The 5G Standard

3GPP TDocs (written contributions) at meeting

Meeting: R5-45 - 2009-10-26 to 2009-10-30, Philadelphia

meeting id: R5-45 (click id for more info on this meeting)

Click on the Tdoc to open its file.

TDoc Title Source Remarks
R5‑095400 Agenda - opening session WG Chairman imported from 3GU
R5‑095401 Agenda - mid week session WG Chairman imported from 3GU
R5‑095402 Agenda - closing session WG Chairman imported from 3GU
R5‑095403 Session Programme WG Chairman imported from 3GU
R5‑095404 Leadership Team WG Chairman imported from 3GU
R5‑095405 Previous RAN5 WG Minutes Project Manager imported from 3GU
R5‑095406 Previous RAN5 WG Action Points Project Manager imported from 3GU
R5‑095407 Previous RAN5 WG bis Minutes Project Manager imported from 3GU
R5‑095408 Previous RAN Plenary Notes WG Chairman imported from 3GU
R5‑095409 Active WI Update after previous RAN Plenary Project Manager imported from 3GU
R5‑095410 TF 160 Status Report - current TF 160 Manager imported from 3GU
R5‑095411 Previous GCF SG/CAG mtg notes WG Chairman imported from 3GU
R5‑095412 RAN5 Status Report at previous Plenary WG Chairman imported from 3GU
R5‑095413 TF 160 Status Report - previous Plenary WG Chairman imported from 3GU
R5‑095414 Email agreement status at previous Plenary Project Manager -
R5‑095415 RAN Plenary draft report WG Chairman imported from 3GU
R5‑095416 SA Plenary draft report WG Chairman imported from 3GU
R5‑095417 RAN Chair report to SA Plenary WG Chairman imported from 3GU
R5‑095418 PCG Meeting - latest draft report Project Manager imported from 3GU
R5‑095419 OP Meeting- latest draft report Project Manager imported from 3GU
R5‑095420 Meeting Schedule RAN5 WG Chairman imported from 3GU
R5‑095421 Liaison statement - template WG Chairman imported from 3GU
R5‑095422 RAN5 Agreed CRs summary Project Manager imported from 3GU
R5‑095423 RAN5 CRs for email agreement Project Manager imported from 3GU
R5‑095424 Target Review - RF WG Chairman imported from 3GU
R5‑095425 Target Review - Sig WG Chairman imported from 3GU
R5‑095426 RAN5 meeting minutes - first draft Project Manager imported from 3GU
R5‑095427 RAN5 draft Status Report for next Plenary WG Chairman imported from 3GU
R5‑095428 Meeting Schedule RAN5 update WG Chairman imported from 3GU
R5‑095429 Deadlines for next 3 months WG Chairman imported from 3GU
R5‑095430 RAN5 next meeting details WG Chairman imported from 3GU
R5‑095431 CT Draft Plenary Report WG Chairman imported from 3GU
R5‑095432 LTE ASP clarifications and update MCC TF160 imported from 3GU
R5‑095433 cell frequency allocation MCC TF160, NEC, NTT DoCoMo imported from 3GU
R5‑095434 Cleanup of default NAS message contents NTT DOCOMO imported from 3GU
R5‑095435 Correction to the default NAS message contents NTT DOCOMO imported from 3GU
R5‑095436 Correction to the generic procedure for IP allocation and more NTT DOCOMO, Samsung imported from 3GU
R5‑095437 Correction to test case 11.2.3.2 NTT DOCOMO, Sony Ericsson Mobile imported from 3GU
R5‑095438 GCF Priority 1 - Various corrections to Idle Mode section of 36.523-1 NTT DOCOMO imported from 3GU
R5‑095439 GCF Priority 3 - Addition of test case 6.2.3.6 NTT DOCOMO imported from 3GU
R5‑095440 GCF Priority 2 - Update to test case 7.2.2.11 NTT DOCOMO -
R5‑095441 GCF Priority 3 - Update to test case 8.1.1.2 NTT DOCOMO imported from 3GU
R5‑095442 GCF Priority 2 - Update to test case 8.1.2.5 NTT DOCOMO imported from 3GU
R5‑095443 GCF Priority 2 - Update to test case 8.1.2.7 NTT DOCOMO imported from 3GU
R5‑095444 Removal of TC 8.1.2.10 from TS 36.523-1 NTT DOCOMO imported from 3GU
R5‑095445 GCF Priority 2 - Update to test case 8.1.3.5 NTT DOCOMO imported from 3GU
R5‑095446 GCF Priority 1 - Various corrections to RRC Part 2 section of 36.523-1 NTT DOCOMO imported from 3GU
R5‑095447 Removal of TC 8.2.1.2 from TS 36.523-1 NTT DOCOMO imported from 3GU
R5‑095448 Removal of TC 8.2.1.4 from TS 36.523-1 NTT DOCOMO imported from 3GU
R5‑095449 GCF Priority 3 - Addition of test case 8.2.4.4 NTT DOCOMO imported from 3GU
R5‑095450 GCF Priority 2 - Update to test case 8.2.4.5 NTT DOCOMO imported from 3GU
R5‑095451 GCF Priority 3 - Update to test case 8.2.4.9 NTT DOCOMO imported from 3GU
R5‑095452 GCF Priority 2 - Various corrections to RRC Part 3 section of 36.523-1 NTT DOCOMO imported from 3GU
R5‑095453 GCF Priority 2 - Update to test case 8.4.2.2 NTT DOCOMO imported from 3GU
R5‑095454 GCF Priority 2 - Update to test case 8.4.2.4 NTT DOCOMO imported from 3GU
R5‑095455 GCF Priority 3 – Various corrections to EMM section of 36.523-1 NTT DOCOMO -
R5‑095456 GCF Priority 3 - Addition of new test case 9.2.1.2.5 NTT DOCOMO imported from 3GU
R5‑095457 GCF Priority 3 - Update to test case 9.2.1.2.6 NTT DOCOMO imported from 3GU
R5‑095458 GCF Priority 3 - Addition of test case 9.2.1.2.7 NTT DOCOMO imported from 3GU
R5‑095459 GCF Priority 3 – Addition of test case 9.2.1.2.11 NTT DOCOMO -
R5‑095460 GCF Priority 3 - Addition of test case 9.2.1.2.13 NTT DOCOMO imported from 3GU
R5‑095461 GCF Priority 3 - Addition of new test case 9.2.1.2.15 NTT DOCOMO imported from 3GU
R5‑095462 GCF Priority 3 - Addition of test case 9.2.3.1.9a NTT DOCOMO imported from 3GU
R5‑095463 GCF Priority 3 - Addition of test cases 9.2.3.1.23 and 9.2.3.1.24 NTT DOCOMO imported from 3GU
R5‑095464 GCF Priority 3 - Addition of new test case 9.2.3.1.25 NTT DOCOMO imported from 3GU
R5‑095465 GCF Priority 3 - Addition of new test case 9.2.3.2.9 NTT DOCOMO imported from 3GU
R5‑095466 GCF Priority 3 - Update to test case 9.3.1.4 NTT DOCOMO imported from 3GU
R5‑095467 GCF Priority 3 - Addition of test case 9.3.1.16 NTT DOCOMO imported from 3GU
R5‑095468 GCF Priority 3 - Addition of new test case 9.3.1.17 NTT DOCOMO imported from 3GU
R5‑095469 GCF Priority 3 - Addition of new test case 10.7.3 NTT DOCOMO imported from 3GU
R5‑095470 GCF Priority 3 - Addition of new test case 10.7.4 NTT DOCOMO imported from 3GU
R5‑095471 GCF Priority TBC - Addition of new test case 10.7.5 NTT DOCOMO imported from 3GU
R5‑095472 GCF Priority 3 - Addition of new test case 10.8.2 NTT DOCOMO imported from 3GU
R5‑095473 GCF Priority 3 - Addition of new test case 10.8.3 NTT DOCOMO imported from 3GU
R5‑095474 GCF Priority TBC - Addition of new test case 10.8.4 NTT DOCOMO imported from 3GU
R5‑095475 GCF Priority 3 - Addition of new test case 10.8.5 NTT DOCOMO imported from 3GU
R5‑095476 GCF Priority 3 - Addition of new test case 10.8.6 NTT DOCOMO imported from 3GU
R5‑095477 GCF Priority 3 - Addition of new test case 10.8.7 NTT DOCOMO imported from 3GU
R5‑095478 GCF Priority TBC - Addition of new test case 13.1.5 NTT DOCOMO imported from 3GU
R5‑095479 Applicability of new TC 6.2.3.6 NTT DOCOMO imported from 3GU
R5‑095480 Applicability of new/removed RRC Part 2 test cases NTT DOCOMO imported from 3GU
R5‑095481 Applicability of new RRC Inter-RAT test cases NTT DOCOMO imported from 3GU
R5‑095482 Applicability of new EMM test cases NTT DOCOMO imported from 3GU
R5‑095483 Applicability of new ESM test cases NTT DOCOMO imported from 3GU
R5‑095484 Applicability of new TC 13.1.5 NTT DOCOMO imported from 3GU
R5‑095485 Addition of new generic procedure for TAU after inter-RAT HO from UTRA NTT DOCOMO -
R5‑095486 Correction to 4.3.1.2.6 TDD reference test frequencies for Operating Band 38 Rohde & Schwarz imported from 3GU
R5‑095487 36.521 followup database to RAN4 core specifications Rohde & Schwarz imported from 3GU
R5‑095488 Update to 6.6 Transmit signal quality test cases Rohde & Schwarz -
R5‑095489 Update to 6.6 Transmit signal quality test cases Rohde & Schwarz -
R5‑095490 Update to 6.5 Transmit signal quality test cases Rohde & Schwarz imported from 3GU
R5‑095491 Update for 36.521-1 Annex A Rohde & Schwarz imported from 3GU
R5‑095492 Removal of test state 4 in RRM test cases Rohde & Schwarz imported from 3GU
R5‑095493 CR to 36.521-3 Annexs of E-UTRAN cell reselection test cases Rohde & Schwarz imported from 3GU
R5‑095494 Addition of TC to 36.521-3: E-UTRAN TDD – TDD Inter frequency handover: unknown Target Cell Rohde & Schwarz -
R5‑095495 Addtion of new TC to 36.521-3:E-UTRAN TDD - GSM Handover: Unknown Target Cell Rohde & Schwarz imported from 3GU
R5‑095496 Addtion of new TC to 36.521-3 E-UTRAN TDD - UTRAN TDD HO test: unknown target cell Rohde & Schwarz imported from 3GU
R5‑095497 Addtion of new TC to 34.122 UTRA TDD - E-UTRA TDD HO test: unknown target cell Rohde & Schwarz -
R5‑095498 Update to RRM TC:E-UTRAN FDD - UTRAN TDD cell re-selection Rohde & Schwarz imported from 3GU
R5‑095499 CR for E-UTRAN FDD - UTRAN TDD handover Rohde & Schwarz imported from 3GU
R5‑095500 CR for E-UTRAN TDD - Contention Based Random Access Test Rohde & Schwarz imported from 3GU
R5‑095501 CR for E-UTRAN TDD - UE Transmit Timing Accuracy Rohde & Schwarz imported from 3GU
R5‑095502 CR for E-UTRAN TDD – UE Timing Advance Adjustment Accuracy Rohde & Schwarz -
R5‑095503 CR for E-UTRAN FDD - UTRAN TDD event triggered reporting under fading propagation conditions Rohde & Schwarz imported from 3GU
R5‑095504 Correction to TDD RSRP and RSRQ measurement requirements Rohde & Schwarz imported from 3GU
R5‑095505 GCF Priority 2 - Update test case 6.1.2.11 Panasonic imported from 3GU
R5‑095506 GCF Priority 2 - update test case 8.5.1.3 Panasonic imported from 3GU
R5‑095507 GCF Priority 2 - Correction for Measurement test cases Panasonic imported from 3GU
R5‑095508 GCF Priority 3 - Update test case 8.3.1.4 Panasonic imported from 3GU
R5‑095509 Correction to test case 8.1.2.21 Panasonic imported from 3GU
R5‑095510 Correction to test case 8.1.2.22 Panasonic imported from 3GU
R5‑095511 Correction to test case 8.1.2.23 Panasonic imported from 3GU
R5‑095512 Correction to test case 8.1.2.24 Panasonic imported from 3GU
R5‑095513 Measurement uncertainties and Test Tolerances for transmit quality test cases Rohde & Schwarz imported from 3GU
R5‑095514 Correction CR to 36.508: Set the default parameter for offsetFreq in MeasObjectGERAN Information Element Motorola imported from 3GU
R5‑095515 Correction CR to 36.521-1: Additional Spectrum Emission Mask test need to be updated to include the network signalled value "NS_07ö message contents exceptions Motorola imported from 3GU
R5‑095516 Correction CR to 36.521-1: Additional Maximum Power Reduction (A-MPR) Motorola imported from 3GU
R5‑095517 Correction CR to 36.521-1: Configured UE Transmitted Output Power Motorola imported from 3GU
R5‑095518 Correction CR to 36.521-1: Update for Demodulation of PDSCH (FDD) tests to correct CR merges results from RAN5#44 Motorola imported from 3GU
R5‑095519 Correction CR to 36.521-2: Applicability changes to update the Demodulation of PDSCH (FDD) tests based on the CR merge results from RAN5#44 Motorola imported from 3GU
R5‑095520 GCF Priority 1 - Various editorial corrections to RLC section Qualcomm Europe, Rohde & Schwarz imported from 3GU
R5‑095521 GCF Priority 1 - Update of RLC test case 7.2.3.14 Qualcomm Europe, Anite imported from 3GU
R5‑095522 GCF Priority 2 - Update of RLC test case 7.2.3.13 Qualcomm Europe imported from 3GU
R5‑095523 GCF Priority 1 - Update of RLC test case 7.2.3.9 Qualcomm Europe, Anite imported from 3GU
R5‑095524 GCF Priority 2 - Update of EMM test case 9.2.3.3.5 Qualcomm Europe imported from 3GU
R5‑095525 GCF Priority 2 - Update of EMM test case 9.3.1.7a Qualcomm Europe imported from 3GU
R5‑095526 GCF Priority 1 - Update of RLC test case applicability Qualcomm Europe imported from 3GU
R5‑095527 Correction CR to 36.521-3: E-UTRAN FDD - FDD cell re-selection intra frequency case and inter frequency case conformance minimum requirements updates Motorola imported from 3GU
R5‑095528 Correction CR to 36.521-3: E-UTRAN FDD - UTRAN FDD cell re-selection: UTRA FDD is of higher priority and UTRA FDD is of lower priority conformance minimum requirements Motorola imported from 3GU
R5‑095529 Correction CR to 36.521-3: E-UTRAN FDD - FDD Inter Frequency event triggered reporting under fading propagation conditions in asynchronous cells case Motorola imported from 3GU
R5‑095530 Correction CR to 36.521-3: E-UTRAN FDD - FDD Inter Frequency event triggered reporting when DRX is used under fading propagation conditions Motorola imported from 3GU
R5‑095531 Correction CR to 36.521-3: E-UTRAN FDD - FDD Intra Frequency event triggered reporting under fading propagation conditions Motorola imported from 3GU
R5‑095532 Correction CR to 36.521-3: E-UTRAN FDD - GSM event triggered reporting in AWGN case Motorola imported from 3GU
R5‑095533 Correction CR to 36.521-3: E-UTRAN FDD - FDD Handover intra frequency and inter frequency case Motorola imported from 3GU
R5‑095534 Correction CR to 36.521-3: E-UTRAN FDD - UTRA FDD Handover case Motorola imported from 3GU
R5‑095535 Correction CR to 36.521-3: E-UTRAN FDD - FDD Inter Frequency Absolute RSRP Accuracy case Motorola imported from 3GU
R5‑095536 Correction CR to 36.521-3: E-UTRAN FDD - Contention Based Random Access case Motorola imported from 3GU
R5‑095537 Correction CR to 36.521-3: E-UTRAN FDD - UE Transmit Timing Accuracy case Motorola imported from 3GU
R5‑095538 Correction CR to 36.521-3: E-UTRAN FDD - FDD inter frequency event triggered reporting when DRX is used Motorola imported from 3GU
R5‑095539 Correction CR to 36.521-3: Addition of message contents exceptions for E-UTRAN inter frequency and inter-RAT Cell Search for when DRX is used Motorola imported from 3GU
R5‑095540 Addition of a New Test Case for location updating request rejected Huawei imported from 3GU
R5‑095541 Addition of a New Test Case for combined routing area updating request rejected Huawei imported from 3GU
R5‑095542 Addition of a New Test Case for Inter-RAT Cell Reselection from GSM_Idle / GPRS Packet_Idle to a UTRA idle CSG cell Huawei imported from 3GU
R5‑095543 Addition of a New Test Case for Inter-RAT Cell reselection from an E-UTRA idle non-CSG cell to a UTRA CSG cell. Huawei imported from 3GU
R5‑095544 Addition of a New Test Case for Support of HNB - Inter frequency CSG Cell Reselection / UE is in Idle, Cell_PCH and URA_PCH states Huawei imported from 3GU
R5‑095545 Addition of a New Test Case for Support of HNB - Intra frequency CSG Cell Reselection / UE is in Idle, Cell_PCH and URA_PCH states Huawei imported from 3GU
R5‑095546 Addition applicability of a New Test Case for location updating request / rejected / Not authorized for this CSG Huawei imported from 3GU
R5‑095547 Addition applicability of a New Test Case for combined routing area updating request rejected / Not authorized for this CSG Huawei imported from 3GU
R5‑095548 Addition applicability of a New Test Case for Support of Inter-RAT Cell Reselection from GSM_Idle / GPRS Packet_Idle to a UTRA idle CSG cell. Huawei imported from 3GU
