3GPP TDocs (written contributions) at meeting
Meeting: R4-78b - 2016-04-11 to 2016-04-15, San Jose del Cabo
meeting id: R4-78b (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R4‑161501 | RAN4-78Bis meeting Agenda | NGComm-Solutions | imported from 3GU |
R4‑161502 | RAN4-78 meeting report | MCC | imported from 3GU |
R4‑161503 | Performance degradation induced by the extra power amplifiers | CATR | imported from 3GU |
R4‑161504 | MPAC measurement results under different test zones | CATR | imported from 3GU |
R4‑161505 | Way forward for Band 41 HPUE E-UTRA and UTRA ACLR | Sprint, China Telecom, CMCC, Mediatek, Nokia, Skyworks, Qorvo, Samsung | imported from 3GU |
R4‑161506 | UTRA BHH TRP/TRS performance requirements | Motorola Mobility UK Ltd. | imported from 3GU |
R4‑161507 | TP for TR36.714-03-01: delta values on B1+B41+B42 CA | KDDI Corporation | imported from 3GU |
R4‑161508 | TP for TR36.714-04-01: Co-existence studies on B1+B41+B41+B42 CA | KDDI Corporation | imported from 3GU |
R4‑161509 | TP for TR36.714-04-01: delta values on B1+B41+B41+B42 CA | KDDI Corporation | imported from 3GU |
R4‑161510 | TP for TR36.714-04-01: Co-existence studies on B1+B41+B42+B42 CA | KDDI Corporation | imported from 3GU |
R4‑161511 | TP for TR36.714-04-01: delta values on B1+B41+B42+B42 CA | KDDI Corporation | imported from 3GU |
R4‑161512 | TP for TR36.714-05-01: Co-existence studies on B1+B41+B41+B42+B42 CA | KDDI Corporation | imported from 3GU |
R4‑161513 | TP for TR36.714-05-01: delta values on B1+B41+B41+B42+B42 CA | KDDI Corporation | imported from 3GU |
R4‑161514 | Correction on B39 coexistence spurious emission requirements | China Telecom | imported from 3GU |
R4‑161515 | Correction on B39 coexistence spurious emission requirements | China Telecom | imported from 3GU |
R4‑161516 | The requirement of CDMA and NB-IoT coexistence study | China Telecom | imported from 3GU |
R4‑161517 | TP for TR36.714-02-01: Co-existence studies on B11+B46 CA | KDDI Corporation | imported from 3GU |
R4‑161518 | TP for TR36.714-03-01: Co-existence studies on B11+B46+B46 CA | KDDI Corporation | imported from 3GU |
R4‑161519 | TP for TR 36.714 harmonics and inter-modulation analysis for B1+B3+B41 CA combination | China Telecom | imported from 3GU |
R4‑161520 | TP for TR36.714-04-01: Co-existence studies on B11+B46+B46+B46 CA | KDDI Corporation | imported from 3GU |
R4‑161521 | TP for TR36.714-05-01: Co-existence studies on B11+B46+B46+B46+B46 CA | KDDI Corporation | imported from 3GU |
R4‑161522 | TR 36.884 V1.0.0: Performance requirements of MMSE-IRC receiver for LTE BS | China Telecom | imported from 3GU |
R4‑161523 | Summary of BS IRC alignment and impairment results for synchronous network | China Telecom | imported from 3GU |
R4‑161524 | BS IRC impairment results for synchronous network | China Telecom | imported from 3GU |
R4‑161525 | BS IRC alignment results for asynchronous network | China Telecom | imported from 3GU |
R4‑161526 | 36.104 CR for BS MMSE-IRC receiver - Definitions | China Telecom, Huawei, ZTE | imported from 3GU |
R4‑161527 | 36.104 CR for BS MMSE-IRC receiver - Demodulation tests in synchronous interference scneario | China Telecom, Huawei, ZTE | imported from 3GU |
R4‑161528 | 36.104 CR for BS MMSE-IRC receiver - Demodulation tests in asynchronous interference scneario | China Telecom | imported from 3GU |
R4‑161529 | 36.104 CR for BS MMSE-IRC receiver - FRC definitions | China Telecom, Huawei, ZTE | imported from 3GU |
R4‑161530 | 36.104 CR for BS MMSE-IRC receiver - Interference model for synchronous and asynchronous scnearios | China Telecom, Huawei, ZTE | imported from 3GU |
R4‑161531 | TP on BS MMSE-IRC receiver in asynchronous network | China Telecom | imported from 3GU |
R4‑161532 | TP on demodulation performance requirements in synchronous network | China Telecom | imported from 3GU |
R4‑161533 | Additional simulation assumptions for coexistence study on Band 41 HPUE | China Telecom, Sprint, Nokia Networks | imported from 3GU |
R4‑161534 | TP to TR 36.886: Simulation assumptions for B41 HPUE co-existence study in expanded cell size scenario (scenario A1) | China Telecom | imported from 3GU |
R4‑161535 | TP to TR 36.886: Simulation results summary for B41 HPUE co-existence study in expanded cell size scenario (scenario A1) | China Telecom | imported from 3GU |
R4‑161536 | TP to TR 36.886: Simulation assumptions for B41 HPUE co-existence study in modified CLx-ile scenario (scenario A2) | China Telecom | imported from 3GU |
R4‑161537 | TP to TR 36.886: Simulation results summary for B41 HPUE co-existence study in modified CLx-ile scenario (scenario A2) | China Telecom | imported from 3GU |
R4‑161538 | Simulation results for B41 HPUE co-existence study in expanded cell size scenario (scenario A1) | China Telecom | imported from 3GU |
R4‑161539 | Simulation results for B41 HPUE co-existence study in modified CLx-ile scenario (scenario A2) | China Telecom | imported from 3GU |
R4‑161540 | Square brackets on B39 single carrier spurious emission requirements for protecting B3 | China Telecom | imported from 3GU |
R4‑161541 | Square brackets on B39 single carrier spurious emission requirements for protecting B3 | China Telecom | imported from 3GU |
R4‑161542 | TP for TR36.714-04-01: channel bandwidths per operating band and co-existence study for CA_3A-41D | ZTE, Nubia | imported from 3GU |
R4‑161543 | TP for TR36.714-04-01: Delta Tib/Rib and REFSEN for CA_3A-41D | ZTE, Nubia | imported from 3GU |
R4‑161544 | TP for TR36.714-04-01: channel bandwidths per operating band and co-existence study for CA_3C-41C | ZTE, Nubia | imported from 3GU |
R4‑161545 | TP for TR36.714-04-01: Delta Tib/Rib and REFSEN for CA_3C-41C | ZTE, Nubia | imported from 3GU |
R4‑161546 | TP for TR36.714-05-01: channel bandwidths per operating band and co-existence study for CA_3C-41D | ZTE, Nubia | imported from 3GU |
R4‑161547 | TP for TR36.714-05-01: Delta Tib/Rib and REFSEN for CA_3C-41D | ZTE, Nubia | imported from 3GU |
R4‑161548 | TP for TR36.714-02-02: channel bandwidths per operating band and co-existence study for CA_3A-41A 2DL/2UL | ZTE, Nubia | imported from 3GU |
R4‑161549 | MSD for CA_3A-41A 2DL/2UL | ZTE, Nubia | imported from 3GU |
R4‑161550 | TP for TR36.714-02-02: Delta Tib/Rib and REFSEN for CA_3A-41A 2DL/2UL | ZTE, Nubia | imported from 3GU |
R4‑161551 | Discussion on UE reference architecture for Band 3 and Band 39 2DL CA | ZTE, Nubia | imported from 3GU |
R4‑161552 | Impact of Band 41 HPUE on CA band combinations | Samsung | imported from 3GU |
R4‑161553 | ACLR Simulation results for HPUE coexistence study | Samsung | imported from 3GU |
R4‑161554 | The impact of TX EVM on four layer MIMO demodulation | Samsung | imported from 3GU |
R4‑161555 | Discussion on test applicability and antenna connections for 4RX capable UE | Samsung | imported from 3GU |
R4‑161556 | Discussion on RI test for 4RX capable UE | Samsung | imported from 3GU |
R4‑161557 | CC-IM simulation results | Samsung | imported from 3GU |
R4‑161558 | E-mail discussion summary for FD-MIMO Class A PMI test parameters | Samsung | imported from 3GU |
R4‑161559 | Test case design for PDSCH demodulation test | Samsung | imported from 3GU |
R4‑161560 | Test case design for Class A PMI test | Samsung | imported from 3GU |
R4‑161561 | Test case design for Class B K=1 PMI test | Samsung | imported from 3GU |
R4‑161562 | Test case design for Class B K>1 CRI test | Samsung | imported from 3GU |
R4‑161563 | Test case design for MR funcationality test | Samsung | imported from 3GU |
R4‑161564 | Introduction of EB/FD-MIMO channel model using 2D XP antennas at eNB | Samsung | imported from 3GU |
R4‑161565 | Uplink Simulation results for e-MTC | Samsung | imported from 3GU |
R4‑161566 | Simulation reslults MMSE-IRC in BS side | Samsung | imported from 3GU |
R4‑161567 | CR to Correct Notes for CA REFSENS Tables | ZTE, Nubia | imported from 3GU |
R4‑161568 | TR for TR36.866 : Band 41 HPUE impact on BS blocking requirements | SAMSUNG Electronics Co., Ltd. | imported from 3GU |
R4‑161569 | Removal of superseded bands from TS36.101 for future releases | Dish Network | imported from 3GU |
R4‑161570 | AWS 3_4 standalone band or integrated CA WI | Dish Network | imported from 3GU |
R4‑161571 | TP for TR36.749v.0.1.0 Section 8.1.1 (Filter data) | Dish Network | imported from 3GU |
R4‑161572 | Draft CR for the introduction of B70 to TS36.101 | Dish Network | imported from 3GU |
R4‑161573 | General Issues for LTE DL Control Channel IM | MediaTek Inc. | imported from 3GU |
R4‑161574 | Discussion on Interference Model and Simulation Assumptions | MediaTek Inc. | imported from 3GU |
R4‑161575 | CCIM Simulation results | MediaTek Inc. | imported from 3GU |
R4‑161576 | Impact of TX EVM on 4-layer MIMO | MediaTek Inc. | imported from 3GU |
R4‑161577 | Discussion on 4RX CQI tests | MediaTek Inc. | imported from 3GU |
R4‑161578 | UTRA recommended and min/min and min/max TRP and TRS requirements for Tablet for bands I, V and XIX | NTT DOCOMO INC. | imported from 3GU |
R4‑161579 | 3GPP & ITU-R WP 5D Coordination on "5G" | NTT DOCOMO INC. | imported from 3GU |
R4‑161580 | Discussion on BS emission masks for NB-IoT guard-band operation with LTE channel bandwidth of 1.4/3/5 MHz | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑161581 | TP for TR 36.714-02-01: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (12 + 66) | Nokia, T-Mobile USA | imported from 3GU |
R4‑161582 | TP for TR 36.714-02-01: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (29 + 66) | Nokia, Dish Network | imported from 3GU |
R4‑161583 | TP for TR 36.714-03-01: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination CA_2A-66B | Nokia, Verizon | imported from 3GU |
R4‑161584 | TP for TR 36.714-03-01: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination CA_2A-66C | Nokia, Verizon | imported from 3GU |
R4‑161585 | TP for TR 36.714-03-01: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination CA_5A-66B | Nokia, Verizon | imported from 3GU |
R4‑161586 | TP for TR 36.714-03-01: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination CA_5A-66C | Nokia, Verizon | imported from 3GU |
R4‑161587 | TP for TR 36.714-03-01: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination CA_5B-66A | Nokia, Verizon | imported from 3GU |
R4‑161588 | TP for TR 36.714-03-01: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination CA_13A-66B | Nokia, Verizon | imported from 3GU |
R4‑161589 | TP for TR 36.714-03-01: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination CA_13A-66C | Nokia, Verizon | imported from 3GU |
R4‑161590 | TP for TR 36.714-03-01: BS Coexistence Studies of Harmonics and Intermodulation Products caused by LTE 3DL/1UL Advanced Carrier Aggregation with Bands 2, 4, 5 and 12A (RAN#71) | Nokia, U.S. Cellular | imported from 3GU |
R4‑161591 | Clean-up of 3 Band Carrier Aggregation (3DL/1UL) of Bands 2, 4, 5 and 12A | Nokia, U.S. Cellular | imported from 3GU |
R4‑161592 | Required BS studies of Harmonics and Intermodulation Products caused by LTE Advanced 4DL/1UL Carrier Aggregation with Bands 2, 4, 5 and 12A (RAN#71) | Nokia, U.S. Cellular | imported from 3GU |
R4‑161593 | TP for TR 36.714-04-01: BS Coexistence Studies of Harmonics and Intermodulation Products caused by LTE 4DL/1UL Advanced Carrier Aggregation with Bands 2, 4, 5 and 12A (RAN#71) | Nokia, U.S. Cellular | imported from 3GU |
R4‑161594 | TP for TR 36.714-04-01: BS Coexistence Studies of Harmonics and Intermodulation Products caused by LTE 4DL/1UL Advanced Carrier Aggregation with Bands 2, 4, 5 and 30 (RAN#70) | Nokia, AT&T | imported from 3GU |
R4‑161595 | TP for TR 36.714-05-01: BS Coexistence Studies of Harmonics and Intermodulation Products caused by LTE 5DL/1UL Advanced Carrier Aggregation with Bands 2, 4, 5 and 30 (RAN#70) | Nokia, AT&T | imported from 3GU |
R4‑161596 | TP for TR 36.714-02-01: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (3 + 69) | Nokia, Orange | imported from 3GU |
R4‑161597 | Analysis and simulation results on BS RF filtering for 2.6 GHz Supplemental DL band for Region 1 | Nokia | imported from 3GU |
R4‑161598 | TR 37.871 V0.1.0 | Nokia | imported from 3GU |
R4‑161599 | TP for TR 37.871: Necessary changes to the core requirements for Multi-Band Base Station testing with three or more bands | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑161600 | TP for TR 37.871: Generic approach for Multi-Band Base Station testing with three or more bands | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑161601 | System level simulation results for coexistence study on new Band 41 UE power class supporting +26 dBm (urban and suburban areas) | Nokia | imported from 3GU |
R4‑161602 | System level simulation results for coexistence study on new Band 41 UE power class supporting +26 dBm (rural areas) | Nokia | imported from 3GU |
R4‑161603 | Cat-M1 PRACH Initial Simulation Results | Nokia | imported from 3GU |
R4‑161604 | Cat-M1 PUCCH Initial Simulation Results | Nokia | imported from 3GU |
R4‑161605 | Cat-M1 PUSCH Initial Simulation Results | Nokia | imported from 3GU |
R4‑161606 | CR: Cat-M1 PRACH Performance Requirements | Nokia | imported from 3GU |
R4‑161607 | CR: Cat-M1 PUCCH Performance Requirements | Nokia | imported from 3GU |
R4‑161608 | CR: Cat-M1 PUSCH Performance Requirements | Nokia | imported from 3GU |
R4‑161609 | Cat-M1 RRM Test Case List | Nokia, Huawei, HiSilicon, CATT | imported from 3GU |
R4‑161610 | Discussion of MPDCCH RMCs for Cat-M1 RRM Tests | Nokia | imported from 3GU |
R4‑161611 | Discussion of PDSCH RMCs for Cat-M1 RRM Tests | Nokia | imported from 3GU |
R4‑161612 | Discussion of OCNG patterns for Cat-M1 RRM Tests | Nokia | imported from 3GU |
R4‑161613 | CR: MPDCCH RMCs for Cat-M1 RRM Tests | Nokia | imported from 3GU |
R4‑161614 | CR: PDSCH RMCs for Cat-M1 RRM Tests | Nokia | imported from 3GU |
R4‑161615 | CR: OCNG patterns for Cat-M1 RRM Tests | Nokia | imported from 3GU |
R4‑161616 | Discussion: Intra-frequency handover requirements for Cat-M1 UEs | Nokia | imported from 3GU |
R4‑161617 | CR: Intra-frequency handover requirements for Cat-M1 UEs in CEModeA | Nokia | imported from 3GU |
R4‑161618 | Discussion of Intra-frequency handover test cases for Cat-M1 UEs | Nokia | imported from 3GU |
R4‑161619 | CR: Intra-frequency handover test cases for Cat-M1 UEs in CEModeA | Nokia | imported from 3GU |
R4‑161620 | Discussion of UE transmit timing requirements for Cat-M1 UEs | Nokia | imported from 3GU |
R4‑161621 | CR: UE transmit timing requirements for Cat-M1 UEs | Nokia | imported from 3GU |
R4‑161622 | Discussion of UE transmit timing test cases for Cat-M1 UEs | Nokia | imported from 3GU |
R4‑161623 | CR: UE transmit timing test cases for Cat-M1 UEs | Nokia | imported from 3GU |
R4‑161624 | Discussion of PRACH test cases for Cat-M1 UEs | Nokia | imported from 3GU |
R4‑161625 | CR: PRACH test cases for Cat-M1 UEs in CEModeA | Nokia | imported from 3GU |
R4‑161626 | Phase II Practical Link Level Simulation Results (Set 2) for BS MMSE-IRC Receiver | Nokia | imported from 3GU |
R4‑161627 | TP for TR 36.714-02-01 operating bands, CH BW, co-existence studies and delta Tib Rib values for CA_5A-46A | LG Uplus, LG Electronics | imported from 3GU |
R4‑161628 | TP for TR 36.714-03-01 operating bands, CH BW, co-existence studies and delta Tib Rib values for CA_5A-46C | LG Uplus, LG Electronics | imported from 3GU |
R4‑161629 | TP for TR 36.714-04-01 operating bands, CH BW, co-existence studies and delta Tib Rib values for CA_5A-46D | LG Uplus, LG Electronics | imported from 3GU |
R4‑161630 | TP for TR 36.714-05-01 operating bands, CH BW, co-existence studies and delta Tib Rib values for CA_5A-46E | LG Uplus, LG Electronics | imported from 3GU |
R4‑161631 | TP for TR37.842: Adding uncertainty value to the EIRP measurement with Indoor Anechoic Chamber | Sumitomo Elec. Industries, NTT DOCOMO | imported from 3GU |
R4‑161632 | SFN channel model in high speed scenarios | Intel Corporation | imported from 3GU |
R4‑161633 | Discussion on the baseline of receivers in high speed scenarios | Intel Corporation | imported from 3GU |
R4‑161634 | Discussion on CSI reporting in high speed scenarios | Intel Corporation | imported from 3GU |
R4‑161635 | Network assistance for performance enhancement in high speed scenarios | Intel Corporation | imported from 3GU |
R4‑161636 | LTE DL Control Channels IM: UE Capabilities | Intel Corporation | imported from 3GU |
R4‑161637 | LTE DL Control Channels IM: Reference IM receiver structures | Intel Corporation | imported from 3GU |
R4‑161638 | LTE DL Control Channels IM: Interference models | Intel Corporation | imported from 3GU |
R4‑161639 | LTE DL Control Channels IM: UE demodulation test cases | Intel Corporation | imported from 3GU |
R4‑161640 | LTE DL Control Channels IM: Simulation results | Intel Corporation | imported from 3GU |
R4‑161641 | Draft CR on Introduction of the LTE DL Control Channels IM - PDCCH/PCFICH performance requirements | Intel Corporation | imported from 3GU |
R4‑161642 | Draft CR on Introduction of the LTE DL Control Channels IM - Interference models | Intel Corporation | imported from 3GU |
R4‑161643 | eD2D UE-NW Relaying RRM performance requirements | Intel Corporation | imported from 3GU |
R4‑161644 | eD2D UE demodulation performance requirements | Intel Corporation | imported from 3GU |
R4‑161645 | EB/FD MIMO CSI Reporting Requirements | Intel Corporation | imported from 3GU |
R4‑161646 | EB/FD MIMO Class A CSI Reporting Simulation Results | Intel Corporation | imported from 3GU |
R4‑161647 | EB/FD MIMO PDSCH Demodulation Requirements | Intel Corporation | imported from 3GU |
R4‑161648 | Discussion on V2V RRM Impacts | Intel Corporation | imported from 3GU |
R4‑161649 | New Work Item Proposal: Enhanced CRS Interference Mitigation for LTE | Intel Corporation | imported from 3GU |
R4‑161650 | Motivation for new WI proposal on the Enhanced CRS Interference Mitigation for LTE | Intel Corporation | imported from 3GU |
R4‑161651 | Further consideration on LAA measurement requirements | Intel Corporation | imported from 3GU |
R4‑161652 | CR on LAA measurement requirements | Intel Corporation | imported from 3GU |
R4‑161653 | Discussion on enhanced RRM requirements under DRX for HST | Intel Corporation | imported from 3GU |
R4‑161654 | Discussion on 4 RX AP UE PDSCH SDR test and CA tests | Intel Corporation | imported from 3GU |
R4‑161655 | TX EVM impacts on four MIMO layer performances | Intel Corporation | imported from 3GU |
R4‑161656 | Discussion on 4-RX CSI tests | Intel Corporation | imported from 3GU |
R4‑161657 | Discussion on TM9 MBSFN testcase | Intel Corporation | imported from 3GU |
R4‑161658 | Discussion on LAA test scope and scenario | Intel Corporation | imported from 3GU |
R4‑161659 | Discussion on LAA demodulation tests | Intel Corporation | imported from 3GU |
R4‑161660 | Discussion on LAA CSI tests | Intel Corporation | imported from 3GU |
R4‑161661 | Work plan on measurement gap enhancement WI | Intel Corporation | imported from 3GU |
R4‑161662 | On measurement gap enhancement | Intel Corporation | imported from 3GU |
R4‑161663 | WF on measurement gap enhancement | Intel Corporation | imported from 3GU |
R4‑161664 | CR on IEEE802.11 RSSI measurement accuracy tests | Intel Corporation | imported from 3GU |
R4‑161665 | CR on IEEE802.11 RSSI reporting delay tests | Intel Corporation | imported from 3GU |
R4‑161666 | TP for TR37.842: Adding uncertainty value to the EIS measurement with Indoor Anechoic Chamber | Sumitomo Elec. Industries, NTT DOCOMO | imported from 3GU |
R4‑161667 | Discussion on RS-SINR test case selection | ZTE Microelectronics, Nubia | imported from 3GU |
R4‑161668 | Baseline test case list for RS-SINR | ZTE Microelectronics, Nubia | imported from 3GU |
R4‑161669 | Way Forward on test case list for new RS-SINR | ZTE Microelectronics, Nubia | imported from 3GU |
R4‑161670 | Editorial modification on uplink inter-band CA | CATT | imported from 3GU |
R4‑161671 | Updated PDSCH simulation result for TM3 3layer test | CATT | imported from 3GU |
R4‑161672 | Evaluation result on TM9 tests with MBSFN subframes configured for PDSCH | CATT | imported from 3GU |
R4‑161673 | Evaluation result on TX EVM impact | CATT | imported from 3GU |
R4‑161674 | CQI simulation result for 4RX | CATT | imported from 3GU |
R4‑161675 | Low rank PMI simulation result for 4RX | CATT | imported from 3GU |
R4‑161676 | TP for TR 36.714-02-01: CA_8A-39A UE RF relaxation | CATT | imported from 3GU |
R4‑161677 | Discussion on RAN4 V2V co-existence study | CATT | imported from 3GU |
R4‑161678 | Way forward on performance metric of V2V system | CATT | imported from 3GU |
R4‑161679 | Discussion on V2V UE RF requirement | CATT | imported from 3GU |
R4‑161680 | Discussion on measurement requirements for LAA | CATT | imported from 3GU |
R4‑161681 | Modification on measurement requirements under Frame Structure 3 | CATT | imported from 3GU |
R4‑161682 | Discussion on measurement accuracy requirements for LAA | CATT | imported from 3GU |
R4‑161683 | Introduction of RSRP/RSRQ measurement requirements for LAA | CATT | imported from 3GU |
R4‑161684 | Removal of conditions for intra-frequency relative RSRQ measurement accuracy requirements under operation with frame structure 3 | CATT | imported from 3GU |
