rel-8) SA WG2 Approved
SP‑080120 10 Category F CRs to 23.401 (SAES, Rel-8) SA WG2 Approved
SP‑080121 9 Category B CRs to 23.402 (SAES, Rel-8) SA WG2 Approved
SP‑080122 15 Category C CRs to 23.402 (SAES, Rel-8) SA WG2 Approved
SP‑080123 16 Category C CRs to 23.402 (SAES, Rel-8) SA WG2 Approved
SP‑080124 12 Category F CRs to 23.402 (SAES, Rel-8) SA WG2 Approved
SP‑080125 11 Category F CRs to 23.402 (SAES, Rel-8) SA WG2 Approved
SP‑080126 1 Category B CR to 23.401: Subscriber Type on S1 (SAES, Rel-8) SA WG2 Approved
SP‑080127 1 Category F CR to 23.401: MME Overload handling (SAES, Rel-8) SA WG2 Approved
SP‑080128 1 Category C CR to 23.402: On IPMS on handover between accesses (SAES, Rel-8) SA WG2 Approved
SP‑080129 Stage 1 exception for 3GPP2 Common IMS Telecom Italia, BT, Alcatel-Lucent, KDDI Exceptions Granted
SP‑080130 SA3 Status Report to SA#39 SA WG3 Chairman Noted
SP‑080131 Draft Report of SA WG3 Meeting #50 SA WG3 Secretary Noted
SP‑080132 Updated WID: 3GPP System Architecture Evolution Specification (SAES) to include Security Building blocks based on SP-070933 after accepting revision marks SA WG3 Approved
SP‑080133 Generic Bootstrapping Architecture Push Function (GBAPush) SA WG3 Approved
SP‑080134 Security aspects of early IP Multimedia Subsystem (IMS) (Release 8) SA WG3 Noted
SP‑080135 3GPP System Architecture Evolution: Security aspects of non-3GPP accesses; (Release 8) SA WG3 Noted
SP‑080136 WITHDRAWN: IMS media plane security (Release 8) SA WG3 WITHDRAWN
SP‑080137 CRs to 33.203 on IMS security enhancements SA WG3 WITHDRAWN
SP‑080138 CRs to 33.203 on IMS Security requirements for Packet Cable SA WG3 Approved
SP‑080139 CRs to 33.203 on correction of integrity protection indicator SA WG3 Approved
SP‑080140 CR to 33.920 on Addition of 2G GBA related CRs SA WG3 Approved
SP‑080141 CR to 33.220 on Simultaneous handling of Zh' and Zh in a BSF SA WG3 Approved
SP‑080142 CRs to 33.210 on adding support for EPS requirements SA WG3 Approved
SP‑080143 CR to 33.220 and 33.110 on Manual TLS handling SA WG3 Approved
SP‑080144 CR to 33.234 on using an unauthenticated Diffie_Hellman exchange for emergency calls SA WG3 Approved
SP‑080145 CR to 33.310 on Introducing a certificates-based Zb-interface and adding IKEv2 SA WG3 Approved
SP‑080146 CR to 33.259 on corrections on typos on references SA WG3 Approved
SP‑080147 CR to TS 22.022 on Control key length increase in OTA de-personalisation message SA WG3 Revised in SP-080194
SP‑080148 CR to 33.110 on Removal of editor SA WG3 Approved
SP‑080149 CR to 33.246: Clarification of usage of SRTCP in MBMS SA WG3 Approved
SP‑080150 CR to 33.106 on Alignment of CC encryption statement in ETSI TS 101 671 SA WG3 Revised in SP-080171
SP‑080151 CRs to 33.107 SA WG3 Revised in SP-080172
SP‑080152 CR to 33.108 on editorial update SA WG3 Revised in SP-080173
SP‑080153 IETF Status Report TSG CT Chairman Noted
SP‑080154 Report of TSG CT activities TSG CT Chairman Noted
SP‑080155 LS (from CT WG6) on Release 8 definition of a new framework for UICC services CT WG6 Noted
SP‑080156 LS (from ETSI TC SCP) on Release 8 definition of a new framework for services TC SCP Noted
SP‑080157 On release planning Alcatel-Lucent Discussed and noted
SP‑080158 New WID on 3GPP2 Input to Common IMS Alcatel-Lucent -