R5‑095549 Addition applicability of a New Test Case for Support of Inter-RAT Cell reselection from an E-UTRA idle non-CSG cell to a UTRA CSG cell. Huawei imported from 3GU
R5‑095550 Addition applicability of a New Test Case for Support of HNB -Inter frequency CSG Cell Reselection / UE is in Idle, Cell_PCH and URA_PCH states Huawei imported from 3GU
R5‑095551 Addition applicability of a New Test Case for Support of HNB -Intra frequency CSG Cell Reselection / UE is in Idle, Cell_PCH and URA_PCH states Huawei imported from 3GU
R5‑095552 Addition applicability of 6 New Test Cases for Support of HNB Huawei imported from 3GU
R5‑095553 OTA antenna performance: New informative Annex for Recommended performance in 34.114 Orange imported from 3GU
R5‑095554 GCF Priority 1: Correction to EMM test case 9.3.1.1 Ericsson, ST-Ericsson, Rohde & Schwarz imported from 3GU
R5‑095555 Addition of HSPA UTRA reference radio bearer parameters for E-UTRA Inter-RAT testing Ericsson, ST-Ericsson imported from 3GU
R5‑095556 GCF Priority 2: Updates to TAU/RAU procedure for inter-system cell re-selection between A/Gb and S1 modes Vodafone imported from 3GU
R5‑095557 Correcton CR to 36.521-3: General RRM Updates Motorola imported from 3GU
R5‑095558 GCF Priority 1 - Update of RRC test case 8.2.2.1 Ericsson, ST-Ericsson imported from 3GU
R5‑095559 GCF Priority 1 - Update of RRC test case 8.2.2.2 Ericsson, ST-Ericsson imported from 3GU
R5‑095560 GCF Priority 2 - Update of RRC test case 8.3.2.6 Ericsson, ST-Ericsson imported from 3GU
R5‑095561 GCF Priority 2 - Update of RRC test case 8.4.1.2 Ericsson, ST-Ericsson imported from 3GU
R5‑095562 GCF Priority 2 - Update of RRC test case 8.4.1.4 Ericsson, ST-Ericsson imported from 3GU
R5‑095563 GCF Priority 3 - Update of RRC test case 8.2.1.7 Ericsson, ST-Ericsson imported from 3GU
R5‑095564 Test Methodology for E-UTRAN FDD - UTRAN FDD cell re-selection in fading propagation conditions: UTRA FDD is of lower priority Motorola imported from 3GU
R5‑095565 Addition of test scenario CR to 36.521-3: E-UTRAN FDD - UTRAN FDD cell re-selection in fading propagation conditions: UTRA FDD is of lower priority Motorola imported from 3GU
R5‑095566 Addition of a New Test Case for eCall - Registration of eCall only capable UE Qualcomm Europe S.A.R.L. imported from 3GU
R5‑095567 Addition of a New Test Case for eCall - Test Call using eCall capable UE Qualcomm Europe S.A.R.L. imported from 3GU
R5‑095568 Addition of a New Test Case for eCall - eCall using eCall capable UE with "eCall onlyö subscription on USIM Qualcomm Europe S.A.R.L. imported from 3GU
R5‑095569 Work plan for Conformance Test Aspects - eCall - Status after RAN5#45 Qualcomm Europe S.A.R.L. imported from 3GU
R5‑095570 Status report for WI Conformance Test Aspects of eCall Qualcomm Europe S.A.R.L. imported from 3GU
R5‑095571 Adding applicability of the test cases for eCall Qualcomm Europe S.A.R.L. imported from 3GU
R5‑095572 Update TC 8.7.2 E-UTRAN TDD - UTRAN TDD cell search when DRX is used under fading propagation conditions Huawei imported from 3GU
R5‑095573 Update TC 8.10.2 E-UTRAN TDD - GSM event triggered reporting when DRX is used in AWGN Huawei imported from 3GU
R5‑095574 Add new TC 5.1.6 E-UTRAN TDD - TDD inter frequency handover: unknown target cell Huawei imported from 3GU
R5‑095575 Update TC 8.7.1 E-UTRAN TDD - UTRAN TDD event triggered reporting under fading propagation conditions Huawei imported from 3GU
R5‑095576 Update TC 8.2.1 E-UTRAN TDD - TDD intra-frequency event triggered reporting under fading propagation conditions in synchronous cells Huawei imported from 3GU
R5‑095577 List of test cases and scenarios proposal for 3G LTE Protocol Testing for PDCP after RAN5#45 Huawei imported from 3GU
R5‑095578 GCF Priority 1: Update of MAC TC 7.1.7.1.1 DL-SCH TBS selection/DCI format 1/RA type0 Huawei imported from 3GU
R5‑095579 GCF Priority 1: Update of MAC TC 7.1.7.1.2 DL-SCH TBS selection/DCI format 1/RA type1 Huawei imported from 3GU
R5‑095580 GCF Priority 1: Update of MAC TC 7.1.7.1.3 DL-SCH TBS selection/DCI format 1A/RA type2/Localized VRB Huawei imported from 3GU
R5‑095581 GCF Priority 1: Update of MAC TC 7.1.7.1.4 DL-SCH TBS selection/DCI format 1A/RA type2/Distributed VRB Huawei imported from 3GU
R5‑095582 GCF Priority 1: Update of MAC TC 7.1.7.2.1 UL-SCH TBS selection/DCI format 0 Huawei imported from 3GU
R5‑095583 GCF Priority 1: Update of E-UTRA MAC test case 7.1.4.7 Huawei imported from 3GU
R5‑095584 GCF Priority 2: Update of E-UTRA MAC test case 7.1.6.1 Huawei imported from 3GU
R5‑095585 GCF Priority 1: Update of E-UTRA MAC test case 7.1.3.6 Huawei imported from 3GU
R5‑095586 GCF Priority 1: Update of E-UTRA MAC test case 7.1.3.7 Huawei imported from 3GU
R5‑095587 Work plan for UMTS ETWS (Earthquake and Tsunami Warning Systems) (FDD) - Status after RAN5#45 NTT DOCOMO imported from 3GU
R5‑095588 Status report for UMTS ETWS (Earthquake and Tsunami Warning Systems) (FDD) - Status after RAN5#45 NTT DOCOMO imported from 3GU
R5‑095589 Update for test period description in the general section Rohde & Schwarz imported from 3GU
R5‑095590 Addition of new TC to 36.521-3: E-UTRAN TDD - UTRAN FDD cell re-selection test Nokia imported from 3GU
R5‑095591 update of Annex H.2.3 in 36.521-3 Nokia imported from 3GU
R5‑095592 Addition of new TC to 36.521-3: E-UTRAN TDD to E-UTRAN TDD and UTRA TDD cell search test case Nokia imported from 3GU
R5‑095593 Addition of new TC to 36.521-3: E-UTRAN TDD - E-UTRAN TDD and E-UTRAN TDD Inter-frequency event triggered reporting under fading propagation conditions test case Nokia imported from 3GU
R5‑095594 Introduction of RS power boosting to reduce interference NTT DOCOMO, Nokia imported from 3GU
R5‑095595 Update of generic radio bearer test procedure (14.1.3.5a) for Dual-Cell radio bearer testing. Ericsson, ST-Ericsson imported from 3GU
R5‑095596 GCF Priority 3 - Addition of E-UTRAN test case 8.3.3.3 for Measurement configuration control and reporting / SON / ANR: CGI reporting of GERAN cell ZTE corporation imported from 3GU
R5‑095597 GCF Priority 3 - Addition of E-UTRAN test case 8.3.1.11 ZTE corporation imported from 3GU
R5‑095598 New radio bearar test case 14.6.1f for Dual-Cell Ericsson, ST-Ericsson imported from 3GU
R5‑095599 GCF Priority 3 - Addition of E-UTRAN test case 8.3.3.2 :Measurement configuration control and reporting / SON / ANR: CGI reporting of UTRAN cell ZTE corporation imported from 3GU
R5‑095600 New radio bearar test case 14.6.1g for Dual-Cell Ericsson, ST-Ericsson imported from 3GU
R5‑095601 Removal of Applicability of TC 8.1.2.10 NTT DOCOMO imported from 3GU
R5‑095602 New radio bearar test case 14.6.6e for Dual-Cell Ericsson, ST-Ericsson imported from 3GU
R5‑095603 New radio bearar test case 14.6.6f for Dual-Cell Ericsson, ST-Ericsson imported from 3GU
R5‑095604 Applicability of new radio bearar test cases 14.6.1f, 14.6.1g, 14.6.6e and 14.6.6f for Dual Cell Ericsson, ST-Ericsson imported from 3GU
R5‑095605 Addition of radio bearer parameters for UE HS-DSCH Physical Layer category 21, 22, 23 and 24 (Dual Cell) Ericsson, ST-Ericsson imported from 3GU
R5‑095606 GCF Priority 3 - Update of EMM test case 9.2.1.1.25 ZTE corporation imported from 3GU
R5‑095607 GCF Priority 3 - Update EMM test case 9.2.1.2.2 ZTE corporation imported from 3GU
R5‑095608 GCF Priority 1 - Update of EMM test case 9.2.3.1.1 ZTE corporation imported from 3GU
R5‑095609 GCF Priority 1 - Update of EMM test case 9.2.3.1.5 ZTE corporation imported from 3GU
R5‑095610 GCF Priority 3 - Update of EMM test case 9.2.3.2.1 ZTE corporation imported from 3GU
R5‑095611 Correction of radio bearar test case 14.6.1e for combination 64QAM and MIMO. Ericsson, ST-Ericsson imported from 3GU
R5‑095612 Introduction of Reference Radio Bearer configurations used in CPC for 1.28Mcps TDD ZTE corporation imported from 3GU
R5‑095613 Introduction of MAC test case for HS-DSCH SPS operation for 1.28Mcps TDD ZTE corporation imported from 3GU
R5‑095614 Introduction of RRC test case for HS-DSCH SPS operation for 1.28Mcps TDD ZTE corporation -
R5‑095615 Correction of radio bearar test case 14.6.6d for combination 64QAM and MIMO Ericsson, ST-Ericsson imported from 3GU
R5‑095616 GCF Priority 3 - Add applicabilities for new test case 8.3.3.2 ZTE corporation imported from 3GU
R5‑095617 GCF Priority 3 - Add applicabilities for new test case 8.3.3.3 ZTE corporation imported from 3GU
R5‑095618 GCF Priority 3 - Add applicabilities for new test case 8.3.1.11 ZTE corporation imported from 3GU
R5‑095619 GCF Priority 3 - Addition of EMM test case 9.1.2.6 CATR imported from 3GU
R5‑095620 GCF Priority 3 - Addition of new EMM test case 9.1.5.2 CATR imported from 3GU
R5‑095621 GCF Priority 2 - Removal of TC 8.4.2.6 NTT DOCOMO imported from 3GU
R5‑095622 GCF Priority 3 - Addition of new EMM test case 9.2.1.1.18 CATR imported from 3GU
R5‑095623 GCF Priority 3 - Addition of EMM test case 9.2.1.2.12 CATR imported from 3GU
R5‑095624 GCF Priority 3 - Addition of EMM test case 9.2.2.2.14 CATR imported from 3GU
R5‑095625 GCF Priority 3 - Addition of EMM test case 9.2.3.1.26 CATR imported from 3GU
R5‑095626 GCF Priority 3 - Addition of EMM test case 9.2.3.1.27 CATR imported from 3GU
R5‑095627 GCF Priority 3 - Addition of EMM test case 9.2.3.1.28 CATR imported from 3GU
R5‑095628 GCF Priority 3 - Addition of EMM test case 9.3.1.15 CATR imported from 3GU
R5‑095629 GCF Priority 3 - Addition of new test case 6.1.2.13 CATR imported from 3GU
R5‑095630 GCF Priority 2 - Update of the test case 6.2.3.3 CATR imported from 3GU
R5‑095631 Correction to RRC testcase 8.1.10.1 ST-Ericsson, Ericsson -
R5‑095632 Correction to RRC testcase 8.1.10.1 ST-Ericsson, Ericsson -
R5‑095633 Correction to RRC testcase 8.1.10.1 ST-Ericsson, Ericsson imported from 3GU
R5‑095634 GCF Priority 2: Updates to Attach Procedure / Success (last visited TAI, TAI list and equivalent PLMN list handling) Vodafone imported from 3GU
R5‑095635 GCF Priority 3: Introduction of a new EMM test case 9.2.3.1.6' Normal tracking area update / UE with ISR active moves to E-UTRAN ' Sony Ericsson Mobile imported from 3GU
R5‑095636 GCF Priority 3: Introduction of 9.2.3.1.17 Normal tracking area update / rejected / Roaming not allowed in this tracking area Sony Ericsson Mobile imported from 3GU
R5‑095637 GCF Priority 3: Introduction of 9.2.3.1.18 Normal tracking area update / rejected / EPS services not allowed in this PLMN Sony Ericsson Mobile imported from 3GU
R5‑095638 GCF Priority 3: Introduction of 9.2.3.1.19 Normal tracking area update / rejected / No Suitable Cells in tracking Area Sony Ericsson Mobile imported from 3GU
R5‑095639 Update of Applicability table for GCF-Priority3 EMM test cases Sony Ericsson Mobile imported from 3GU
R5‑095640 LS Response to RAN5 on A-MPR and band edge relaxation TSG WG RAN4 imported from 3GU
R5‑095641 Response LS to CAG-09-263r2 LS to 3GPP GERAN, GERAN3 & RAN5 on GCF decision to remove certification requirements for GSM/(E)GPRS P-channels (PBCCH/PCCCH) TSG GERAN imported from 3GU
R5‑095642 Response LS to PTCRB LS on P-Channels TSG GERAN imported from 3GU
R5‑095643 Response LS on removal of certification requirements for GSM/(E)GPRS P-channels (PBCCH/PCCCH) TSG GERAN imported from 3GU
R5‑095644 LS on new GERAN to LTE interworking TCs TSG GERAN imported from 3GU
R5‑095645 Status report for WI Conformance Test Aspects of LTE 3500 Ericsson, ST-Ericsson imported from 3GU
R5‑095646 Corrections to the default RRC CONNECTION SETUP message Ericsson, ST-Ericsson imported from 3GU
R5‑095647 Work plan for Conformance Test Aspects - LTE 3500 - Status after RAN5#45 Ericsson, ST-Ericsson imported from 3GU
R5‑095648 Update of the default RADIO BEARER SETUP message for RF testing of Dual Carrier Adjacent Channels for HSDPA Ericsson, ST-Ericsson imported from 3GU
R5‑095649 Status report for WI Conformance Test Aspects of UMTS/LTE 800MHz Europe Ericsson, ST-Ericsson imported from 3GU
R5‑095650 Work plan for Conformance Test Aspects - UMTS/LTE 800MHz Europe - Status after RAN5#45 Ericsson, ST-Ericsson imported from 3GU
R5‑095651 Corrections to default RRC message contents Ericsson, ST-Ericsson, Anite imported from 3GU
R5‑095652 Addition of default UTRA message contents to TS 36.508 Ericsson, ST-Ericsson imported from 3GU
R5‑095653 Corrections to the default MODIFY EPS BEARER CONTEXT REQUEST message Ericsson, ST-Ericsson, Anite imported from 3GU
R5‑095654 GCF Priority 1: Correction to RRC test case 8.2.1.1 Ericsson, ST-Ericsson, NTT DOCOMO imported from 3GU
R5‑095655 Update of header chapter 5.2 in 36.508 Agilent, Ericsson, ST-Ericsson imported from 3GU
R5‑095656 LTE-RF: CR for Aggregate power control tolerance test case Agilent Technologies imported from 3GU
R5‑095657 LTE-RF: CR for Power Control Absolute power tolerance test case Agilent Technologies imported from 3GU
R5‑095658 LTE-RF: CR for UE configured UE transmitted output power test case Agilent Technologies imported from 3GU
R5‑095659 LTE-RF: CR for UE Max output power test case Agilent Technologies imported from 3GU
R5‑095660 LTE-RF: CR for MPR test case Agilent Technologies imported from 3GU
R5‑095661 LTE-RF: CR for UE minimum output power test case Agilent Technologies imported from 3GU
R5‑095662 LTE-RF: CR for Power Control Relative power tolerance test case Agilent Technologies imported from 3GU
R5‑095663 LTE-RF: CR to ON/OFF Time mask test cases Agilent Technologies imported from 3GU
R5‑095664 LTE-RF/RRM: WID update Agilent Technologies imported from 3GU
R5‑095665 LTE-RF/RRM: Work plan Agilent Technologies imported from 3GU
R5‑095666 LTE-RF/RRM: Status report Agilent Technologies imported from 3GU
R5‑095667 E-UTRAN FDD Radio Link Monitoring test for Out-of-sync in DRX Ericsson, ST-Ericsson imported from 3GU
R5‑095668 E-UTRAN FDD Radio Link Monitoring test for in-sync in DRX Ericsson, ST-Ericsson imported from 3GU
R5‑095669 E-UTRAN TDD Radio Link Monitoring test for Out-of-sync in DRX Ericsson, ST-Ericsson imported from 3GU
R5‑095670 E-UTRAN TDD Radio Link Monitoring test for in-sync in DRX Ericsson, ST-Ericsson imported from 3GU
R5‑095671 Update of Annex E for RLM tests in DRX Ericsson, ST-Ericsson imported from 3GU
R5‑095672 Clarification to the mapping of GERAN cells and the default parameter values Vodafone imported from 3GU
R5‑095673 Applicability for new IDLE MODE test case 6.1.2.13 CATR imported from 3GU
R5‑095674 Applicability for new EMM test case 9.1.2.6 CATR imported from 3GU
R5‑095675 Applicability for new EMM test case 9.1.5.2 CATR imported from 3GU
R5‑095676 Applicability for new EMM test case 9.2.1.1.18 CATR imported from 3GU
R5‑095677 Applicability for new EMM test case 9.2.1.2.12 CATR imported from 3GU
R5‑095678 Applicability for new EMM test case 9.2.2.2.14 CATR imported from 3GU