R4‑161685 | Discussion on UE demodulation requirements for SFN scenarios | CATT | imported from 3GU |
R4‑161686 | Discussion on RRM requirements in DRX under high speed scenarios | CATT | imported from 3GU |
R4‑161687 | Channel model for the SFN scenarios | CATT | imported from 3GU |
R4‑161688 | Discussion on the RLM requirements under high speed scenarios | CATT | imported from 3GU |
R4‑161689 | TDD-FDD DC Radio Link Monitoring Test for In-sync in DRX for PSCell | CATT | imported from 3GU |
R4‑161690 | Event triggered reporting on LAA deactivated SCells and interruption probability (0.5%) without DRX | CATT | imported from 3GU |
R4‑161691 | LAA SCell activation and deactivation for known SCells without DRX | CATT | imported from 3GU |
R4‑161692 | Discussion on V2V RRM requirements | CATT | imported from 3GU |
R4‑161693 | 4DL CA Phase I tests #9_4DL FDD CA SCell activation and deactivation for known SCells without DRX | CATT | imported from 3GU |
R4‑161694 | 4DL CA Phase I tests #10_4DL TDD CA SCell activation and deactivation for known SCells without DRX | CATT | imported from 3GU |
R4‑161695 | 5DL CA Phase I tests #11_5DL FDD CA SCell activation and deactivation for known SCells without DRX | CATT | imported from 3GU |
R4‑161696 | 5DL CA Phase I tests #12_5DL TDD CA SCell activation and deactivation for known SCells without DRX | CATT | imported from 3GU |
R4‑161697 | eMTC Phase I tests_E-UTRAN FDD UE Timing Advance Adjustment Accuracy Test under normal coverage | CATT | imported from 3GU |
R4‑161698 | E-UTRAN HD-FDD UE Timing Advance Adjustment Accuracy Test under normal coverage | CATT | imported from 3GU |
R4‑161699 | E-UTRAN TDD UE Timing Advance Adjustment Accuracy Test under normal coverage | CATT | imported from 3GU |
R4‑161700 | TP for TR37.842: Improvements to radiated transmite power requirements in section 7 .1 | CATT | imported from 3GU |
R4‑161701 | TP for TR37.842: installing reference point in OTA testing | CATT | imported from 3GU |
R4‑161702 | Disscussion on radiated transmit power conformance testing | CATT | imported from 3GU |
R4‑161703 | Discussion on potential OTA test methods | Ericsson | imported from 3GU |
R4‑161704 | Considerations on OTA receiver blocking for AAS BS | Ericsson | imported from 3GU |
R4‑161705 | Draft text related to radiated transmit power test requirement in TS 37.145-2, clause 6 | Ericsson | imported from 3GU |
R4‑161706 | Draft text related to OTA sensitivity test requirement in TS 37.145-2, clause 7 | Ericsson | imported from 3GU |
R4‑161707 | TP for TR 37.842: Editorial corrections with respect to q, j and Q, F variables used in sub-clause 3.2, clause 7 and 9 | Ericsson | imported from 3GU |
R4‑161708 | TP for TR 37.842: Updating background on EIRP accuracy in sub-clause 7.1.2.3 | Ericsson | imported from 3GU |
R4‑161709 | TP for TS 37.145-1: Adding informative Annex with information about how to derive interference signal level for TX IMD | Ericsson | imported from 3GU |
R4‑161710 | Motivation for enhancements to UMTS and LTE increased UE carrier monitoring | Ericsson | imported from 3GU |
R4‑161711 | WID for Incmon Enhancement | Ericsson | imported from 3GU |
R4‑161712 | Reference measurement channel for LAA RRM testing | Ericsson | imported from 3GU |
R4‑161713 | LBT model for LAA RRM testing | Ericsson | imported from 3GU |
R4‑161714 | RRM test case list for licence assisted access | Ericsson | imported from 3GU |
R4‑161715 | RSSI RRM test cases for LAA | Ericsson | imported from 3GU |
R4‑161716 | Review of RLM test cases for type 2 UEs | Ericsson | imported from 3GU |
R4‑161717 | Antenna connection method for RLM and RRM tests with 4RX | Ericsson | imported from 3GU |
R4‑161718 | RRM test cases for DC; SSTD accuray tests | Ericsson | imported from 3GU |
R4‑161719 | RRM test cases for DC; SSTD delay tests | Ericsson | imported from 3GU |
R4‑161720 | E-UTRAN FDD-TDD and TDD-FDD DC interruption at transitions between active and non-active during DRX in synchronous DC | Ericsson | imported from 3GU |
R4‑161721 | RRM requirements for idle mode in high speed scenarios | Ericsson | imported from 3GU |
R4‑161722 | RRM requirements for connected mode in high speed scenarios | Ericsson | imported from 3GU |
R4‑161723 | Considerations on using multiple RF chains for interfrequency measurements | Ericsson | imported from 3GU |
R4‑161724 | Considerations on using measurement gaps for interruption control | Ericsson | imported from 3GU |
R4‑161725 | Considerations on shorter MGL for syncronous interfrequency measurements | Ericsson | imported from 3GU |
R4‑161726 | RRM requirements for New Radio Access Technology | Ericsson | imported from 3GU |
R4‑161727 | RAN4 work plan for Study on NR New Radio Access Technology | Ericsson | imported from 3GU |
R4‑161728 | RF parameters for sharing studies in ITU-R WP5D | Ericsson | imported from 3GU |
R4‑161729 | Draft LS to RAN1 on Parameters for WP5D Sharing and compatibility studies | Ericsson | imported from 3GU |
R4‑161730 | Proposed frequency range for WP 5D LS and new RAT SI | KT Corporation | imported from 3GU |
R4‑161731 | TP for TR 36.714-02-01: LTE Advanced Carrier Aggregation of Band Combination (3+21: 2DL/1UL) | NTT DOCOMO, INC. | imported from 3GU |
R4‑161732 | TP for TR 36.714-03-01: LTE Advanced Carrier Aggregation of Band Combination (1+46: 3DL/1UL) | NTT DOCOMO, INC. | imported from 3GU |
R4‑161733 | TP for TR 36.714-04-01: LTE Advanced Carrier Aggregation of Band Combination (1+46: 4DL/1UL) | NTT DOCOMO, INC. | imported from 3GU |
R4‑161734 | TP for TR 36.714-05-01: LTE Advanced Carrier Aggregation of Band Combination (1+46: 5DL/1UL) | NTT DOCOMO, INC. | imported from 3GU |
R4‑161735 | CSI requirements for 2DL FDD-TDD for UE Cat 3 (Rel 12) | ROHDE & SCHWARZ | imported from 3GU |
R4‑161736 | CSI requirements for 2DL FDD-TDD for UE Cat 3 (Rel 13) | ROHDE & SCHWARZ | imported from 3GU |
R4‑161737 | Wrong RMC description in overview table (Rel-12) | ROHDE & SCHWARZ | imported from 3GU |
R4‑161738 | Wrong RMC description in overview table (Rel-13) | ROHDE & SCHWARZ | imported from 3GU |
R4‑161739 | On HST - Unidirectional SFN scenario | ROHDE & SCHWARZ | imported from 3GU |
R4‑161740 | CR: Correction to Band 66 notes in E-UTRA band groups | Dish Network | imported from 3GU |
R4‑161741 | Criteria for capturing test methods in TS | Ericsson | imported from 3GU |
R4‑161742 | Capturing the limits and scope of each test method | Ericsson | imported from 3GU |
R4‑161743 | Test Methods measurement procedure for AAS polarization properties | Ericsson | imported from 3GU |
R4‑161744 | How to capture each uncertainty contribution | Ericsson | imported from 3GU |
R4‑161745 | TP to TR 37.842 Section 10.3.1.1.2.1 for EIRP description for CATR | Ericsson | imported from 3GU |
R4‑161746 | TP to TR 37.842 Section 10.3.2.1.2.1 for EIS description for CATR | Ericsson | imported from 3GU |
R4‑161747 | TP to TR 37.842 Section 10.3.1.1.2.2 for EIRP procedure for CATR | Ericsson | imported from 3GU |
R4‑161748 | TP to TR 37.842 Section 10.3.2.1.2.2 for EIS procedure for CATR | Ericsson | imported from 3GU |
R4‑161749 | AAS Unwanted Emission | Ericsson | imported from 3GU |
R4‑161750 | TR 36.858 V0.2.0: LTE 2.6 GHz FDD SDL band (2570-2620 MHz) for Region 1 | ORANGE | imported from 3GU |
R4‑161751 | TP for TR 36.858: Operating band number and EARFCN for LTE 2.6 GHz FDD SDL band for Region 1 | ORANGE | imported from 3GU |
R4‑161752 | TP to TR 36.858: BS specification impact due to introduction of Band [69] | ORANGE | imported from 3GU |
R4‑161753 | Scenarios for V2V Requirements Analysis | Ericsson Inc. | imported from 3GU |
R4‑161754 | Multi-carrier scenarios for V2V | Ericsson Inc. | imported from 3GU |
R4‑161755 | Simulation assumptions for V2V Co-existence Analysis | Ericsson Inc. | imported from 3GU |
R4‑161756 | RF requirements for V2V in Licensed Bands | Ericsson Inc. | imported from 3GU |
R4‑161757 | Initial Simulation Results for V2V Adjacent Channel Co-existence | Ericsson Inc. | imported from 3GU |
R4‑161758 | Pcmax Discrepancy Between TS 36.101 and TS 36.213 for ProSe | Ericsson Inc. | imported from 3GU |
R4‑161759 | Band 41 HPUE impact on Band 7 | Sprint, Skyworks, Qorvo, TCL Communications | imported from 3GU |
R4‑161760 | TS 37.105 Correction on interfering signal level for TX intermodulation | Ericsson | imported from 3GU |
R4‑161761 | TR 37.852 Correction on interfering signal level for TX intermodulation | Ericsson | imported from 3GU |
R4‑161762 | TS 37.105 Editorial corrections and alignment with drafting rules | Ericsson | imported from 3GU |
R4‑161763 | TS 37.145-1 TP for clause 7 - Conducted Receiver Charcteristics | Ericsson | imported from 3GU |
R4‑161764 | TS 37.145-1: TP for Addition of transmitter intermodulation requirement in clause 6.7 | Ericsson | imported from 3GU |
R4‑161765 | TS 37.145-1: TP for clause 6.6: Unwanted Emissions | Ericsson | imported from 3GU |
R4‑161766 | LS to RAN2 regarding additional signalling needs for Band 41 HPUE | SPRINT Corporation | imported from 3GU |
R4‑161767 | LS to RAN2 regarding additional signalling needs for Band 41 HPUE | SPRINT Corporation | imported from 3GU |
R4‑161768 | WF on Tx EVM for 4 layer MIMO | Qualcomm Incorporated | imported from 3GU |
R4‑161769 | Tx EVM requirement for 4 layer MIMO with MMSE-IRC receiver | Qualcomm Incorporated | imported from 3GU |
R4‑161770 | Introduction of Tx EVM requirement for BS supporting 4 layer MIMO | Qualcomm Incorporated | imported from 3GU |
R4‑161771 | On 4 layer SDR test for CA | Qualcomm Incorporated | imported from 3GU |
R4‑161772 | TM9 PDSCH demodulation test in MBSFN subframe | Qualcomm Incorporated | imported from 3GU |
R4‑161773 | Simulation results for 4 Rx CQI definition test | Qualcomm Incorporated | imported from 3GU |
R4‑161774 | Simulation results for 4 Rx MMSE-IRC receiver CQI test | Qualcomm Incorporated | imported from 3GU |
R4‑161775 | 8 Tx PMI test for 4 Rx UE | Qualcomm Incorporated | imported from 3GU |
R4‑161776 | UE capability for CRS-IM receiver | Qualcomm Incorporated | imported from 3GU |
R4‑161777 | PDSCH demodulation test with Rel-13 DM-RS enhancement | Qualcomm Incorporated | imported from 3GU |
R4‑161778 | PMI test for CSI class A | Qualcomm Incorporated | imported from 3GU |
R4‑161779 | CRI feedback test for EB/FD-MIMO CSI class B with K>1 | Qualcomm Incorporated | imported from 3GU |
R4‑161780 | TM10 CQI test for interference measurement restriction | Qualcomm Incorporated | imported from 3GU |
R4‑161781 | PMI test for CSI class B K=1 with W2-only PMI feedback | Qualcomm Incorporated | imported from 3GU |
R4‑161782 | LAA demodulation performance requirements | Qualcomm Incorporated | imported from 3GU |
R4‑161783 | CQI test framework for LAA | Qualcomm Incorporated | imported from 3GU |
R4‑161784 | Guidelines for Laboratories and Test Solutions Utilized for MIMO OTA Performance and Harmonization Work | Spirent Communications, AT&T, Motorola Mobility | imported from 3GU |
R4‑161785 | New test cases: E-UTRAN TDD-FDD DC intra-frequency event triggered reporting with DRX in synchronous DC with PCell in FDD/PCell in TDD | Nokia | imported from 3GU |
R4‑161786 | Inter-band ProSe Clarifications | Ericsson Inc. | imported from 3GU |
R4‑161787 | On test cases for PUCCH SCell activation delay | Nokia | imported from 3GU |
R4‑161788 | List of test cases for PUCCH Scell activation delay | Nokia | imported from 3GU |
R4‑161789 | E-UTRAN FDD activation and deactivation of known PUCCH SCell in non-DRX with and without valid UL timing | Nokia | imported from 3GU |
R4‑161790 | New test cases: Event triggered reporting on deactivated SCells and interruption probability (0.5%) without DRX (FDD 4 DL CA and TDD 4 DL CA) | Nokia | imported from 3GU |
R4‑161791 | New test cases: Event triggered reporting on deactivated SCells and interruption probability (0.5%) without DRX (FDD 5 DL CA and TDD 5 DL CA) | Nokia | imported from 3GU |
R4‑161792 | Discussion on simulation assumptions for NB-IoT cell detection | Nokia | imported from 3GU |
R4‑161793 | DRX, measurement capability and number of cells for NB-IoT | Nokia | imported from 3GU |
R4‑161794 | NB-IoT measurement performance and simulation results | Nokia | imported from 3GU |
R4‑161795 | Discussion on other RRM requirements for NB-IoT. | Nokia | imported from 3GU |
R4‑161796 | Additional simulation for adjacent channel co-existence of B41 HPUE | Ericsson | imported from 3GU |
R4‑161797 | Band 68 UE spurious emissions | Ericsson | imported from 3GU |
R4‑161798 | B68 UE spurious emissions for DTT protection in the arab region | Ericsson | imported from 3GU |
R4‑161799 | LS Out: Response to LS on WORK TOWARDS REV. 1 OF RECOMMENDATIONS ITU-R ITU-R WP5D^^ M.2070 AND M.2071 - QUESTIONS FOR CLARIFICATION WITHIN 3GPP SPECIFICATIONS (ITU-R WP5D) | Ericsson | imported from 3GU |
R4‑161800 | Regulatory requirements for the 5.9GHz band | Ericsson | imported from 3GU |
R4‑161801 | Band plan for V2X in unlicensed spectrum | Ericsson | imported from 3GU |
R4‑161802 | eD2D RRM test case list | Qualcomm Incorporated | imported from 3GU |
R4‑161803 | Details for eD2D RRM test cases | Qualcomm Incorporated | imported from 3GU |
R4‑161804 | eD2D demodulation performance requirements | Qualcomm Incorporated | imported from 3GU |
R4‑161805 | DSRC-V2V adjacent channel coexistence in unlicensed ITS (5.9GHz) spectrum | Qualcomm Incorporated | imported from 3GU |
R4‑161806 | Regulatory requirements for V2V in unlicensed ITS (5.9GHz) spectrum | Qualcomm Incorporated | imported from 3GU |
R4‑161807 | Clarification on Pcmax for eD2D | Qualcomm Incorporated | imported from 3GU |
R4‑161808 | Spectrum consideration in New Radio | Intel | imported from 3GU |
R4‑161809 | Considerations from RF perspectives | Intel | imported from 3GU |
R4‑161810 | RX requirements in eMTC | Intel | imported from 3GU |
R4‑161811 | Simulation results of coexistence studies between NB-IoT and LTE, in-band case | Intel Corporation | imported from 3GU |
R4‑161812 | Simulation results of coexistence studies between NB-IoT and LTE, guard-band case | Intel Corporation | imported from 3GU |
R4‑161813 | On NB-IoT ACLR | Intel Corporation | imported from 3GU |
R4‑161814 | On eMTC RRM performance test cases and requirements | Intel Corporation | imported from 3GU |
R4‑161815 | Way Forward on continuous uplink transmission in eMTC | Intel Corporation | imported from 3GU |
R4‑161816 | DRAFT LS to RAN1 on continuous uplink transmission in eMTC | Intel Corporation | imported from 3GU |
R4‑161817 | Initial eMTC demodulation results | Intel Corporation | imported from 3GU |
R4‑161818 | Spectral emission mask evaluation results | Intel Corporation | imported from 3GU |
R4‑161819 | Views on UE REFSENS requirements | Intel Corporation | imported from 3GU |
R4‑161820 | Views on UE out of band blocking | Intel Corporation | imported from 3GU |
R4‑161821 | Way Forward on continuous uplink transmission in NB-IoT | Intel Corporation | imported from 3GU |
R4‑161822 | DRAFT LS to RAN1 on continuous uplink transmission in NB-IoT | Intel Corporation | imported from 3GU |
R4‑161823 | Simulation results of RRM measurements for NB-IoT | Intel Corporation | imported from 3GU |
R4‑161824 | On the testability of RF requirements for potential 5G devices | Intel Corporation | imported from 3GU |
R4‑161825 | MIMO OTA Work Plan | Intel Corporation | imported from 3GU |
R4‑161826 | Views on test case parameters and the FoM | Intel Corporation | imported from 3GU |
R4‑161827 | Views on lab alignment procedures | Intel Corporation | imported from 3GU |
R4‑161828 | MIMO OTA Way Forward | Intel Corporation | imported from 3GU |
R4‑161829 | MIMO OTA evening adhoc notes | Intel Corporation | imported from 3GU |
R4‑161830 | DRAFT LS to CTIA on test case parameters and harmonization work plan | Intel Corporation | imported from 3GU |
R4‑161831 | Discussion on RRM core requirement list for V2V | LG Electronics Inc. | imported from 3GU |
R4‑161832 | WF for list of RRM core requirement | LG Electronics Inc. | imported from 3GU |
R4‑161833 | Discussion on GNSS and high speed for RRM core requirement | LG Electronics Inc. | imported from 3GU |
R4‑161834 | Discussion on E-UTRAN intra-frequency measurements with FS3 | LG Electronics Inc. | imported from 3GU |
R4‑161835 | Discussion on RRM measurement accuracy test with FS3 | LG Electronics Inc. | imported from 3GU |
R4‑161836 | CR of FDD intrafrequency absolute and relative RSRP accuracies for SCell with FS3 | LG Electronics Inc. | imported from 3GU |
R4‑161837 | CR of TDD intrafrequency absolute and relative RSRP accuracies for SCell with FS3 | LG Electronics Inc. | imported from 3GU |
R4‑161838 | CR of FDD intrafrequency RSRQ meaurement accuracy test for SCell with FS3 | LG Electronics Inc. | imported from 3GU |
R4‑161839 | CR of TDD intrafrequency RSRQ meaurement accuracy test for SCell with FS3 | LG Electronics Inc. | imported from 3GU |
R4‑161840 | CR on measurement reference channel and OCNG with FS3 | LG Electronics Inc. | imported from 3GU |
R4‑161841 | CR on minimum ProSe SCH_RP condition on FDD_F | LG Electronics Inc. | imported from 3GU |
R4‑161842 | CR on minimum ProSe SCH_RP condition on FDD_F | LG Electronics Inc. | imported from 3GU |
R4‑161843 | CR on minimum ProSe SCH_RP condition on FDD_F | LG Electronics Inc. | imported from 3GU |
R4‑161844 | CR of typo in interruption requirements | LG Electronics Inc. | imported from 3GU |
R4‑161845 | Coexistence Simulation Results on Adjacent Channel in Licensed Band for V2V System | ZTE Corporation | imported from 3GU |
R4‑161846 | Corrections to BS spurious emissions requirements in TS25.104 (Rel-12) | ZTE Corporation, Nubia | imported from 3GU |
R4‑161847 | Coexistence simulation results on Adjacent Channel in unlicensed band for V2V system | ZTE Corporation | imported from 3GU |
R4‑161848 | Editorial CR in RSRQ test case for CA in CRS based discovery signal | LG Electronics Inc. | imported from 3GU |
R4‑161849 | Corrections to BS spurious emissions requirements in TS25.104 (Rel-13) | ZTE Corporation, Nubia | imported from 3GU |
R4‑161850 | Editorial CR in RSRQ test case for CA in CRS based discovery signal | LG Electronics Inc. | imported from 3GU |
R4‑161851 | Corrections to BS spurious emissions requirements in TS25.141 (Rel-12) | ZTE Corporation, Nubia | imported from 3GU |
R4‑161852 | Corrections to BS spurious emissions requirements in TS25.141 (Rel-13) | ZTE Corporation, Nubia | imported from 3GU |
R4‑161853 | TP for TR 36.714-00-02: LTE Advanced Carrier Aggregation of Band Combination (1+42: 3DL/2UL) | NTT DOCOMO, INC. | imported from 3GU |
R4‑161854 | TP for TR 36.714-02-02: LTE Advanced Carrier Aggregation of Band Combination (19+42: 2DL/2UL) | NTT DOCOMO, INC. | imported from 3GU |
R4‑161855 | TP for TR 36.714-02-01: LTE Advanced Carrier Aggregation of Band Combination (21+28: 2DL/1UL) | NTT DOCOMO, INC. | imported from 3GU |
R4‑161856 | How to specify MSD requirements for CA_3A-42A(2DL/2UL) | NTT DOCOMO, INC. | imported from 3GU |
R4‑161857 | Unwanted emission requirement for NB-IoT guard-band operation with 1.4/3/5 MHz CBW | NTT DOCOMO INC. | imported from 3GU |
R4‑161858 | Proposal for section structures of BS specs | NTT DOCOMO INC. | imported from 3GU |
R4‑161859 | Cat-M1 PRACH simulation result | Ericsson | imported from 3GU |
R4‑161860 | Cat-M1 PUCCH simulation result | Ericsson | imported from 3GU |
R4‑161861 | Cat-M1 PUSCH simulation result | Ericsson | imported from 3GU |
R4‑161862 | Cat-M1 PBCH simulation result | Ericsson | imported from 3GU |
R4‑161863 | Cat-M1 MPDCCH simulation result | Ericsson | imported from 3GU |
R4‑161864 | Cat-M1 PDSCH simulation result | Ericsson | imported from 3GU |
R4‑161865 | Cat-M1 CQI test simulation result | Ericsson | imported from 3GU |
R4‑161866 | Introduction of PBCH demodulation requirement for Cat-M1 UE | Ericsson | imported from 3GU |
R4‑161867 | Introduction of MPDCCH demodulation requirement for Cat-M1 UE | Ericsson | imported from 3GU |
R4‑161868 | Introduction of PDSCH demodulation requirement for Cat-M1 UE | Ericsson | imported from 3GU |
R4‑161869 | Introduction of CQI test for Cat-M1 UE | Ericsson | imported from 3GU |
R4‑161870 | Simulation results for CSI-RS Class A | Ericsson | imported from 3GU |
R4‑161871 | BS correlation matrix parameters for FD-MIMO | Ericsson | imported from 3GU |
R4‑161872 | The consideration of BS transmitter characteristics for LTE bandwidth flexibility enhancements | China Unicom | imported from 3GU |
R4‑161873 | draft CR for section 6.1/6.5 in TS 36.104 and section 6.1/6.2/6.5 in TS 37.104 | NTT DOCOMO INC. | imported from 3GU |
R4‑161874 | The UE RF consideration for LTE bandwidth flexibility enhancements | China Unicom | imported from 3GU |
R4‑161875 | Update of BS RF requirement agreements and clarifications of open issues | NTT DOCOMO INC. | imported from 3GU |
R4‑161876 | BS REFSENS for NB-IoT | NTT DOCOMO INC. | imported from 3GU |
R4‑161877 | TP for TR 36.714-05-01: LTE Advanced Carrier Aggregation of Band Combination (3+46: 5DL/1UL) | NTT DOCOMO INC. | imported from 3GU |
R4‑161878 | TP for TR 36.714-00-02: LTE Advanced Carrier Aggregation of Band Combination (19+42: 3DL/2UL) | NTT DOCOMO INC. | imported from 3GU |