SP‑080159 WI Status Report: Evaluation of LCS Control Plane Solution for EPS Rapporteur WITHDRAWN
SP‑080160 3GPP System Architecture Evolution: Security Architecture; (Release 8) SA WG3 Noted
SP‑080161 New WID: IMS initiated and controlled PSS and MBMS User Service Ericsson, RealNetworks, Apple, Huawei Technologies, Orange, Telecom Italia, China Mobile Revised
SP‑080162 Mobility Mode Protocol Choices in EPC Intel Corp. WITHDRAWN. Revision in SP-080163
SP‑080163 Mobility Mode Protocol Choices in EPC Intel Corp. Revised in SP-080189
SP‑080164 TR 22.983, version 2.0.0: Service alignment and migration SA WG1 Approved
SP‑080165 TS 23.272, Version 1.0.0: Circuit Switched Fallback in Evolved Packet System; Stage 2 Specification (Release 8) - For Information SA WG2 Noted
SP‑080166 Status Report on PCG/OP process discussions TSG SA Chairman Noted
SP‑080167 2 CRs to 23.402 (SAES, Rel-8) SA WG2 Approved
SP‑080168 3GPP/3GPP2 Common IMS Workshop Draft MEETING REPORT v1.0.0 TSG SA Chairman Approved
SP‑080169 Conclusions from 3GPP/3GPP2 Common IMS Workshop TSG SA Chairman Noted
SP‑080170 CRs to 33.203 on IMS security enhancements SA WG3 CR0129R1 -> SP-080211. Other CRs approved
SP‑080171 CR to 33.106 on Alignment of CC encryption statement in ETSI TS 101 671 SA WG3 Approved
SP‑080172 CRs to 33.107 SA WG3 Approved
SP‑080173 CR to 33.108 on editorial update SA WG3 Approved
SP‑080174 Focusing SAE work SA WG2 chairman (Balazs Bertenyi), SA WG2 SAE Rapporteurs (Chris Pudney, Irfan Ali) TSG-CT chairman (Hannu Hietalahti) TSG-CT WG1 chairman (Atle Monrad) TSG-CT WG3 chairman (Ragnar Huslende) TSG-CT WG4 chairman (Peter Schmitt) Discussed and noted
SP‑080175 1 CR to 23.203: Role of the V-PCRF (SAES, Rel-8) SA WG2 Approved
SP‑080176 Proposed Follow-up LS to 3GPP2 Regarding Development of TS 33.xyz(402) ("Security aspects of non-3GPP accesses") Nortel, Alcatel-Lucent, Motorola, Verizon Wireless Revised
SP‑080177 Planning of SAE workload and future 3GPP releases Vodafone Discussed and noted
SP‑080178 Draft report of TSG CT meeting #39 TSG CT Secretary Revised in SP-080183
SP‑080179 LS (from TSG CT) Transfer of API work from 3GPP to OMA TSG CT Noted
SP‑080180 Proposal (from ETSI BOARD IMS-TEST Interest Group) for creation of new Technical Committee for IMS Network Testing (TC INT) ETSI BOARD IMS-TEST Interest Group Noted
SP‑080181 LS (from ETSI TISPAN) on transfer of charging in common IMS specifications ETSI TISPAN Noted
SP‑080182 Rel-8 SAE Essential and non Essential work the way forward NTT DoCoMo Discussed and noted
SP‑080183 Draft report of TSG CT meeting #39 TSG CT Secretary Noted
SP‑080184 Response LS on the creation of new Technical Committee for IMS Network Testing (TC INT) TSG SA (Enrico) Revised
SP‑080185 ETWS TS 22.168v.2.0.0 SA WG1 Approved
SP‑080186 Response LS on Transfer of API work from 3GPP to OMA TSG SA Approved
SP‑080187 Calendar of TSG meetings TSG SA Secretary (MCC) Noted
SP‑080188 22.011 CR0109R4: HNB/HeNB - Closed Subscriber Group (CSG) requirements for UTRA and E-UTRA (Rel-8) Alcatel-Lucent, Nokia Siemens Networks, Motorola, RIM, T-Mobile, Vodafone Approved
SP‑080189 Mobility Mode Protocol Choices in EPC Intel, NTT-DoCoMo, Sprint Noted
SP‑080190 R7 CRs on Charging Management (CH7) TSG SA Approved
SP‑080191 Stage 1 CRs on CR 22.273: Editorial corrections to align to the TISPAN text SA WG1 Revised in SP-080195