R5‑095679 Applicability for new EMM test case 9.2.3.1.26 CATR imported from 3GU
R5‑095680 Applicability for new EMM test case 9.3.1.15 CATR imported from 3GU
R5‑095681 Applicability for new EMM test case 9.2.3.1.28 CATR imported from 3GU
R5‑095682 Applicability for new EMM test case 9.2.3.1.27 CATR imported from 3GU
R5‑095683 Routine maintenance for divergent updates MCC TF160 imported from 3GU
R5‑095684 Latency test method MCC TF160 imported from 3GU
R5‑095685 Work plan for Rel-8 Short Message Services over IMS (SMSoverIMS) conformance test cases - Status after RAN5#44 Alcatel-Lucent imported from 3GU
R5‑095686 Status Report for WI to TSG: SMSoverIMS-UEConTest Alcatel-Lucent imported from 3GU
R5‑095687 Update to SMS over IMS in E-UTRAN WID Alcatel-Lucent imported from 3GU
R5‑095688 GCF Priority 3 - Addition of new test case 8.3.3.4 Alcatel-Lucent imported from 3GU
R5‑095689 GCF Priority 3 - Addition of new test case 8.3.3.5 Alcatel-Lucent imported from 3GU
R5‑095690 Introduction of 3.84 Mcps TDD IMB option in 34.122 IPWireless imported from 3GU
R5‑095691 Tests to verify the demodulation of MCCH and MTCH for 3.84 Mcps TDD IMB UEs IPWireless imported from 3GU
R5‑095692 Receiver characteristics for 3.84 Mcps TDD IMB IPWireless imported from 3GU
R5‑095693 DL reference measurement parameters for 3.84 Mcps TDD IMB tests IPWireless imported from 3GU
R5‑095694 Tests to verify Idle mode procedures for 3.84 Mcps TDD IMB UE IPWireless imported from 3GU
R5‑095695 Tests to verify MBSFN specific procedures for 3.84 Mcps TDD IMB UEs IPWireless imported from 3GU
R5‑095696 Tests to verify MCCH out of sequence handling for 3.84 Mcps TDD IMB UEs IPWireless imported from 3GU
R5‑095697 Tests to verify the unacknowledged mode operation for 3.84 Mcps TDD IMB UEs IPWireless imported from 3GU
R5‑095698 Default SIB configuration for 3.84 Mcps TDD IMB IPWireless imported from 3GU
R5‑095699 MBSFN service availability for 3.84 Mcps TDD IMB IPWireless imported from 3GU
R5‑095700 Reference radio condition for 3.84 Mcps TDD IMB IPWireless imported from 3GU
R5‑095701 Add 3.84 Mcps TDD IMB related items to capability tables IPWireless imported from 3GU
R5‑095702 Add test applicability and conditions for 3.84 Mcps TDD IMB idle mode procedure tests IPWireless imported from 3GU
R5‑095703 Add test applicability and conditions for 3.84 Mcps TDD IMB MAC and RLC tests IPWireless imported from 3GU
R5‑095704 Add test applicability and conditions for 3.84 Mcps TDD IMB RRC tests IPWireless imported from 3GU
R5‑095705 Add test applicability and conditions for 3.84 Mcps TDD IMB RB tests IPWireless imported from 3GU
R5‑095706 Update of target completion date of Rel-8 work item on Conformance Test Aspects -MBSFN-IMB_UEConTest IPWireless imported from 3GU
R5‑095707 Status Report for 3.84 Mcps TDD MBSFN Integrated Mobile Broadcast (MBSFN_IMB_UEConTest) IPWireless imported from 3GU
R5‑095708 Work plan for "Conformance test aspects-3.84 Mcps TDD MBSFN Integrated Mobile Broadcastö (MBSFN-IMB_UEConTest)- Status after RAN5#45 IPWireless imported from 3GU
R5‑095709 Summary of RF input documents for Work Item "MBSFN-IMB_UEConTestö IPWireless imported from 3GU
R5‑095710 Summary of sig input documents for Work Item "MBSFN-IMB_UEConTest" IPWireless imported from 3GU
R5‑095711 GCF Priority 1 - Update to test case 7.2.3.4 NTT DOCOMO, Qualcomm Europe, Anite imported from 3GU
R5‑095712 GCF Priority 2 - Modification of Cell reselection using Qhyst, Qoffset and Treselection test case 6.1.2.6 ZTE corporation imported from 3GU
R5‑095713 Update of RRC part TC 8.5.1.2 RRC Connection Re-establishment: End of procedure after T301 expiry (after Radio Link Failure) ZTE corporation imported from 3GU
R5‑095714 GCF Priority 3 - Addition of new EMM connection management procedures test case 9.3.1.15 ZTE corporation imported from 3GU
R5‑095715 GCF Priority 3 - Addition of new EMM connection management procedures test case 9.3.1.16 ZTE corporation imported from 3GU
R5‑095716 GCF Priority 3 - Addition of new EMM connection management procedures test case 9.3.1.17 ZTE corporation imported from 3GU
R5‑095717 GCF Priority 3 – Addition of test case 13.3.1.1 CMCC, Huawei, Motorola -
R5‑095718 Update of Applicability table for Multi-layer Procedure test cases ZTE corporation imported from 3GU
R5‑095719 GCF Priority 1 - Update of Multi-layer Procedures part TC 13.1.1 Activation and deactivation of additional data radio bearer in E-UTRA ZTE corporation imported from 3GU
R5‑095720 GCF Priority 1 - Update of Multi-layer Procedures part TC 13.2.1 RRC Connection Reconfiguration: E-UTRA to E-UTRA ZTE corporation imported from 3GU
R5‑095721 GCF Priority 3 - Update of E-UTRAN test case 9.2.1.1.20 ZTE corporation imported from 3GU
R5‑095722 GCF Priority 3 – Addition of test case 13.3.1.1 CMCC, Huawei, Motorola -
R5‑095723 GCF Priority 3 - Addition of E-UTRAN test case 9.2.1.1.21 ZTE corporation imported from 3GU
R5‑095724 GCF Priority 3 - Addition of E-UTRAN test case 9.2.1.1.22 ZTE corporation imported from 3GU
R5‑095725 Correction to Demodulation of PHICH test cases NEC -
R5‑095726 GCF Priority 3 - Addition of E-UTRAN test case 9.2.1.1.24 ZTE corporation imported from 3GU
R5‑095727 GCF Priority 3 - Addition of E-UTRAN test case 9.2.1.1.26 ZTE corporation imported from 3GU
R5‑095728 Correction to Demodulation of PHICH test cases NEC imported from 3GU
R5‑095729 GCF Priority 3 - Update of E-UTRAN test case 9.2.1.2.3 ZTE corporation imported from 3GU
R5‑095730 Introduction of CQI reporting test with frequency-selective interference NEC imported from 3GU
R5‑095731 Correction to FDD PMI reporting test cases NEC imported from 3GU
R5‑095732 GCF Priority 3 – Addition of test case 13.3.1.1 CMCC, Huawei, Motorola -
R5‑095733 Intorduction of RI reporting test NEC imported from 3GU
R5‑095734 Update of Applicability table for EPS Mobility Management Procedure test cases ZTE corporation imported from 3GU
R5‑095735 Corrections to Annex A.4 NEC imported from 3GU
R5‑095736 Correction to E-UTRAN FDD - GSM event triggered reporting in AWGN test case NEC imported from 3GU
R5‑095737 Intorduction of E-UTRAN FDD - GSM event triggered reporting in AWGN with DRX NEC imported from 3GU
R5‑095738 GCF Priority 3 – Addition of test case 13.3.1.2 CMCC, Huawei, Motorola -
R5‑095739 CR for Additional Maximum Power Reduction ZTE corporation imported from 3GU
R5‑095740 CR to the RA response window's name in Random Access conformance requirements ZTE corporation imported from 3GU
R5‑095741 CR to the inconsistent expression in UE Measurements Procedures ZTE corporation imported from 3GU
R5‑095742 List of test cases/scenarios proposal for LTE Protocol Testing in Idle Mode Operation NTT DOCOMO imported from 3GU
R5‑095743 List of test cases/scenarios proposal for LTE Protocol Testing in Inter-RAT Handover NTT DOCOMO imported from 3GU
R5‑095744 DC activation by HS-DSCH serving cell change from non-DC-HSDPA capable cell to DC-HSDPA capable cell. Nokia imported from 3GU
R5‑095745 DC deactivation by HS-DSCH - serving cell change from DC-HSDPA capable cell to non DC-HSDPA capable cell Nokia imported from 3GU
R5‑095746 Addition of ICS-parameters for FDD HS-DSCH physical layer categories 21, 22, 23 and 24 Nokia imported from 3GU
R5‑095747 Applicability of new RRC test cases for Dual Cell HSDPA Nokia, Ericsson, ST-Ericsson imported from 3GU
R5‑095748 New test case: Active set update in soft handover with simultaneous activation/deactivation of 64QAM and MIMO Nokia imported from 3GU
R5‑095749 New test case: Physical Channel Reconfiguration Failure (64QAM and MIMO activated, physical channel failure and reversion to old channel) Nokia imported from 3GU
R5‑095750 Status report for WI Conformance Test Aspects of Combination of 64QAM and MIMO Ericsson imported from 3GU
R5‑095751 New test case: Physical Channel Reconfiguration for transition from CELL_DCH to CELL_DCH: Success (HHO to another frequency, MIMO and 64QAM enabled) Nokia imported from 3GU
R5‑095752 New test case: Physical Channel Reconfiguration for transition from CELL_DCH to CELL_DCH: Success (HHO to another frequency, MIMO and 64QAM enabled) Nokia imported from 3GU
R5‑095753 New test case: Radio Bearer Reconfiguration from CELL_DCH to CELL_DCH: Success (simultaneous activation and deactivation of 64QAM and MIMO) Nokia imported from 3GU
R5‑095754 Applicability of Rel-8 64QAM and MIMO RRC test cases Nokia imported from 3GU
R5‑095755 New Enh-UL for CELL_FACH test case for RACH procedure with both normal AIs and extended AIs (using E-AICH) Nokia imported from 3GU
R5‑095756 Applicability of new Enh-UL for CELL_FACH test case Nokia imported from 3GU
R5‑095757 Correction to condition A27 for Improved L2 UL Testing and generic table formatting Nokia imported from 3GU
R5‑095758 Correction to Improved L2 UL Test cases 7.1.7.1 and 7.1.7.4 Nokia imported from 3GU
R5‑095759 Correction to Improved L2 UL test case 7.2.3.38 Nokia imported from 3GU
R5‑095760 Maximum output power with E-DCH for TDD And FRC CATR imported from 3GU
R5‑095761 Work plan for Combination of 64QAM and MIMO - Status after RAN5#45 Ericsson imported from 3GU
R5‑095762 Adding RRC test coverage for MIMO reconfiguration scenarios in the work plan Ericsson, ST-Ericsson imported from 3GU
R5‑095763 CR to TDD PHICH demodulation test cases Rohde & Schwarz,CMCC imported from 3GU
R5‑095764 GCF Priority 1 - Update to Idle Mode test case 6.1.2.2 Ericsson, ST-Ericsson, Telecom Italia imported from 3GU
R5‑095765 Addition of RF specific messages to 36.508 Rohde & Schwarz imported from 3GU
R5‑095766 LTE-RF: CR for In band emission for non-allocated RB Agilent Technologies imported from 3GU
R5‑095767 Work plan for UTRA HNB for FDD (RANimp-UEConTest_HNBsupp) after RAN5#45 Huawei imported from 3GU
R5‑095768 GCF Priority 2 - Updated to test case 6.1.2.6 Ericsson, ST-Ericsson, Telecom Italia imported from 3GU
R5‑095769 Status report for WI UTRA HNB for FDD after RAN5#45 Huawei imported from 3GU
R5‑095770 GCF Priority 2 - Correction to TC 8.1.3.8 Telecom Italia imported from 3GU
R5‑095771 Add applicabilities for test case 8.1.3.7 and 8.5.2.1 Telecom Italia imported from 3GU
R5‑095772 New TC 8.5.2.1 RRC Connection Reject: redirection from UTRAN to E-UTRAN Telecom Italia imported from 3GU
R5‑095773 Correction of test procedures in TS 36.508 Telecom Italia imported from 3GU
R5‑095774 GCF Priority 2 - Correction to test case 6.1.1.1 Telecom Italia imported from 3GU
R5‑095775 GCF Priority 2 - Correction to test case 6.1.2.7 Telecom Italia imported from 3GU
R5‑095776 GCF Priority 2 - Correction to test case 6.3.6 Telecom Italia imported from 3GU
R5‑095777 Scheduling of retransmissions and number of active HARQ processes for DL performance RMC-s Rohde & Schwarz imported from 3GU
R5‑095778 Update of RRM Confomance test applicability for RLM in DRX test cases Ericsson, ST-Ericsson imported from 3GU
R5‑095779 Tests to verify the demodulation of MTCH for 3.84 Mcps TDD IMB UEs IPWireless imported from 3GU
R5‑095780 Work plan for Enhanced UL for CELL_FACH state (FDD) - Status after RAN5#45 Nokia imported from 3GU
R5‑095781 Status report for WI Enhanced UL for CELL_FACH state (FDD) Nokia imported from 3GU
R5‑095782 GCF Priority 2 - Update to test case 9.2.1.1.7 Nokia imported from 3GU
R5‑095783 GCF Priority 3 - Update to test case 9.2.1.1.25 Nokia imported from 3GU
R5‑095784 GCF Priority 2 - Update to test case 9.2.2.1.1 Nokia imported from 3GU
R5‑095785 GCF Priority 3 - Update to test case 9.2.2.1.2 Nokia imported from 3GU
R5‑095786 GCF Priority 2 - Update to test case 9.2.2.1.6 Nokia imported from 3GU
R5‑095787 List of test cases/scenarios proposed for 3G LTE Protocol Testing for EMM (EPS Mobility Management) Nokia imported from 3GU
R5‑095788 Measurement period for TX-Tests Rohde & Schwarz imported from 3GU
R5‑095789 Missing category in 8.2.1.1.2 Rohde & Schwarz imported from 3GU
R5‑095790 Completion of Statistical testing (36.521 Annex G) Rohde & Schwarz imported from 3GU
R5‑095791 Corrections to Annex E Rohde & Schwarz imported from 3GU
R5‑095792 New Work Item Proposal: Conformance test aspects - Mobility between 3GPP WLAN Interworking and 3GPP Systems Qualcomm Europe imported from 3GU
R5‑095793 Work plan for Conformance test aspects - Mobility management based on DSMIPv6 (Dual-Stack Mobile IPv6) - Status after RAN5#45 Qualcomm Europe imported from 3GU
R5‑095794 Status report for WI Conformance test aspects of Mobility management based on DSMIPv6 (Dual-Stack Mobile IPv6) Qualcomm Europe imported from 3GU
R5‑095795 Addition of new DSMIPv6 test case for Discovery of the Home Agent via DNS Qualcomm Europe imported from 3GU
R5‑095796 Addition of new DSMIPv6 test case for Security association establishment without Home Agent reallocation procedure Qualcomm Europe imported from 3GU
R5‑095797 Addition of applicability for new DSMIPv6 test cases Qualcomm Europe imported from 3GU
R5‑095798 Removal of GPRS P-channels from GERAN Inter-RAT RRC test cases (8.3.9.3, 8.3.11.2 and 8.3.11.11) Ericsson, ST-Ericsson imported from 3GU
R5‑095799 CR to 36.521-3: Update of E-UTRA FDD to HRPD Handover and E-UTRA FDD to cdma2000 1xRTT Handover test cases Spirent Communications imported from 3GU
R5‑095800 CR to 36.521-1: Update to Derivation of Test Requirements for A-MPR Spirent Communications imported from 3GU
R5‑095801 List of test cases/scenarios proposal for 3G LTE Protocol Testing for RLC Qualcomm Europe imported from 3GU
R5‑095802 GCF Priority 3 - Addition of new RRC test case 8.4.5.4 Qualcomm Europe imported from 3GU
R5‑095803 GCF Priority 3 - Addition of new RRC test case 8.4.7.3 Qualcomm Europe imported from 3GU
R5‑095804 GCF Priority 3 - Addition of new RRC test case 8.4.7.4 Qualcomm Europe imported from 3GU
R5‑095805 GCF Priority 3 - Addition of applicability for new LTE-C2k interworking test cases Qualcomm Europe imported from 3GU
R5‑095806 Update SDP speech offer for test case 12.13, annex C.11 and C.16 Ericsson, STEricsson imported from 3GU
R5‑095807 Update SDP speech offer for test cases 15.6 Ericsson, STEricsson imported from 3GU
R5‑095808 Update SDP speech offer for test cases 16.1, 16.2, 16.3 and 16.4 Ericsson, STEricsson imported from 3GU
R5‑095809 Update SDP speech offer for test cases 17.2 and 17.6 Ericsson, STEricsson imported from 3GU
R5‑095810 Correct gruu requirements in annex A Ericsson, STEricsson imported from 3GU
R5‑095811 Update test case 12.2 Ericsson, ST-Ericsson imported from 3GU
R5‑095812 Update test case 14.2 with XML correction Ericsson, STEricsson imported from 3GU
R5‑095813 Correct XML schema in 380 Alternative Service message Ericsson, STEricsson imported from 3GU
R5‑095814 Update test cases 16.11, 16.12 and 16.13 with multiple SDP check Ericsson, ST-Ericsson imported from 3GU