R4‑161879 | TP for TR 36.714-00-02: LTE Advanced Carrier Aggregation of Band Combination (21+42: 3DL/2UL) | NTT DOCOMO INC. | imported from 3GU |
R4‑161880 | B46 REFSENS test exclusion with UL harmonic interference | MediaTek Inc. | imported from 3GU |
R4‑161881 | CA_1A_3A_41A UE requirement relaxations | MediaTek Inc. | imported from 3GU |
R4‑161882 | Work Plan towards completion of New Radio Access Technology SI in RAN4 | NTT DOCOMO INC. | imported from 3GU |
R4‑161883 | UE downlink performance investigation for HST unidirectional SFN | ITRI | imported from 3GU |
R4‑161884 | MSD analysis for 2UL CA_8A_41A | MediaTek Inc. | imported from 3GU |
R4‑161885 | HPUE impact to CA | MediaTek Inc. | imported from 3GU |
R4‑161886 | Revision of WID: LTE Advanced inter-band CA Rel-14 for 2DL/1UL | Qualcomm Incorporated | imported from 3GU |
R4‑161887 | TR: 3GPP TR 36.714-02-01 | Qualcomm Incorporated | imported from 3GU |
R4‑161888 | TP for TR: Scope of TR 36 714-02-01_Rel14_2DL 1UL CA | Qualcomm Incorporated | imported from 3GU |
R4‑161889 | XDL 2UL IMDs, testpoints and CFs | Qualcomm Incorporated | imported from 3GU |
R4‑161890 | TX Challenges for 256 QAM | Qualcomm Incorporated | imported from 3GU |
R4‑161891 | NB-IoT MPR | Qualcomm Incorporated | imported from 3GU |
R4‑161892 | NB IoT Frequency error | Qualcomm Incorporated | imported from 3GU |
R4‑161893 | TP for 36.714-03-01: Channel Bandwidth and BS coexistence studies of B3+B3+B7 CA | CHTTL, Nokia | imported from 3GU |
R4‑161894 | TP for 36.714-03-01: Channel Bandwidth and BS coexistence studies of B3+B7+B7 CA | CHTTL, Nokia | imported from 3GU |
R4‑161895 | 3GPP MIMO OTA MPAC data template for performance requirement phase | ROHDE & SCHWARZ | imported from 3GU |
R4‑161896 | WF on task for WRC-19 agenda item 1.13 | NTT DOCOMO INC. | imported from 3GU |
R4‑161897 | Harmonization between B5 and B19 for NB-IoT | NTT DOCOMO INC. | imported from 3GU |
R4‑161898 | Harmonization between B5 and B19 for eMTC | NTT DOCOMO, INC. | imported from 3GU |
R4‑161899 | Correcting fallback inconsistencies in CA of B41 and B42 in REL-13 | SoftBank Corp. | imported from 3GU |
R4‑161900 | TP for 36.714-03-01: Channel Bandwidth and BS coexistence studies of B7+B7+B8 CA | CHTTL, Nokia | imported from 3GU |
R4‑161901 | TP for TR36.714-02-01: Finalization of B8+B28 (2DL/1UL) | SoftBank Corp. | imported from 3GU |
R4‑161902 | TP to TR 36.714-03-01: Additional bandwidth combination set for CA_3A-7A-8A | CHTTL | imported from 3GU |
R4‑161903 | TP for TR36.714-02-01: IMD/Harmonics Issues on LTE-A Inter-band Carrier Aggregation (2DL/1UL) of Band 11 and Band 28 | SoftBank Corp. | imported from 3GU |
R4‑161904 | TP for TR36.714-02-01: IMD/Harmonics Issues and relaxations on LTE-A Inter-band Carrier Aggregation (2DL/1UL) of Band 11 and Band 41 | SoftBank Corp. | imported from 3GU |
R4‑161905 | TP for TR36.714-02-01: IMD/Harmonics Issues and relaxations on LTE-A Inter-band Carrier Aggregation (2DL/1UL) of Band 11 and Band 42 | SoftBank Corp. | imported from 3GU |
R4‑161906 | TP for Rel-13 3DL TR36.714-03-01: Finalization of LTE-A Inter-band Carrier Aggregation (3DL/1UL) of Band 11, Band 41 and Band 41 | SoftBank Corp. | imported from 3GU |
R4‑161907 | TP for Rel-13 3DL TR36.714-03-01: Finalization of LTE-A Inter-band Carrier Aggregation (3DL/1UL) of Band 11, Band 42 and Band 42 | SoftBank Corp. | imported from 3GU |
R4‑161908 | Revised WID: Basket WI for LTE Advanced inter-band CA Rel-14 for 4DL/1UL | Ericsson | imported from 3GU |
R4‑161909 | Revised WID: Basket WI for LTE Advanced Intra-band CA | Ericsson | imported from 3GU |
R4‑161910 | Introduction of Rel-14 4DL scope as agreed in basket WID at RAN #71 | Ericsson | imported from 3GU |
R4‑161911 | Introduction of Rel-14 intra-band scope as agreed in basket WID at RAN #71 | Ericsson | imported from 3GU |
R4‑161912 | Introduction of Rel-14 4DL/1UL combinations in 36.101 | Ericsson | imported from 3GU |
R4‑161913 | Introduction of Rel-14 4DL/1UL combinations in 36.104 | Ericsson | imported from 3GU |
R4‑161914 | Introduction of Rel-14 4DL/1UL combinations in 36.141 | Ericsson | imported from 3GU |
R4‑161915 | Introduction of Rel-14 4DL/1UL combinations in 36.133 | Ericsson | imported from 3GU |
R4‑161916 | Introduction of Rel-14 Intra-band combinations in 36.101 | Ericsson | imported from 3GU |
R4‑161917 | Introduction of Rel-14 Intra-band combinations in 36.104 | Ericsson | imported from 3GU |
R4‑161918 | Introduction of Rel-14 Intra-band combinations in 36.141 | Ericsson | imported from 3GU |
R4‑161919 | Introduction of Rel-14 Intra-band combinations in 36.133 | Ericsson | imported from 3GU |
R4‑161920 | Co-existence analysis for 2A-46C and 7A-46C | Ericsson | imported from 3GU |
R4‑161921 | Co-existence analysis for 2A-46D and 7A-46D | Ericsson | imported from 3GU |
R4‑161922 | Co-existence analysis for 2A-46E | Ericsson | imported from 3GU |
R4‑161923 | TP to 36.714-03-01 for fallbacks to 2A-4A-5B-30A, 2C-5B-30A and 4A-4A-5B-30A | Ericsson, AT&T | imported from 3GU |
R4‑161924 | TP to 36.714-04-01 for fallbacks to 2A-4A-5B-30A, 2C-5B-30A and 4A-4A-5B-30A | Ericsson, AT&T | imported from 3GU |
R4‑161925 | TP to 36.714-05-01 for 2A-4A-5B-30A, 2C-5B-30A and 4A-4A-5B-30A | Ericsson, AT&T | imported from 3GU |
R4‑161926 | TP to 36.714-03-01 for fallbacks to 1A-3A-7A-20A-42A | Ericsson | imported from 3GU |
R4‑161927 | TP to 36.714-04-01 for fallbacks to 1A-3A-7A-20A-42A | Ericsson | imported from 3GU |
R4‑161928 | TP to 36.714-05-01 for 1A-3A-7A-20A-42A | Ericsson | imported from 3GU |
R4‑161929 | CR to introduce the approved TP R4-161468 to 36.857-13; introduction of CA_1A_3A-7C-28A and CA_3C-7C-28A. | Ericsson | imported from 3GU |
R4‑161930 | TR 4DL/1UL TR 36.714-04-01 | Ericsson | imported from 3GU |
R4‑161931 | TR Intra-band TR 36.714-00-00 | Ericsson | imported from 3GU |
R4‑161932 | Proposal for revision of EMC standards for base station and mobile terminal equipments | CATR | imported from 3GU |
R4‑161933 | Discussion on UE Behavior in C-DRX for Control Channel IM | LG Electronics Inc. | imported from 3GU |
R4‑161934 | WF on CCIM UE Behavior during C-DRX | LG Electronics Inc. | imported from 3GU |
R4‑161935 | Simulation results for CCIM in Asynchronous network | LG Electronics Inc. | imported from 3GU |
R4‑161936 | Simulation results for CCIM in Synchronous network | LG Electronics Inc. | imported from 3GU |
R4‑161937 | Discussion on demodulation performance for LAA | LG Electronics Inc. | imported from 3GU |
R4‑161938 | Discussion on Implementation Issue for CSI measurement in LAA | LG Electronics Inc. | imported from 3GU |
R4‑161939 | Simulation results for 4 Rx SDR tests | LG Electronics Inc. | imported from 3GU |
R4‑161940 | TM9 PDSCH demodulation in MBSFN subframe | LG Electronics Inc. | imported from 3GU |
R4‑161941 | Summary of power leakage level between LTE and NB-IoT | ZTE Corporation | imported from 3GU |
R4‑161942 | Updated simulation results for in-band scenario | ZTE Corporation | imported from 3GU |
R4‑161943 | Updated simulation results for guard band scenario | ZTE Corporation | imported from 3GU |
R4‑161944 | RRM measurement of NB-IoT | ZTE Corporation | imported from 3GU |
R4‑161945 | Analysis of uplink transmit timing in NB-IoT | Ericsson | imported from 3GU |
R4‑161946 | Analysis of Random Access in NB-IoT | Ericsson | imported from 3GU |
R4‑161947 | Link simulations for cell search in NB-IoT | Ericsson | imported from 3GU |
R4‑161948 | TP to TR 36.714-02-01: Additional bandwidth combination set for CA_7A-8A | CHTTL | imported from 3GU |
R4‑161949 | TP to TR 36.714-00-00: Additional bandwidth combination set for CA_7A-7A | CHTTL | imported from 3GU |
R4‑161950 | Re-consider the channel model | MediaTek Inc. | imported from 3GU |
R4‑161951 | Impact of lower SNR and larger Dmin to the advanced receiver performance in Bi-directional scenario | MediaTek Inc. | imported from 3GU |
R4‑161952 | Analysis on the SFN deployment by Uni-direction | MediaTek Inc. | imported from 3GU |
R4‑161953 | eMIMO-Type A results for simulation alignment | MediaTek Inc. | imported from 3GU |
R4‑161954 | Test setup for eMIMO-Type B with K larger than one | MediaTek Inc. | imported from 3GU |
R4‑161955 | TR update 36.714-00-02 v0.1.0 for xDL/2UL CA | LG Electronics Inc. | imported from 3GU |
R4‑161956 | TP for general part for xDL/2UL CA | LG Electronics Inc. | imported from 3GU |
R4‑161957 | TP on the self-desense analysis results for xDL/2UL CA band combinations | LG Electronics Inc. | imported from 3GU |
R4‑161958 | Downlink power allocation for PDSCH with DMRS based transmission mode | Huawei, HiSilicon | imported from 3GU |
R4‑161959 | Clarification on NAICS signalling | Huawei, HiSilicon | imported from 3GU |
R4‑161960 | Demodulation performance requirement with minimum spacing | Huawei, HiSilicon | imported from 3GU |
R4‑161961 | Discussion on test requirements on new UE behavior on PDSCH collision with PSS/SSS/PBCH | Huawei, HiSilicon | imported from 3GU |
R4‑161962 | CR on eDC TDD-FDD demodulation requirement | Huawei, HiSilicon | imported from 3GU |
R4‑161963 | PDSCH demodulation performance requirement for LAA | Huawei, HiSilicon | imported from 3GU |
R4‑161964 | Burst transmission model for PDSCH demodulation requirements | Huawei, HiSilicon | imported from 3GU |
R4‑161965 | PDCCH/EPDCCH demodulation performance requirement for LAA | Huawei, HiSilicon | imported from 3GU |
R4‑161966 | CSI test requirements for LAA | Huawei, HiSilicon | imported from 3GU |
R4‑161967 | Further discussion on BS conformance test for LAA | Huawei, HiSilicon | imported from 3GU |
R4‑161968 | Further discussion on UE demodulation test for B5C | Huawei, HiSilicon | imported from 3GU |
R4‑161969 | Addition of performance requirements for FDD CA with PUCCH Scell | Huawei, HiSilicon | imported from 3GU |
R4‑161970 | Addition of performance requirements for TDD CA with PUCCH Scell | Huawei, HiSilicon | imported from 3GU |
R4‑161971 | Addition of performance requirements for TDD-FDD CA with PUCCH Scell | Huawei, HiSilicon | imported from 3GU |
R4‑161972 | Test setup for PUCCH format 4 performance requirements | Huawei | imported from 3GU |
R4‑161973 | Clarification of reference receiver | Huawei | imported from 3GU |
R4‑161974 | Performance comparison between PUCCH format 4 and format 5 | Huawei | imported from 3GU |
R4‑161975 | Further discussion on channel model | Huawei, HiSilicon | imported from 3GU |
R4‑161976 | UE demodulation performance tests for EB/FD-MIMO | Huawei, HiSilicon | imported from 3GU |
R4‑161977 | Discussion on CSI requirement for CSI class B with K>1 | Huawei, HiSilicon | imported from 3GU |
R4‑161978 | Discussion on CSI requirement for CSI class B with K=1 | Huawei, HiSilicon | imported from 3GU |
R4‑161979 | Discussion on CSI test case for MR | Huawei, HiSilicon | imported from 3GU |
R4‑161980 | Discussion on UE and network cooperation | Huawei, HiSilicon | imported from 3GU |
R4‑161981 | Evaluation on the reference receiver for PCFICHPDCCH | Huawei, HiSilicon | imported from 3GU |
R4‑161982 | Discussion on reference receiver in asynchronous network | Huawei, HiSilicon | imported from 3GU |
R4‑161983 | Discussion on interference modeling and simulation assumptions for downlink CCH-IM | Huawei, HiSilicon | imported from 3GU |
R4‑161984 | Simulation results for synchronous network with impairment | Huawei | imported from 3GU |
R4‑161985 | Summary of BS IRC link simulation results in asynchronous network | Huawei | imported from 3GU |
R4‑161986 | Simulation results for asynchronous network | Huawei | imported from 3GU |
R4‑161987 | TP: summary of phase-II simulation results for asynchronous network | Huawei | imported from 3GU |
R4‑161988 | 36.141 CR for BS MMSE-IRC receiver - Synchronous network demodulation conformance tests | Huawei | imported from 3GU |
R4‑161989 | Discussion and simulation results for M-PDSCH | Huawei, HiSilicon | imported from 3GU |
R4‑161990 | Draft CR for eMTC PDSCH demodulation requirement for CE Mode A and CE Mode B | Huawei, HiSilicon | imported from 3GU |
R4‑161991 | Discussion and simulation results for M-PDCCH (control channel) | Huawei, HiSilicon | imported from 3GU |
R4‑161992 | Draft CR for eMTC M-PDCCH demodulation requirement for CE Mode A and CE Mode B | Huawei, HiSilicon | imported from 3GU |
R4‑161993 | Discussion and simulation results for eMTC PBCH | Huawei, HiSilicon | imported from 3GU |
R4‑161994 | Draft CR for eMTC PBCH demodulation requirement for enhanced coverage | Huawei, HiSilicon | imported from 3GU |
R4‑161995 | Discussion and simulation results for eMTC CQI tests | Huawei, HiSilicon | imported from 3GU |
R4‑161996 | Draft CR for eMTC CQI definition test with PUCCH 1-0 | Huawei, HiSilicon | imported from 3GU |
R4‑161997 | Draft CR for eMTC CQI reporting under fading condition with PUSCH 2-0 | Huawei, HiSilicon | imported from 3GU |
R4‑161998 | Discussion and simulation results for eMTC PRACH | Huawei, HiSilicon | imported from 3GU |
R4‑161999 | Draft CR for eMTC PRACH performance requirements | Huawei | imported from 3GU |
R4‑162000 | Discussion and simulation results for eMTC PUCCH | Huawei, HiSilicon | imported from 3GU |
R4‑162001 | Draft CR for eMTC PUCCH performance requirements | Huawei | imported from 3GU |
R4‑162002 | Discussion and simulation results for eMTC PUSCH | Huawei, HiSilicon | imported from 3GU |
R4‑162003 | Draft CR for eMTC PUSCH performance requirements | Huawei | imported from 3GU |
R4‑162004 | Discussion on conformance testing for eMTC BS | Huawei, HiSilicon | imported from 3GU |
R4‑162005 | Test applicability of 4Rx UE | Huawei, HiSilicon | imported from 3GU |
R4‑162006 | 4Rx test with CA | Huawei, HiSilicon | imported from 3GU |
R4‑162007 | Correction on 4Rx demodulation tests | Huawei, HiSilicon | imported from 3GU |
R4‑162008 | Apply 2Rx demodulation performance requirements to 4Rx UE | Huawei, HiSilicon | imported from 3GU |
R4‑162009 | Evaluation and discussion on TM9 with MBSFN subframes for 4Rx | Huawei, HiSilicon | imported from 3GU |
R4‑162010 | Evaluation and discussion on TM9 with MBSFN subframes for 2Rx | Huawei, HiSilicon | imported from 3GU |
R4‑162011 | Evaluation and discussion of 4Rx SDR test | Huawei, HiSilicon | imported from 3GU |
R4‑162012 | Discussion of 4Rx UE with IRC receiver | Huawei, HiSilicon | imported from 3GU |
R4‑162013 | Evaluation and discussion of 4RX CSI requirements | Huawei, HiSilicon | imported from 3GU |
R4‑162014 | Discussion on UE enhancement receiver under SFN channel model | Huawei, HiSilicon | imported from 3GU |
R4‑162015 | Discussion on unidirectional RRH deployment | Huawei, HiSilicon | imported from 3GU |
R4‑162016 | SFN channel model for advanced UE performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑162017 | Performance requirements for advanced UE | Huawei, HiSilicon | imported from 3GU |
R4‑162018 | PUSCH ETU600 test | Huawei | imported from 3GU |
R4‑162019 | Way forward on PUSCH ETU600 test | Huawei | imported from 3GU |
R4‑162020 | On BS frequency pre-compensation solution | Huawei | imported from 3GU |
R4‑162021 | Discussion on cell search for flexible bandwidth | Huawei, HiSilicon | imported from 3GU |
R4‑162022 | TP on the operating band and coexistence analysis for 3DL/2UL inter-band CA in rel-14 | LG Electronics Inc. | imported from 3GU |
R4‑162023 | TP on the operating band and coexistence analysis for 4DL/2UL inter-band CA in rel-14 | LG Electronics Inc. | imported from 3GU |
R4‑162024 | Introduction of additional 3DL/2UL CA band combinations in Rel-14 | LG Electronics Inc. | imported from 3GU |
R4‑162025 | Discussion on RS-SINR measurement accuracy at high SINR level | NTT DOCOMO, INC. | imported from 3GU |
R4‑162026 | Introduction of new CA band combinations for 3DL/2UL inter-band CA in TS36.307 | LG Electronics Inc. | imported from 3GU |
R4‑162027 | Introduction of new CA band combinations for 3DL/2UL inter-band CA in TS36.307 Rel-12 | LG Electronics Inc. | imported from 3GU |
R4‑162028 | RRM requirements for RS-SINR measurement accuracy in wide bandwidth | NTT DOCOMO, INC. | imported from 3GU |
R4‑162029 | Introduction of new CA band combinations for 3DL/2UL inter-band CA in TS36.307 Rel-13 | LG Electronics Inc. | imported from 3GU |
R4‑162030 | RRM test requirements for activation and deactivation of PUCCH SCell | NTT DOCOMO, INC. | imported from 3GU |
R4‑162031 | TP on the operating bands and coexistence analysis for CA_5A-7C in 3DL/1UL CA | LG Electronics Inc., LG Uplus | imported from 3GU |
R4‑162032 | B1+B3+B41 3DL CA architecture consideration | China Unicom | imported from 3GU |
R4‑162033 | TP on the operating bands and coexistence analysis for CA_1A-5A-7C in 4DL/1UL CA | LG Electronics Inc., LG Uplus | imported from 3GU |
R4‑162034 | RLM for eMTC | Qualcomm Incorporated | imported from 3GU |
R4‑162035 | RRM Requirements for LAA | Qualcomm Incorporated | imported from 3GU |
R4‑162036 | Performance Tests for LAA | Qualcomm Incorporated | imported from 3GU |
R4‑162037 | RRM Corrections for eMTC | Qualcomm Incorporated | imported from 3GU |
R4‑162038 | Long DRX Requirements for HST | Qualcomm Incorporated | imported from 3GU |
R4‑162039 | Gaps for Inter-frequency Measurements per Component Carrier | Qualcomm Incorporated | imported from 3GU |
R4‑162040 | Enhanced Gaps for Inter-frequency Measurements | Qualcomm Incorporated | imported from 3GU |
R4‑162041 | Cell Search with Flexible Bandwidth | Qualcomm Incorporated | imported from 3GU |
R4‑162042 | Next Radio Technology SI Scope | Qualcomm Incorporated | imported from 3GU |
R4‑162043 | Band Grouping in the 24-86GHz Range | Qualcomm Incorporated | imported from 3GU |
R4‑162044 | Draft LS out on Rel.13 Capabilities | Qualcomm Incorporated | imported from 3GU |
R4‑162045 | Corrections to BS spurious emissions requirements in TS36.104 (Rel-12) | ZTE Corporation, Nubia | imported from 3GU |
R4‑162046 | Operating band plan in 5.9GHz for V2V Service | LG Electronics Inc. | imported from 3GU |
R4‑162047 | Corrections to BS spurious emissions requirements in TS36.104 (Rel-13) | ZTE Corporation, Nubia | imported from 3GU |
R4‑162048 | Draft reply LS on V2V high power UE requirements | LG Electronics Inc. | imported from 3GU |
R4‑162049 | Corrections to BS spurious emissions requirements in TS36.141 (Rel-12) | ZTE Corporation, Nubia | imported from 3GU |
R4‑162050 | WF on the adjacent coexistence scenarios and parameters at 5.9GHz | LG Electronics Inc. | imported from 3GU |
R4‑162051 | Corrections to BS spurious emissions requirements in TS36.141 (Rel-13) | ZTE Corporation, Nubia | imported from 3GU |
R4‑162052 | TP on adjacent channel co-existence scenarios and parameters for V2V service | LG Electronics Inc. | imported from 3GU |
R4‑162053 | Corrections to BS spurious emissions requirements in TS37.104 (Rel-12) | ZTE Corporation, Nubia | imported from 3GU |
R4‑162054 | TP on ITS regulatory aspects at 5.9GHz operating frequency | LG Electronics Inc. | imported from 3GU |
R4‑162055 | Corrections to BS spurious emissions requirements in TS37.104 (Rel-13) | ZTE Corporation, Nubia | imported from 3GU |
R4‑162056 | Preliminary adjacent channel coexistence simulation results at 2GHz operating band | LG Electronics Inc. | imported from 3GU |
R4‑162057 | Corrections to BS spurious emissions requirements in TS37.141 (Rel-12) | ZTE Corporation, Nubia | imported from 3GU |
R4‑162058 | Alignment of AAS BS output power & Emission requirements | Ericsson | imported from 3GU |
R4‑162059 | TP for TR 37.842 - Alignment of AAS Base station output power requirement | Ericsson | imported from 3GU |
R4‑162060 | TP for TR 37.842 - Alignment of AAS Emission requirements | Ericsson | imported from 3GU |
R4‑162061 | Alignment of AAS Base station output power requirements | Ericsson | imported from 3GU |
R4‑162062 | Alignment of AAS Emission requirements | Ericsson | imported from 3GU |
R4‑162063 | Measurement metrics for testing core requirements | Ericsson | imported from 3GU |
R4‑162064 | Clarification in MB test configuration TC7b | Ericsson | imported from 3GU |
R4‑162065 | Preliminary adjacent channel coexistence simulation results at 5.9GHz operating frequency | LG Electronics Inc. | imported from 3GU |
R4‑162066 | Frequency error for NB-IoT | NTT DOCOMO, INC. | imported from 3GU |
R4‑162067 | Corrections to BS spurious emissions requirements in TS37.141 (Rel-13) | ZTE Corporation, Nubia | imported from 3GU |
R4‑162068 | Way forward on RRM test case list with basic test parameters for Dual Connectivity enhancement | NTT DOCOMO, INC. | imported from 3GU |
R4‑162069 | Details of the RRM test cases for DC enhancement | NTT DOCOMO, INC. | imported from 3GU |
R4‑162070 | TDD-FDD DC test cases list for Rel-12 DC features | NTT DOCOMO, INC. | imported from 3GU |
R4‑162071 | CR on TDD-FDD DC Radio Link Monitoring Test for Out-of-sync | NTT DOCOMO, INC. | imported from 3GU |
R4‑162072 | CR on TDD-FDD 4DL CA activation and deactivation of known SCell in non-DRX | NTT DOCOMO, INC. | imported from 3GU |
R4‑162073 | CR on TDD-FDD 5DL CA activation and deactivation of known SCell in non-DRX | NTT DOCOMO, INC. | imported from 3GU |
R4‑162074 | Summary of open issues of RRM requirements for NB-IoT | NTT DOCOMO, INC. | imported from 3GU |
R4‑162075 | How to specify cell selection requirements for NB-IoT | NTT DOCOMO, INC. | imported from 3GU |