SP‑080192 Stage 1 CR on charging requirement for multi-phase services SA WG1 Approved
SP‑080193 Stage 1 CR on (CIMS8-TIS) - Corrections to Interworking with PSTN/ISDN networks SA WG1 Revised in SP-080205
SP‑080194 CR to TS 22.022 on Control key length increase in OTA de-personalisation message TSG SA Approved
SP‑080195 Stage 1 CRs on CR 22.273: Editorial corrections to align to the TISPAN text TSG SA Approved
SP‑080196 Report of TSG RAN activities to TSG SA #39 TSG RAN Chairman Revised
SP‑080197 Draft report of RAN meeting #39 TSG RAN Secretary (MCC) Noted
SP‑080198 LTE Open issue list TSG RAN Chairman Noted
SP‑080199 LTE-Advanced Work Item Description TSG RAN Noted
SP‑080200 Summary of discussion on LTE/SAE additional Feature List Session Convenor (Dan Warren GSMA) Discussed and noted
SP‑080201 New WID: IMS initiated and controlled PSS and MBMS User Service Ericsson, RealNetworks, Apple, Huawei Technologies, Orange, Telecom Italia, China Mobile Approved
SP‑080202 LS on Decision of MBMS and LCS in SAE Rel-8 Scope Discussions TSG SA (NTT DoCoMo) Revised
SP‑080203 LS informing WGs on the decision on SAE essential items list and procedure for items not included TSG SA (Chairman) Revised
SP‑080204 R7 CR on OAM&P (OAM-NIM) SA WG5 Approved
SP‑080205 Stage 1 CR on (CIMS8-TIS) - Corrections to Interworking with PSTN/ISDN networks TSG SA Approved
SP‑080206 23.228 CR0772R3: (IMS_Common, Rel-8) SA WG2 Approved
SP‑080207 CR0772R3 to 23.228: (IMS_Common, Rel-8) TSG SA Approved
SP‑080208 LS informing WGs on the decision on SAE essential items list and procedure for items not included TSG SA (Chairman) Revised
SP‑080209 CR on P-CSCF behaviour Ericsson, RIM Approved
SP‑080210 LS to ATIS PTSC: RE: Handling of LS on Development of Common IMS Standards TSG SA (D Knight) Revised
SP‑080211 33.203 CR0129R2 on IMS security enhancements SA WG3 Approved
SP‑080212 Response LS to WiMAX Forum: 3GPP SAE Rel-8 content TSG SA Approved
SP‑080213 Report of TSG RAN activities to TSG SA #39 TSG RAN Chairman Noted
SP‑080214 LS to 3GPP2 Regarding Development of TS 33.xyz(402) ("Security aspects of non-3GPP accesses") TSG SA Revised
SP‑080215 3GPP work Plan: Version 11 March 2008 Work Plan Manager (MCC) Noted
SP‑080216 Work Plan Slide Review MCC Revised
SP‑080217 Rel-7 Feature summary document MCC Noted
SP‑080218 LS informing WGs on the decision on SAE essential items list and procedure for items not included TSG SA (Chairman) Approved
SP‑080219 LS to ATIS PTSC: RE: Handling of LS on Development of Common IMS Standards TSG SA Approved
SP‑080220 New WID: 3GPP2 Input to Common IMS SA WG2 Approved
SP‑080221 Response LS on the creation of new Technical Committee for IMS Network Testing (TC INT) TSG SA Revised
SP‑080222 LS to 3GPP2 Regarding Development of TS 33.xyz(402) ("Security aspects of non-3GPP accesses") TSG SA Approved
SP‑080223 LS on Decision of MBMS and LCS in SAE Rel-8 Scope Discussions TSG SA Approved
SP‑080224 Response LS on the creation of new Technical Committee for IMS Network Testing (TC INT) TSG SA Approved
SP‑080225 Work Plan Slide Review MCC Noted

page generated from database: 2024-03-25 09:25:51

Get news. Get knowledge. Get involved
Get news.
Get knowledge.
Get involved.
Image
The 5G Standard
3GPP General Enquiries:
info@3gpp.org 


Connect:

Quick Links