R5‑095815 Update test cases 17.2, 17.6 and 17.18 with multiple SDP check Ericsson, ST-Ericsson imported from 3GU
R5‑095816 Update IMS test case 8.1, 8.5, 8.6 and 8.7 with registration expire corrections Ericsson, STEricsson imported from 3GU
R5‑095817 Update IMS test case 8.1, 8.5, 8.6 and 8.7 with subscribe correction Ericsson, STEricsson imported from 3GU
R5‑095818 Update applicability for test cases 14.1 and 14.2 Ericsson, ST-Ericsson imported from 3GU
R5‑095819 Update table A.12 Ericsson, ST-Ericsson imported from 3GU
R5‑095820 Update applicability for test case 12.2 Ericsson, ST-Ericsson imported from 3GU
R5‑095821 Test Methodology for E-UTRAN FDD to Inter-RAT Cell Search Motorola imported from 3GU
R5‑095822 Addition of test scenario CR to 36.521-3: E-UTRAN FDD - UTRAN FDD Cell Search when DRX is used Motorola imported from 3GU
R5‑095823 Addition of test scenario CR to 36.521-3: E-UTRAN FDD - GSM Cell Search when DRX is used Motorola imported from 3GU
R5‑095824 Update to DC-HSDPA related sections 9.2 of TS 34.121-1 Qualcomm Europe imported from 3GU
R5‑095825 Update to Reporting CQI test cases for DC-HSDPA Qualcomm Europe imported from 3GU
R5‑095826 Updates to Applicability table corresponding to DC-HSDPA tests Qualcomm Europe imported from 3GU
R5‑095827 Updates to Annexure A to Annexure F. in 34.121-1 Qualcomm Europe imported from 3GU
R5‑095828 Clarification for Maximum Output Power with HS-DPCCH and E-DCH 5.2B Test case Qualcomm Europe imported from 3GU
R5‑095829 Updates to the Transmit power test cases in 36.521-1 Qualcomm Europe imported from 3GU
R5‑095830 Update to the test procedure of OBW and SEM test cases of 36.521-1 Qualcomm Europe imported from 3GU
R5‑095831 Update to the test procedure and message contents of TDD PMI reporting test cases Qualcomm Europe imported from 3GU
R5‑095832 Test description for CQI test cases under AWGN conditions QUALCOMM EUROPE, NEC, Rohde & Schwarz imported from 3GU
R5‑095833 Status report for WI Conformance Test Aspects of Receiver Type3i Qualcomm Europe imported from 3GU
R5‑095834 Work plan for Rel-8 work item for Receiver Type 3i - Status after RAN5#45 Qualcomm Europe imported from 3GU
R5‑095835 GCF Priority 2: Updates to first Iu mode to S1 mode intersystem change after attach: go to E-UTRAN RRC idle: RAU to UTRAN Vodafone imported from 3GU
R5‑095836 Test Methodology for E-UTRAN FDD Handover: Unknown Target Cell Motorola imported from 3GU
R5‑095837 Addition of test scenario CR to 36.521-3: E-UTRAN FDD - FDD inter frequency Handover test cases: Unknown Target Cell Motorola imported from 3GU
R5‑095838 Addition of test scenario CR to 36.521-3: E-UTRAN FDD - GSM Handover: Unknown Target Cell Motorola imported from 3GU
R5‑095839 Addition of test scenario CR to 36.521-3: E-UTRAN FDD - UTRAN FDD Handover: Unknown Target Cell Motorola imported from 3GU
R5‑095840 Addition of test scenario CR to 36.521-3: Cell Configuration Mapping for some RRM FDD tests Motorola imported from 3GU
R5‑095841 CR to 36.521-2: Applicability additions for new RRM (FDD) tests Motorola imported from 3GU
R5‑095842 Addition of a New Test Case for Enhanced UL in Cell_FACH - DTCH/DCCH transmission - explicit common E-DCH resource release by E-AGCH Qualcomm Europe S.A.R.L. imported from 3GU
R5‑095843 Addition of a New Test Case for HS-DSCH Serving Cell Change Enhancements: Unsynchronized Enhanced HS-DSCH Serving Cell Change Procedure Qualcomm Europe S.A.R.L. imported from 3GU
R5‑095844 Addition of a New Test Case for HS-DSCH Serving Cell Change Enhancements: Synchronized Enhanced HS-DSCH Serving Cell Change Procedure Qualcomm Europe S.A.R.L. imported from 3GU
R5‑095845 Adding applicability of the test cases for HS-DSCH Serving Cell Change Enhancements Qualcomm Europe S.A.R.L. imported from 3GU
R5‑095846 Work plan for Conformance Test Aspects - HS-DSCH Serving Cell Change Enhancements-Status after RAN5#45 Qualcomm Europe S.A.R.L. imported from 3GU
R5‑095847 Status report Conformance Test Aspects - HS-DSCH Serving Cell Change Enhancements Qualcomm Europe S.A.R.L. imported from 3GU
R5‑095848 Addition of a New Test Case for Support of HNB - Inter-frequency cell reselection from a non-CSG cell to an allowed CSG cell Qualcomm Europe S.A.R.L. imported from 3GU
R5‑095849 Adding applicability of the test case for Support of HNB - Inter-frequency cell reselection from a non-CSG cell to an allowed CSG cell Qualcomm Europe S.A.R.L. imported from 3GU
R5‑095850 Update to Dual-Cell HSDPA operation on adjacent carriers Work Item Description Qualcomm Europe S.A.R.L. imported from 3GU
R5‑095851 Work plan for Rel-8 work item for Dual-Cell HSDPA operation on adjacent carriers - Status after RAN5#45 Qualcomm Europe S.A.R.L. imported from 3GU
R5‑095852 Status report Conformance Test Aspects - Dual Cell HSDPA on adjacent carriers Qualcomm Europe S.A.R.L. imported from 3GU
R5‑095853 Correction of test case 6.1.2.13 Panasonic imported from 3GU
R5‑095854 List of test cases/scenarios proposal for LTE Protocol Testing in Multi-layer Procedures Panasonic imported from 3GU
R5‑095855 Discussion on latency check test case for Intra-LTE mobility procedure Panasonic, NTT DoCoMo, Nokia, Motorola imported from 3GU
R5‑095856 GCF Priority 1 - Update of PDCP test case 7.3.3.1 : Ciphering and Deciphering: Correct functionality of EPS AS encription algorithms (SNOW 3G) ZTE corporation imported from 3GU
R5‑095857 ETWS primary and secondary notification without security reception via S-CCPCH in idle mode, URA_PCH and CELL_PCH state NTT DOCOMO imported from 3GU
R5‑095858 GCF Priority 3 - Addition of test case 13.3.1.1 CMCC, Huawei, Motorola imported from 3GU
R5‑095859 GCF Priority 3 - Addition of test case 13.3.1.2 CMCC, Huawei, Motorola imported from 3GU
R5‑095860 GCF Priority 2 - Addition of test case 11.1.4 MO-SMS over SGs in active mode CMCC imported from 3GU
R5‑095861 Work plan for WI Extended UMTS/LTE 1500 - UE conformance test NTT DOCOMO imported from 3GU
R5‑095862 Status report for WI Extended UMTS/LTE 1500 - UE conformance test NTT DOCOMO imported from 3GU
R5‑095863 CR to 36.521-1: Update to UE max output power test case NTT DOCOMO imported from 3GU
R5‑095864 CR to 36.521-1: Update to A-MPR test case NTT DOCOMO, Spirent Communications imported from 3GU
R5‑095865 CR to 36.521-1: Update to ACLR test case NTT DOCOMO imported from 3GU
R5‑095866 CR to 36.521-1: Update to Spurious Emissions test cases NTT DOCOMO imported from 3GU
R5‑095867 CR to 36.521-1: Update to Additional Spurious Emissions test case NTT DOCOMO imported from 3GU
R5‑095868 CR to 36.521-3: Update to FDD Intra-frequency RRC Re-establishment test case NTT DOCOMO imported from 3GU
R5‑095869 CR to 36.521-3: Update to FDD Inter-frequency RRC Re-establishment test case NTT DOCOMO imported from 3GU
R5‑095870 CR to 34.121-1: Update to UTRA FDD - E-UTRA FDD cell search (fading) test case NTT DOCOMO imported from 3GU
R5‑095871 CR to 34.121-1: Update to UTRA FDD - E-UTRA FDD HO test case NTT DOCOMO imported from 3GU
R5‑095872 CR to 34.121-1: Addtion of UTRA FDD - E-UTRA FDD HO test: unknown target cell NTT DOCOMO imported from 3GU
R5‑095873 E-UTRAN - HRPD Inter-RAT Test Model Anritsu Ltd, Rohde & Schwarz imported from 3GU
R5‑095874 Addition of Applicability for new ETWS test case NTT DOCOMO imported from 3GU
R5‑095875 Update to the list of test cases for UMTS ETWS (Earthquake and Tsunami Warning Systems) (FDD) NTT DOCOMO imported from 3GU
R5‑095876 CDMA2000 specification baseline for E-UTRAN - CDMA2000 InterRAT testcases Anritsu Ltd. imported from 3GU
R5‑095877 GCF Priority 3 - Various corrections to EMM section of 36.523-1 NTT DOCOMO imported from 3GU
R5‑095878 GCF Priority 3 - Addition of test case 9.2.1.2.11 NTT DOCOMO imported from 3GU
R5‑095879 Further Discussion on Interference reduction for LTE Signaling test cases with multiple cells for TDD Nokia imported from 3GU
R5‑095880 LTE-RF CR to 36.521-1:Update the MPR test case ZTE corporation imported from 3GU
R5‑095881 LTE-RF CR to 36.521-1:Update the chapter 6.5.2.2 IQ original offset test ZTE corporation imported from 3GU
R5‑095882 Introduction of MIMO in Typical radio parameter sets for 1.28Mcps TDD ZTE corporation imported from 3GU
R5‑095883 GCF Priority 1 - Correction of TC 8.5.4.1 UE capability transfer / Success NEC imported from 3GU
R5‑095884 GCF Priority 1 - Correction of TC 9.2.1.1.1 Attach Procedure / Success (valid GUTI) NEC imported from 3GU
R5‑095885 GCF Priority x - Proposed removal of TC 9.3.1.2 Service Request initiated by UE for uplink signalling NEC imported from 3GU
R5‑095886 GCF Priority 2 - Proposed removal of TC 9.2.1.1.5 Attach Procedure / Success / ATTACH ACCEPT message includes the PDN address assigned to the UE NEC imported from 3GU
R5‑095887 GCF Priority 4 - New test case 9.2.1.1.6 Attach Procedure / Success / Shared network NEC imported from 3GU
R5‑095888 GCF Priority 2 - Correction of test cases 9.2.1.1.9, 9.2.1.1.10, 9.2.1.1.11 Attach / rejected / IMSI invalid / Illegal UE / EPS and non-EPS services not allowed NEC imported from 3GU
R5‑095889 GCF Priority 2 - Correction of TC 9.2.1.1.13 Attach / rejected / PLMN not allowed NEC imported from 3GU
R5‑095890 GCF Priority 2 - Correction of TC 9.2.1.1.14 Attach / rejected / tracking area not allowed NEC imported from 3GU
R5‑095891 GCF Priority 2 - Correction of TC 9.2.1.1.15 Attach / rejected / roaming not allowed in this tracking area NEC imported from 3GU
R5‑095892 GCF Priority 3 - New TC 9.2.1.1.16 Attach / rejected / EPS services not allowed in this PLMN NEC imported from 3GU
R5‑095893 GCF Priority 2 - Correction of TC 9.2.1.1.17 Attach / rejected / no suitable cells in tracking area NEC imported from 3GU
R5‑095894 GCF Priority 3 - Correction of TC 9.2.1.1.19 Attach / Abnormal case / Failure due to non integrity protection NEC imported from 3GU
R5‑095895 GCF Priority 3 - Correction of TC 9.2.1.2.2 Combined attach procedure / Success / EPS services only / IMSI unknown in HSS NEC imported from 3GU
R5‑095896 GCF Priority 3 - Correction of TC 9.2.1.2.3 Combined attach procedure / Success / EPS services only / MSC temporarily not reachable NEC imported from 3GU
R5‑095897 GCF Priority 2 - Correction of TC 9.2.1.2.4 Combined attach procedure / Success / EPS services only / MSC temporarily not reachable NEC imported from 3GU
R5‑095898 GCF Priority 2 - Correction of TC 9.2.3.2.1 Combined tracking area update / successful NEC imported from 3GU
R5‑095899 GCF Priority 4 - New TC 9.2.3.2.2 Combined tracking area update / successful for EPS services only / IMSI unknown in HSS NEC imported from 3GU
R5‑095900 GCF Priority 2 - Correction of TC 9.2.3.3.1 First Iu mode to S1 mode intersystem change after attach: go to E-UTRAN RRC idle: RAU to UTRAN NEC imported from 3GU
R5‑095901 GCF Priority 2 - Correction of TC 9.2.3.3.6 E-UTRAN RRC connection failure / reselection of UTRAN cell / NAS signaling to release old S1 interface connection NEC imported from 3GU
R5‑095902 GCF Priority 2 - Correction of TC 10.2.1 Dedicated EPS bearer context activation / Success NEC imported from 3GU
R5‑095903 GCF Priority 2 - Correction of TC 10.3.1 EPS bearer context modification / Success NEC imported from 3GU
R5‑095904 GCF Priority 2 - Correction of TC 10.4.1 EPS bearer context deactivation / Success NEC imported from 3GU
R5‑095905 GCF Priority 2 - Update of Idle Mode Operations test case 6.1.2.5 Cell reselection for inter-band operation ZTE corporation imported from 3GU
R5‑095906 GCF Priority 2 - Correction of TC 10.5.1 UE requested PDN connectivity procedure accepted by the network NEC imported from 3GU
R5‑095907 GCF Priority 2 - Update of RRC test case 8.3.2.7 : Measurement configuration control and reporting / inter-RAT measurements: event B2 (measurement HRPD cells) ZTE corporation imported from 3GU
R5‑095908 GCF Priority 2 - Correction of TC 10.6.1 UE requested PDN disconnect procedure accepted by the network NEC imported from 3GU
R5‑095909 GCF priority 2 - Correction of TC 10.6.1 UE requested PDN disconnect procedure accepted by the network NEC -
R5‑095910 GCF priority 2 - Correction of TC 10.6.1 UE requested PDN disconnect procedure accepted by the network NEC -
R5‑095911 GCF Priority 2 - Update of Idle Mode Operations test case 6.6.2.3.7 ZTE corporation imported from 3GU
R5‑095912 GCF Priority 2 - Update of Idle Mode Operations test case 6.6.2.3.7 ZTE corporation -
R5‑095913 work plan for WI UE conformance test aspects - MIMO in LCR TDD-Status after RAN5#45 ZTE corporation imported from 3GU
R5‑095914 work plan for WI UE conformance test aspects - 1.28Mcps TDD Continuous Connectivity for packet data users-Status after RAN5#45 ZTE corporation imported from 3GU
R5‑095915 Status report for WI UE conformance test aspects - MIMO in LCR TDD ZTE corporation imported from 3GU
R5‑095916 Work plan for WI UE conformance test aspects - 1.28Mcps TDD Continuous Connectivity for packet data users ZTE corporation imported from 3GU
R5‑095917 Update: Radio Link Monitoring test cases: no DRX Ericsson, ST-Ericsson imported from 3GU
R5‑095918 Addition of Connection Diagrams for DC-HSDPA receiver tests Nokia imported from 3GU
R5‑095919 Addition of AWGN definition for DC-HSDPA tests Nokia imported from 3GU
R5‑095920 Addition of DC-HSDPA receiver test cases to annex F Nokia imported from 3GU
R5‑095921 Adding test tolerances and connection diagram references into DC-HSDPA receiver tests Nokia imported from 3GU
R5‑095922 Addition of new generic procedure for TAU after inter-RAT HO from UTRA NTT DOCOMO imported from 3GU
R5‑095923 RRM:Update of test case 8.3.1 FDD inter-frequency event triggered reporting Ericsson, ST-Ericsson imported from 3GU
R5‑095924 Work Plan for Conformance Test Aspects - UMTS 3500 - Status after RAN5#45 Nokia imported from 3GU
R5‑095925 RRM:Update of test case 8.4.1 TDD inter-frequency event triggered reporting Ericsson, ST-Ericsson imported from 3GU
R5‑095926 Update to the EMM test case titles to align with the latest work plan Nokia imported from 3GU
R5‑095927 Status report for WI Conformance Test Aspects of UMTS 3500 Nokia imported from 3GU
R5‑095928 LS on outcome of AWGN and signal flatness UE demodulation simulations TSG WG RAN4 imported from 3GU
R5‑095929 LTE-RF: CR for Additional Maximum Power Reduction ZTE corporation imported from 3GU
R5‑095930 Addition of DC-HSDPA receiver tests into TS 34.121-2 Nokia imported from 3GU
R5‑095931 GCF Priority 2 - Update to test case 8.4.2.2 NTT DOCOMO imported from 3GU
R5‑095932 GCF Priority 2 - Update to test case 8.4.2.4 NTT DOCOMO imported from 3GU
R5‑095933 Addition of applicability of MBSFN RRC test cases Huawei imported from 3GU
R5‑095934 Work plan for MBSFN for FDD (MBMSE-UEConTest_RANPhysFDD) after RAN5#45 Huawei imported from 3GU