R4‑162076 | RRM requirements related to UE timing for NB-IoT | NTT DOCOMO, INC. | imported from 3GU |
R4‑162077 | In-band emission for NB-IoT | NTT DOCOMO, INC. | imported from 3GU |
R4‑162078 | General aspects for NR BS core requirements | Ericsson | imported from 3GU |
R4‑162079 | Considerations on OTA NR basestation testing | Ericsson | imported from 3GU |
R4‑162080 | NR BS requirement overview | Ericsson | imported from 3GU |
R4‑162081 | Clarifying AAS beam declarations in the context of MIMO operation | Ericsson | imported from 3GU |
R4‑162082 | On beams and “independent power resources” | Ericsson | imported from 3GU |
R4‑162083 | pCR to 37.842: Description of the RX OTA sensitivity requirement | Ericsson | imported from 3GU |
R4‑162084 | pCR to 37.842: Description of the TX radiated power requirement | Ericsson | imported from 3GU |
R4‑162085 | pCR to 37.842: Minimum beam declaration | Ericsson | imported from 3GU |
R4‑162086 | Draft specification text on minimum beam declaration | Ericsson | imported from 3GU |
R4‑162087 | Overview and priorities for AAS Rel-14 | Ericsson | imported from 3GU |
R4‑162088 | Considerations for an OTA EVM requirement | Ericsson | imported from 3GU |
R4‑162089 | Reference sensitivity and minimum sensitivity definitions | Ericsson | imported from 3GU |
R4‑162090 | Transmit intermodulation for NB-IoT | NTT DOCOMO, INC. | imported from 3GU |
R4‑162091 | Updated results for 3/4 layer PDSCH demodulation tests | SAMSUNG Electronics Co., Ltd. | imported from 3GU |
R4‑162092 | Introduction of 4Rx requirement for Band 1 | NTT DOCOMO, INC. | imported from 3GU |
R4‑162093 | TS36.101 Section 5 operating bands (clean up) | Dish Network | imported from 3GU |
R4‑162094 | TP to TR for coexistence study results - standalone operation | Ericsson | imported from 3GU |
R4‑162095 | TP to TR for MSR RF requirement | Ericsson | imported from 3GU |
R4‑162096 | TP to TR for Unwanted emissions mask RF requirement | Ericsson | imported from 3GU |
R4‑162097 | Coexistence evaluation for in band and guard band | Ericsson | imported from 3GU |
R4‑162098 | NB-IoT guard band deployment for small LTE BW (<=5 MHz) | Ericsson | imported from 3GU |
R4‑162099 | BS RF ACLR requirement | Ericsson | imported from 3GU |
R4‑162100 | BS RF Dynamic Range and ICS requirements | Ericsson | imported from 3GU |
R4‑162101 | BS RF REFSENS requirement | Ericsson | imported from 3GU |
R4‑162102 | BS RF ACS abd NB blocking requirements | Ericsson | imported from 3GU |
R4‑162103 | BS RF Blocking requirement | Ericsson | imported from 3GU |
R4‑162104 | BS RF Occupied bandwidth requirement | Ericsson | imported from 3GU |
R4‑162105 | Channel Bandwidth for BS when in band and guard band | Ericsson | imported from 3GU |
R4‑162106 | Draft CR on TS 37.104 MSR RF requirement | Ericsson | imported from 3GU |
R4‑162107 | Drafr CR on TS 36.104 BS RF requirement | Ericsson | imported from 3GU |
R4‑162108 | LS to RAN on new RAN4 TR for documenting multi-node tests for LAA | Ericsson LM | imported from 3GU |
R4‑162109 | Updates on LBT core requirements for TS 36.104 | Ericsson LM | imported from 3GU |
R4‑162110 | TM9 demodulation with MBSFN subframes on 4Rx | ZTE | imported from 3GU |
R4‑162111 | Simulation results for 4Rx CQI reporting | ZTE | imported from 3GU |
R4‑162112 | PMI reporting requirements on 4Rx | ZTE | imported from 3GU |
R4‑162113 | Link level simulation results for EMMSE IRC receiver for DLCCH-IM | ZTE | imported from 3GU |
R4‑162114 | Link level simulation results for MMSE IRC receiver for DLCCH-IM | ZTE | imported from 3GU |
R4‑162115 | Discussion on Asynchronous networks for DLCCH-IM | ZTE | imported from 3GU |
R4‑162116 | Discussion on remaining open issues for DLCCH-IM | ZTE | imported from 3GU |
R4‑162117 | CR on Definitions for DL control channel IM | ZTE | imported from 3GU |
R4‑162118 | CR on PHICH performance requirements for DL control channel IM | ZTE | imported from 3GU |
R4‑162119 | CR on ePDCCH performance requirements for DL control channel IM | ZTE | imported from 3GU |
R4‑162120 | Alignment results for BS IRC receiver requirements for async network | ZTE | imported from 3GU |
R4‑162121 | Impairment results for BS IRC receiver requirements for sync network | ZTE | imported from 3GU |
R4‑162122 | CR on definition for BS IRC performance requirements in 36.141 | ZTE | imported from 3GU |
R4‑162123 | TP: Interference modelling and simulation results for async network | ZTE | imported from 3GU |
R4‑162124 | Workplan for Rel-14 eLAA workitem | Ericsson LM | imported from 3GU |
R4‑162125 | Potential UL CA configurations for eLAA operation in 5GHz | Ericsson LM | imported from 3GU |
R4‑162126 | Overall impact on BS receiver RF specifications for inclusion of UL LAA | Ericsson LM | imported from 3GU |
R4‑162127 | Suitable RF receiver selectivity requirement for LAA BS | Ericsson LM | imported from 3GU |
R4‑162128 | Way forward on BS receiver requirements for LAA | Ericsson LM | imported from 3GU |
R4‑162129 | On LAA Cell Detection and Measurements | Nokia | imported from 3GU |
R4‑162130 | LAA Cell Detection and Measurement Requirements | Nokia | imported from 3GU |
R4‑162131 | Test case: Intra frequency absolute and relative CSI-RSRP accuracies in CSI-RS based discovery signal under frame structure 3 | Nokia | imported from 3GU |
R4‑162132 | Test case: Inter-frequency event triggered reporting under fading propagation conditions under frame structure 3 | Nokia | imported from 3GU |
R4‑162133 | New reference measurement channels for FS3 | Nokia | imported from 3GU |
R4‑162134 | On eLAA RRM impacts | Nokia | imported from 3GU |
R4‑162135 | UE demodulation requirements for 4Rx UE | NTT DOCOMO INC. | imported from 3GU |
R4‑162136 | Editorial correction in RRM requirements | Ericsson | imported from 3GU |
R4‑162137 | On MBSFN measurements in RRC_IDLE with eDRX | Ericsson | imported from 3GU |
R4‑162138 | MBSFN measurements in RRC_IDLE with eDRX | Ericsson | imported from 3GU |
R4‑162139 | Test cases for eDRX | Ericsson | imported from 3GU |
R4‑162140 | Test cases for eDRX in RRC_IDLE | Ericsson | imported from 3GU |
R4‑162141 | On reporting criteria for LAA | Ericsson | imported from 3GU |
R4‑162142 | Reporting criteria for LAA | Ericsson | imported from 3GU |
R4‑162143 | Channel occupancy accuracy requirements | Ericsson | imported from 3GU |
R4‑162144 | Channel occupancy measurement requirements | Ericsson | imported from 3GU |
R4‑162145 | Intra-frequency RSRP and RSRQ measurement requirements | Ericsson | imported from 3GU |
R4‑162146 | Intra-frequency CSI-RSRP measurement requirements | Ericsson | imported from 3GU |
R4‑162147 | Inter-frequency RSRP and RSRQ measurement requirements | Ericsson | imported from 3GU |
R4‑162148 | Inter-frequency CSI-RSRP measurement requirements | Ericsson | imported from 3GU |
R4‑162149 | Inter-frequency RSSI measurement requirements | Ericsson | imported from 3GU |
R4‑162150 | RSRP and RSRQ accuracy requirements | Ericsson | imported from 3GU |
R4‑162151 | Editorial correction in LAA requirements | Ericsson | imported from 3GU |
R4‑162152 | On RS-SINR accuracy in low load scenarios | Ericsson | imported from 3GU |
R4‑162153 | RS-SINR accuracy requirements | Ericsson | imported from 3GU |
R4‑162154 | On test cases for RS-SINR | Ericsson | imported from 3GU |
R4‑162155 | On intra-frequency relative RS-SINR accuracy requirements | Ericsson | imported from 3GU |
R4‑162156 | On wideband RS-SINR | Ericsson | imported from 3GU |
R4‑162157 | RS-SINR accuracy requirements with CA | Ericsson | imported from 3GU |
R4‑162158 | RS-SINR measurement requirements with CA | Ericsson | imported from 3GU |
R4‑162159 | RRM requirements impact with eLAA | Ericsson | imported from 3GU |
R4‑162160 | RSTD measurement reporting mapping enhancement | Ericsson | imported from 3GU |
R4‑162161 | Way Forward on higher-resolution RSTD measurement report mapping | Ericsson, Qualcomm Inc. | imported from 3GU |
R4‑162162 | Discussion on BS Tx EVM and UE demodulation requirements for 4 layer MIMO operation | China Mobile Com. Corporation | imported from 3GU |
R4‑162163 | Simulation assumptions and scenarios for adjacent channel coexistence studies in UL LAA operation | Ericsson LM | imported from 3GU |
R4‑162164 | Inclusion of 10MHz CBW for LAA operation | Ericsson LM | imported from 3GU |
R4‑162165 | 4 DL PCell in FDD Event triggered reporting on deactivated SCells in non-DRX # 3 | Ericsson | imported from 3GU |
R4‑162166 | 4 DL PCell in TDD Event triggered reporting on deactivated SCells in non-DRX # 4 | Ericsson | imported from 3GU |
R4‑162167 | 5 DL PCell in FDD Event triggered reporting on deactivated SCells in non-DRX # 1 | Ericsson | imported from 3GU |
R4‑162168 | 5 DL PCell in TDD Event triggered reporting on deactivated SCells in non-DRX # 2 | Ericsson | imported from 3GU |
R4‑162169 | Analysis of RRM Test Cases for 3 UL CA | Ericsson | imported from 3GU |
R4‑162170 | Test Case List of RRM Test Cases for 3 UL CA | Ericsson, CATT | imported from 3GU |
R4‑162171 | RRM Test Cases for PUCCH SCell | Ericsson | imported from 3GU |
R4‑162172 | Analysis of RRM Test Cases for WLAN-LTE Inter-working | Ericsson | imported from 3GU |
R4‑162173 | List of RRM Test Cases for WLAN-LTE Inter-working | Ericsson | imported from 3GU |
R4‑162174 | RRM Requirements with eDRX for NB-IoT | Ericsson | imported from 3GU |
R4‑162175 | Paging Interruption Requirements in NB-IoT | Ericsson | imported from 3GU |
R4‑162176 | CR for fixing power level for TM9 dual layer test in Rel-11 | Ericsson, Anritsu | imported from 3GU |
R4‑162177 | CR for fixing power level for TM9 dual layer test in Rel-12 | Ericsson, Anritsu | imported from 3GU |
R4‑162178 | CR for fixing power level for TM9 dual layer test in Rel-13 | Ericsson, Anritsu | imported from 3GU |
R4‑162179 | General demodulation test for intra-band contiguous CA deployment with minimum channel spacing | Ericsson, TeliaSonera, Deutsche Telekom | imported from 3GU |
R4‑162180 | Way forward on general demodulation test for intra-band contiguous CA deployment with minimum channel spacing | Ericsson, TeliaSonera, Deutsche Telekom | imported from 3GU |
R4‑162181 | Test method and antenna connection for UE demodulation and CSI tests | Ericsson | imported from 3GU |
R4‑162182 | Discussions on 4Rx features for release independent from Rel-10 | Ericsson | imported from 3GU |
R4‑162183 | LS to RAN5 on the applicability of 4Rx features for Release 10/11/12 devices | Ericsson | imported from 3GU |
R4‑162184 | CR for 4Rx requirements for release independent in Rel-10 | Ericsson | imported from 3GU |
R4‑162185 | CR for 4Rx requirements for release independent in Rel-11 | Ericsson | imported from 3GU |
R4‑162186 | CR for 4Rx requirements for release independent in Rel-12 | Ericsson | imported from 3GU |
R4‑162187 | CR for 4Rx requirements for release independent in Rel-13 | Ericsson | imported from 3GU |
R4‑162188 | Evaluation of Tx and Rx EVM impact to UE demodulation tests | Ericsson | imported from 3GU |
R4‑162189 | Way forward on Tx EVM for 4 layers MIMO operation with 4Rx | Ericsson | imported from 3GU |
R4‑162190 | Evaluation and discussion for TM9 tests with MBSFN subframes configured for PDSCH | Ericsson | imported from 3GU |
R4‑162191 | Discussion on 4Rx under CA deployment for normal demodulation and SDR tests | Ericsson | imported from 3GU |
R4‑162192 | Evaluation on candidate receivers for synchronous network for PDCCH/PCFICH/PHICH and interference model | Ericsson | imported from 3GU |
R4‑162193 | Discussions and evaluation on candidate receivers for asynchronous network for PDCCH/PCFICH/PHICH | Ericsson | imported from 3GU |
R4‑162194 | Performance results with candidate receivers for ePDCCH for synchronous and asynchronous networks | Ericsson | imported from 3GU |
R4‑162195 | New WI proposal for LTE DL 4Rx with CA in Rel-14 | Ericsson | imported from 3GU |
R4‑162196 | Motivation and general proposal for new WI for LTE DL 4Rx with CA in Rel-14 | Ericsson | imported from 3GU |
R4‑162197 | Discussion on RSRP/RSRQ measurement accuracy requirements | China Mobile Com. Corporation | imported from 3GU |
R4‑162198 | Considerations related to SRS carrier based switching for LTE WI | Ericsson LM | imported from 3GU |
R4‑162199 | UE demodulation requirements under SFN scenario | NTT DOCOMO INC. | imported from 3GU |
R4‑162200 | Introduction of band 46 in 37.104 | Ericsson LM | imported from 3GU |
R4‑162201 | MSD for 3+41 2UL CA | Huawei, Hisilicon | imported from 3GU |
R4‑162202 | MSD for 8+41 2UL CA | Huawei, Hisilicon | imported from 3GU |
R4‑162203 | Introduction of band 46 in 36.141 | Ericsson LM | imported from 3GU |
R4‑162204 | Introduction of band 46 in 36.141 | Ericsson LM | imported from 3GU |
R4‑162205 | Introduction of band 46 in 25.141 | Ericsson LM | imported from 3GU |
R4‑162206 | Introduction of band 46 in 25.141 | Ericsson LM | imported from 3GU |
R4‑162207 | Introduction of band 46 in 25.142 | Ericsson LM | imported from 3GU |
R4‑162208 | eLAA UE RF TX requirements | Huawei, Hisilicon | imported from 3GU |
R4‑162209 | Introduction of band 46 in 25.142 | Ericsson LM | imported from 3GU |
R4‑162210 | Introduction of band 46 in 37.141 | Ericsson LM | imported from 3GU |
R4‑162211 | Introduction of band 46 in 37.141 | Ericsson LM | imported from 3GU |
R4‑162212 | Coexistence and collocation requirements between subbands of band 46 | Ericsson LM | imported from 3GU |
R4‑162213 | LAA 10MHz UE RX requirements | Huawei, Hisilicon | imported from 3GU |
R4‑162214 | Consideration on V2V candidate band | China Mobile Com. Corporation | imported from 3GU |
R4‑162215 | Details of LBT tests for LAA | Ericsson LM | imported from 3GU |
R4‑162216 | Multi-node tests for Rel-13 LAA | Ericsson LM | imported from 3GU |
R4‑162217 | Core requirments overview for Uplink Capacity Enhancements for LTE | China Mobile Com. Corporation | imported from 3GU |
R4‑162218 | Correction on E-UTRAN TDD-FDD CA activation and deactivation of known/unknown SCell in non-DRX with PCell in FDD for Rel-12 | NTT DOCOMO, INC. | imported from 3GU |
R4‑162219 | Draft CR on UE requirements due to introduction of 10MHz CBW | Huawei, Hisilicon | imported from 3GU |
R4‑162220 | Introduction of LBT functionalities tests for LAA | Ericsson LM | imported from 3GU |
R4‑162221 | ACLR and ACS for standalone NB-IoT | China Mobile Com. Corporation | imported from 3GU |
R4‑162222 | Introduction of LBT functionalities tests for LAA | Ericsson LM | imported from 3GU |
R4‑162223 | Discussion on LTE Advanced Carrier Aggregation for Band 3 and Band 39 | China Mobile Com. Corporation | imported from 3GU |
R4‑162224 | Discussion on 4Rx REFSENS for Band 41 | China Mobile Com. Corporation | imported from 3GU |
R4‑162225 | Discussion on co-location spurious emissions and MCL for AAS | China Mobile Com. Corporation | imported from 3GU |
R4‑162226 | Correction on E-UTRAN TDD-FDD CA activation and deactivation of known/unknown SCell in non-DRX with PCell in FDD for Rel-13 | NTT DOCOMO, INC. | imported from 3GU |
R4‑162227 | Consideration on mobility for high speed | China Mobile Com. Corporation | imported from 3GU |
R4‑162228 | Correction on E-UTRAN TDD-FDD CA activation and deactivation of known/unknown SCell in non-DRX with PCell in FDD for Rel-13 | NTT DOCOMO, INC. | imported from 3GU |
R4‑162229 | Consideration on TDD 8TX PMI test for 4RX UE | China Mobile Com. Corporation | imported from 3GU |
R4‑162230 | TP for Rel-14 36.714-03-01 version 0.0.1 for 3DL/1ULTR: Insertion loss parameters for CA with LAA band (3DL case) | Ericsson LM | imported from 3GU |
R4‑162231 | TP for Rel-14 36.714-04-01 version 0.0.1 for 4DL/1UL TR: Insertion loss parameters for CA with LAA band (4DL case) | Ericsson LM | imported from 3GU |
R4‑162232 | CR on E-UTRAN TDD-FDD CA activation and deactivation of known SCell in non-DRX with PCell in TDD for Rel-12 | NTT DOCOMO, INC. | imported from 3GU |
R4‑162233 | TP for Rel-14 36.714-05-01 version 0.0.1 for 5DL/1UL TR: Insertion loss parameters for CA with LAA band (5DL case) | Ericsson LM | imported from 3GU |
R4‑162234 | TP for Rel-14 xDL/2UL TR 36.714-00-02: Co-existence and dTib and dRib for CA_3DL_2A-4A-29A_2UL_2A-4A, CA_3DL_2A-4A-5A_2UL_2A-4A, and CA_4DL_2A-4A-5A-29A_2UL_2A-4A | Huawei, Hisilicon | imported from 3GU |
R4‑162235 | CR on E-UTRAN TDD-FDD CA activation and deactivation of known SCell in non-DRX with PCell in TDD for Rel-13 | NTT DOCOMO, INC. | imported from 3GU |
R4‑162236 | ACS requirements for eMTC UE | Ericsson | imported from 3GU |
R4‑162237 | CR on ACS requirements for eMTC UE | Ericsson | imported from 3GU |
R4‑162238 | UL RMC for eMTC | Ericsson | imported from 3GU |
R4‑162239 | Work plan for UL 256QAM in RAN4 | Ericsson | imported from 3GU |
R4‑162240 | Overview of requirements for UL 256QAM | Ericsson | imported from 3GU |
R4‑162241 | Operating bands for NB-IoT | Ericsson | imported from 3GU |
R4‑162242 | Text proposal for channel bandwidth and channel spacing for NB-IoT | Ericsson | imported from 3GU |
R4‑162243 | CR on Channel raster for NB-IoT | Ericsson | imported from 3GU |
R4‑162244 | Carrier frequency and EARFCN for NB-IoT | Ericsson | imported from 3GU |
R4‑162245 | TP on maximum transmitter power for NB-IoT UE | Ericsson | imported from 3GU |
R4‑162246 | Maximum transmitter power for NB-IoT UE | Ericsson | imported from 3GU |
R4‑162247 | CR on minimum output power, transmit off power, on/off mask, and absolute power tolerance for NB-IoT | Ericsson | imported from 3GU |
R4‑162248 | UE emissions requirements for NB-IoT | Ericsson | imported from 3GU |
R4‑162249 | Adjacent channel selectivity requirements for NB-IOT | Ericsson | imported from 3GU |
R4‑162250 | UE REFSENS for NB-IoT | Ericsson | imported from 3GU |
R4‑162251 | TP for Rel-14 2UL/2DL TR 36.714-00-02: operating bands, channel bandwidths for CA_3DL_2A-4A-29A_2UL_2A-4A, CA_3DL_2A-4A-5A_2UL_2A-4A, CA_4DL_2A-4A-5A-29A_2UL_2A-4A | Huawei, Hisilicon | imported from 3GU |
R4‑162252 | Introduction of 4Rx REFSENS for Band 41 to TS 36.101 | China Mobile Com. Corporation | imported from 3GU |
R4‑162253 | TP for Rel-14 2UL/2DL TR 36.714-02-02: operating bands, channel bandwidths for CA_2DL_2A-7A_2UL_2A-7A | Huawei, Hisilicon | imported from 3GU |
R4‑162254 | CR on E-UTRAN TDD-FDD CA activation and deactivation of unknown SCell in non-DRX with PCell in TDD for Rel-12 | NTT DOCOMO, INC. | imported from 3GU |
R4‑162255 | TP for Rel-14 2UL/2DL TR 36.714-02-02: Co-existence and dTib and dRib for CA_2DL_2A-7A_2UL_2A-7A | Huawei, Hisilicon | imported from 3GU |
R4‑162256 | CR on E-UTRAN TDD-FDD CA activation and deactivation of unknown SCell in non-DRX with PCell in TDD for Rel-13 | NTT DOCOMO, INC. | imported from 3GU |
R4‑162257 | Draft CR TS.36.307 REL-8 | Nokia, Ericsson | imported from 3GU |
R4‑162258 | Draft CR TS.36.307 REL-9 | Nokia, Ericsson | imported from 3GU |
R4‑162259 | Draft CR TS.36.307 REL-10 | Nokia, Ericsson | imported from 3GU |
R4‑162260 | Draft CR TS.36.307 REL-11 | Nokia, Ericsson | imported from 3GU |
R4‑162261 | Draft CR TS.36.307 REL-12 | Nokia, Ericsson | imported from 3GU |
R4‑162262 | Draft CR TS.36.307 REL-13 | Nokia, Ericsson | imported from 3GU |
R4‑162263 | NB-IoT SEM Study | Nokia | imported from 3GU |
R4‑162264 | NB-IoT ACLR Study | Nokia | imported from 3GU |
R4‑162265 | TP to TR 36.802: NB-IoT ACS | Nokia | imported from 3GU |
R4‑162266 | NB-IoT MPR summary | Nokia | imported from 3GU |
R4‑162267 | TP to TR 36.802: NB-IoT A-MPR | Nokia | imported from 3GU |
R4‑162268 | TP to TR 36.802: NB-IoT In-band blocking | Nokia | imported from 3GU |
R4‑162269 | NB-IoT draft CR template for 36.101 | Nokia | imported from 3GU |
R4‑162270 | eMTC A-MPR | Nokia | imported from 3GU |
R4‑162271 | TRP/TRS WI status and open issues | Nokia | imported from 3GU |
R4‑162272 | TP to TR 36.714-03-03: Possible 3 UL UE architectures | Nokia | imported from 3GU |
R4‑162273 | Test equipment complexity up to Rel-13 | ANRITSU LTD | imported from 3GU |
R4‑162274 | Impact of B41 HPUE to CA_B3_B41 | China Mobile Com. Corporation | imported from 3GU |
R4‑162275 | TP to 36.714-03-01: Operating bands, channel bandwidths, relaxation values and MSD for CA_3C-8A | Nokia, KT | imported from 3GU |
R4‑162276 | TP to 36.714-03-01: BS coexistence study for CA_3C-8A | Nokia, KT | imported from 3GU |
R4‑162277 | TP to 36.714-04-01: Operating bands, channel bandwidths, relaxation values and MSD for CA_1A-3C-8A | Nokia, KT | imported from 3GU |
R4‑162278 | Introduction of Rel-14 5DL inter-band combinations in 36.101 | Nokia | imported from 3GU |
R4‑162279 | Bandwidth combination sets for LAA | Nokia | imported from 3GU |
R4‑162280 | WF on LAA Bandwidth combination sets in CA basket work items | Nokia | imported from 3GU |
R4‑162281 | Discussion on spectrum for the NR system | Nokia | imported from 3GU |
R4‑162282 | Discussion on RF parameters in 24.25-86GHz | Nokia | imported from 3GU |
R4‑162283 | RX requirement for LAA with non-contiguous carriers within band 46 | Nokia | imported from 3GU |
R4‑162284 | Rx requirement for the non-contiguous CA with more than two component carriers | Nokia | imported from 3GU |
R4‑162285 | Text proposal for introduction of chapter 10.3.1.1 (Test methods) | KATHREIN-Werke KG | imported from 3GU |