R5‑095935 Status report for WI MBSFN for FDD after RAN5#45 Huawei imported from 3GU
R5‑095936 GCF Priority 3 - Addition of test case 9.2.1.2.13 NTT DOCOMO imported from 3GU
R5‑095937 GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.4.6 Anite imported from 3GU
R5‑095938 GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.4.6 Anite -
R5‑095939 Correction to 34.123-2 Annex C Panasonic imported from 3GU
R5‑095940 GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.4.7 Anite imported from 3GU
R5‑095941 GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.2.9 Anite imported from 3GU
R5‑095942 GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.2.9 Anite -
R5‑095943 GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.2.9 Anite -
R5‑095944 GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.3.6 Anite imported from 3GU
R5‑095945 Update 5.5.1.4 for MBSFN TC Reference test conditions Huawei imported from 3GU
R5‑095946 GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.4.13 Anite imported from 3GU
R5‑095947 Correction to Default Radio Bearer Conditions for Improved L2 UL RLC AM test cases Nokia imported from 3GU
R5‑095948 Update of MAC configuration for disabling PHR and BSR for L2 test cases Anite imported from 3GU
R5‑095949 Disabling PHR and periodic BSR for L2 test cases in 36.523-1 Anite imported from 3GU
R5‑095950 GCF Priority 2: Correction to the MAC DRX test cases preamble RIM imported from 3GU
R5‑095951 Tx power range and core update for Receiver tests Ericsson, ST-Ericsson imported from 3GU
R5‑095952 Update of tests 9.6.1 and 9.6.2 (HS-DSCH and HS-SCCH in CELL_FACH state) Ericsson, ST-Ericsson imported from 3GU
R5‑095953 GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.4.10 Anite imported from 3GU
R5‑095954 New RF procedure for Dual Cell HSDPA Ericsson, ST-Ericsson imported from 3GU
R5‑095955 Addition Conformance requirement in test case 7.1.5a.6 for LCR TDD CATT imported from 3GU
R5‑095956 Addition contents of LCR TDD in MAC-ehs test cases CATT imported from 3GU
R5‑095957 Inclusion of common HS-DSCH and E-DCH info in SIB5 to be used by new enhanced CELL_FACH test cases for LCR TDD CATT imported from 3GU
R5‑095958 Addition Reference Radio Bearer configurations used in MAC-ehs and MAC-i/is testing for LCR TDD CATT imported from 3GU
R5‑095959 GCF Priority 1 and Priority 2- EMM Successful Attach consistent description Samsung imported from 3GU
R5‑095960 Summary of the CRs for LCR TDD in RAN5#45 Signaling Group CATT imported from 3GU
R5‑095961 Work Plan for Conformance test aspects - Enhanced CELL_FACH CATT imported from 3GU
R5‑095962 Handling of IP address allocation/configuration in U-plane Samsung, NEC imported from 3GU
R5‑095963 GCF Priority 2 - Update of TC 9-1-2-5 for IP handling over U-plane Samsung imported from 3GU
R5‑095964 GCF Priority 2 - Addition of new test case 8.4.3.2 CATR imported from 3GU
R5‑095965 Status Report for WI UE conformance test aspect - Enhanced CELL_FACH CATT imported from 3GU
R5‑095966 Work Plan for Conformance test aspects - 1.28Mcps TDD Improved L2 support for high data rates CATT imported from 3GU
R5‑095967 Addition of generic procedure for IP address allocation / configuration in U-plane Samsung, NEC, Vodafone imported from 3GU
R5‑095968 Status Report for WI UE conformance test aspect - 1.28Mcps TDD Improved L2 support for high data rates CATT imported from 3GU
R5‑095969 LTE-RF: Update to section 6.3.4 AT4 wireless -
R5‑095970 LTE-RF: Update to section 6.3.4 AT4 wireless imported from 3GU
R5‑095971 LTE-RF: Update to Annex E Cell Configuration Mapping AT4 wireless imported from 3GU
R5‑095972 GCF Priority 1 - Update of TC 9-1-2-1 for IP handling over U-plane Samsung imported from 3GU
R5‑095973 LTE-RF: Applicability of RRM inter-frequency test cases to frequency bands AT4 wireless -
R5‑095974 LTE-RF: Applicability of RRM inter-frequency test cases to frequency bands AT4 wireless -
R5‑095975 GCF Priority 2 - Update of TC 9-1-2-3 for IP handling over U-plane Samsung imported from 3GU
R5‑095976 GCF Priority 2 - Update of TC 9-3-1-7 for IP handling over U-plane Samsung imported from 3GU
R5‑095977 GCF Priority 4 - Correction to RRC test case 8.5.1.4 Nokia imported from 3GU
R5‑095978 LTE-RF: Applicability of RRM inter-frequency test cases to frequency bands AT4 wireless imported from 3GU
R5‑095979 GCF Priority 2 - Update of TC 9-1-2-4 for IP handling over U-plane Samsung imported from 3GU
R5‑095980 GCF Priority 2 - Test Case 9.1.4.2 Clause title formatting error Samsung imported from 3GU
R5‑095981 List of test cases/scenarios proposal for 3G LTE Terminal Protocol Conformance Test Specifications - RRC part 3 (Measurement Configuration Control and Reporting) Nokia imported from 3GU
R5‑095982 LTE-Sig: Assignment of different rootSequenceIndex for cells at the same frequency AT4 wireless -
R5‑095983 GCF Priority 2 - Applicabilityfor new RRC test case 8.4.3.2 CATR imported from 3GU
R5‑095984 LTE-Sig: Assignment of different rootSequenceIndex for cells at the same frequency AT4 wireless -
R5‑095985 LTE-Sig: Assignment of different rootSequenceIndex for cells at the same frequency AT4 wireless imported from 3GU
R5‑095986 Correction to GCF WI 10 MRAT testcase 8.4.1.33 Anite imported from 3GU
R5‑095987 Correction to GCF WI 10 MRAT testcase 8.4.1.33 Anite -
R5‑095988 Addition of new test case 6.2.2.2a for 1.28M TDD CMCC,CATT -
R5‑095989 Wrong reference in TC applicability condition C01 Samsung imported from 3GU
R5‑095990 RAN5 LTE SIG P1 and P2 TCs not ready for TTCN after RAN5#44 Samsung imported from 3GU
R5‑095991 Removal of GPRS P-channels from GERAN test model and ASPs Ericsson, ST-Ericsson, MCC TF160 imported from 3GU
R5‑095992 RAN5 LTE RF-RRM P1 and P2 TCs with status not completed after RAN5#44 Samsung imported from 3GU
R5‑095993 Addition of new test case 6.2.2.3a for 1.28M TDD CMCC,CATT imported from 3GU
R5‑095994 Correction to GCF WI 14 HSDPA testcase 8.2.2.42 Anite imported from 3GU
R5‑095995 Correction to WI 12, RRC testcases 8.2.6.39 and 8.2.6.44 Anite imported from 3GU
R5‑095996 Addition of new test case 6.2.2.2a for 1.28M TDD CMCC,CATT imported from 3GU
R5‑095997 GCF Priority 2 - Correction to RRC test case 8.5.1.1 Nokia imported from 3GU
R5‑095998 GCF Priority 2 - Correction to RRC test case 8.5.1.3 Nokia imported from 3GU
R5‑095999 LTE-C2K Interworking Tests: Proposed Cooperation between 3GPP and 3GPP2 Qualcomm Europe imported from 3GU
R5‑096000 Joint 3GPP-3GPP2 test case template for LTE-C2k interworking Qualcomm Europe imported from 3GU
R5‑096001 GCF Priority 3: Addition of new test case 9.2.1.1.21: Attach / Abnormal case / success after several attempts due to no network response Motorola imported from 3GU
R5‑096002 Proposed modifications to the LTE-C2k interworking test list Qualcomm Europe imported from 3GU
R5‑096003 GCF Priority 3: Addition of new test case 9.2.1.1.22: : Attach / Abnormal case / unssuccesful attach after 5 attempts Motorola imported from 3GU
R5‑096004 Corrections to CPC testcase 8.1.2.19 Rohde & Schwarz imported from 3GU
R5‑096005 Clarification for Cell Configuration Identifiers in 36.508 Anritsu Ltd. imported from 3GU
R5‑096006 GCF Priority 3: Addition of new test case 9.2.1.1.24: Attach / Abnormal case / Change of cell into a new tracking area Motorola imported from 3GU
R5‑096007 Corrections to CPC testcase in section 8.2..1 & 8.2.2 Rohde & Schwarz imported from 3GU
R5‑096008 GCF Priority 3: Addition of new test case 9.2.1.1.24: Attach / Abnormal case / Change of cell into a new tracking area Motorola imported from 3GU
R5‑096009 GCF Priority 1 - Correction to E-UTRAN MAC test case 7.2.3.5 Anite imported from 3GU
R5‑096010 Corrections to CPC testcase in section 8.2.6 Rohde & Schwarz imported from 3GU
R5‑096011 GCF Priority 3: Addition of new test case 9.2.1.1.26: Attach / Abnormal case / Detach procedure collision Motorola imported from 3GU
R5‑096012 Corrections to CPC testcase in section 8.3.1 & 8.3.4 Rohde & Schwarz imported from 3GU
R5‑096013 Corrections to 64QAM testcase 8.2.6.62 Rohde & Schwarz imported from 3GU
R5‑096014 Corrections to UL 16QAM testcase 8.2.6.64 Rohde & Schwarz imported from 3GU
R5‑096015 Correction of Minimum Cell Configuration for GCF P2, P3 and P4 test cases 8.1.3.5, 8.3.1.3, 8.3.1.4, 8.3.1.5, 8.3.1.6, 8.3.1.7 and 8.3.1.10 Anritsu Ltd. imported from 3GU
R5‑096016 GCF Priority 3: Addition of new test case 9.2.1.1.27 Motorola imported from 3GU
R5‑096017 Corrections to UL 16QAM testcase 8.3.4.12 Rohde & Schwarz imported from 3GU
R5‑096018 Corrections to 64QAM testcase 8.3.4.13 Rohde & Schwarz imported from 3GU
R5‑096019 GCF Priority 2: Addition of new test case 9.3.2.3:Paging for EPS services using IMSI Motorola imported from 3GU
R5‑096020 Correction to GCF P2 Testcases 8.3.2.1, 8.3.2.7 Anritsu Ltd. -
R5‑096021 GCF Priority 2 - Correction test cases 8.3.2.1, 8.3.2.7 Anritsu Ltd. imported from 3GU
R5‑096022 GCF Priority 2 and 3: Applicability statements for new EMM Tests. Motorola imported from 3GU
R5‑096023 GCF Priority 1 - Correction to E-UTRA DRB test case 12.2 Ericsson, ST-Ericsson imported from 3GU
R5‑096024 GCF Priority 1: Cell number allignment in Test case 9.1.3.1 Motorola and MCC160 imported from 3GU
R5‑096025 GCF Priority 2 & 3 - Correction to test cases 9.2.1.1.9 and 9.2.1.1.12 Anritsu Ltd. imported from 3GU
R5‑096026 GCF Priority 3 - Correction to E-UTRA DRB test case 12.3 Ericsson, ST-Ericsson imported from 3GU
R5‑096027 GCF Priority 2 - Cell number allignment in Test case 9.1.3.2 Motorola and MCC160 imported from 3GU
R5‑096028 GCF Priority 1 - Update of applicabilty entry for DRB test case 12.3 Ericsson, ST-Ericsson imported from 3GU
R5‑096029 GCF Priority 2 - Cell number allignment in Test case 9.4.1 Motorola and MCC160 imported from 3GU
R5‑096030 GCF Priority 3 - Applicabilty of new E-UTRA DRB test case 12.3 Ericsson, ST-Ericsson imported from 3GU
R5‑096031 GCF Priority 2: Cell number allignment in Test case 9.4.3 Motorola and MCC160 imported from 3GU
R5‑096032 Corrections to DL 64QAM and UL 16QAM RRC testcase applicabilities Rohde & Schwarz imported from 3GU
R5‑096033 GCF Priority 2: Correction to Test case 7.1.3.2 Motorola and MCC160 imported from 3GU
R5‑096034 GCF Priority 2: Correction to Test case 7.1.4.2 Motorola and MCC160 imported from 3GU
R5‑096035 LTE-RF: CR to Tranmission signal quality Agilent Technologies imported from 3GU
R5‑096036 GCF Priority 2: Correction to Test case 7.1.4.14 Motorola and MCC160 imported from 3GU
R5‑096037 Active set update in soft handover: Radio Link addition/removal and serving HS-DSCH / E-DCH cell change, with activation/deactivation of MIMO Nokia imported from 3GU
R5‑096038 Applicability of Rel-7 MIMO test case Nokia imported from 3GU
R5‑096039 GCF Priority 1: Correction to Test case 7.1.7.1.1 Motorola, Ericsson, ST-Ericsson and MCC 160 -
R5‑096040 GCF Priority 1: Correction to Test case 7.1.7.1.1 Motorola, Ericsson, ST-Ericsson and MCC160 imported from 3GU
R5‑096041 GCF Priority 1: Correction to Test case 7.1.7.1.2 Motorola, Ericsson, ST-Ericsson and MCC160 imported from 3GU
R5‑096042 GCF Priority 1: Correction to Test case 7.1.7.1.3 Motorola, Ericsson, ST-Ericsson and MCC 160 -
R5‑096043 GCF Priority 1: Correction to Test case 7.1.7.1.3 Motorola, Ericsson, ST-Ericsson and MCC160 imported from 3GU
R5‑096044 GCF Priority 1: Correction to Test case 7.1.7.1.4 Motorola, Ericsson, ST-Ericsson and MCC 160 -
R5‑096045 GCF Priority 1: Correction to Test case 7.1.7.1.4 Motorola, Ericsson, ST-Ericsson and MCC 160 -
R5‑096046 GCF Priority 1: Correction to Test case 7.1.7.1.4 Motorola, Ericsson, ST-Ericsson and MCC 160 -
R5‑096047 GCF Priority 1: Correction to Test case 7.1.7.1.4 Motorola, Ericsson, ST-Ericsson and MCC160 imported from 3GU
R5‑096048 GCF Priority 1: Correction to Test case 7.1.7.2.1 Motorola, Ericsson, ST-Ericsson and MCC160 imported from 3GU
R5‑096049 Editorial correction in clause 8.1.2.1 Motorola and MCC160 imported from 3GU
R5‑096050 Correction to 9.2.3D for supported UE categories Anritsu Ltd. imported from 3GU
R5‑096051 Introduction of Type 3i test case uncertainties and Test Tolerances Anritsu Ltd. imported from 3GU
R5‑096052 Correction of RADIO BEARER SETUP for 5.2B Anritsu Ltd. imported from 3GU
R5‑096053 Update of 6.6.1 OBW Anritsu Ltd. imported from 3GU
R5‑096054 Correction to SEM Anritsu Ltd. imported from 3GU
R5‑096055 Update of 6.7 Transmit intermodulation Anritsu Ltd. imported from 3GU
R5‑096056 Corrections to GCF priority GMM test cases for T3340 timer expiry at UE Motorola and MCC160 -
R5‑096057 Corrections to GCF priority GMM test cases for T3340 timer expiry at UE Motorola and MCC160 imported from 3GU
R5‑096058 Removal of [ ] from 7.6.1, 7.8.1, and 7.5 of Annex F3.3 Anritsu Ltd. imported from 3GU
R5‑096059 Update on 7.4, 7.5, and 7.8.1 Anritsu Ltd. imported from 3GU
R5‑096060 Introduction of uncertainties for RRM test cases 4.2.1 and 4.2.2 Anritsu Ltd. imported from 3GU
R5‑096061 CR on 36.521-1, 'Introduction of clause 8.2.1.1 test case uncertainties and Test Tolerances' Anritsu Ltd. imported from 3GU
R5‑096062 Clarification on encoding of DRB Identity in LB setup DRB IE Motorola and MCC160 imported from 3GU
R5‑096063 Results collation of AWGN and signal flatness UE demodulation impact Anritsu Ltd. imported from 3GU
R5‑096064 GCF Priority 1 - Corrections to MAC test case applicability Motorola and MCC160 imported from 3GU
R5‑096065 GCF Priority 2 - Update of RRC part TC 8.5.1.1 RRC Connection Re-establishment: Success (after Radio Link Failure) CETECOM GmbH imported from 3GU
R5‑096066 Corrections to RRC testcase 8.2.6.39 & 8.2.6.44 Rohde & Schwarz imported from 3GU
R5‑096067 GCF Priority 3 - Update of RRC part TC 8.5.1.2 RRC Connection Re-establishment: Success (after Radio Link Failure) CETECOM GmbH imported from 3GU
R5‑096068 Modifying applicability to the Rel. 7 test cases – Chapter 8 Qualcomm Europe S.A.R.L. -
R5‑096069 Modifying applicability to the Rel. 7 test cases - Chapter 8 Qualcomm Europe S.A.R.L. imported from 3GU
R5‑096070 Modifying applicability to the Rel. 7 test cases - Chapter 14 Qualcomm Europe S.A.R.L. imported from 3GU
R5‑096071 Accelerate 3GPP/3GPP2 Cooperation Alcatel-Lucent -
R5‑096072 Accelerate 3GPP/3GPP2 Cooperation Alcatel-Lucent imported from 3GU
R5‑096073 Correction of TFTs for reference dedicated EPS bearer contexts NEC imported from 3GU
R5‑096074 LAI and TMSI in ATTACH ACCEPT and TAU ACCEPT messages NEC imported from 3GU
R5‑096075 Work plan for 3G Long-Term Evolution Terminal Protocol Conformance Test Specifications - Status after RAN5#45 NEC, Motorola imported from 3GU
R5‑096076 Status report for 3G Long-Term Evolution Terminal Protocol Conformance Test Specifications NEC, Motorola imported from 3GU
R5‑096077 Proposed correction for security of TC messages NEC imported from 3GU