R4‑162286 | Text proposal for chapter 10.3.1.1 (Test methods) | KATHREIN-Werke KG | imported from 3GU |
R4‑162287 | Correction on UE category for MTC in TS 36.101 | Huawei | imported from 3GU |
R4‑162288 | Correction on UE category for MTC and eMTC in TS 36.101 | Huawei | imported from 3GU |
R4‑162289 | Correction on eMTC in TS 36.101 | Huawei | imported from 3GU |
R4‑162290 | Correction on co-existence and co-location emssion requirement for LAA | Huawei | imported from 3GU |
R4‑162291 | Correction on LBT requirement for LAA | Huawei | imported from 3GU |
R4‑162292 | Discussion on BS transmitter intermodulation for LAA | Huawei | imported from 3GU |
R4‑162293 | CR on BS transmitter intermodulation for LAA | Huawei | imported from 3GU |
R4‑162294 | Considerations on adding 10MHz channel bandwidth for CA combinations with Band 46 | Huawei, Hisilicon | imported from 3GU |
R4‑162295 | Consideration on DL LBT test procedure | Huawei | imported from 3GU |
R4‑162296 | Consideration on multi-node test for LAA | Huawei | imported from 3GU |
R4‑162297 | Work plan for RAN4 work on enhanced LAA for LTE | Huawei, Hisilicon | imported from 3GU |
R4‑162298 | Discussion on channel bandwidth for LAA | Huawei | imported from 3GU |
R4‑162299 | CR on BS requirements due to introduction of 10MHz CBW | Huawei | imported from 3GU |
R4‑162300 | Overview of BS RX requirements for enhanced LAA | Huawei | imported from 3GU |
R4‑162301 | RAN4 TR V 0.2.0 for NB-IoT | Huawei | imported from 3GU |
R4‑162302 | On RF channels for NB-IoT | Huawei | imported from 3GU |
R4‑162303 | TP on BS Transmit ON/OFF power for NB-IoT | Huawei | imported from 3GU |
R4‑162304 | TP on BS unwanted emission for NB-IoT | Huawei | imported from 3GU |
R4‑162305 | TP on BS transmit intermodulation for NB-IoT | Huawei | imported from 3GU |
R4‑162306 | TP on BS REFSENS for NB-IoT | Huawei | imported from 3GU |
R4‑162307 | TP on BS RX requirements for NB-IoT | Huawei | imported from 3GU |
R4‑162308 | Way forward on BS RX requirement for NB-IoT | Huawei | imported from 3GU |
R4‑162309 | Draft CR on introduction of NB-IoT in TS 37.104 | Huawei | imported from 3GU |
R4‑162310 | TP on UE Minimum power for single-tone for NB-IoT | Huawei | imported from 3GU |
R4‑162311 | UL coeixstence simulation results for in-band operation | Huawei | imported from 3GU |
R4‑162312 | UL coexistence simulation results for guard band operation | Huawei | imported from 3GU |
R4‑162313 | TP for standalone co-existence study | Huawei | imported from 3GU |
R4‑162314 | Summary of coexistence simulation results for in-band and guard band | Huawei | imported from 3GU |
R4‑162315 | WF on coexistence simulation results for in-band and guard-band | Huawei | imported from 3GU |
R4‑162316 | NB-IoT EVM measurement method for uplink | Huawei | imported from 3GU |
R4‑162317 | NB-IoT spurious emissions | Huawei | imported from 3GU |
R4‑162318 | On regulatory requirements and operating bands for V2V service | Huawei | imported from 3GU |
R4‑162319 | On co-existence scenario and simualtion assumptions for V2V service | Huawei | imported from 3GU |
R4‑162320 | Initial simulation resultes for V2V co-existence | Huawei | imported from 3GU |
R4‑162321 | Discussion on RAN4 RF issues for SRS switching | Huawei | imported from 3GU |
R4‑162322 | RAN4 work plan for SRS switching | Huawei | imported from 3GU |
R4‑162323 | TR 36.714-02-02 v0.1.0 | Huawei, Hisilicon | imported from 3GU |
R4‑162324 | TP for TR 36.714-02-02 Update of scope for 2DL 2UL basket WI | Huawei, Hisilicon | imported from 3GU |
R4‑162325 | Introduction of completed R14 2DL2UL band combinations to TS 36.101 | Huawei, Hisilicon | imported from 3GU |
R4‑162326 | Multiplexer for four and five bands CA band combinations | Huawei, Hisilicon | imported from 3GU |
R4‑162327 | Further consideration on UE architecture and requirements for CA_B1_B3_B7_B40 | Huawei, Hisilicon | imported from 3GU |
R4‑162328 | On V2V UE RF requirements | Huawei, Hisilicon | imported from 3GU |
R4‑162329 | TP for TR 36.714-04-01: UE requirement relaxation for CA_1A-3A-7A-40A | Huawei, Hisilicon | imported from 3GU |
R4‑162330 | TP for TR 36.714-04-01: UE requirement relaxation for CA_3A-7A-40C | Huawei, Hisilicon | imported from 3GU |
R4‑162331 | TP for TR 36.714-03-01: UE requirement relaxation for CA_1A-7A-40A | Huawei, Hisilicon | imported from 3GU |
R4‑162332 | TP for TR 36.714-03-01: UE requirement relaxation for CA_3A-7A-40A | Huawei, Hisilicon | imported from 3GU |
R4‑162333 | UE requirement relaxation consideration for CA_1A-3A-38A | Huawei, Hisilicon | imported from 3GU |
R4‑162334 | TP for TR 36.714-03-01: UE requirement relaxation for CA_1A-3A-38A | Huawei, Hisilicon | imported from 3GU |
R4‑162335 | TP for TR 36.714-02-01: UE requirement relaxation for CA_1A-38A | Huawei, Hisilicon | imported from 3GU |
R4‑162336 | TP for TR 36.714-03-01: operating bands, channel bandwidths for CA_2A-7A-7A | Huawei, Hisilicon | imported from 3GU |
R4‑162337 | TP for TR 36.714-03-01: co-existence studies, delta Tib and Rib values for CA_2A-7A-7A | Huawei, Hisilicon | imported from 3GU |
R4‑162338 | TP for TR 36.714-03-01: operating bands, channel bandwidths for CA_4A-7A-7A | Huawei, Hisilicon | imported from 3GU |
R4‑162339 | TP for TR 36.714-03-01: co-existence studies, delta Tib and Rib values for CA_4A-7A-7A | Huawei, Hisilicon | imported from 3GU |
R4‑162340 | TP for TR 36.714-04-01: operating bands, channel bandwidths for CA_2A-4A-7A-7A | Huawei, Hisilicon | imported from 3GU |
R4‑162341 | TP for TR 36.714-04-01: co-existence studies, delta Tib and Rib values for CA_2A-4A-7A-7A | Huawei, Hisilicon | imported from 3GU |
R4‑162342 | TP for TR 36.714-03-01: operating bands, channel bandwidths for CA_3A-46C | Huawei, Hisilicon | imported from 3GU |
R4‑162343 | TP for TR 36.714-03-01: co-existence studies, delta Tib and Rib values for CA_3A-46C | Huawei, Hisilicon | imported from 3GU |
R4‑162344 | TP for TR 36.714-03-01: operating bands, channel bandwidths for CA_7A-46C | Huawei, Hisilicon | imported from 3GU |
R4‑162345 | TP for TR 36.714-03-01: co-existence studies, delta Tib and Rib values for CA_7A-46C | Huawei, Hisilicon | imported from 3GU |
R4‑162346 | TP for TR 36.714-04-01: operating bands, channel bandwidths for CA_3A-46D | Huawei, Hisilicon | imported from 3GU |
R4‑162347 | TP for TR 36.714-04-01: co-existence studies, delta Tib and Rib values for CA_3A-46D | Huawei, Hisilicon | imported from 3GU |
R4‑162348 | TP for TR 36.714-04-01: operating bands, channel bandwidths for CA_7A-46D | Huawei, Hisilicon | imported from 3GU |
R4‑162349 | TP for TR 36.714-04-01: co-existence studies, delta Tib and Rib values for CA_7A-46D | Huawei, Hisilicon | imported from 3GU |
R4‑162350 | TP for TR 36.714-02-01: operating bands, channel bandwidths for CA_3A-46A | Huawei, Hisilicon | imported from 3GU |
R4‑162351 | TP for TR 36.714-02-01: co-existence studies, delta Tib and Rib values for CA_3A-46A | Huawei, Hisilicon | imported from 3GU |
R4‑162352 | TP for TR 36.714-02-01: operating bands, channel bandwidths for CA_7A-46A | Huawei, Hisilicon | imported from 3GU |
R4‑162353 | TP for TR 36.714-02-01: co-existence studies, delta Tib and Rib values for CA_7A-46A | Huawei, Hisilicon | imported from 3GU |
R4‑162354 | TP for TR 36.714-00-00: operating bands, channel bandwidths for CA_46C | Huawei, Hisilicon | imported from 3GU |
R4‑162355 | TP for TR 36.714-00-00: operating bands, channel bandwidths for CA_46D | Huawei, Hisilicon | imported from 3GU |
R4‑162356 | UE RF analysis for 1+3+41 | Huawei, Hisilicon | imported from 3GU |
R4‑162357 | Co-existence study for HPUE in scenario A2 with PC4A | Huawei, Hisilicon | imported from 3GU |
R4‑162358 | MSD analysis for 1+46 | Huawei, Hisilicon | imported from 3GU |
R4‑162359 | Discussion on B46 NC CA GAP | Huawei, Hisilicon | imported from 3GU |
R4‑162360 | TP for TR 36.714-03-01: update the scope | Huawei, Hisilicon | imported from 3GU |
R4‑162361 | Introduction of completed R14 3DL band combinations to TS 36.101 | Huawei, Hisilicon | imported from 3GU |
R4‑162362 | Introduction of completed R14 3DL band combinations to TS 36.104 | Huawei, Hisilicon | imported from 3GU |
R4‑162363 | Introduction of completed R14 3DL band combinations to TS 36.141 | Huawei, Hisilicon | imported from 3GU |
R4‑162364 | WF on improving TS 36.101 CA spec | Huawei, Hisilicon | imported from 3GU |
R4‑162365 | 5.5A clause improvement for TS 36.101 CA spec | Huawei, Hisilicon | imported from 3GU |
R4‑162366 | Spec improvement for Tib/Rib tables in TS 36.101 | Huawei, Hisilicon | imported from 3GU |
R4‑162367 | Test for MB Base Station with three bands | Huawei | imported from 3GU |
R4‑162368 | Correction on multi-band definition | Huawei | imported from 3GU |
R4‑162369 | Correction on multi-band definition | Huawei | imported from 3GU |
R4‑162370 | Correction on multi-band definition | Huawei | imported from 3GU |
R4‑162371 | Correction on multi-band definition | Huawei | imported from 3GU |
R4‑162372 | Correction on multi-band definition | Huawei | imported from 3GU |
R4‑162373 | Correction on multi-band definition | Huawei | imported from 3GU |
R4‑162374 | General views on 5G coexistence study | Huawei, Hisilicon | imported from 3GU |
R4‑162375 | Considerations on 5G new waveforms | Huawei, Hisilicon | imported from 3GU |
R4‑162376 | Considerations on high frequency bands and wide bandwidth for 5G | Huawei, Hisilicon | imported from 3GU |
R4‑162377 | Work plan for LTE BW flexibility enhancement | Huawei, China Unicom, China Telecom | imported from 3GU |
R4‑162378 | TP for 36.740: Use cases | Huawei | imported from 3GU |
R4‑162379 | Co-existence study for HPUE in scenario A1 | Huawei, Hisilicon | imported from 3GU |
R4‑162380 | Considerations on UL 256QAM | Huawei, Hisilicon | imported from 3GU |
R4‑162381 | Text proposal for chapter 10.3.2.1 (Test methods) | KATHREIN-Werke KG | imported from 3GU |
R4‑162382 | TR skeleton for LTE BW flexibility enhancement | Huawei, China Unicom, China Telecom | imported from 3GU |
R4‑162383 | TP for 36.740: Analysis on the impact to UE RF requirements | Huawei, Hisilicon | imported from 3GU |
R4‑162384 | ACS for CA Bandwidth Class D: Case 2 wanted signal power | ANRITSU LTD | imported from 3GU |
R4‑162385 | TP for 36.740: Analysis on impact to BS RF | Huawei | imported from 3GU |
R4‑162386 | ACS for CA Bandwidth Class D: Case 2 wanted signal power | ANRITSU LTD | imported from 3GU |
R4‑162387 | TR 36.714-03-01: 3DL/1UL inter-band CA R14 v0.1.0 | Huawei, Hisilicon | imported from 3GU |
R4‑162388 | Maintenance CR for demodulation performance requirements (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑162389 | Maintenance CR for demodulation performance requirements (Rel-12) | Huawei, HiSilicon | imported from 3GU |
R4‑162390 | Maintenance CR for demodulation performance requirements (Rel-13) | Huawei, HiSilicon | imported from 3GU |
R4‑162391 | Correction of power allocation for PDSCH demodulation requirements with DMRS (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑162392 | Correction of power allocation for PDSCH demodulation requirements with DMRS (Rel-12) | Huawei, HiSilicon | imported from 3GU |
R4‑162393 | Correction of power allocation for PDSCH demodulation requirements with DMRS (Rel-13) | Huawei, HiSilicon | imported from 3GU |
R4‑162394 | Correction of power allocation for CSI requirements with DMRS (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑162395 | Correction of power allocation for CSI requirements with DMRS (Rel-12) | Huawei, HiSilicon | imported from 3GU |
R4‑162396 | Correction of power allocation for CSI requirements with DMRS (Rel-13) | Huawei, HiSilicon | imported from 3GU |
R4‑162397 | Maintenance CR for CRS-IM | Huawei, HiSilicon | imported from 3GU |
R4‑162398 | TP: cell search for legacy UE | Huawei, HiSilicon | imported from 3GU |
R4‑162399 | Discussion on eD2D demodulation performance requirement | Huawei, HiSilicon | imported from 3GU |
R4‑162400 | Corrections on PDSCH RMC for UE category 0 R12 | Huawei,HiSilicon | imported from 3GU |
R4‑162401 | Corrections on PDSCH RMC for UE category 0 R13 | Huawei,HiSilicon | imported from 3GU |
R4‑162402 | Discussion on RS-SINR measurement accuracy under high SINR | Huawei,HiSilicon | imported from 3GU |
R4‑162403 | Discussion on RS-SINR relative accuracy | Huawei,HiSilicon | imported from 3GU |
R4‑162404 | CR on RS-SINR measurement accuracy | Huawei,HiSilicon | imported from 3GU |
R4‑162405 | Discussion on RS-SINR test cases | Huawei,HiSilicon | imported from 3GU |
R4‑162406 | CR on FDD-FDD inter-frequency RS-SINR accuracy test case | Huawei,HiSilicon | imported from 3GU |
R4‑162407 | CR on TDD-TDD inter-frequency RS-SINR accuracy test case | Huawei,HiSilicon | imported from 3GU |
R4‑162408 | 5 DL FDD CA Event Triggered Reporting with Deactivated SCells in Non-DRX | Huawei,HiSilicon | imported from 3GU |
R4‑162409 | 5 DL TDD CA Event Triggered Reporting with Deactivated SCells in Non-DRX | Huawei,HiSilicon | imported from 3GU |
R4‑162410 | 4 DL FDD CA Event Triggered Reporting with 3 deactivated SCells in Non-DRX | Huawei,HiSilicon | imported from 3GU |
R4‑162411 | 4 DL TDD CA Event Triggered Reporting with 3 deactivated SCells in Non-DRX | Huawei,HiSilicon | imported from 3GU |
R4‑162412 | RSTD CA interruption on SCC in release 12 | Huawei,HiSilicon | imported from 3GU |
R4‑162413 | RSTD CA interruption on SCC in release 13 | Huawei,HiSilicon | imported from 3GU |
R4‑162414 | Further discussion on cell identification and measurement requirements in LAA | Huawei,HiSilicon | imported from 3GU |
R4‑162415 | Modification on intra-frequency measurement requirements in LAA | Huawei,HiSilicon | imported from 3GU |
R4‑162416 | CR on inter-frequency measurement requirements in LAA | Huawei,HiSilicon | imported from 3GU |
R4‑162417 | Discussion on channel occupancy in LAA | Huawei,HiSilicon | imported from 3GU |
R4‑162418 | Intra-frequency event triggered reporting under fading propagation conditions in synchronous cells in non-DRX based on CRS under Operation with Frame Structure 3 | Huawei,HiSilicon | imported from 3GU |
R4‑162419 | Intra-frequency event triggered reporting under fading propagation conditions in synchronous cells in DRX based on CRS under Operation with Frame Structure 3 | Huawei,HiSilicon | imported from 3GU |
R4‑162420 | CR on testing principle of Carrier Aggregation under operation with Frame 3 with Different Duplex Modes | Huawei,HiSilicon | imported from 3GU |
R4‑162421 | Overview on RRM requirements in HST | Huawei,HiSilicon | imported from 3GU |
R4‑162422 | Link level evaluation in idle state in high speed scenario | Huawei,HiSilicon | imported from 3GU |
R4‑162423 | System level evaluation on RRM requirements in IDLE mode under high speed scenarios | Huawei,HiSilicon | imported from 3GU |
R4‑162424 | Simulation assumptions on RRM requirements in IDLE mode under high speed scenarios | Huawei,HiSilicon | imported from 3GU |
R4‑162425 | Further discussion on the candidate solutions in DRX state under high speed scenarios | Huawei,HiSilicon | imported from 3GU |
R4‑162426 | Link level evaluation for measurements in connected state in high speed scenario | Huawei,HiSilicon | imported from 3GU |
R4‑162427 | Further discussion on enhanced requirements in DRX in connected state under high speed scenario | Huawei,HiSilicon | imported from 3GU |
R4‑162428 | Simulation assumptions on RRM requirements in Connected mode under high speed scenarios | Huawei,HiSilicon | imported from 3GU |
R4‑162429 | Discussion on eLAA RRM impact | Huawei,HiSilicon | imported from 3GU |
R4‑162430 | CR on maximum Transmission Timing Difference in eLAA | Huawei,HiSilicon | imported from 3GU |
R4‑162431 | Discussion on RRM requirements for V2V | Huawei,HiSilicon | imported from 3GU |
R4‑162432 | Discussion on sidelink synchronization for PC5-based V2V | Huawei,HiSilicon | imported from 3GU |
R4‑162433 | Discussion on eMTC testcase design | Huawei,HiSilicon | imported from 3GU |
R4‑162434 | E-UTRAN Intra frequency case for Cat-M1 UE in normal coverage | Huawei,HiSilicon | imported from 3GU |
R4‑162435 | E-UTRAN FDD-FDD intra-frequency event triggered reporting under fading propagation conditions for Cat-M1 UE in normal coverage | Huawei,HiSilicon | imported from 3GU |
R4‑162436 | E-UTRAN HD-FDD intra-frequency event triggered reporting under fading propagation conditions for Cat-M1 UE in normal coverage | Huawei,HiSilicon | imported from 3GU |
R4‑162437 | E-UTRAN TDD- TDD intra-frequency event triggered reporting under fading propagation conditions for Cat-M1 UE in normal coverage | Huawei,HiSilicon | imported from 3GU |
R4‑162438 | RSRP Intra frequency case for Cat-M1 UE in normal coverage | Huawei,HiSilicon | imported from 3GU |
R4‑162439 | Discussion on measurement gap enhancement | Huawei,HiSilicon | imported from 3GU |
R4‑162440 | Discussion on SRS carrier based switching | Huawei,HiSilicon | imported from 3GU |
R4‑162441 | E-UTRAN TDD-FDD Addition and Release Delay of known PSCell in Synchronous DC with PCell in FDD | Huawei,HiSilicon | imported from 3GU |
R4‑162442 | E-UTRAN TDD-FDD Addition and Release Delay of known PSCell in Synchronous DC with PCell in TDD | Huawei,HiSilicon | imported from 3GU |
R4‑162443 | E-UTRAN FDD - FDD DC Intra-frequency identification of a new CGI of E-UTRA cell using autonomous gaps in synchronous DC | Huawei,HiSilicon | imported from 3GU |
R4‑162444 | Discussion on requirement for maximum UL TX time difference with more than two TAGs in DC | Huawei,HiSilicon | imported from 3GU |
R4‑162445 | CR for maximum UL TX time difference requirement with more than two TAGs in DC | Huawei,HiSilicon | imported from 3GU |
R4‑162446 | Discussion on PUCCH SCell activation and deactivation test case | Huawei,HiSilicon | imported from 3GU |
R4‑162447 | E-UTRAN FDD activation of known PUCCH SCell without valid uplink synchronization in non-DRX | Huawei,HiSilicon | imported from 3GU |
R4‑162448 | E-UTRAN TDD activation of known PUCCH SCell without valid uplink synchronization in non-DRX | Huawei,HiSilicon | imported from 3GU |
R4‑162449 | Discussion on NB-IoT RRM measurement | Huawei,HiSilicon | imported from 3GU |
R4‑162450 | Simulation result of NB-IoT RRM measurement | Huawei,HiSilicon | imported from 3GU |
R4‑162451 | Wayforward on NB-IoT RRM measurement | Huawei,HiSilicon | imported from 3GU |
R4‑162452 | Simulation assumption for NB-IoT cell identification | Huawei,HiSilicon | imported from 3GU |
R4‑162453 | Discussion on NB-IoT RLM | Huawei,HiSilicon | imported from 3GU |
R4‑162454 | Wayforward on NB-IoT RLM | Huawei,HiSilicon | imported from 3GU |
R4‑162455 | Discussion on long DRX impact on NB-IoT RRM requirement | Huawei,HiSilicon | imported from 3GU |
R4‑162456 | CR on UE transmit timing requirement in R13 | Huawei,HiSilicon | imported from 3GU |
R4‑162457 | CR on UE transmit timing requirement in R12 | Huawei,HiSilicon | imported from 3GU |
R4‑162458 | maintenance on radio link monitoring for Rel-13 MTC UE | Huawei,HiSilicon | imported from 3GU |
R4‑162459 | maintenance on measurement requirements for Rel-13 MTC UE under normal coverage | Huawei,HiSilicon | imported from 3GU |
R4‑162460 | maintenance on measurement requirements for Rel-13 MTC UE under enhanced coverage | Huawei,HiSilicon | imported from 3GU |
R4‑162461 | maintenance on eMTC measurement accuracy | Huawei,HiSilicon | imported from 3GU |
R4‑162462 | Summary of results for PDSCH SDR demodulation | Ericsson | imported from 3GU |
R4‑162463 | Summary of results for CQI reporting | Ericsson | imported from 3GU |
R4‑162464 | UE Demodulation Requirements for DL PDSCH SDR requirements | Ericsson | imported from 3GU |
R4‑162465 | On 4Rx PMI test for 8x4 TDD | Ericsson | imported from 3GU |
R4‑162466 | Simulation results for 4Rx CQI tests | Ericsson | imported from 3GU |
R4‑162467 | ON 4Rx RI tests | Ericsson | imported from 3GU |
R4‑162468 | Discussion on the specification of performance requirements for bidirectional deployment | Ericsson | imported from 3GU |
R4‑162469 | Discussion on the specification of performance requirements for unidirectional deployment | Ericsson | imported from 3GU |
R4‑162470 | RMCs for verification of RF receiver characteristics for LAA | Ericsson | imported from 3GU |
R4‑162471 | RMC for verification of RF receiver characteristics for LAA | Ericsson | imported from 3GU |
R4‑162472 | TP for 36.714-02-01: UE requirements for CA_8A-28A | Ericsson | imported from 3GU |
R4‑162473 | On UE uplink requirements for eLAA: single-CC in Band 46 | Ericsson | imported from 3GU |
R4‑162474 | General aspects for NR UE RF core requirements | Ericsson | imported from 3GU |
R4‑162475 | UE-UE coexistence for CA_39-41 and outstanding requirements for ITU-R Recommendation M.2071 | Ericsson | imported from 3GU |
R4‑162476 | Demodulation performance requirements for combinations of advanced receiver and 4Rx | HuaWei Technologies Co., Ltd | imported from 3GU |
R4‑162477 | Discussion on the maximum UL transmission timing difference for DC | Nokia | imported from 3GU |
R4‑162478 | Further discussion on the remaining issues for eMTC RLM | Nokia | imported from 3GU |
R4‑162479 | CR for eMTC RLM | Nokia | imported from 3GU |
R4‑162480 | Discussion on Cat-M1 RLM test cases | Nokia | imported from 3GU |
R4‑162481 | Draft CR for Cat-M1 RLM test cases | Nokia | imported from 3GU |