R5‑096078 Proposed correction for deactivation of UE test mode NEC imported from 3GU
R5‑096079 Applicability of EMM test cases NEC imported from 3GU
R5‑096080 Work plan for 3G Long-Term Evolution Terminal Protocol Conformance Test Specifications - Status after RAN5#44 NEC, Motorola imported from 3GU
R5‑096081 GCF Priority 4 - Addition of new EMM test case 9.2.1.1.3 Qualcomm Europe imported from 3GU
R5‑096082 GCF Priority 4 - Addition of applicability for new EMM test case Qualcomm Europe imported from 3GU
R5‑096083 GCF Priority 4 - Addition of new RRC test case 8.3.2.10 Qualcomm Europe imported from 3GU
R5‑096084 GCF Priority 4 - Addition of applicability for new LTE-C2k interworking test case Qualcomm Europe imported from 3GU
R5‑096085 Correction to section title 7.1.8 applicable to Enh UL in CELL_FACH MAC test cases Nokia imported from 3GU
R5‑096086 LTE RF: Applicability of 6.2.4 A-MPR Nokia imported from 3GU
R5‑096087 Test Configurations in A-SEM and A-Spurious Emissions to include the impact of allowed power reductions Nokia imported from 3GU
R5‑096088 LTE RF: A-SEM update and A-MPR verification Nokia imported from 3GU
R5‑096089 LTE RF: Additional Spurious Emissions update and A-MPR verification Nokia imported from 3GU
R5‑096090 LTE RF: Blocking Characteristics update Nokia imported from 3GU
R5‑096091 LTE RF: Spurious Response Update Nokia imported from 3GU
R5‑096092 LTE RF: Spurious Emissions update Nokia imported from 3GU
R5‑096093 Update TDD PDSCH test cases CATT imported from 3GU
R5‑096094 Adding Demodulation test case for LCR TDD 64QAM CATT imported from 3GU
R5‑096095 Adding CQI test for LCR TDD 64QAM CATT imported from 3GU
R5‑096096 Update on 8.2.1 Anritsu Ltd. imported from 3GU
R5‑096097 Correction to Default message contents NTT DOCOMO imported from 3GU
R5‑096098 LS on LTE DL Sustained Data Rate Test for Release 9 TSG WG RAN2 imported from 3GU
R5‑096099 Correction of TBS test points tables used in Rel-7 MIMO radio bearer test cases Ericsson, ST-Ericsson imported from 3GU
R5‑096100 Correction to Rel-7 MIMO radio bearer test cases Ericsson, ST-Ericsson imported from 3GU
R5‑096101 Correction of TBS test points tables used in Rel-8 radio bearer test cases for combination of 64QAM and MIMO Ericsson, ST-Ericsson imported from 3GU
R5‑096102 Correction to GCF WI-12 test case 16.3 Anritsu Ltd. imported from 3GU
R5‑096103 Testcase names and numbering correction to 34.123-2 in for LCR TDD CATT imported from 3GU
R5‑096104 Receiver Demodulation Throughput Simulations for Minimum Test Time Nokia imported from 3GU
R5‑096105 LTE RF: Symbols Update on Configured UE Transmitted Power Nokia imported from 3GU
R5‑096106 Combined UTRA TDD - UTRA TDD and E-UTRA FDD cell search in fading CATT imported from 3GU
R5‑096107 Combined UTRA TDD - UTRA TDD and E-UTRA TDD cell search in fading CATT imported from 3GU
R5‑096108 UTRA TDD - E-UTRA FDD HO test_unknown target cell CATT imported from 3GU
R5‑096109 UTRA TDD - E-UTRA TDD HO test_unknown target cell CATT imported from 3GU
R5‑096110 ASP updates in Annex D MCC TF160 imported from 3GU
R5‑096111 LTE-HRPD test model MCC TF160 imported from 3GU
R5‑096112 RAN5 LTE SIG P1 and P2 TCs not ready for TTCN after RAN5#44 Samsung -
R5‑096113 Correction for IP address allocation NEC, Samsung -
R5‑096114 Correction to the generic procedure for IP allocation and more NTT DOCOMO, Samsung -
R5‑096115 Addition of new generic procedure for TAU after inter-RAT HO from UTRA NTT DOCOMO -
R5‑096116 GCF Priority 3 - Update to test case 9.3.1.4 NTT DOCOMO -
R5‑096117 GCF Priority 3 - Addition of new test case 9.3.1.17 NTT DOCOMO -
R5‑096118 Applicability for section 6.1 Idle Mode test cases NTT DOCOMO NTT DOCOMO -
R5‑096119 Applicability for section 8.4 RRC Inter-RAT test cases NTT DOCOMO NTT DOCOMO -
R5‑096120 GCF Priority 3 - Addition of new EMM test case 9.2.1.1.18 CATR -
R5‑096121 GCF Priority 3 - Addition of EMM test case 9.2.1.2.12 CATR -
R5‑096122 GCF Priority 3 - Addition of EMM test case 9.2.2.2.14 CATR -
R5‑096123 GCF Priority 3 - Addition of EMM test case 9.2.3.1.26 CATR -
R5‑096124 GCF Priority 3 - Addition of EMM test case 9.3.1.15 CATR -
R5‑096125 GCF Priority 2 - Addition of new test case 8.4.3.2 CATR -
R5‑096126 Update of generic radio bearer test procedure (14.1.3.5a) for Dual-Cell radio bearer testing. Ericsson, ST-Ericsson -
R5‑096127 New radio bearar test case 14.6.1f for Dual-Cell Ericsson, ST-Ericsson -
R5‑096128 New radio bearar test case 14.6.1g for Dual-Cell Ericsson, ST-Ericsson -
R5‑096129 New radio bearar test case 14.6.6f for Dual-Cell Ericsson, ST-Ericsson -
R5‑096130 Applicability of new radio bearar test cases 14.6.1f, 14.6.1g, 14.6.6e and 14.6.6f for Dual Cell Ericsson, ST-Ericsson -
R5‑096131 Correction of radio bearar test case 14.6.1e for combination 64QAM and MIMO. Ericsson, ST-Ericsson -
R5‑096132 Correction of radio bearar test case 14.6.6d for combination 64QAM and MIMO Ericsson, ST-Ericsson -
R5‑096133 GCF Priority 1 - Correction to E-UTRA DRB test case 12.2 Ericsson, ST-Ericsson -
R5‑096134 GCF Priority 3 - Correction to E-UTRA DRB test case 12.3 Ericsson, ST-Ericsson -
R5‑096135 GCF Priority 1 - Update of applicabilty entry for DRB test case 12.3 Ericsson, ST-Ericsson -
R5‑096136 GCF Priority 3 - Applicabilty of new E-UTRA DRB test case 12.3 Ericsson, ST-Ericsson -
R5‑096137 Update of DRB test cases in LTE SIG work plan Ericsson, ST-Ericsson -
R5‑096138 Discussion on latency check test case for Intra-LTE mobility procedure Panasonic, NTT DoCoMo, Nokia, Motorola, Anritsu -
R5‑096139 GCF Priority 2 - Addition of test case 11.1.4 MO-SMS over SGs in active mode CMCC -
R5‑096140 Addition of new test case 6.2.2.3a for 1.28M TDD CMCC,CATT -
R5‑096141 Addition of new test case 6.2.2.2a for 1.28M TDD CMCC,CATT -
R5‑096142 GCF Priority 1 - Update of PDCP test case 7.3.3.1 : Ciphering and Deciphering: Correct functionality of EPS AS encription algorithms (SNOW 3G) ZTE corporation -
R5‑096143 Correction CR to 36.521-1: Update for Demodulation of PDSCH (FDD) tests to correct CR merges results from RAN5#44 Motorola -
R5‑096144 Correction CR to 36.521-3: E-UTRAN FDD - FDD Handover intra frequency and inter frequency case Motorola -
R5‑096145 Correction CR to 36.521-3: E-UTRAN FDD - FDD Inter Frequency Absolute RSRP Accuracy case Motorola -
R5‑096146 Addition of test scenario CR to 36.521-3: E-UTRAN FDD - UTRAN FDD Cell Search when DRX is used Motorola -
R5‑096147 Addition of test scenario CR to 36.521-3: E-UTRAN FDD - GSM Cell Search when DRX is used Motorola -
R5‑096148 New radio bearar test case 14.6.6e for Dual-Cell Ericsson, ST-Ericsson -
R5‑096149 GCF Priority 2 - update test case 8.5.1.3 Panasonic -
R5‑096150 Correction to condition A27 for Improved L2 UL Testing and generic table formatting Nokia -
R5‑096151 Correction to Improved L2 UL Test cases 7.1.7.1 and 7.1.7.4 Nokia -
R5‑096152 Correction to Improved L2 UL test case 7.2.3.38 Nokia -
R5‑096153 Correction to Default Radio Bearer Conditions for Improved L2 UL RLC AM test cases Nokia -
R5‑096154 New test case: Radio Bearer Reconfiguration from CELL_DCH to CELL_DCH: Success (simultaneous activation and deactivation of 64QAM and MIMO) Nokia -
R5‑096155 DC deactivation by HS-DSCH - serving cell change from DC-HSDPA capable cell to non DC-HSDPA capable cell Nokia -
R5‑096156 GCF Priority 2 - Update of RLC test case 7.2.3.13 Qualcomm Europe -
R5‑096157 GCF Priority 1 - Update of RLC test case 7.2.3.9 Qualcomm Europe, Anite -
R5‑096158 Correction to GCF WI-12 test case 16.3 Anritsu Ltd. -
R5‑096159 GCF Priority 2 & 3 - Correction to test cases 9.2.1.1.9 and 9.2.1.1.12 Anritsu Ltd. -
R5‑096160 GCF Priority 2 - Update of TC 9-1-2-3 for IP handling over U-plane Samsung -
R5‑096161 GCF Priority 1 and Priority 2- EMM Successful Attach consistent description Samsung -
R5‑096162 GCF Priority 3 - Addition of test case 13.3.1.1 CMCC, Huawei, Motorola -
R5‑096163 GCF Priority 3 - Addition of test case 13.3.1.2 CMCC, Huawei, Motorola -
R5‑096164 Modifying applicability to the Rel. 7 test cases - Chapter 8 Qualcomm Europe S.A.R.L. -
R5‑096165 Modifying applicability to the Rel. 7 test cases - Chapter 14 Qualcomm Europe S.A.R.L. -
R5‑096166 Adding applicability of the test cases for HS-DSCH Serving Cell Change Enhancements Qualcomm Europe S.A.R.L. -
R5‑096167 Adding applicability of the test cases for eCall Qualcomm Europe S.A.R.L. -
R5‑096168 Addition of a New Test Case for Support of HNB - Inter-frequency cell reselection from a non-CSG cell to an allowed CSG cell Qualcomm Europe S.A.R.L. -
R5‑096169 Adding applicability of the test case for Support of HNB - Inter-frequency cell reselection from a non-CSG cell to an allowed CSG cell Qualcomm Europe S.A.R.L. -
R5‑096170 ETWS primary and secondary notification without security reception via S-CCPCH in idle mode, URA_PCH and CELL_PCH state NTT DOCOMO -
R5‑096171 Correction to Default message contents NTT DOCOMO -
R5‑096172 Applicability of new RRC test cases for Dual Cell HSDPA Nokia, Ericsson, ST-Ericsson -
R5‑096173 Addition of applicability of MBSFN RRC test cases Huawei -
R5‑096174 Addition of a New Test Case for eCall - Registration of eCall only capable UE Qualcomm Europe S.A.R.L. -
R5‑096175 Addition of a New Test Case for eCall - Test Call using eCall capable UE Qualcomm Europe S.A.R.L. -
R5‑096176 Addition of a New Test Case for eCall - eCall using eCall capable UE with "eCall onlyö subscription on USIM Qualcomm Europe S.A.R.L. -
R5‑096177 GCF Priority 2 & 3 - Correction to test cases 9.2.1.1.9 and 9.2.1.1.12 Anritsu Ltd. -
R5‑096178 GCF Priority 2 - Correction test cases 8.3.2.1, 8.3.2.7 Anritsu Ltd. -
R5‑096179 GCF Priority 2: Correction to the MAC DRX test cases preamble RIM -
R5‑096180 Align USIM content to the latest REl-8 USIM files RIM -
R5‑096181 Update table A.12 Ericsson, ST-Ericsson -
R5‑096182 Update test case 12.2 Ericsson, STEricsson -
R5‑096183 Update test cases 16.11, 16.12 and 16.13 with multiple SDP check Ericsson, ST-Ericsson -
R5‑096184 Update test cases 17.2, 17.6 and 17.18 with multiple SDP check Ericsson, ST-Ericsson -
R5‑096185 New radio bearar test case 14.6.1g for Dual-Cell Ericsson, ST-Ericsson -
R5‑096186 WI TCD after RAN5#45 WG chairman -
R5‑096187 Corrections to 64QAM testcase 8.2.6.62 Rohde & Schwarz -
R5‑096188 Corrections to UL 16QAM testcase 8.2.6.64 Rohde & Schwarz -
R5‑096189 Corrections to UL 16QAM testcase 8.3.4.12 Rohde & Schwarz -
R5‑096190 Corrections to 64QAM testcase 8.3.4.13 Rohde & Schwarz -
R5‑096191 Corrections to DL 64QAM and UL 16QAM RRC testcase applicabilities Rohde & Schwarz -
R5‑096192 GCF Priority 1 - Various editorial corrections to RLC section Qualcomm Europe, Rohde & Schwarz, NTT DOCOMO -
R5‑096193 GCF Priority 1 - Update to Idle Mode test case 6.1.2.2 Ericsson, ST-Ericsson, Telecom Italia -
R5‑096194 GCF Priority 2 - Updated to test case 6.1.2.6 Ericsson, ST-Ericsson, Telecom Italia -
R5‑096195 New TC 8.5.2.1 RRC Connection Reject: redirection from UTRAN to E-UTRAN Telecom Italia -
R5‑096196 GCF Priority 2 - Correction to test case 6.3.6 Telecom Italia -
R5‑096197 GCF Priority 2 - Correction to test case 6.1.2.7 Telecom Italia -
R5‑096198 Active set update in soft handover: Radio Link addition/removal and serving HS-DSCH / E-DCH cell change, with activation/deactivation of MIMO Nokia -
R5‑096199 Applicability of Rel-7 MIMO test case Nokia -
R5‑096200 Introduction of feature group indicator UE applicability Ericsson -
R5‑096201 Update of AP status WG chairman -
R5‑096202 Update of header chapter 5.2 in 36.508 Ericsson, ST-Ericsson, Rohde&Schwarz -
R5‑096203 Update to 6.5 Transmit signal quality test cases Rohde & Schwarz -
R5‑096204 LTE-RF: CR to Tranmission signal quality Agilent Technologies -
R5‑096205 3i uncertainties and Test Tolerances Anritsu -
R5‑096206 Test Description for FDD CQI test cases under fading conditions NEC -
R5‑096207 LTE-RF: CR for Aggregate power control tolerance test case Agilent Technologies -
R5‑096208 LTE-RF: CR for Power Control Relative power tolerance test case Agilent Technologies -
R5‑096210 LTE-RF: CR to ON/OFF Time mask test cases Agilent Technologies -
R5‑096211 Measurement period for TX-Tests Rohde & Schwarz -
R5‑096212 Update of 6.6.1 OBW Anritsu Ltd. -
R5‑096213 CR to 36.521-1: Update to Spurious Emissions test cases NTT DOCOMO -
R5‑096214 CR to 36.521-1: Update to ACLR test case NTT DOCOMO -
R5‑096215 Correction to SEM Anritsu Ltd. -
R5‑096216 Update of 6.7 Transmit intermodulation Anritsu Ltd. -
R5‑096217 CR to 36.521-1: Update to UE max output power test case NTT DOCOMO -
R5‑096218 Update to the test procedure of OBW and SEM test cases of 36.521-1 Qualcomm Europe -
R5‑096219 LTE-RF: CR for UE configured UE transmitted output power test case Agilent Technologies -
R5‑096220 Tx power range and core update for Receiver tests Ericsson, ST-Ericsson -
R5‑096221 Update on 7.4, 7.5, and 7.8.1 Anritsu Ltd. -
R5‑096222 Test description for CQI test cases under AWGN conditions QUALCOMM EUROPE, NEC, Rohde & Schwarz -
R5‑096223 LTE RF: Blocking Characteristics update Nokia -
R5‑096224 LTE RF: Spurious Response Update Nokia -
R5‑096225 LTE RF: Spurious Emissions update Nokia -
R5‑096226 LTE RF: A-SEM update and A-MPR verification Nokia -
R5‑096227 CR to 36.521-1: Update to Additional Spurious Emissions test case NTT DOCOMO -
R5‑096228 LTE-RF: CR for MPR test case Agilent Technologies -
R5‑096229 CR to 36.521-1: Update to A-MPR test case NTT DOCOMO, Spirent Communications -
R5‑096230 LTE RF: Applicability of 6.2.4 A-MPR Nokia -
R5‑096231 Correction to Demodulation of PHICH test cases NEC -
R5‑096232 CR to TDD PHICH demodulation test cases Rohde & Schwarz,CMCC -
R5‑096234 Update TDD PDSCH test cases CATT -
R5‑096235 Introduction of CQI reporting test with frequency-selective interference NEC -
R5‑096236 Correction to FDD PMI reporting test cases NEC -
R5‑096237 Intorduction of RI reporting test NEC -
R5‑096239 Update to the test procedure and message contents of TDD PMI reporting test cases Qualcomm Europe -
R5‑096240 CR to 36.521-1: Update to Derivation of Test Requirements for A-MPR Spirent Communications -
R5‑096241 Measurement uncertainties and Test Tolerances for transmit quality test cases Rohde & Schwarz -
R5‑096242 Update for 36.521-1 Annex A Rohde & Schwarz -
R5‑096243 Update to RRM TC:E-UTRAN FDD - UTRAN TDD cell re-selection Rohde & Schwarz -
R5‑096244 Addition of new TC to 36.521-3: E-UTRAN TDD – UTRAN FDD cell re-selection test Nokia -
R5‑096245 Introduction of uncertainties for RRM test cases 4.2.1 and 4.2.2 Anritsu Ltd. -
R5‑096246 Modification of section 4.2.2 in 36.521-3 CATT -
R5‑096247 Modification of section 4.2.2 in 36.521-3 CATT -
R5‑096248 Test Case of E-UTRAN TDD to GSM Handover CATT -