R4‑162482 | Work plan for performance part of eCA WI | Nokia, NTT Docomo | imported from 3GU |
R4‑162483 | Further discussion on the BS demod requirements for new PUCCH formats | Nokia | imported from 3GU |
R4‑162484 | WF on BS demod performance for new PUCCH formats | Nokia | imported from 3GU |
R4‑162485 | Summary of simulation results for new PUCCH formats | Nokia | imported from 3GU |
R4‑162486 | Initial simulation results for mobility performance for high speed scenario | Nokia | imported from 3GU |
R4‑162487 | Further discussion on UE RRM requirements for high speed | Nokia | imported from 3GU |
R4‑162488 | Initial discussion on the RRM impacts of V2V | Nokia | imported from 3GU |
R4‑162489 | Initial discussion on the RRM impacts of SRS switching | Nokia | imported from 3GU |
R4‑162490 | TP Power boosting of NB-IoT carrier in LTE in-band/guard band operation | NEC | imported from 3GU |
R4‑162491 | TP on BS Unwanted Emission Requirements for in and guard band NB-IoT operation modes | NEC | imported from 3GU |
R4‑162492 | TP on BS output power for NB-IoT | NEC | imported from 3GU |
R4‑162493 | TP cleanup for TR 37.842 | NEC | imported from 3GU |
R4‑162494 | TP to TS 37.145 (part 1) – Sections 6.5 | NEC | imported from 3GU |
R4‑162495 | TP for TR 37.842: Indoor Anechoic Chamber EIRP testing procedure | NEC | imported from 3GU |
R4‑162496 | TR 37.842: Indoor Anechoic Chamber EIRP testing uncertainty value | NEC | imported from 3GU |
R4‑162497 | TP for TR 37.842: Indoor Anechoic Chamber EIS testing procedure | NEC | imported from 3GU |
R4‑162498 | TR 37.842: Indoor Anechoic Chamber EIS testing uncertainty value | NEC | imported from 3GU |
R4‑162499 | TP for EIRP performance requirements TS 37.145 (part 2) – Sections 6 | NEC | imported from 3GU |
R4‑162500 | TP for EIS performance requirements TS 37.145 (part 2) – Sections 7 | NEC | imported from 3GU |
R4‑162501 | Rel-14 AAS BS Workplan | NEC | imported from 3GU |
R4‑162502 | MIMO OTA Harmonization Test Plan | Bluetest AB | imported from 3GU |
R4‑162503 | RC+CE Validation Project Plan | Bluetest AB | imported from 3GU |
R4‑162504 | RC+CE Test Volume Validation | Bluetest AB | imported from 3GU |
R4‑162505 | CR to TR37.977: RC+CE Test Volume Validation | Bluetest AB | imported from 3GU |
R4‑162506 | New Test cases: E-UTRAN TDD-FDD DC inter-frequency event triggered reporting with DRX in synchronous DC with PCell in FDD/PCell in TDD | ANRITSU LTD | imported from 3GU |
R4‑162507 | Draft TR36.785 skeleton for V2V service in Rel-14 | NGComm-Solutions | imported from 3GU |
R4‑162508 | Handling of CRs for 36.101/104 and 37.101 for NB-IoT | NTT DOCOMO INC. | imported from 3GU |
R4‑162509 | TP on adjacent channel co-existence scenarios and parameters for V2V service | LG Electronics Inc. | imported from 3GU |
R4‑162510 | TP on ITS regulatory aspects at 5.9GHz operating frequency | LG Electronics Inc. | imported from 3GU |
R4‑162511 | UE RF open issue list | NTT DOCOMO INC. | imported from 3GU |
R4‑162512 | Considering switched channel bandwidth for 2DL CA RRM | ANRITSU LTD | imported from 3GU |
R4‑162513 | Impact on core requirements | Ericsson | imported from 3GU |
R4‑162514 | On MB 3 or more bands testing aspect | Ericsson | imported from 3GU |
R4‑162515 | Asynchronous IRC simulation results | Ericsson | imported from 3GU |
R4‑162516 | Synchronous IRC simulation results | Ericsson | imported from 3GU |
R4‑162517 | Simulation results for performance requirements for new PUCCH formats 4 and 5 | Ericsson | imported from 3GU |
R4‑162518 | Results for BS demodulation performance under ETU600 | Ericsson | imported from 3GU |
R4‑162519 | BS PRACH options | Ericsson | imported from 3GU |
R4‑162520 | Correction to UE Categories for 64 QAM Reference channels | ANRITSU LTD | imported from 3GU |
R4‑162521 | RTS work plan | Keysight Technologies UK Ltd, Rohde & Schwarz | imported from 3GU |
R4‑162522 | Minute of AAS adhoc | Huawei | imported from 3GU |
R4‑162523 | TR 37.842 v1.10.0 | Huawei | imported from 3GU |
R4‑162524 | TS 37.145 (part2) v0.2.0 | Huawei | imported from 3GU |
R4‑162525 | TP to TR 37.842 - Capture EIRP accuracy agreement | Huawei | imported from 3GU |
R4‑162526 | TP to TR37.842 - Conformance testing of parallel beams | Huawei | imported from 3GU |
R4‑162527 | TP to TR37.842 - beams to be declared for EIRP conformance | Huawei | imported from 3GU |
R4‑162528 | TP to TR37.842 - TAE declarations | Huawei | imported from 3GU |
R4‑162529 | TP to TS 37.842 - Updated to declaration tables | Huawei | imported from 3GU |
R4‑162530 | TP to TS 37.145 (part 1)- Sections 1-5 | Huawei | imported from 3GU |
R4‑162531 | TP to TS 37.145 (part 1) - Sections 6.1,6.2,6.3. 6.6 | Huawei | imported from 3GU |
R4‑162532 | TP to TS 37.145 (part 1) – Annex B | Huawei | imported from 3GU |
R4‑162533 | TP to TS 37.145 (part 1) – Annex E,F | Huawei | imported from 3GU |
R4‑162534 | TP to TS 37.145 (part 1)- Sections 8 - performance requirements | Huawei | imported from 3GU |
R4‑162535 | TP to TS 37.145 (part 1) - Sections 7.2 | Huawei | imported from 3GU |
R4‑162536 | TP to TS 37.145 (part 1) - Sections 7.6 | Huawei | imported from 3GU |
R4‑162537 | CR to TS37.105 - Adding UTRA TDD to performance requirements | Huawei | imported from 3GU |
R4‑162538 | Draft text to TS 37.145 (part 2)- Sections 1-5 | Huawei | imported from 3GU |
R4‑162539 | Draft text to TS 37.145 (part 2)- Sections 7 - Radiated receiver characteristics | Huawei | imported from 3GU |
R4‑162540 | Discussion on Enhanced AAS in Rel14 | Huawei | imported from 3GU |
R4‑162541 | Discussion on in-band Tx requirements | Huawei | imported from 3GU |
R4‑162542 | Discussion on in-band Rx requirements | Huawei | imported from 3GU |
R4‑162543 | Discussion on out of band Tx requirements | Huawei | imported from 3GU |
R4‑162544 | Discussion on EMC requirements | Huawei | imported from 3GU |
R4‑162545 | Discussion on performance/demodulation requirements | Huawei | imported from 3GU |
R4‑162546 | Event Triggered Reporting Test case for FDD 3 DL CA Deactivated SCell with PCell and SCell Interruptions | ANRITSU LTD | imported from 3GU |
R4‑162547 | Channel model validation | Keysight Technologies UK Ltd | imported from 3GU |
R4‑162548 | Event Triggered Reporting Test case for FDD 3 DL CA Deactivated SCell with PCell and SCell Interruptions | ANRITSU LTD | imported from 3GU |
R4‑162549 | NB IOT Spectrum Emission Mask and Spurious Emission Requirements | Sony | imported from 3GU |
R4‑162550 | WF on NB-IOT out-of-band blocking requirements | Sony | imported from 3GU |
R4‑162551 | Test time optimization and FoM | Keysight Technologies UK Ltd | imported from 3GU |
R4‑162552 | WF on REFSENS for NB IOT | Sony | imported from 3GU |
R4‑162553 | Discussion on enhanced RRM requirements with network assistant signaling in HST | Intel | imported from 3GU |
R4‑162554 | TP for 36.893: Additional filter data and A-MPR for 700 MHz protection of DTV | Motorola Solutions UK Ltd. | imported from 3GU |
R4‑162555 | Discussions on ProSe periodicity for ProSe inter-frequency and CA operation | Ericsson | imported from 3GU |
R4‑162556 | RRM test cases for eD2D | Ericsson | imported from 3GU |
R4‑162557 | Defining of ProSe periodicity ProSe inter-frequency and CA operation | Ericsson | imported from 3GU |
R4‑162558 | List of RRM test cases for eMTC | Ericsson | imported from 3GU |
R4‑162559 | Discussions on test configurations for eMTC tets | Ericsson | imported from 3GU |
R4‑162560 | Measurement accuracy requirements for Rel-13 MTC UE | Ericsson | imported from 3GU |
R4‑162561 | Timing requirements for eMTC | Ericsson | imported from 3GU |
R4‑162562 | On RRM requirements for V2V | Ericsson | imported from 3GU |
R4‑162563 | Discussions on V2V UE transmit timing requirements | Ericsson | imported from 3GU |
R4‑162564 | Further discussions on radio link monitoring procedure for NB-IOT | Ericsson | imported from 3GU |
R4‑162565 | NB-IOT UE measurement capability | Ericsson | imported from 3GU |
R4‑162566 | Link simulation results for RRM measurements for NB-IOT in stationary scenario | Ericsson | imported from 3GU |
R4‑162567 | Applicability of number of carriers and CCs for ProSe operation | Ericsson | imported from 3GU |
R4‑162568 | Defining of maximum number of CC/carriers that supported for ProSe inter-frequency and CA operation | Ericsson | imported from 3GU |
R4‑162569 | Discussions on timing requirements for eMTC | Ericsson | imported from 3GU |
R4‑162570 | Link simulation results for RRM measurements for NB-IOT in mobility scenario | Ericsson | imported from 3GU |
R4‑162571 | Additional simulation results for RRM measurements for NB-IOT | Ericsson | imported from 3GU |
R4‑162572 | [draft] LS on CSI reporting timing for PUCCH SCell activation | Huawei,HiSilicon | imported from 3GU |
R4‑162573 | Additional simulation results for HPUE adjacent channel coexistence study | Qualcomm Incorporated | imported from 3GU |
R4‑162574 | MSD and guard band requirements for LAA CA combos | Qualcomm Incorporated | imported from 3GU |
R4‑162575 | MSD analysis for B42+B46 | Qualcomm Incorporated | imported from 3GU |
R4‑162576 | LBT testing proposal for LAA | Qualcomm Incorporated | imported from 3GU |
R4‑162577 | On multi-node tests for LAA: categories and key aspects | Qualcomm Incorporated | imported from 3GU |
R4‑162578 | TP for TR 36.714-02-01: For CA_2DL_20A-28A_1UL_BCS0 | TeliaSonera AB | imported from 3GU |
R4‑162579 | TP for TR 36.714-03-01: Missing fallback 3DL for CA_5DL_1A-3C-40C_1UL_BCS0 | TeliaSonera AB | imported from 3GU |
R4‑162580 | TP for TR 36.714-04-01: Missing fallbacks 4DL for CA_5DL_1A-3C-40C_1UL_BCS0 | TeliaSonera AB | imported from 3GU |
R4‑162581 | TP for TR 36.714-05-01: For CA_5DL_1A-3C-40C_1UL_BCS0 | TeliaSonera AB | imported from 3GU |
R4‑162582 | TP for TR 36.802: NB IoT power classes | TeliaSonera AB | imported from 3GU |
R4‑162583 | UTRA BHH TRP/TRS performance requirements proposal for Bands I, II, V and VIII | Motorola Mobility UK Ltd. | imported from 3GU |
R4‑162584 | Physical channels undefined in RRM Test cases A.9.1.22, A.9.1.23 | ANRITSU LTD | imported from 3GU |
R4‑162585 | Physical channels undefined in RRM Test cases A.9.1.22, A.9.1.23 | ANRITSU LTD | imported from 3GU |
R4‑162586 | Cleanup of Dual Connectivity RRM Test cases | ANRITSU LTD | imported from 3GU |
R4‑162587 | Cleanup of Dual Connectivity RRM Test cases | ANRITSU LTD | imported from 3GU |
R4‑162588 | Further discussion on the transmission signal model for LAA demodulation | Ericsson | imported from 3GU |
R4‑162589 | General test setup and requirements applicability for LAA demodulation | Ericsson | imported from 3GU |
R4‑162590 | Discussion on LAA CSI test | Ericsson | imported from 3GU |
R4‑162591 | Clean up for CRS-IM related requirements | Ericsson | imported from 3GU |
R4‑162592 | Discussion on the eD2D performance requirements | Ericsson | imported from 3GU |
R4‑162593 | Discussion on LBT and fair coexistence tests for LAA | BROADCOM CORPORATION | imported from 3GU |
R4‑162594 | TP for TR 36.714-02-01: CA_3A-32A operating band and channel bandwidths | TELECOM ITALIA S.p.A. | imported from 3GU |
R4‑162595 | TP for TR 36.714-02-01: CA_7A-32A operating band and channel bandwidths | TELECOM ITALIA S.p.A. | imported from 3GU |
R4‑162596 | TP for TR 36.714-02-01: CA_20A-32A BCS1 operating band and channel bandwidths | TELECOM ITALIA S.p.A. | imported from 3GU |
R4‑162597 | TP for TR 36.714-03-01: CA_3A-20A-32A operating band and channel bandwidths | TELECOM ITALIA S.p.A. | imported from 3GU |
R4‑162598 | TP for TR 36.714-03-01: CA_7A-20A-32A operating band and channel bandwidths | TELECOM ITALIA S.p.A. | imported from 3GU |
R4‑162599 | TP for TR 36.714-03-01: CA_3A-7A-32A operating band and channel bandwidths | TELECOM ITALIA S.p.A. | imported from 3GU |
R4‑162600 | Maximum Transmit Power Considerations for NB-IoT UE | u-blox AG, Neul | imported from 3GU |
R4‑162601 | TP for TR 36.714-04-01: CA_3A-7A-20A-32A operating band and channel bandwidths | TELECOM ITALIA S.p.A. | imported from 3GU |
R4‑162602 | Remaining requirements for CA combinations including Band 32 | Vodafone | imported from 3GU |
R4‑162603 | MIMO OTA next steps | Vodafone | imported from 3GU |
R4‑162604 | TRP/TRS next steps | Vodafone | imported from 3GU |
R4‑162605 | LAA 10MHz | Vodafone | imported from 3GU |
R4‑162606 | 1+38 carrier aggregation | Vodafone | imported from 3GU |
R4‑162607 | 7+38 blocking requirement | Vodafone | imported from 3GU |
R4‑162608 | 20+28 CA and DTV protection | Vodafone | imported from 3GU |
R4‑162609 | NB-IoT UE Tx ACLR requirement | MediaTek Inc. | imported from 3GU |
R4‑162610 | NB-IoT UE Rx RF Requirements | MediaTek Inc. | imported from 3GU |
R4‑162611 | Updated scope of TR: LTE Advanced inter-band CA Rel-14 for 5DL/1UL | Nokia | imported from 3GU |
R4‑162612 | TP to 36.714-05-01: symbols and abbreviations | Nokia | imported from 3GU |
R4‑162613 | Revised WI: LTE Advanced inter-band CA Rel-14 for 5DL/1UL | Nokia | imported from 3GU |
R4‑162614 | TP to 36.714-04-01: CA_1A-3A-40C | Nokia, TeliaSonera | imported from 3GU |
R4‑162615 | TP to 36.714-04-01: CA_1A-3C-40A | Nokia, TeliaSonera | imported from 3GU |
R4‑162616 | TP to 36.714-05-01: CA_1A-3C-40C | Nokia, TeliaSonera | imported from 3GU |
R4‑162617 | TP to 36.714-03-01: CA_1A-40C | Nokia, TeliaSonera | imported from 3GU |
R4‑162618 | TP to 36.714-03-01: CA_3C-40A | Nokia, TeliaSonera | imported from 3GU |
R4‑162619 | TP to 36.714-04-01: CA_3C-40C | Nokia, TeliaSonera | imported from 3GU |
R4‑162620 | TP to TR 36.749: revision of EARFCN | Nokia, Dish Network | imported from 3GU |
R4‑162621 | Reference correction | Nokia | imported from 3GU |
R4‑162622 | TR 36.714-05-01 v0.0.2 | Nokia | imported from 3GU |
R4‑162623 | Introduction of 5DL CA combinations to 36.104 | Nokia | imported from 3GU |
R4‑162624 | Introduction of 5DL CA combinations to 36.141 | Nokia | imported from 3GU |
R4‑162625 | On EIRP test uncertainty | Nokia | imported from 3GU |
R4‑162626 | On EIS test uncertainty | Nokia | imported from 3GU |
R4‑162627 | Enhanced UL scheduling solution for measurement gap enhancements | Nokia | imported from 3GU |
R4‑162628 | Procedures for legacy testing of 4 Rx UE | Qualcomm Incorporated | imported from 3GU |
R4‑162629 | Accuracy of RS-SINR measurement | Qualcomm Incorporated | imported from 3GU |
R4‑162630 | MCS selection for UE demodulation performance testing | Qualcomm Incorporated | imported from 3GU |
R4‑162631 | Demod simulations results for eMTC | Qualcomm Incorporated | imported from 3GU |
R4‑162632 | Clarifications required for eMTC demod/CSI test case assumptions | Qualcomm Incorporated | imported from 3GU |
R4‑162633 | Simulation results for reference receivers for Control Channel Interference Mitigation | Qualcomm Incorporated | imported from 3GU |
R4‑162634 | NB-IOT RSRP Simulation Results | QUALCOMM UK Ltd | imported from 3GU |
R4‑162635 | Discussion on NB-IOT RRM Requirements | QUALCOMM UK Ltd | imported from 3GU |
R4‑162636 | NB-PSS Detection Performance Simulation Results | QUALCOMM UK Ltd | imported from 3GU |
R4‑162637 | Simulation assumptions for UL 256QAM | Qualcomm Incorporated | imported from 3GU |
R4‑162638 | Simulation results of uplink MMSE-IRC under asynchronous networks | Nokia | imported from 3GU |
R4‑162639 | Link level simulation results (Set 1) with IM of uplink MMSE-IRC | Nokia | imported from 3GU |
R4‑162640 | CR on Applicability of MMSE-IRC PUSCH performance | Nokia | imported from 3GU |
R4‑162641 | On CRI test for FD-MIMO CSI requirements | Nokia | imported from 3GU |
R4‑162642 | BS demodulation performance of TU600 | Nokia | imported from 3GU |
R4‑162643 | Further discussion on power leakage model for NB-IOT in-band/guard band | Nokia | imported from 3GU |
R4‑162644 | Simulation results of co-existence study of NB-IOT in-band/guard band operations | Nokia | imported from 3GU |
R4‑162645 | TP for TR 36.714-02-01: 2DL/1UL Band 2 + Band 66 carrier aggregation combination | Qualcomm Incorporated | imported from 3GU |
R4‑162646 | TP for TR 36.714-03-01: 3DL/1UL Band 2 + Band 66 related carrier aggregation combinations | Qualcomm Incorporated | imported from 3GU |
R4‑162647 | Addition of 10 MHz channel bandwidth for LAA | Qualcomm Incorporated | imported from 3GU |
R4‑162648 | A-MPR for 700 MHz Band 68 | Qualcomm Incorporated | imported from 3GU |
R4‑162649 | Correction to A-MPR for NS_26 | Qualcomm Incorporated | imported from 3GU |
R4‑162650 | TP for TR 36.714-03-01: Reference sensitivity for CA_3A-20A-32A | Qualcomm Incorporated | imported from 3GU |
R4‑162651 | TP for TR 36.714-02-01: Reference sensitivity for CA_3A-32A | Qualcomm Incorporated | imported from 3GU |
R4‑162652 | eLAA specification changes for UL operation | Qualcomm Incorporated | imported from 3GU |
R4‑162653 | MPR and A-MPR for HPUE | Qualcomm Incorporated | imported from 3GU |
R4‑162654 | Band 41 HPUE UTRA ACLR | Qualcomm Incorporated | imported from 3GU |
R4‑162655 | Impact of HPUE to CA | Qualcomm Incorporated | imported from 3GU |
R4‑162656 | B68 Filter Consolidation with B28A, TCSAW filter data and A-MPR for 700 MHz protection of DTV | Skyworks Solutions Inc. | imported from 3GU |
R4‑162657 | DRAFT Reply LS to RAN1 on uplink transmission gap in NB-IoT | Intel Corporation | imported from 3GU |
R4‑162658 | eLAA TX Signal influence on the output spectrum | Intel | imported from 3GU |
R4‑162659 | AAS BS OTA sensitivity: Preliminary Simulation Results for Near Field Test Range | MVG Industries | imported from 3GU |
R4‑162660 | HPUE Band 41 A-MPR | Skyworks Solutions Inc. | imported from 3GU |
R4‑162661 | TP to TR 37.842: Near Field Test Range Uncertainty table | MVG Industries | imported from 3GU |
R4‑162662 | Skeleton for TS 37.171 | NextNav | imported from 3GU |
R4‑162663 | RF reference architecture and necessary assumptions | Intel | imported from 3GU |
R4‑162664 | LS to RAN1 on parameters for New Radio study | Intel | imported from 3GU |
R4‑162665 | TP for TR 37.842: Text Proposal for Annex B – Near Field Test Range | MVG Industries | imported from 3GU |
R4‑162666 | TP for TS 37.171 | NextNav, AT&T, Broadcom | imported from 3GU |
R4‑162667 | TP for TR 37.842: Adding calibration section for Near Field Test Method | MVG Industries | imported from 3GU |
R4‑162668 | Proposed Uncertainty Budget for EIRP in Near Field Test Range | MVG Industries | imported from 3GU |
R4‑162669 | MBS performance signal levels in 37.171 | NextNav, AT&T, Broadcom | imported from 3GU |
R4‑162670 | MBS Coexistence Discussion | NextNav, AT&T, Broadcom | imported from 3GU |
R4‑162671 | Skeleton for TS 37.171 | NextNav | imported from 3GU |
R4‑162672 | TP to 36.714-02-01: CA_2DL_46A-66A-1UL_BCS0 | Nokia | imported from 3GU |
R4‑162673 | TP to 36.714-03-01: CA_3DL_2A-46A-46A_1UL_BCS0, CA_3DL_2A-46C_1UL_BCS0 | Nokia | imported from 3GU |
R4‑162674 | TP to 36.714-03-01: CA_3DL_4A-46A-46A_1UL_BCS0, CA_3DL_4A-46C_1UL_BCS0 | Nokia | imported from 3GU |
R4‑162675 | TP to 36.714-03-01: CA_3DL_46A-46A-66A_1UL_BCS0, CA_3DL_46C-66A_1UL_BCS0 | Nokia | imported from 3GU |
R4‑162676 | TP to 36.714-04-01: CA_4DL_2A-46A-46C_1UL_BCS0, CA_4DL_2A-46D_1UL_BCS0 | Nokia | imported from 3GU |
R4‑162677 | TP to 36.714-04-01: CA_4DL_4A-46A-46C_1UL_BCS0, CA_4DL_4A-46D_1UL_BCS0 | Nokia | imported from 3GU |
R4‑162678 | TP to 36.714-04-01: CA_4DL_46A-46C-66A_1UL_BCS0, CA_4DL_46D-66A_1UL_BCS0 | Nokia | imported from 3GU |
R4‑162679 | TP to 36.714-04-01: CA_5DL_2A-46A-46D_1UL_BCS0 | Nokia | imported from 3GU |
R4‑162680 | TP to 36.714-04-01: CA_5DL_4A-46A-46D_1UL_BCS0 | Nokia | imported from 3GU |
R4‑162681 | TP to 36.714-04-01: CA_5DL_46A-46D-66A_1UL_BCS0 | Nokia | imported from 3GU |
R4‑162682 | Band 46 operating band unwanted emissions | Nokia, Huawei | imported from 3GU |
R4‑162683 | Band 46 sub-bands indication | Nokia | imported from 3GU |
R4‑162684 | On BS co-existence and co-location requirements for LAA | Nokia | imported from 3GU |
R4‑162685 | On channel access procedures requirements for LAA | Nokia | imported from 3GU |
R4‑162686 | Band 46 channel access procedures requirements | Nokia | imported from 3GU |
R4‑162687 | On LBT performance tests | Nokia | imported from 3GU |
R4‑162688 | On multi-node test for LAA | Nokia | imported from 3GU |
R4‑162689 | LS on LAA defer and slot duration mismatch with LTE basic time unit (R1-161493 Source: TSG RAN WG1, To: TSG RAN WG4, Cc: ) | TSG RAN WG1 | imported from 3GU |
R4‑162690 | LS on ECID positioning for TDD (R1-161518 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG4, Cc: ) | TSG RAN WG1 | imported from 3GU |
R4‑162691 | LS on sidelink synchronization for PC5-based V2V (R1-161525 Source: TSG RAN WG1, To: TSG RAN WG4, Cc: ) | TSG RAN WG1 | imported from 3GU |
R4‑162692 | LS on Channel Bandwidths for LAA (R1-161540 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG4, Cc: ) | TSG RAN WG1 | imported from 3GU |
R4‑162693 | LS on LTE Rel-13 UE feature list (R1-161547 Source: TSG RAN WG1, To: TSG RAN WG2, Cc: TSG RAN WG3 and RAN 4) | TSG RAN WG1 | imported from 3GU |
R4‑162694 | Response LS on maximum UL Transmission timing difference in dual connectivity (R2-161998 Source: TSG RAN WG2, To: TSG RAN WG4, Cc: TSG RAN WG1) | TSG RAN WG2 | imported from 3GU |
R4‑162695 | WORK TOWARDS REVISION 1 OF RECOMMENDATIONS ITU-R M.2070 AND M.2071 - QUESTIONS FOR CLARIFICATION WITHIN 3GPP SPECIFICATIONS ( Source: , To: , Cc: ) | ITU Working Party 5D | imported from 3GU |
R4‑162696 | LS on V2V Requirements (RP-160684 Source: TSG RAN, To: TSG RAN WG1,TSG RAN WG4, Cc: ) | TSG RAN | imported from 3GU |
R4‑162697 | Request for support in defining an antenna testing method for Switched-Antenna Transmit Diversity ( Source: GSMA, To: RAN4, Cc: ) | GSMA | imported from 3GU |
R4‑162698 | LS to GCF on MIMO OTA Requirement Work Plan | RAN | imported from 3GU |
R4‑162699 | Characteristics of terrestrial IMT systems for frequency sharing/interference analysis in the frequency range between 24.25 GHz and 86 GHz | ITU Working Party 5D | imported from 3GU |
R4‑162700 | LS on NB-IoT | RAN WG1 | imported from 3GU |
R4‑162701 | LS on uplink transmission gap in NB-IoT | RAN1 | imported from 3GU |
R4‑162702 | Reply LS on distinction of intra-band non-contiguous CA types | TSG-RAN WG2 | imported from 3GU |
R4‑162703 | LS on updated LTE Rel-13 UE feature list | RAN WG1 | imported from 3GU |
R4‑162704 | Cat-M1 PRACH Initial Simulation Results | Nokia | imported from 3GU |
R4‑162705 | Cat-M1 PUCCH Initial Simulation Results | Nokia | imported from 3GU |
R4‑162706 | Cat-M1 PUSCH Initial Simulation Results | Nokia | imported from 3GU |
R4‑162707 | Summary of eMTC PRACH/PUCCH/PUSCH demodulation results | Nokia | imported from 3GU |
R4‑162708 | Results for BS demodulation performance under ETU600 | Ericsson | imported from 3GU |
R4‑162709 | Uplink Simulation results for e-MTC | Samsung | imported from 3GU |
R4‑162710 | CC-IM simulation results | Samsung | imported from 3GU |
R4‑162711 | Evaluation of Tx and Rx EVM impact to UE demodulation tests | Ericsson | imported from 3GU |
R4‑162712 | CR for maximum UL TX time difference requirement with more than two TAGs in DC | Huawei,HiSilicon | imported from 3GU |
R4‑162713 | Way forward on RRM test case list with basic test parameters for Dual Connectivity enhancement | NTT DOCOMO, INC. | imported from 3GU |
R4‑162714 | The impact of TX EVM on four layer MIMO demodulation | Samsung | imported from 3GU |
R4‑162715 | Reporting criteria for LAA | Ericsson | imported from 3GU |
R4‑162716 | CR on measurement reference channel and OCNG with FS3 | LG Electronics Inc. | imported from 3GU |
R4‑162717 | CR on testing principle of Carrier Aggregation under operation with Frame 3 with Different Duplex Modes | Huawei,HiSilicon | imported from 3GU |
R4‑162718 | WF on eD2D RRM test cases | Qualcomm, Samsung, Nokia | imported from 3GU |
R4‑162719 | Cat-M1 RRM Test Case List | Nokia, Huawei, HiSilicon, CATT | imported from 3GU |
R4‑162720 | Simulation results for 4 Rx SDR tests | LG Electronics Inc. | imported from 3GU |
R4‑162721 | Channel model for the SFN scenarios | CATT | imported from 3GU |
R4‑162722 | Ad hoc minutes for LAA RRM | Huawei | imported from 3GU |
R4‑162723 | Discussion on 4-RX CSI tests | Intel Corporation | imported from 3GU |
R4‑162724 | BS demodulation performance of TU600 | Nokia | imported from 3GU |
R4‑162725 | WF on eLAA | Ericsson, Nokia, Intel, Qualcomm Inc., ZTE, Samsung | imported from 3GU |
R4‑162726 | WF on intra-frequency relative RS-SINR measurement | Ericsson, CMCC | imported from 3GU |
R4‑162727 | WF on RS-SINR measurement accuracy | Ericsson, CMCC | imported from 3GU |
R4‑162728 | WF on RRM requirement for new band combinations for dual connectivety | Ericsson | imported from 3GU |
R4‑162729 | Modification on intra-frequency measurement requirements in LAA | Huawei,HiSilicon | imported from 3GU |
R4‑162730 | Inter-frequency RSRP and RSRQ measurement requirements | Ericsson | imported from 3GU |
R4‑162731 | RSRP and RSRQ accuracy requirements | Ericsson | imported from 3GU |
R4‑162732 | Way Forward on test case list for new RS-SINR | ZTE Microelectronics, Nubia, CMCC | imported from 3GU |
R4‑162733 | WF on ProSe multi-carrier operation | Ericsson | imported from 3GU |
R4‑162734 | WF on eD2D demodulation requirements | Qualcomm, Intel | imported from 3GU |
R4‑162735 | CR: Intra-frequency handover requirements for Cat-M1 UEs in CEModeA | Nokia | imported from 3GU |
R4‑162736 | CR: UE transmit timing requirements for Cat-M1 UEs | Nokia | imported from 3GU |
R4‑162737 | Timing requirements for eMTC | Ericsson | imported from 3GU |
R4‑162738 | CR for eMTC RLM | Nokia | imported from 3GU |
R4‑162739 | maintenance on radio link monitoring for Rel-13 MTC UE | Huawei,HiSilicon | imported from 3GU |
R4‑162740 | maintenance on measurement requirements for Rel-13 MTC UE under normal coverage | Huawei,HiSilicon | imported from 3GU |
R4‑162741 | maintenance on measurement requirements for Rel-13 MTC UE under enhanced coverage | Huawei,HiSilicon | imported from 3GU |
R4‑162742 | Booked for RRM session: Not used | RRM Session | imported from 3GU |
R4‑162743 | Cat-M1 RRM Test Case List | Nokia, Huawei, HiSilicon, CATT | imported from 3GU |
R4‑162744 | E-UTRAN Intra frequency case for Cat-M1 UE in normal coverage | Huawei,HiSilicon | imported from 3GU |
R4‑162745 | E-UTRAN FDD-FDD intra-frequency event triggered reporting under fading propagation conditions for Cat-M1 UE in normal coverage | Huawei,HiSilicon | imported from 3GU |
R4‑162746 | E-UTRAN HD-FDD intra-frequency event triggered reporting under fading propagation conditions for Cat-M1 UE in normal coverage | Huawei,HiSilicon | imported from 3GU |
R4‑162747 | CR: Cat-M1 PRACH Performance Requirements | Nokia, Ericsson, Huawei, Samsung | imported from 3GU |
R4‑162748 | - | - | - |
R4‑162749 | Discussion on BS Tx EVM and UE demodulation requirements for 4 layer MIMO operation | China Mobile Com. Corporation | imported from 3GU |
R4‑162750 | Ad hoc minutes on 4Rx performance | Ericsson | imported from 3GU |
R4‑162751 | Ad hoc minutes on eMTC performance | Ericsson | imported from 3GU |
R4‑162752 | WF on SRS switching | Huawei, HiSilicon | imported from 3GU |
R4‑162753 | Way forward on demodulation and CSI tests | Huawei | imported from 3GU |
R4‑162754 | Burst transmission model for LAA | Ericsson | imported from 3GU |
R4‑162755 | RS-SINR measurement requirements with CA | Ericsson | imported from 3GU |
R4‑162756 | Ad hoc minutes for DL Control Channel IM | Intel Corporation, ZTE | imported from 3GU |
R4‑162757 | WF on DL Control Channel IM UE capabilities | Intel Corporation, ZTE | imported from 3GU |
R4‑162758 | WF on DL Control Channel IM interference models for synchronous networks | ZTE, Intel Corporation | imported from 3GU |
R4‑162759 | WF on DL Control Channel IM UE demodulation test cases | ZTE, Intel Corporation | imported from 3GU |
R4‑162760 | WF on DL Control IM for PDCCH/PCFICH/PHICH in asynchronous networks | Ericsson, Intel Corporation, ZTE | imported from 3GU |
R4‑162761 | DL Control Channel IM simulation alignment results summary (FDD) | Intel Corporation, ZTE | imported from 3GU |
R4‑162762 | TP for TS 37.171 | NextNav, AT&T, Broadcom | imported from 3GU |
R4‑162763 | TP for TS 37.171 | NextNav, AT&T, Broadcom | imported from 3GU |
R4‑162764 | 36.104 CR for BS MMSE-IRC receiver - Demodulation tests in synchronous interference scneario | China Telecom, Huawei, ZTE | imported from 3GU |
R4‑162765 | TP on demodulation performance requirements in synchronous network | China Telecom | imported from 3GU |
R4‑162766 | - | - | - |
R4‑162768 | WF on CCIM UE Behavior during C-DRX | LG Electronics Inc. | imported from 3GU |
R4‑162769 | WF on 4Rx CQI | Ericsson | imported from 3GU |
R4‑162770 | WF on 4Rx PMI with 1-layer | Ericsson | imported from 3GU |
R4‑162771 | WF on 4Rx PMI with multiple-layer | Ericsson | imported from 3GU |
R4‑162772 | WF on 4Rx RI | Ericsson | imported from 3GU |
R4‑162773 | 36.141 CR for BS MMSE-IRC receiver - Synchronous network demodulation conformance tests | Huawei, HiSilicon, China Telecom | imported from 3GU |
R4‑162774 | Introduction of EB/FD-MIMO channel model using 2D XP antennas at eNB | Samsung,Qualcomm,MediaTek,Ericsson | imported from 3GU |
R4‑162775 | Example eMTC RRM test cases | Anritsu | imported from 3GU |
R4‑162776 | Reply LS on PC5 DMRS and L1 format for V2V | Intel | imported from 3GU |
R4‑162777 | Booked for RRM session: Not used | RRM Session | imported from 3GU |
R4‑162778 | CR: MPDCCH RMCs for Cat-M1 RRM Tests | Nokia, Ericsson | imported from 3GU |
R4‑162779 | CR: PDSCH RMCs for Cat-M1 RRM Tests | Nokia, Ericsson | imported from 3GU |
R4‑162780 | Discussion of OCNG patterns for Cat-M1 RRM Tests | Nokia, Ericsson | imported from 3GU |
R4‑162781 | Summary of simulation results for PDSCH 3 and 4 layers demodulation test for 4Rx | Ericsson | imported from 3GU |
R4‑162782 | Summary of simulation results for ePDCCH demodulation test for 4Rx | Ericsson | imported from 3GU |
R4‑162783 | Way forward on simulation assumptions for SFN scenario with unidirectional deployment | Ericsson | imported from 3GU |
R4‑162784 | Summary of results for PDSCH SDR demodulation | Ericsson | imported from 3GU |
R4‑162785 | Summary of results for CQI reporting | Ericsson | imported from 3GU |
R4‑162786 | - | - | - |
R4‑162787 | - | - | - |
R4‑162788 | Introduction of PDSCH demodulation requirement for Cat-M1 UE | Ericsson | imported from 3GU |
R4‑162789 | Introduction of CQI test for Cat-M1 UE | Ericsson | imported from 3GU |
R4‑162790 | WF on eMTC demodulation and CSI | Huawei, HiSilicon, Ericsson | imported from 3GU |
R4‑162791 | WF for list of RRM core requirement | LG Electronics Inc. | imported from 3GU |
R4‑162792 | CR: Cat-M1 PUCCH Performance Requirements | Nokia, Huawei, Ericsson | imported from 3GU |
R4‑162793 | Way forward on RS-SINR measurement tests | NTT DoCoMo, Ericsson | imported from 3GU |
R4‑162794 | 36.104 CR for BS MMSE-IRC receiver - FRC definitions | China Telecom, Huawei, ZTE | imported from 3GU |
R4‑162795 | CR on eDC TDD-FDD demodulation requirement | Huawei, HiSilicon | imported from 3GU |
R4‑162796 | WF for LBT functionality test | Huawei | imported from 3GU |
R4‑162797 | Simulation assumptions for LAA demodulation | Huawei | imported from 3GU |
R4‑162798 | WF on simulation assumption of downlink CCH-IM receiver in async network for PDCCH/PCFICH/PHICH | Huawei | imported from 3GU |
R4‑162799 | WF on RRM requirement in high speed scenario | Huawei, HiSilicon, Ericson, CMCC, Nokia, NTT DOCOMO, INC | imported from 3GU |
R4‑162800 | Reply LS on PC5 | LGE | imported from 3GU |
R4‑162801 | Maintenance CR for CRS-IM | Huawei, HiSilicon | imported from 3GU |
R4‑162802 | WF on BS demod performance for new PUCCH formats | Nokia | imported from 3GU |
R4‑162803 | RRM test requirements for activation and deactivation of PUCCH Scell | NTT DOCOMO, INC. | imported from 3GU |
R4‑162804 | Simulation results of co-existence study of NB-IOT in-band/guard band operations | Nokia | imported from 3GU |
R4‑162805 | Summary of coexistence simulation results for in-band and guard band | Huawei | imported from 3GU |
R4‑162806 | WF on coexistence simulation results for in-band and guard-band | Huawei | imported from 3GU |
R4‑162807 | NB-IoT SEM Study | Nokia | imported from 3GU |
R4‑162808 | NB-IoT UE Rx RF Requirements | MediaTek Inc. | imported from 3GU |
R4‑162809 | NB IoT UL Transmission Gaps and Draft Response LS to RAN1 | Sony | imported from 3GU |
R4‑162810 | Link simulations for cell search in NB-IoT | Ericsson | imported from 3GU |
R4‑162811 | RAN4 TR V 0.2.0 for NB-IoT | Huawei | imported from 3GU |
R4‑162812 | Draft CR on Operating bands for NB-IoT | Ericsson | imported from 3GU |
R4‑162813 | Draft CR on Channel raster for NB-IoT | Ericsson | imported from 3GU |
R4‑162814 | WF on EARFCN for NB-IoT | Huawei | imported from 3GU |
R4‑162815 | - | - | - |
R4‑162816 | draft CR for section 6.1/6.5 in TS 36.104 | NTT DOCOMO INC | imported from 3GU |
R4‑162817 | - | - | - |
R4‑162818 | - | - | - |
R4‑162819 | WF on BS Tx requirements for NB-IoT | Ericsson, Huawei | imported from 3GU |
R4‑162820 | Way forward on BS RX requirement for NB-IoT | Huawei | imported from 3GU |
R4‑162821 | WF on SEM and ?fOOB for NB-IoT UE | Nokia | imported from 3GU |
R4‑162822 | WF on ACLR for NB-IoT UE | Nokia | imported from 3GU |
R4‑162823 | WF on MPR simulation assumption | Nokia | imported from 3GU |
R4‑162824 | WF on EVM measurement method for uplink for NB-IoT | Huawei | imported from 3GU |
R4‑162825 | WF on In-band emission for NB-IoT UE | NTT DOCOMO, INC. | imported from 3GU |
R4‑162826 | WF on Transmit intermodulation for NB-IoT UE | NTT DOCOMO, INC | imported from 3GU |
R4‑162827 | Draft CR on minimum output power, transmit off power, on/off mask, and absolute power tolerance for NB-IoT | Ericsson | imported from 3GU |
R4‑162828 | WF on REFSENS for NB IOT UE | Sony | imported from 3GU |
R4‑162829 | WF on NB-IOT out-of-band blocking requirements | Sony | imported from 3GU |
R4‑162830 | - | - | - |
R4‑162831 | WF on BS REFSENS for NB-IoT | Ericsson | imported from 3GU |
R4‑162832 | - | - | - |
R4‑162833 | Way forward on handling of CDMA and NB-IoT coexistence study | China Telecom | imported from 3GU |
R4‑162834 | Evening AH minutes for NB-IoT | NTT DOCOMO INC. | imported from 3GU |
R4‑162835 | Wayforward on NB-IoT RRM measurement | Huawei,HiSilicon, HiSilicon, Qualcomm,Ericsson | imported from 3GU |
R4‑162836 | WF on simulation assumption for NB-IoT cell identification | Nokia | imported from 3GU |
R4‑162837 | Wayforward on NB-IoT RLM | Huawei,HiSilicon | imported from 3GU |
R4‑162838 | Booked for NB-IoT session: Not used | NB-IoT session | imported from 3GU |
R4‑162839 | Booked for NB-IoT session: Not used | NB-IoT session | imported from 3GU |
R4‑162840 | WF on Paging Interruption Requirements in NB-IoT | Ericsson | imported from 3GU |
R4‑162841 | WF on Random Access in NB-IoT RRM requirements | Ericsson | imported from 3GU |
R4‑162842 | WF on uplink transmit timing in NB-IoT RRM requirements | Ericsson | imported from 3GU |
R4‑162843 | WF on RRM requirements for UE timing for NB-IoT | NTT DOCOMO, INC. | imported from 3GU |
R4‑162844 | Way forward on handling of CRs for RRM requirements for NB-IoT | NTT DOCOMO, INC. | imported from 3GU |
R4‑162845 | LS on RRM measurement for NB-IOT | Ericsson | imported from 3GU |
R4‑162846 | Way forward on NB-IoT RLM simulation assumption | Ericsson | imported from 3GU |
R4‑162847 | Booked for NB-IoT session: Not used | NB-IoT session | imported from 3GU |
R4‑162848 | - | - | - |
R4‑162849 | WF on ACLR for NB-IoT UE | Nokia | imported from 3GU |
R4‑162850 | WF on MPR simulation assumption | Nokia | imported from 3GU |
R4‑162851 | Draft CR on minimum output power, transmit off power, on/off mask, and absolute power tolerance for NB-IoT | Ericsson | imported from 3GU |
R4‑162852 | Drafr CR on TS 36.104 BS RF requirement | Ericsson | imported from 3GU |
R4‑162853 | - | - | - |
R4‑162854 | LS on carrier frequency and EARFCN for NB-IoT | Huawei | imported from 3GU |
R4‑162855 | Draft CR on introduction of NB-IoT in TS 37.104 | Huawei | imported from 3GU |
R4‑162856 | Drafr CR on TS 36.104 BS RF requirement | Ericsson | imported from 3GU |
R4‑162857 | Way Forward on continuous uplink transmission in NB-IoT | Intel Corporation | imported from 3GU |
R4‑162858 | - | - | - |
R4‑162859 | - | - | - |
R4‑162860 | Draft CR on TS 36.104 BS RF requirement | Ericsson | imported from 3GU |
R4‑162861 | NB-IoT draft CR template for TS 37.104 | Huawei | imported from 3GU |
R4‑162862 | WF on BS Tx requirements for NB-IoT | Ericsson, Huawei | imported from 3GU |
R4‑162863 | Draft CR for NB-IoT | Ericsson | imported from 3GU |
R4‑162864 | WF on REFSENS for NB IOT UE | Sony | imported from 3GU |
R4‑162865 | WF on Random Access in NB-IoT RRM requirements | Ericsson | imported from 3GU |
R4‑162866 | WF on uplink transmit timing in NB-IoT RRM requirements | Ericsson | imported from 3GU |
R4‑162867 | Way forward on handling of CRs for RRM requirements for NB-IoT | NTT DOCOMO, INC. | imported from 3GU |
R4‑162868 | Wayforward on NB-IoT RRM measurement | Huawei,HiSilicon, HiSilicon, Qualcomm,Ericsson | imported from 3GU |
R4‑162869 | Way forward on NB-IoT RLM simulation assumption | Ericsson | imported from 3GU |
R4‑162870 | WF on simulation assumption for NB-IoT cell identification | Nokia | imported from 3GU |
R4‑162871 | Way forward on NB-IoT RLM simulation assumption | Ericsson | imported from 3GU |
R4‑162872 | Wayforward on NB-IoT RLM | Huawei,HiSilicon | imported from 3GU |
R4‑162873 | NB-IoT draft CR template for TS 36.104 | Ericsson | imported from 3GU |
R4‑162874 | Way Forward on continuous uplink transmission in NB-IoT | Intel Corporation | imported from 3GU |
R4‑162875 | Draft CR on introduction of NB-IoT in TS 37.104 | Huawei | imported from 3GU |
R4‑162876 | WF on RF parameters requested by WP 5D | NTT DOCOMO, INC., Qualcomm, CMCC, Nokia, Huawei, Ericsson | imported from 3GU |
R4‑162877 | Evening AH minutes for NR | NTT DOCOMO INC. | imported from 3GU |
R4‑162878 | Draft LS to RAN1 on Parameters for WP5D Sharing and compatibility studies | Ericsson | imported from 3GU |
R4‑162879 | WF on RF parameters requested by WP 5D | NTT DOCOMO, INC., Qualcomm, CMCC, Nokia, Huawei, Ericsson | imported from 3GU |
R4‑162880 | LS to RAN1 on Parameters for WP5D Sharing and compatibility studies | Ericsson | imported from 3GU |
R4‑162881 | LS on RRM measurement for NB-IOT | Ericsson | imported from 3GU |
R4‑162882 | Booked for NB-IoT session: Not used | NB-IoT session | imported from 3GU |
R4‑162883 | Booked for NB-IoT session: Not used | NB-IoT session | imported from 3GU |
R4‑162884 | Booked for NB-IoT session: Not used | NB-IoT session | imported from 3GU |
R4‑162885 | Booked for NB-IoT session: Not used | NB-IoT session | imported from 3GU |
R4‑162886 | Booked for NB-IoT session: Not used | NB-IoT session | imported from 3GU |
R4‑162887 | Booked for NB-IoT session: Not used | NB-IoT session | imported from 3GU |
R4‑162888 | Booked for NB-IoT session: Not used | NB-IoT session | imported from 3GU |
R4‑162889 | Booked for NB-IoT session: Not used | NB-IoT session | imported from 3GU |
R4‑162890 | Booked for NB-IoT session: Not used | NB-IoT session | imported from 3GU |
R4‑162891 | Booked for NB-IoT session: Not used | NB-IoT session | imported from 3GU |
R4‑162892 | Booked for NB-IoT session: Not used | NB-IoT session | imported from 3GU |
R4‑162893 | Booked for NB-IoT session: Not used | NB-IoT session | imported from 3GU |
R4‑162894 | Booked for NB-IoT session: Not used | NB-IoT session | imported from 3GU |
R4‑162895 | Booked for NB-IoT session: Not used | NB-IoT session | imported from 3GU |
R4‑162896 | Booked for NB-IoT session: Not used | NB-IoT session | imported from 3GU |
R4‑162897 | Booked for NB-IoT session: Not used | NB-IoT session | imported from 3GU |
R4‑162898 | Booked for NB-IoT session: Not used | NB-IoT session | imported from 3GU |
R4‑162899 | Booked for NB-IoT session: Not used | NB-IoT session | imported from 3GU |
R4‑162900 | Booked for NB-IoT session: Not used | NB-IoT session | imported from 3GU |
R4‑162901 | Booked for NB-IoT session: Not used | NB-IoT session | imported from 3GU |
R4‑162902 | Booked for NB-IoT session: Not used | NB-IoT session | imported from 3GU |
R4‑162903 | Booked for NB-IoT session: Not used | NB-IoT session | imported from 3GU |
R4‑162904 | Draft LS out on Rel.13 Capabilities | Qualcomm Incorporated | imported from 3GU |
R4‑162905 | WF on work plan for eLAA for LTE. | Ericsson | imported from 3GU |
R4‑162906 | WF on LAA Bandwidth combination sets in CA basket work items | Nokia | imported from 3GU |
R4‑162907 | WF on MSD for CA combinations including band 46 | NTT Docomo | imported from 3GU |
R4‑162908 | RX requirement for LAA with non-contiguous carriers within band 46 | Nokia | imported from 3GU |
R4‑162909 | Correction on co-existence and co-location emssion requirement for LAA | Huawei, Nokia, Ericsson | imported from 3GU |
R4‑162910 | Band 46 sub-bands indication | Nokia | imported from 3GU |
R4‑162911 | CR on ACS requirements for eMTC UE | Ericsson | imported from 3GU |
R4‑162912 | Correction on eMTC in TS 36.101 | Huawei | imported from 3GU |
R4‑162913 | Pcmax Discrepancy Between TS 36.101 and TS 36.213 for ProSe | Ericsson Inc. | imported from 3GU |
R4‑162914 | Inter-band ProSe Clarifications | Ericsson Inc. | imported from 3GU |
R4‑162915 | Correcting fallback inconsistencies in CA of B41 and B42 in REL-13 | SoftBank Corp. | imported from 3GU |
R4‑162916 | Correction to A-MPR for NS_26 | Qualcomm Incorporated | imported from 3GU |
R4‑162917 | Additional filter data and A-MPR for 700 MHz protection of DTV | Motorola Solutions UK Ltd. | imported from 3GU |
R4‑162918 | TS36.101 Section 5 operating bands (clean up) | Dish Network | imported from 3GU |
R4‑162919 | Spec improvement for Tib/Rib tables in TS 36.101 | Huawei, Hisilicon | imported from 3GU |
R4‑162920 | LS on NB-IoT | RAN WG1 | imported from 3GU |
R4‑162921 | TR: 3GPP TR 36.714-02-01 | Qualcomm Incorporated | imported from 3GU |
R4‑162922 | LS on SRS carrier switching interruption time | RAN WG1 | imported from 3GU |
R4‑162923 | TP for TR: Scope of TR 36 714-02-01_Rel14_2DL 1UL CA | Qualcomm Incorporated | imported from 3GU |
R4‑162924 | TR for eMBMS enhancements for LTE | RAN1 | imported from 3GU |
R4‑162925 | - | - | - |
R4‑162926 | TP for TR36.714-02-01: Finalization of B8+B28 (2DL/1UL) | SoftBank Corp. | imported from 3GU |