R5‑096249 Combined UTRA TDD - UTRA TDD and E-UTRA FDD cell search in fading CATT -
R5‑096253 Test Configurations in A-SEM and A-Spurious Emissions to include the impact of allowed power reductions Nokia -
R5‑096254 OTA antenna performance: New informative Annex for Recommended performance in 34.114 Orange -
R5‑096255 CR to the RA response window's name in Random Access conformance requirements ZTE corporation -
R5‑096257 Addition of test scenario CR to 36.521-3: E-UTRAN FDD - UTRAN FDD cell re-selection in fading propagation conditions: UTRA FDD is of lower priority Motorola -
R5‑096258 Addtion of new TC to 36.521-3:E-UTRAN TDD - GSM Handover: Unknown Target Cell Rohde & Schwarz -
R5‑096259 Addtion of new TC to 36.521-3 E-UTRAN TDD - UTRAN TDD HO test: unknown target cell Rohde & Schwarz -
R5‑096260 Addition of test scenario CR to 36.521-3: E-UTRAN FDD - FDD inter frequency Handover test cases: Unknown Target Cell Motorola -
R5‑096261 Addition of test scenario CR to 36.521-3: E-UTRAN FDD - GSM Handover: Unknown Target Cell Motorola -
R5‑096262 Addition of test scenario CR to 36.521-3: E-UTRAN FDD - UTRAN FDD Handover: Unknown Target Cell Motorola -
R5‑096263 Add new TC 5.1.6 E-UTRAN TDD - TDD inter frequency handover: unknown target cell Huawei -
R5‑096264 Correction CR to 36.521-3: E-UTRAN FDD - FDD Handover intra frequency and inter frequency case Motorola -
R5‑096265 CR to 36.521-3: Update of E-UTRA FDD to HRPD Handover and E-UTRA FDD to cdma2000 1xRTT Handover test cases Spirent Communications -
R5‑096266 Test Description for FDD CQI test cases under fading conditions NEC -
R5‑096267 Addition of test scenario CR to 36.521-3: E-UTRAN FDD - GSM Cell Search when DRX is used Motorola -
R5‑096268 Addition of test scenario CR to 36.521-3: E-UTRAN FDD - UTRAN FDD Cell Search when DRX is used Motorola -
R5‑096269 RRM:Update of test case 8.4.1 TDD inter-frequency event triggered reporting Ericsson, ST-Ericsson -
R5‑096270 LS on Applicability of RRM inter-frequency test cases to frequency bands TSG WG RAN5 -
R5‑096271 LTE-RF: Update to Annex E Cell Configuration Mapping AT4 wireless -
R5‑096272 Correction CR to 36.521-3: Addition of message contents exceptions for E-UTRAN inter frequency and inter-RAT Cell Search for when DRX is used Motorola -
R5‑096273 Correction CR to 36.521-3: E-UTRAN FDD - UTRA FDD Handover case Motorola -
R5‑096274 CR to 36.521-3: Update to FDD Intra-frequency RRC Re-establishment test case NTT DOCOMO -
R5‑096275 CR to 36.521-3: Update to FDD Inter-frequency RRC Re-establishment test case NTT DOCOMO -
R5‑096276 Test Case of E-UTRAN TDD to GSM Handover CATT -
R5‑096277 LS on scheduling of retransmissions in DL performance tests TSG WG RAN5 -
R5‑096278 Number of used HARQ processes in DL Performance tests Rohde & Schwarz -
R5‑096279 DL reference measurement parameters for 3.84 Mcps TDD IMB tests IPWireless -
R5‑096280 Update of the default RADIO BEARER SETUP message for RF testing of Dual Carrier Adjacent Channels for HSDPA Ericsson, ST-Ericsson -
R5‑096281 New RF procedure for Dual Cell HSDPA Ericsson, ST-Ericsson -
R5‑096282 Update to DC-HSDPA related sections 9.2 of TS 34.121-1 Qualcomm Europe -
R5‑096283 Update to Reporting CQI test cases for DC-HSDPA Qualcomm Europe -
R5‑096284 Updates to Annexure A to Annexure F. in 34.121-1 Qualcomm Europe -
R5‑096285 Updates to Applicability table corresponding to DC-HSDPA tests Qualcomm Europe -
R5‑096286 Addition of AWGN definition for DC-HSDPA tests Nokia -
R5‑096287 Addition of DC-HSDPA receiver tests into TS 34.121-2 Nokia -
R5‑096288 Clarification for Maximum Output Power with HS-DPCCH and E-DCH 5.2B Test case Qualcomm Europe -
R5‑096289 CR on 36.521-1, 'Introduction of clause 8.2.1.1 test case uncertainties and Test Tolerances' Anritsu Ltd. -
R5‑096290 Update of tests 9.6.1 and 9.6.2 (HS-DSCH and HS-SCCH in CELL_FACH state) Ericsson, ST-Ericsson -
R5‑096291 RRM:Update of test case 8.3.1 FDD inter-frequency event triggered reporting Ericsson, ST-Ericsson -
R5‑096292 E-UTRAN TDD Radio Link Monitoring test for in-sync in DRX Ericsson, ST-Ericsson -
R5‑096293 E-UTRAN TDD Radio Link Monitoring test for Out-of-sync in DRX Ericsson, ST-Ericsson -
R5‑096294 E-UTRAN FDD Radio Link Monitoring test for in-sync in DRX Ericsson, ST-Ericsson -
R5‑096295 E-UTRAN FDD Radio Link Monitoring test for Out-of-sync in DRX Ericsson, ST-Ericsson -
R5‑096296 Update TC 8.7.1 E-UTRAN TDD - UTRAN TDD event triggered reporting under fading propagation conditions Huawei -
R5‑096298 Update on 7.4, 7.5, and 7.8.1 Anritsu Ltd. -
R5‑096299 Addition of new TC to 36.521-3: E-UTRAN TDD - E-UTRAN TDD and E-UTRAN TDD Inter-frequency event triggered reporting under fading propagation conditions test case Nokia -
R5‑096301 Correction CR to 36.521-1: Update for Demodulation of PDSCH (FDD) tests to correct CR merges results from RAN5#44 Motorola -
R5‑096302 Correction CR to 36.521-3: E-UTRAN FDD - GSM event triggered reporting in AWGN case Motorola -
R5‑096303 Addition of new TC to 36.521-3: E-UTRAN TDD to E-UTRAN TDD and UTRA TDD cell search test case Nokia -
R5‑096306 Update to the test procedure of SEM test cases of 36.521-1 Qualcomm Europe -
R5‑096307 Addition of test scenario CR to 36.521-3: E-UTRAN FDD - FDD inter frequency Handover test cases: Unknown Target Cell Motorola -
R5‑096308 New RF procedure for Dual Cell HSDPA Ericsson, ST-Ericsson -
R5‑096309 Addition of test scenario CR to 36.521-3: E-UTRAN FDD - GSM Handover: Unknown Target Cell Motorola -
R5‑096310 Addition of test scenario CR to 36.521-3: E-UTRAN FDD - UTRAN FDD Handover: Unknown Target Cell Motorola -
R5‑096311 Update of 6.6.1 OBW Anritsu Ltd. -
R5‑096312 Correction to SEM Anritsu Ltd. -
R5‑096313 Update of 6.7 Transmit intermodulation Anritsu Ltd. -
R5‑096314 LS to RAN4 on PCMAX TSG WG RAN5 -
R5‑096315 CR to 36.521-1: Update to UE max output power test case NTT DOCOMO, Agilent -
R5‑096316 CR to 36.521-1: Update to Additional Spurious Emissions test case NTT DOCOMO -
R5‑096317 CR to TDD PHICH demodulation test cases Rohde & Schwarz,CMCC -
R5‑096318 Correction to FDD PMI reporting test cases NEC -
R5‑096319 Intorduction of RI reporting test NEC -
R5‑096320 Tx power range and core update for Receiver tests Ericsson, ST-Ericsson -
R5‑096321 LTE RF: A-SEM update and A-MPR verification Nokia -
R5‑096322 Update on 7.4, 7.5, and 7.8.1 Anritsu Ltd. -
R5‑096323 Intorduction of RI reporting test NEC -
R5‑096324 Addtion of new TC to 36.521-3 E-UTRAN TDD - UTRAN TDD HO test: unknown target cell Rohde & Schwarz -
R5‑096325 Addition of test scenario CR to 36.521-3: E-UTRAN FDD - FDD inter frequency Handover test cases: Unknown Target Cell Motorola -
R5‑096326 Addition of test scenario CR to 36.521-3: E-UTRAN FDD - GSM Handover: Unknown Target Cell Motorola -
R5‑096327 Addition of new TC to 36.521-3: E-UTRAN TDD - E-UTRAN TDD and E-UTRAN TDD Inter-frequency event triggered reporting under fading propagation conditions test case Nokia -
R5‑096328 E-UTRAN FDD Radio Link Monitoring test for Out-of-sync in DRX Ericsson, ST-Ericsson -
R5‑096329 E-UTRAN FDD Radio Link Monitoring test for in-sync in DRX Ericsson, ST-Ericsson -
R5‑096330 E-UTRAN TDD Radio Link Monitoring test for Out-of-sync in DRX Ericsson, ST-Ericsson -
R5‑096331 E-UTRAN TDD Radio Link Monitoring test for in-sync in DRX Ericsson, ST-Ericsson -
R5‑096332 RRM:Update of test case 8.3.1 FDD inter-frequency event triggered reporting Ericsson, ST-Ericsson -
R5‑096333 Update to 6.5 Transmit signal quality test cases Rohde & Schwarz -
R5‑096334 LTE-RF: CR for Aggregate power control tolerance test case Agilent Technologies -
R5‑096335 Correction CR to 36.521-1: Update for Demodulation of PDSCH (FDD) tests to correct CR merges results from RAN5#44 Motorola -
R5‑096336 Update TDD PDSCH test cases CATT -
R5‑096337 Correction CR to 36.521-3: E-UTRAN FDD - FDD Handover intra frequency and inter frequency case Motorola -
R5‑096338 Number of used HARQ processes in DL Performance tests Rohde & Schwarz -
R5‑096340 Introduction of uncertainties for RRM test cases 4.2.1 and 4.2.2 Anritsu Ltd. -
R5‑096341 LTE RF: A-SEM update and A-MPR verification Nokia -
R5‑096342 Minimum test time for performance tests Rohde&Schwarz -
R5‑096343 LS on TTI DCCH insertion uncertainty calculation and cell timing change for re-appearing cells for RRM tests TSG WG RAN5 -
R5‑096344 LS on scheduling of retransmissions in DL performance tests TSG WG RAN5 -
R5‑096345 RAN5-RF SWG Action Points after RAN5#45 WG chairman -
R5‑096400 GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.4.10 Anite -
R5‑096401 GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.2.9 Anite -
R5‑096402 GCF Priority 3 - Addition of EMM test case 9.2.3.1.27 CATR -
R5‑096403 Correction to the default NAS message contents NTT DOCOMO -
R5‑096404 TF 160 Status Report - current TF 160 Manager -
R5‑096405 LTE ASP clarifications and update MCC TF160 -
R5‑096406 cell frequency allocation MCC TF160, NEC, NTT DoCoMo -
R5‑096407 Routine maintenance for divergent updates MCC TF160 -
R5‑096408 Correction to 34.123-2 Annex C Panasonic -
R5‑096409 Modifying applicability to the Rel. 7 test cases - Chapter 14 Qualcomm Europe S.A.R.L. -
R5‑096410 Clarification to the mapping of GERAN cells and the default parameter values Vodafone -
R5‑096411 GCF Priority 2: Updates to TAU/RAU procedure for inter-system cell re-selection between A/Gb and S1 modes Vodafone -
R5‑096412 GCF Priority 2: Updates to Attach Procedure / Success (last visited TAI, TAI list and equivalent PLMN list handling) Vodafone -
R5‑096413 Correction of Minimum Cell Configuration for GCF P2, P3 and P4 test cases 8.1.3.5, 8.3.1.3, 8.3.1.4, 8.3.1.5, 8.3.1.6, 8.3.1.7 and 8.3.1.10 Anritsu Ltd. -
R5‑096414 GCF Priority 2 & 3 - Correction to test cases 9.2.1.1.9 and 9.2.1.1.12 Anritsu Ltd. -
R5‑096415 Addition of a New Test Case for location updating request rejected Huawei -
R5‑096416 Addition of a New Test Case for combined routing area updating request rejected Huawei -
R5‑096417 Addition of a New Test Case for Inter-RAT Cell Reselection from GSM_Idle / GPRS Packet_Idle to a UTRA idle CSG cell Huawei -
R5‑096419 Addition of a New Test Case for Support of HNB - Inter frequency CSG Cell Reselection / UE is in Idle, Cell_PCH and URA_PCH states Huawei -
R5‑096420 Addition of a New Test Case for Support of HNB - Intra frequency CSG Cell Reselection / UE is in Idle, Cell_PCH and URA_PCH states Huawei -
R5‑096421 GCF Priority 1: Update of MAC TC 7.1.7.1.1 DL-SCH TBS selection/DCI format 1/RA type0 Huawei -
R5‑096422 GCF Priority 1: Update of MAC TC 7.1.7.1.2 DL-SCH TBS selection/DCI format 1/RA type1 Huawei -
R5‑096423 GCF Priority 1: Update of MAC TC 7.1.7.1.3 DL-SCH TBS selection/DCI format 1A/RA type2/Localized VRB Huawei -
R5‑096424 GCF Priority 1: Update of MAC TC 7.1.7.1.4 DL-SCH TBS selection/DCI format 1A/RA type2/Distributed VRB Huawei -
R5‑096425 GCF Priority 1: Update of MAC TC 7.1.7.2.1 UL-SCH TBS selection/DCI format 0 Huawei -
R5‑096426 GCF Priority 1: Update of E-UTRA MAC test case 7.1.4.7 Huawei -
R5‑096427 GCF Priority 2: Update of E-UTRA MAC test case 7.1.6.1 Huawei -
R5‑096428 GCF Priority 1: Update of E-UTRA MAC test case 7.1.3.7 Huawei -
R5‑096429 GCF Priority 2 - Update to test case 9.2.1.1.7 Nokia -
R5‑096430 Correction of test case 6.1.2.13 Panasonic -
R5‑096431 Routine maintenance for divergent updates MCC TF160 -
R5‑096432 Removal of GPRS P-channels from GERAN test model and ASPs Ericsson, ST-Ericsson, MCC TF160 -
R5‑096433 Correction of test case 6.1.2.13 Panasonic -
R5‑096434 GCF Priority 3 - Update test case 8.3.1.4 Panasonic -
R5‑096435 GCF Priority 3: Introduction of a new EMM test case 9.2.3.1.6' Normal tracking area update / UE with ISR active moves to E-UTRAN ' Sony Ericsson Mobile -
R5‑096436 GCF Priority 3: Introduction of 9.2.3.1.17 Normal tracking area update / rejected / Roaming not allowed in this tracking area Sony Ericsson Mobile -
R5‑096437 GCF Priority 3: Introduction of 9.2.3.1.18 Normal tracking area update / rejected / EPS services not allowed in this PLMN Sony Ericsson Mobile -
R5‑096438 Response LS to GCF CAG on Removal of certification requirements for GSM/(E)GPRS P_Channels TSG WG RAN5 -
R5‑096439 Response LS to PTCRB on Removal of certification requirements for GSM/(E)GPRS P_Channels TSG WG RAN5 -
R5‑096440 cell frequency allocation MCC TF160, NEC, NTT DoCoMo -
R5‑096441 GCF Priority 3: Addition of new test case 9.2.1.1.21: Attach / Abnormal case / success after several attempts due to no network response Motorola -
R5‑096442 GCF Priority 3: Addition of new test case 9.2.1.1.22: : Attach / Abnormal case / unssuccesful attach after 5 attempts Motorola -
R5‑096443 GCF Priority 3: Addition of new test case 9.2.1.1.24: Attach / Abnormal case / Change of cell into a new tracking area Motorola -
R5‑096444 GCF Priority 3: Addition of new test case 9.2.1.1.26: Attach / Abnormal case / Detach procedure collision Motorola -
R5‑096445 GCF Priority 2: Correction to Test case 7.1.3.2 Motorola and MCC160 -
R5‑096446 GCF Priority 1: Correction to EMM test case 9.3.1.1 Ericsson, ST-Ericsson, Rohde & Schwarz -
R5‑096447 Correction for IP address allocation NEC, Samsung -
R5‑096448 Correction of TFTs for reference dedicated EPS bearer contexts NEC -
R5‑096449 LAI and TMSI in ATTACH ACCEPT and TAU ACCEPT messages NEC -
R5‑096450 GCF Priority 4 - New test case 9.2.1.1.6 Attach Procedure / Success / Shared network NEC -
R5‑096451 GCF Priority 2 - Correction of test cases 9.2.1.1.9, 9.2.1.1.10, 9.2.1.1.11 Attach / rejected / IMSI invalid / Illegal UE / EPS and non-EPS services not allowed NEC -
R5‑096452 GCF Priority 2 - Correction of TC 9.2.3.2.1 Combined tracking area update / successful NEC -
R5‑096453 GCF Priority 4 - New TC 9.2.3.2.2 Combined tracking area update / successful for EPS services only / IMSI unknown in HSS NEC -
R5‑096454 GCF Priority 2 - Correction of TC 9.2.3.3.1 First Iu mode to S1 mode intersystem change after attach: go to E-UTRAN RRC idle: RAU to UTRAN NEC -
R5‑096455 Addition of generic procedure for IP address allocation / configuration in U-plane Samsung, NEC, Vodafone -
R5‑096456 Correction of test procedures in TS 36.508 Telecom Italia -
R5‑096457 RAN5 2nd Vice Chair Election ETSI Secretary -
R5‑096458 Update of MAC configuration for disabling PHR and BSR for L2 test cases Anite -
R5‑096459 Disabling PHR and periodic BSR for L2 test cases in 36.523-1 Anite -
R5‑096460 Addition applicability of 6 New Test Cases for Support of HNB Huawei -
R5‑096461 Addition of default UTRA message contents to TS 36.508 Ericsson, ST-Ericsson -
R5‑096462 Clarification to the mapping of GERAN cells and the default parameter values Vodafone -
R5‑096463 GCF Priority 1: Update of E-UTRA MAC test case 7.1.3.6 Huawei -
R5‑096464 Correction of TFTs for reference dedicated EPS bearer contexts NEC -
R5‑096465 Cleanup of default NAS message contents NTT DOCOMO -
R5‑096466 Correction of test case 6.1.2.13 Panasonic -
R5‑096467 GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.4.13 Anite -
R5‑096468 GCF Priority 1 - Correction to E-UTRAN MAC test case 7.1.4.10 Anite -
R5‑096469 GCF Priority 3 - Addition of new test case 6.1.2.13 CATR -
R5‑096470 GCF Priority 3 - Addition of E-UTRAN test case 8.3.3.3 for Measurement configuration control and reporting / SON / ANR: CGI reporting of GERAN cell ZTE corporation -
R5‑096471 GCF Priority 3 - Addition of E-UTRAN test case 8.3.3.2 :Measurement configuration control and reporting / SON / ANR: CGI reporting of UTRAN cell ZTE corporation -
R5‑096472 GCF Priority 1 - Update of Multi-layer Procedures part TC 13.1.1 Activation and deactivation of additional data radio bearer in E-UTRA ZTE corporation -
R5‑096473 Tests to verify MCCH out of sequence handling for 3.84 Mcps TDD IMB UEs IPWireless -
R5‑096474 Tests to verify the unacknowledged mode operation for 3.84 Mcps TDD IMB UEs IPWireless -
R5‑096475 Add test applicability and conditions for 3.84 Mcps TDD IMB idle mode procedure tests IPWireless -
R5‑096476 GCF Priority 3 - Update of RRC part TC 8.5.1.2 RRC Connection Re-establishment: Success (after Radio Link Failure) CETECOM GmbH -
R5‑096477 GCF Priority 2 - Update of RRC test case 8.4.1.2 Ericsson, ST-Ericsson -
R5‑096478 GCF Priority 2 - Update of RRC test case 8.4.1.4 Ericsson, ST-Ericsson -
R5‑096479 GCF Priority 3 - Update of RRC test case 8.2.1.7 Ericsson, ST-Ericsson -
R5‑096480 GCF Priority 1 - Update to test case 7.2.3.4 NTT DOCOMO, Qualcomm Europe, Anite -
R5‑096481 GCF Priority 1 - Update to test case 7.2.3.4 NTT DOCOMO, Qualcomm Europe, Anite -
R5‑096482 GCF Priority 1 - Correction of TC 8.5.4.1 UE capability transfer / Success NEC -
R5‑096483 GCF Priority 1 - Update of PDCP test case 7.3.3.1 : Ciphering and Deciphering: Correct functionality of EPS AS encription algorithms (SNOW 3G) ZTE corporation -
R5‑096484 GCF Priority 1: Correction to RRC test case 8.2.1.1 Ericsson, ST-Ericsson, NTT DOCOMO -
R5‑096485 GCF Priority 1 - Update of EMM test case 9.2.3.1.1 ZTE corporation -
R5‑096486 Update of DRB test cases in LTE SIG work plan Ericsson, ST-Ericsson -
R5‑096487 GCF Priority 1 - Various corrections to Idle Mode section of 36.523-1 NTT DOCOMO -
R5‑096488 GCF Priority 2 - Update to test case 8.1.2.5 NTT DOCOMO -
R5‑096489 GCF Priority 2 - Update to test case 8.1.2.7 NTT DOCOMO -
R5‑096490 GCF Priority 2 - Update to test case 8.1.3.5 NTT DOCOMO -
R5‑096491 GCF Priority 2 - Various corrections to RRC Part 3 section of 36.523-1 NTT DOCOMO -
R5‑096492 GCF Priority 1 - Correction to E-UTRA DRB test case 12.2 Ericsson, ST-Ericsson -
R5‑096493 GCF Priority 1 - Update of Multi-layer Procedures part TC 13.2.1 RRC Connection Reconfiguration: E-UTRA to E-UTRA ZTE corporation -
R5‑096494 GCF Priority 1 - Update of applicabilty entry for DRB test case 12.3 Ericsson, ST-Ericsson -
R5‑096495 GCF Priority 2 - Update of the test case 6.2.3.3 CATR -
R5‑096496 GCF Priority 2 - Update of Idle Mode Operations test case 6.1.2.5 Cell reselection for inter-band operation ZTE corporation -
R5‑096497 GCF Priority 2 - Update of Idle Mode Operations test case 6.6.2.3.7 ZTE corporation -
R5‑096498 Correction of radio bearar test case 14.6.1e for combination 64QAM and MIMO. Ericsson, ST-Ericsson -
R5‑096499 Correction of radio bearar test case 14.6.6d for combination 64QAM and MIMO Ericsson, ST-Ericsson -
R5‑096500 New radio bearar test case 14.6.6f for Dual-Cell Ericsson, ST-Ericsson -
R5‑096501 New radio bearar test case 14.6.1g for Dual-Cell Ericsson, ST-Ericsson -
R5‑096502 GCF Priority 2: Correction to the MAC DRX test cases preamble RIM -
R5‑096503 Joint RAN5 3GPP2 Joint Session Agenda WG chairman -
R5‑096504 RAN5 3GPP2 Sep 09 Conf Call Notes WG chairman -
R5‑096505 GCF Priority 2 - Correction of TC 9.2.1.1.13 Attach / rejected / PLMN not allowed NEC -
R5‑096506 GCF Priority 2 - Correction of TC 9.2.1.1.14 Attach / rejected / tracking area not allowed NEC -
R5‑096507 GCF Priority 2 - Correction of TC 9.2.1.1.15 Attach / rejected / roaming not allowed in this tracking area NEC -
R5‑096508 GCF Priority 3 - New TC 9.2.1.1.16 Attach / rejected / EPS services not allowed in this PLMN NEC -
R5‑096509 GCF Priority 2 - Correction of TC 9.2.1.1.17 Attach / rejected / no suitable cells in tracking area NEC -
R5‑096510 GCF Priority 2 - Correction of TC 9.2.1.2.4 Combined attach procedure / Success / EPS services only / MSC temporarily not reachable NEC -
R5‑096511 GCF Priority 2 - Correction of TC 10.2.1 Dedicated EPS bearer context activation / Success NEC -
R5‑096512 GCF Priority 2 - Correction of TC 10.3.1 EPS bearer context modification / Success NEC -
R5‑096513 GCF Priority 2 - Correction of TC 10.5.1 UE requested PDN connectivity procedure accepted by the network NEC -
R5‑096514 GCF Priority 2 - Correction of TC 10.6.1 UE requested PDN disconnect procedure accepted by the network NEC -
R5‑096605 GCF Priority 2 - Update of RRC test case 8.3.2.7 : Measurement configuration control and reporting / inter-RAT measurements: event B2 (measurement HRPD cells) ZTE corporation -
R5‑096606 GCF Priority 2 - Update of RRC test case 8.3.2.6 Ericsson, ST-Ericsson -
R5‑096610 GCF Priority 2 - Update of RRC test case 8.4.1.4 Ericsson, ST-Ericsson -
R5‑096611 GCF Priority 2 - Update of RRC test case 8.4.1.2 Ericsson, ST-Ericsson -
R5‑096612 GCF Priority 2 - Update to test case 8.4.2.2 NTT DOCOMO -
R5‑096613 GCF Priority 2 - Update to test case 8.4.2.4 NTT DOCOMO -
R5‑096614 GCF Priority 2 - Addition of new test case 8.4.3.2 CATR -
R5‑096615 GCF Priority 3 - Addition of test case 6.2.3.6 NTT DOCOMO -
R5‑096616 GCF Priority 3 - Update to test case 8.1.1.2 NTT DOCOMO -
R5‑096617 GCF Priority 3 - Addition of test case 8.2.4.4 NTT DOCOMO -
R5‑096618 GCF Priority 2 - Update to test case 8.1.3.5 NTT DOCOMO -
R5‑096619 GCF Priority 2: Updates to TAU/RAU procedure for inter-system cell re-selection between A/Gb and S1 modes Vodafone -
R5‑096620 GCF Priority 2: Updates to Attach Procedure / Success (last visited TAI, TAI list and equivalent PLMN list handling) Vodafone -
R5‑096621 GCF Priority 2 - Correction to TC 8.1.3.8 Telecom Italia -
R5‑096622 GCF Priority 3 - Update test case 8.3.1.4 Panasonic -
R5‑096624 GCF Priority 2 - Correction of TC 10.4.1 EPS bearer context deactivation / Success NEC -
R5‑096625 Update test cases 16.11, 16.12 and 16.13 with multiple SDP check Ericsson, STEricsson -
R5‑096626 Update test cases 17.2, 17.6 and 17.18 with multiple SDP check Ericsson, STEricsson -
R5‑096627 GCF Priority 1 - Update of RRC test case 8.2.2.1 Ericsson, ST-Ericsson -
R5‑096628 GCF Priority 1 - Update of RRC test case 8.2.2.2 Ericsson, ST-Ericsson -
R5‑096629 GCF Priority 3 - Various corrections to EMM section of 36.523-1 NTT DOCOMO -
R5‑096630 GCF Priority 3 - Addition of new test case 9.2.1.2.5 NTT DOCOMO -
R5‑096631 GCF Priority 3 - Update to test case 9.2.1.2.6 NTT DOCOMO -
R5‑096632 GCF Priority 3 - Addition of test case 9.2.1.2.7 NTT DOCOMO -
R5‑096633 GCF Priority 3 - Addition of test case 9.2.1.2.11 NTT DOCOMO -
R5‑096634 GCF Priority 3 - Addition of test case 9.2.1.2.13 NTT DOCOMO -
R5‑096635 GCF Priority 3 - Addition of new test case 9.2.1.2.15 NTT DOCOMO -
R5‑096636 GCF Priority 3 - Addition of test cases 9.2.3.1.23 and 9.2.3.1.24 NTT DOCOMO -
R5‑096637 GCF Priority 3 - Addition of new test case 9.2.3.1.25 NTT DOCOMO -
R5‑096638 GCF Priority 3 - Addition of new test case 9.2.3.2.9 NTT DOCOMO -
R5‑096639 GCF Priority 3 - Update to test case 9.3.1.4 NTT DOCOMO -
R5‑096640 Applicability of new EMM test cases NTT DOCOMO -
R5‑096641 LTE-Sig: Assignment of different rootSequenceIndex for cells at the same frequency AT4 wireless -
R5‑096642 New Work Item Proposal: Conformance test aspects - Mobility between 3GPP WLAN Interworking and 3GPP Systems Qualcomm Europe -
R5‑096643 GCF Priority 1 - Update of RLC test case 7.2.3.9 Qualcomm Europe, Anite -
R5‑096644 Response LS on LTE DL Sustained Data Rate Test for Rel-9 TSG WG RAN5 -
R5‑096645 GCF Priority 3 - Addition of new test case 8.3.3.4 Alcatel-Lucent -
R5‑096646 GCF Priority 3 - Addition of new test case 8.3.3.5 Alcatel-Lucent -
R5‑096647 GCF Priority 3 - Addition of new test case 10.7.3 NTT DOCOMO -
R5‑096648 GCF Priority 3 - Addition of new test case 10.7.4 NTT DOCOMO -
R5‑096649 GCF Priority TBC - Addition of new test case 10.7.5 NTT DOCOMO -
R5‑096650 GCF Priority 3 - Addition of new test case 10.8.2 NTT DOCOMO -
R5‑096651 GCF Priority 3 - Addition of new test case 10.8.3 NTT DOCOMO -
R5‑096652 GCF Priority TBC - Addition of new test case 10.8.4 NTT DOCOMO -
R5‑096653 GCF Priority 3 - Addition of new test case 10.8.5 NTT DOCOMO -
R5‑096654 GCF Priority 3 - Addition of new test case 10.8.6 NTT DOCOMO -
R5‑096655 GCF Priority 3 - Addition of new test case 10.8.7 NTT DOCOMO -
R5‑096656 GCF Priority 2 - Correction of TC 10.5.1 UE requested PDN connectivity procedure accepted by the network NEC -
R5‑096657 GCF Priority 2 - Addition of test case 11.1.4 MO-SMS over SGs in active mode CMCC -
R5‑096658 GCF Priority 2 - Correction of TC 10.4.1 EPS bearer context deactivation / Success NEC -
R5‑096659 GCF Priority 2 - Addition of applicability for new test case 11.1.4 CMCC -
R5‑096660 GCF Priority 3 - Addition of EMM test case 9.1.2.6 CATR -
R5‑096661 GCF Priority 3 - Addition of new EMM test case 9.1.5.2 CATR -
R5‑096662 GCF Priority 3 - Addition of new EMM test case 9.2.1.1.18 CATR -
R5‑096663 GCF Priority 3 - Addition of EMM test case 9.2.1.2.12 CATR -
R5‑096664 GCF Priority 3 - Correction of TC 9.2.1.1.19 Attach / Abnormal case / Failure due to non integrity protection NEC -
R5‑096665 GCF Priority 3 - Addition of EMM test case 9.2.2.2.14 CATR -
R5‑096666 GCF Priority 3 - Addition of EMM test case 9.2.3.1.26 CATR -
R5‑096667 GCF Priority 3 - Addition of EMM test case 9.2.3.1.27 CATR -
R5‑096668 GCF Priority 3 - Addition of EMM test case 9.2.3.1.28 CATR -
R5‑096669 GCF Priority 3 - Addition of EMM test case 9.3.1.15 CATR -
R5‑096670 GCF Priority 3 - Addition of new test case 9.3.1.17 NTT DOCOMO -
R5‑096671 GCF Priority 3 - Correction of TC 9.2.1.2.2 Combined attach procedure / Success / EPS services only / IMSI unknown in HSS NEC -
R5‑096672 GCF Priority 3 - Correction of TC 9.2.1.2.3 Combined attach procedure / Success / EPS services only / MSC temporarily not reachable NEC -
R5‑096673 GCF Priority 3: Introduction of 9.2.3.1.19 Normal tracking area update / rejected / No Suitable Cells in tracking Area Sony Ericsson Mobile -
R5‑096674 Update of work item on Conformance Test Aspects –Support for UTRA HNB (FDD) Huawei -
R5‑096675 LS to GERAN on Inter-RAT Cell Reselection / from GSM_Idle / GPRS Packet_Idle to a UTRA idle CSG cell scenario testing TSG WG RAN5 -
R5‑096676 Update of Applicability table for GCF-Priority3 EMM test cases Sony Ericsson Mobile -
R5‑096677 Introduction of MAC test case for HS-DSCH SPS operation for 1.28Mcps TDD ZTE corporation -
R5‑096678 Correction to test case 8.1.2.21 Panasonic -
R5‑096679 Correction to test case 8.1.2.22 Panasonic -
R5‑096680 C.P0095_E-UTRAN_IW_SigTestSpec-V&V 3GPP2 WG4 -
R5‑096681 ALU-the way forward for LTE-HRPD IWK (proposal) Alcatel-Lucent -
R5‑096682 GCF Priority 3 - Addition of test case 13.3.1.1 CMCC, Huawei, Motorola -
R5‑096683 GCF Priority 3 - Addition of test case 13.3.1.2 CMCC, Huawei, Motorola -
R5‑096684 Status Report for 3.84 Mcps TDD MBSFN Integrated Mobile Broadcast (MBSFN_IMB_UEConTest) IPWireless -
R5‑096685 Work plan for "Conformance test aspects-3.84 Mcps TDD MBSFN Integrated Mobile Broadcastö (MBSFN-IMB_UEConTest)- Status after RAN5#45 IPWireless -
R5‑096686 n: Correction to test case 8.1.2.21a Panasonic -
R5‑096687 Correction to test case 8.1.2.22a Panasonic -
R5‑096688 : Removal of test cases 8.1.2.23, 8.1.2.23a, 8.1.2.24, 8.1.2.24a Panasonic -
R5‑096689 : Correction to test cases 8.1.2.21, 8.1.2.21a,8.1.2.22,8.1.2.22a,8.1.2.23,8.1.2.23a,8.1.2.24,8.1.2.24a Panasonic -
R5‑096690 Addition of a New Test Case for combined routing area updating request rejected Huawei -
R5‑096691 LTE ASP clarifications and update MCC TF160 -
R5‑096692 GCF Priority 3 - Update of E-UTRAN test case 9.2.1.1.20 ZTE corporation -
R5‑096693 GCF Priority 3 - Correction of TC 9.2.1.1.19 Attach / Abnormal case / Failure due to non integrity protection NEC -
R5‑096694 GCF Priority 3: Addition of new test case 9.2.1.1.21: Attach / Abnormal case / success after several attempts due to no network response Motorola -
R5‑096695 GCF Priority 3: Addition of new test case 9.2.1.1.22: : Attach / Abnormal case / unssuccesful attach after 5 attempts Motorola -
R5‑096696 Chair’s Notes: Outcome of Joint RAN5 3GPP2 WG4 Meeting 28 Oct 09 WG chairman -
R5‑096697 GCF Priority 3 - Addition of test case 13.3.1.1 CMCC, Huawei, Motorola -
R5‑096698 GCF Priority 3 - Addition of test case 13.3.1.2 CMCC, Huawei, Motorola -
R5‑096699 invitation to RAN5 TTCN workshop #9 ETSI -
R5‑096700 Reassessing the bandwidth restriction for Protocol Conformance Testing Rohde&Schwarz -
R5‑096701 3GPP – 3GPP2 inter-RAT test cases WG chairman -
R5‑096702 Add applicabilities for test case 8.1.3.7 and 8.5.2.1 Telecom Italia -
R5‑096703 GCF Priority 3 - Add applicabilities for new test case 8.3.1.11 ZTE corporation -
R5‑096704 Update of Applicability table for Multi-layer Procedure test cases ZTE corporation -
R5‑096705 EMM CRs from RAN5#45 Nokia -
R5‑096706 Correction to radio bearer configuration 6.10.2.4.6.6 for improvedL2 UL Ericsson -
R5‑096707 Correction to ImprovedL2 radio bearer tc 14.7.3a Ericsson -
R5‑096708 Correction to Improved L2 radio bearer tc 14.7.6c Ericsson -
R5‑096709 LTE Signalling Test Case Prioritisation List Vodafone -
R5‑096710 GCF Priority 3 - Addition of applicability for new LTE-C2k interworking test cases Qualcomm Europe -
R5‑096711 IP control signalling in UE test mode NEC -
R5‑096714 LTE Test Case Update after RAN5#45 WG chairman -
R5‑096717 RAN5 LTE RF-RRM P1 and P2 TCs with status not completed after RAN5#44 Samsung -
R5‑096718 LTE RF: A-SEM update and A-MPR verification Nokia, NTT DOCOMO, Spirent Communications -
R5‑096719 Reassessing the bandwidth restriction for Protocol Conformance Testing Rohde&Schwarz -
R5‑096720 TF 160 Status Report - current TF 160 Manager -
R5‑096721 Deadlines for next 3 months WG Chairman -

page generated from database: 2024-04-22 07:58:53

Get news. Get knowledge. Get involved
Get news.
Get knowledge.
Get involved.
Image
The 5G Standard
3GPP General Enquiries:
info@3gpp.org 


Connect:

Quick Links