R4‑162927 | TP for TR36.714-02-01: IMD/Harmonics Issues and relaxations on LTE-A Inter-band Carrier Aggregation (2DL/1UL) of Band 11 and Band 41 | SoftBank Corp. | imported from 3GU |
R4‑162928 | TP for TR36.714-02-01: IMD/Harmonics Issues and relaxations on LTE-A Inter-band Carrier Aggregation (2DL/1UL) of Band 11 and Band 42 | SoftBank Corp. | imported from 3GU |
R4‑162929 | TP for TR 36.714-02-01: For CA_2DL_20A-28A_1UL_BCS0 | TeliaSonera AB | imported from 3GU |
R4‑162930 | - | - | - |
R4‑162931 | WF on LAA Bandwidth combination sets in CA basket work items | Nokia | imported from 3GU |
R4‑162933 | - | - | - |
R4‑162934 | - | - | - |
R4‑162935 | - | - | - |
R4‑162936 | - | - | - |
R4‑162937 | TP for TR 36.714-03-01: Missing fallback 3DL for CA_5DL_1A-3C-40C_1UL_BCS0 | TeliaSonera AB | imported from 3GU |
R4‑162938 | TP for TR 36.714-03-01: 3DL/1UL Band 2 + Band 66 related carrier aggregation combinations | Qualcomm Incorporated | imported from 3GU |
R4‑162939 | - | - | - |
R4‑162940 | - | - | - |
R4‑162941 | TP for TR 36.714-04-01: Missing fallbacks 4DL for CA_5DL_1A-3C-40C_1UL_BCS0 | TeliaSonera AB | imported from 3GU |
R4‑162942 | - | - | - |
R4‑162943 | - | - | - |
R4‑162944 | TP for TR36.714-02-02: Delta Tib/Rib for CA_3A-41A 2DL/2UL | ZTE, Nubia | imported from 3GU |
R4‑162945 | TP on the self-desense analysis results for xDL/2UL CA band combinations | LG Electronics Inc. | imported from 3GU |
R4‑162946 | TP on the operating band and coexistence analysis for 3DL/2UL inter-band CA in rel-14 | LG Electronics Inc. | imported from 3GU |
R4‑162947 | TP on the operating band and coexistence analysis for 4DL/2UL inter-band CA in rel-14 | LG Electronics Inc. | imported from 3GU |
R4‑162948 | - | - | - |
R4‑162949 | LS on PC5 DMRS and L1 format for V2V | RAN WG1 | imported from 3GU |
R4‑162950 | - | - | - |
R4‑162951 | TS 37.105 Editorial corrections and alignment with drafting rules | Ericsson | imported from 3GU |
R4‑162952 | TS 37.105 Correction on interfering signal level for TX intermodulation | Ericsson, Nokia | imported from 3GU |
R4‑162953 | - | - | - |
R4‑162954 | Alignment of AAS Emission requirements | Ericsson | imported from 3GU |
R4‑162955 | CR to TS37.105 - Adding UTRA TDD to performance requirements | Huawei | imported from 3GU |
R4‑162956 | TP to TS 37.145 (part 1)- Sections 1-5 | Huawei | imported from 3GU |
R4‑162957 | TP to TS 37.145 (part 1) - Sections 6.1,6.2,6.3. 6.6 | Huawei | imported from 3GU |
R4‑162958 | TP to TS 37.145 (part 1) – Sections 6.5 | NEC | imported from 3GU |
R4‑162959 | TS 37.145-1: TP for clause 6.6: Unwanted Emissions | Ericsson | imported from 3GU |
R4‑162960 | TS 37.145-1: TP for Addition of transmitter intermodulation requirement in clause 6.7 | Ericsson | imported from 3GU |
R4‑162961 | TP to TS 37.145 (part 1) - Sections 7.2 | Huawei | imported from 3GU |
R4‑162962 | TP to TS 37.145 (part 1)- Sections 8 - performance requirements | Huawei | imported from 3GU |
R4‑162963 | WF on OTA uncertainty | Ericsson, MVG Industries, NEC, SEI, NTT Docomo, Kathrein | imported from 3GU |
R4‑162964 | - | - | - |
R4‑162965 | - | - | - |
R4‑162966 | - | - | - |
R4‑162967 | On EIRP test uncertainty | Nokia | imported from 3GU |
R4‑162968 | On EIS test uncertainty | Nokia | imported from 3GU |
R4‑162969 | - | - | - |
R4‑162970 | - | - | - |
R4‑162971 | - | - | - |
R4‑162972 | - | - | - |
R4‑162974 | WF on method of OTA tests | Huawei | imported from 3GU |
R4‑162975 | WF on Rel-14 AAS | Huawei | imported from 3GU |
R4‑162976 | WF on CA impact on band 41 HPUE | China Mobile | imported from 3GU |
R4‑162977 | Way forward for Band 41 HPUE E-UTRA and UTRA ACLR | Sprint, China Telecom, CMCC, Mediatek, Nokia, Skyworks, Qorvo, Samsung | imported from 3GU |
R4‑162978 | TP for 36.740: Use cases | Huawei | imported from 3GU |
R4‑162979 | TP for TR 37.871: Necessary changes to the core requirements for Multi-Band Base Station testing with three or more bands | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑162980 | Correction on multi-band definition | Huawei | imported from 3GU |
R4‑162981 | Correction on multi-band definition | Huawei | imported from 3GU |
R4‑162982 | Correction on multi-band definition | Huawei | imported from 3GU |
R4‑162983 | TP for TR 37.871: Generic approach for Multi-Band Base Station testing with three or more bands | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑162984 | Correction on multi-band definition | Huawei | imported from 3GU |
R4‑162985 | Correction on multi-band definition | Huawei | imported from 3GU |
R4‑162986 | Correction on multi-band definition | Huawei | imported from 3GU |
R4‑162987 | Reply LS on SRS switching interuption time | Huawei | imported from 3GU |
R4‑162988 | Ad hoc minutes: Rel-13 LAA co-existence testing | Ericsson | imported from 3GU |
R4‑162989 | Way forward on LAA co-existence testing | Ericsson | imported from 3GU |
R4‑162990 | Clarification in MB test configuration TC7b | Ericsson | imported from 3GU |
R4‑162991 | LS on NB-IoT | RAN WG1 | imported from 3GU |
R4‑162992 | LS on PRACH preamble power for eMTC | RAN WG1 | imported from 3GU |
R4‑162993 | LS on Power Headroom report | RAN WG2 | imported from 3GU |
R4‑162994 | LS on NB-IoT RRM requirements | RAN WG2 | imported from 3GU |
R4‑162995 | Regulatory requirements for the 5.9GHz band | Ericsson | imported from 3GU |
R4‑162996 | TP on ITS regulatory aspects at 5.9GHz operating frequency | LG Electronics Inc. | imported from 3GU |
R4‑162997 | LS Out: Response to LS on WORK TOWARDS REV. 1 OF RECOMMENDATIONS ITU-R ITU-R WP5D^^ M.2070 AND M.2071 - QUESTIONS FOR CLARIFICATION WITHIN 3GPP SPECIFICATIONS (ITU-R WP5D) | Ericsson | imported from 3GU |
R4‑162998 | Additional simulation for adjacent channel co-existence of B41 HPUE | Ericsson | imported from 3GU |
R4‑162999 | Revised WID: LTE Advanced inter-band CA Rel-14 for 3DL/1UL | Huawei | imported from 3GU |
R4‑163000 | WF on operating band plan for V2V service | LG Electronics Inc. | imported from 3GU |
R4‑163001 | Revised WID: Basket WI for LTE Advanced inter-band CA Rel-14 for 4DL/1UL | Ericsson | imported from 3GU |
R4‑163002 | Revised WID: Basket WI for LTE Advanced Intra-band CA | Ericsson | imported from 3GU |
R4‑163003 | Way forward on performance metric of V2V system | CATT, Huawei | imported from 3GU |
R4‑163004 | WF on the adjacent coexistence scenarios and parameters at 5.9GHz | LG Electronics Inc. | imported from 3GU |
R4‑163005 | TP on adjacent channel co-existence scenarios and parameters for V2V service | LG Electronics Inc. | imported from 3GU |
R4‑163006 | RC+CE Validation Project Plan | Bluetest AB | imported from 3GU |
R4‑163007 | CR to TR37.977: RC+CE Test Volume Validation | Bluetest AB | imported from 3GU |
R4‑163008 | WF for organising eLAA RF requirements | Qualcomm | imported from 3GU |
R4‑163009 | Guidelines for Laboratories and Test Solutions Utilized for MIMO OTA Performance and Harmonization Work | Spirent Communications, AT&T, Motorola Mobility | imported from 3GU |
R4‑163010 | 3GPP MIMO OTA MPAC data template for performance requirement phase | ROHDE & SCHWARZ | imported from 3GU |
R4‑163011 | List of RRM Test Cases for WLAN-LTE Inter-working | Ericsson | imported from 3GU |
R4‑163012 | New test cases: Event triggered reporting on deactivated SCells and interruption probability (0.5%) without DRX (FDD 4 DL CA and TDD 4 DL CA) | Nokia | imported from 3GU |
R4‑163013 | 4 DL FDD CA Event Triggered Reporting with 3 deactivated SCells in Non-DRX | Huawei,HiSilicon | imported from 3GU |
R4‑163014 | 4 DL TDD CA Event Triggered Reporting with 3 deactivated SCells in Non-DRX | Huawei,HiSilicon | imported from 3GU |
R4‑163015 | New test cases: Event triggered reporting on deactivated SCells and interruption probability (0.5%) without DRX (FDD 5 DL CA and TDD 5 DL CA) | Nokia | imported from 3GU |
R4‑163016 | 5 DL FDD CA Event Triggered Reporting with Deactivated SCells in Non-DRX | Huawei,HiSilicon | imported from 3GU |
R4‑163017 | 5 DL TDD CA Event Triggered Reporting with Deactivated SCells in Non-DRX | Huawei,HiSilicon | imported from 3GU |
R4‑163018 | Test Case List of RRM Test Cases for 3 UL CA | Ericsson, CATT | imported from 3GU |
R4‑163019 | CR on UE transmit timing requirement in R13 | Huawei,HiSilicon | imported from 3GU |
R4‑163020 | E-UTRAN TDD-FDD Addition and Release Delay of known PSCell in Synchronous DC with PCell in FDD | Huawei,HiSilicon | imported from 3GU |
R4‑163021 | E-UTRAN TDD-FDD Addition and Release Delay of known PSCell in Synchronous DC with PCell in TDD | Huawei,HiSilicon | imported from 3GU |
R4‑163022 | CR on UE transmit timing requirement in R12 | Huawei,HiSilicon | imported from 3GU |
R4‑163023 | Way forward on PUCCH SCell activation tests | NTT DOCOMO Inc., Nokia, Ericsson, Huawei | imported from 3GU |
R4‑163024 | RRM test requirements for activation and deactivation of PUCCH Scell | NTT DOCOMO, INC., Nokia, Ericsson, Huawei | imported from 3GU |
R4‑163025 | WF on eMTC RLM CEMode A test | Nokia, Anritsu, Ericsson, Qualcomm | imported from 3GU |
R4‑163026 | WF on eTMC RRM | Ericsson, Nokia | imported from 3GU |
R4‑163027 | WF on channel model | Huawei | imported from 3GU |
R4‑163028 | Simulation assumption for evaluation of UE performance under SFN | Huawei,HiSilicon, NTT DOCOMO | imported from 3GU |
R4‑163029 | Ad hoc minutes for FD-MIMO performance | Samsung | imported from 3GU |
R4‑163030 | WF on UE performance requirments for FD-MIMO | Samsung,Qualcomm,MediaTek,Ericsson,Intel,LGE | imported from 3GU |
R4‑163031 | Framework for CSI performance requirements on FD-MIMO | Samsung | imported from 3GU |
R4‑163032 | DL Control Channel IM simulation alignment results summary (TDD) | Intel | imported from 3GU |
R4‑163033 | Way forward on PUSCH ETU600 test | Huawei | imported from 3GU |
R4‑163034 | Way forward on simulation assumptions for SFN scenario with unidirectional deployment | Ericsson | imported from 3GU |
R4‑163035 | WF on 4Rx PDSCH MMSE-IRC receiver | Huawei | imported from 3GU |
R4‑163036 | 36.104 CR for BS MMSE-IRC receiver - Demodulation tests in asynchronous interference scneario | China Telecom | imported from 3GU |
R4‑163037 | Ad hoc minutes for BS MMSE-IRC receiver | China Telecom | imported from 3GU |
R4‑163038 | Way Forward on test case list for new RS-SINR | ZTE Microelectronics, Nubia, CMCC | imported from 3GU |
R4‑163039 | maintenance on radio link monitoring for Rel-13 MTC UE | Huawei,HiSilicon | imported from 3GU |
R4‑163040 | WF for list of RRM core requirement | LG Electronics Inc. | imported from 3GU |
R4‑163041 | Simulation assumptions on RRM requirements in Connected mode under high speed scenarios | Huawei,HiSilicon | imported from 3GU |
R4‑163042 | TP: cell search for legacy UE | Huawei, HiSilicon | imported from 3GU |
R4‑163043 | 4Rx SDR, CA test | Intel, MediaTek | imported from 3GU |
R4‑163044 | WF on eLAA | Ericsson, Nokia, Intel, Qualcomm Inc., ZTE, Samsung | imported from 3GU |
R4‑163045 | Channel occupancy accuracy requirements | Ericsson | imported from 3GU |
R4‑163046 | maintenance on measurement requirements for Rel-13 MTC UE under normal coverage | Huawei,HiSilicon | imported from 3GU |
R4‑163047 | maintenance on measurement requirements for Rel-13 MTC UE under enhanced coverage | Huawei,HiSilicon | imported from 3GU |
R4‑163048 | WF on DL Control IM for PDCCH/PCFICH/PHICH in asynchronous networks | Ericsson, Intel Corporation, ZTE | imported from 3GU |
R4‑163049 | WF on intra-frequency relative RS-SINR measurement | Ericsson | imported from 3GU |
R4‑163050 | CR on Definitions for DL control channel IM | ZTE | imported from 3GU |
R4‑163051 | Summary of BS IRC link simulation results in asynchronous network | Huawei | imported from 3GU |
R4‑163052 | WF on channel model | Huawei | imported from 3GU |
R4‑163053 | WF on simulation assumption of downlink CCH-IM receiver in async network for PDCCH/PCFICH/PHICH | Huawei | imported from 3GU |
R4‑163054 | Way forward on simulation assumptions for SFN scenario with unidirectional deployment | Ericsson | imported from 3GU |
R4‑163055 | Booked for RRM session: Not used | RRM session | imported from 3GU |
R4‑163056 | Booked for RRM session: Not used | RRM session | imported from 3GU |
R4‑163057 | Booked for RRM session: Not used | RRM session | imported from 3GU |
R4‑163058 | Booked for RRM session: Not used | RRM session | imported from 3GU |
R4‑163059 | Booked for RRM session: Not used | RRM session | imported from 3GU |
R4‑163060 | Booked for RRM session: Not used | RRM session | imported from 3GU |
R4‑163061 | Booked for RRM session: Not used | RRM session | imported from 3GU |
R4‑163062 | Booked for RRM session: Not used | RRM session | imported from 3GU |
R4‑163063 | Booked for RRM session: Not used | RRM session | imported from 3GU |
R4‑163064 | Booked for RRM session: Not used | RRM session | imported from 3GU |
R4‑163065 | Booked for RRM session: Not used | RRM session | imported from 3GU |
R4‑163066 | Booked for RRM session: Not used | RRM session | imported from 3GU |
R4‑163067 | Booked for RRM session: Not used | RRM session | imported from 3GU |
R4‑163068 | Booked for RRM session: Not used | RRM session | imported from 3GU |
R4‑163069 | Booked for RRM session: Not used | RRM session | imported from 3GU |
R4‑163070 | Booked for RRM session: Not used | RRM session | imported from 3GU |
R4‑163071 | UTRA BHH TRP/TRS performance requirements | Motorola Mobility UK Ltd., Huawei, AT&T | imported from 3GU |
R4‑163072 | Core requirments overview for Uplink Capacity Enhancements for LTE | China Mobile Com. Corporation | imported from 3GU |
R4‑163073 | RMC for verification of RF receiver characteristics for LAA | Ericsson | imported from 3GU |
R4‑163074 | Corrections to BS spurious emissions requirements in TS37.104 (Rel-12) | ZTE Corporation, Nubia | imported from 3GU |
R4‑163075 | Corrections to BS spurious emissions requirements in TS37.141 (Rel-12) | ZTE Corporation, Nubia | imported from 3GU |
R4‑163076 | - | - | - |
R4‑163077 | TP to 36.714-04-01: Operating bands, channel bandwidths, relaxation values and MSD for CA_1A-3C-8A | Nokia, KT | imported from 3GU |
R4‑163078 | Revised WI: LTE Advanced inter-band CA Rel-14 for 5DL/1UL | Nokia | imported from 3GU |
R4‑163079 | Minutes of Band 41 HPUE ad-hoc | Qualcomm Incorporated | imported from 3GU |
R4‑163080 | WF for organising eLAA RF requirements | Qualcomm | imported from 3GU |
R4‑163081 | TP for 36.740: Analysis on impact to BS RF | Huawei | imported from 3GU |
R4‑163082 | Introduction of band 46 in 37.104 | Ericsson LM, Nokia | imported from 3GU |
R4‑163083 | Corrections to BS spurious emissions requirements in TS37.104 (Rel-12) | ZTE Corporation, Nubia | imported from 3GU |
R4‑163084 | Corrections to BS spurious emissions requirements in TS37.104 (Rel-13) | ZTE Corporation, Nubia | imported from 3GU |
R4‑163085 | Corrections to BS spurious emissions requirements in TS37.141 (Rel-12) | ZTE Corporation, Nubia | imported from 3GU |
R4‑163086 | Corrections to BS spurious emissions requirements in TS37.141 (Rel-13) | ZTE Corporation, Nubia | imported from 3GU |
R4‑163087 | How to specify MSD requirements for CA_3A-42A(2DL/2UL) | NTT DOCOMO, INC. | imported from 3GU |
R4‑163088 | Introduction of additional 3DL/2UL CA band combinations in Rel-14 | LG Electronics Inc. | imported from 3GU |
R4‑163089 | Introduction of new CA band combinations for 3DL/2UL inter-band CA in TS36.307 Rel-12 | LG Electronics Inc. | imported from 3GU |
R4‑163090 | Introduction of new CA band combinations for 3DL/2UL inter-band CA in TS36.307 Rel-13 | LG Electronics Inc. | imported from 3GU |
R4‑163091 | - | - | - |
R4‑163092 | Booked for RRM session: Not used | RRM Session | imported from 3GU |
R4‑163093 | Booked for RRM session: Not used | RRM Session | imported from 3GU |
R4‑163094 | Booked for RRM session: Not used | RRM Session | imported from 3GU |
R4‑163095 | Booked for RRM session: Not used | RRM Session | imported from 3GU |
R4‑163096 | Booked for RRM session: Not used | RRM Session | imported from 3GU |
R4‑163097 | Booked for RRM session: Not used | RRM Session | imported from 3GU |
R4‑163098 | Booked for RRM session: Not used | RRM Session | imported from 3GU |
R4‑163099 | Booked for RRM session: Not used | RRM Session | imported from 3GU |
R4‑163100 | Booked for RRM session: Not used | RRM Session | imported from 3GU |
R4‑163101 | Booked for RRM session: Not used | RRM Session | imported from 3GU |
R4‑163102 | Booked for RRM session: Not used | RRM Session | imported from 3GU |
R4‑163103 | Booked for RRM session: Not used | RRM Session | imported from 3GU |
R4‑163104 | Booked for RRM session: Not used | RRM Session | imported from 3GU |
R4‑163105 | Booked for RRM session: Not used | RRM Session | imported from 3GU |
R4‑163106 | Booked for RRM session: Not used | RRM Session | imported from 3GU |
R4‑163107 | Booked for RRM session: Not used | RRM Session | imported from 3GU |
R4‑163108 | Booked for RRM session: Not used | RRM Session | imported from 3GU |
R4‑163109 | Booked for RRM session: Not used | RRM Session | imported from 3GU |
R4‑163110 | Booked for RRM session: Not used | RRM Session | imported from 3GU |
R4‑163111 | Booked for RRM session: Not used | RRM Session | imported from 3GU |
R4‑163112 | LS to RAN5 on the applicability of 4Rx features for Release 10/11/12 devices | Ericsson | imported from 3GU |
R4‑163113 | CR for 4Rx requirements for release independent in Rel-10 | Ericsson | imported from 3GU |
R4‑163114 | CR for 4Rx requirements for release independent in Rel-11 | Ericsson | imported from 3GU |
R4‑163115 | CR for 4Rx requirements for release independent in Rel-12 | Ericsson | imported from 3GU |
R4‑163116 | Draft CR TS.36.307 REL-8 | Nokia, Ericsson | imported from 3GU |
R4‑163117 | Draft CR TS.36.307 REL-9 | Nokia, Ericsson | imported from 3GU |
R4‑163118 | Draft CR TS.36.307 REL-10 | Nokia, Ericsson | imported from 3GU |
R4‑163119 | Draft CR TS.36.307 REL-11 | Nokia, Ericsson | imported from 3GU |
R4‑163120 | Draft CR TS.36.307 REL-12 | Nokia, Ericsson | imported from 3GU |
R4‑163121 | Draft CR TS.36.307 REL-13 | Nokia, Ericsson | imported from 3GU |
R4‑163122 | TP to TS 37.144: Addition of missing Tablet requirements | NTT Docomo | imported from 3GU |
R4‑163123 | LS on Potential Parameters for Blind Detection in MUST | RAN WG 1 | imported from 3GU |
R4‑163124 | LS on V2X synchronization procedure | RAN WG 1 | imported from 3GU |
R4‑163125 | LS on UE/band specific support of UL 256QAM | RAN WG 1 | imported from 3GU |
R4‑163126 | LS on UE assumption on the number of CRS ports for DRS | RAN WG 1 | imported from 3GU |
R4‑163127 | LS on DRS Duty Cycle | RAN WG 1 | imported from 3GU |
R4‑163128 | LS on realistic power amplifier model for NR waveform evaluation | RAN WG 1 | imported from 3GU |
R4‑163129 | WF on LAA Bandwidth combination sets in CA basket work items | Nokia | imported from 3GU |
R4‑163130 | CR for 4Rx requirements for release independent in Rel-11 | Ericsson | imported from 3GU |
R4‑163131 | CR for 4Rx requirements for release independent in Rel-12 | Ericsson | imported from 3GU |
R4‑163132 | LS to RAN5 on the applicability of 4Rx features for Release 10/11/12 devices | Ericsson | imported from 3GU |
R4‑163133 | TP for TR 37.871: Necessary changes to the core requirements for Multi-Band Base Station testing with three or more bands | Nokia, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑163134 | LS to RAN on new RAN4 TR for documenting multi-node tests for LAA | Ericsson LM | imported from 3GU |
R4‑163135 | Minutes of TRP/TRS Ad-Hoc | Nokia | imported from 3GU |
R4‑163136 | DRAFT LS to RAN1 on continuous uplink transmission in eMTC | Intel Corporation | imported from 3GU |
R4‑163137 | Introduction of band 46 in 37.104 | Ericsson LM, Nokia | imported from 3GU |
R4‑163138 | Spec improvement for Tib/Rib tables in TS 36.101 | Huawei, Hisilicon | imported from 3GU |
R4‑163139 | WF on LAA Bandwidth combination sets in CA basket work items | Nokia, Vodafone, Huawei, LGU plus | imported from 3GU |
R4‑163140 | TR: 3GPP TR 36.714-02-01 | Qualcomm Incorporated | imported from 3GU |
R4‑163141 | - | - | - |
R4‑163142 | Reply LS on SRS switching interuption time | Huawei | imported from 3GU |
R4‑163143 | Revision of WID: LTE Advanced inter-band CA Rel-14 for 2DL/1UL | Qualcomm Incorporated | imported from 3GU |
R4‑163144 | WF on operating band plan for V2V service | LG Electronics Inc. | imported from 3GU |
R4‑163145 | TP for 36.740: Analysis on impact to BS RF | Huawei | imported from 3GU |
R4‑163146 | MIMO OTA Way Forward | Intel Corporation | imported from 3GU |
R4‑163147 | MIMO OTA Way Forward | Intel Corporation | imported from 3GU |
R4‑163148 | WF on LAA Bandwidth combination sets in CA basket work items | Nokia, Vodafone, Huawei, LGU plus | imported from 3GU |
R4‑163149 | WF on revision of the LAA BCS in basket Wis | Nokia, Qualcomm, Huawei, Ericsson | imported from 3GU |
R4‑163150 | LS to RAN1 on continuous uplink transmission in eMTC | Intel Corporation | imported from 3GU |
R4‑163151 | LS to RAN5 on the applicability of 4Rx features for Release 10/11/12 devices | Ericsson | imported from 3GU |
R4‑163152 | WF on revision of the LAA BCS in basket Wis | Nokia, Qualcomm, Huawei, Ericsson | imported from 3GU |
page generated from database: 2024-04-22 07:58:53