3GPP TDocs (written contributions) at meeting
Meeting: R4-74 - 2015-02-09 to 2015-02-13, Athens
meeting id: R4-74 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R4‑150001 | RA4-74 Meeting Agenda | Chairman | - |
R4‑150002 | RAN4-73 Meeting Report | MCC | - |
R4‑150003 | TP for Rel-13 2DL TR 36.8XX: Introduction of LTE_CA_B5_B40 | SK Telecom | - |
R4‑150004 | TR 36.861 v0.8.0 (Study on LTE FDD in the bands 1980-2010 MHz and 2170-2200 MHz) | SK Telecom | - |
R4‑150005 | New WI Proposal: LTE Advanced 3 Band Carrier Aggregation (3DL) of Band 1, Band 5 and Band 40 | SK Telecom | - |
R4‑150006 | New WI Proposal: LTE Advanced 3 Band Carrier Aggregation (3DL) of Band 3, Band 5 and Band 40 | SK Telecom | - |
R4‑150007 | New WI Proposal: LTE Advanced 4 Band Carrier Aggregation (4DL) of Band 1, Band 3, Band 5 and Band 40 | SK Telecom | - |
R4‑150008 | CR to Correct Implementation Errors in Intra-Frequency RSTD Measurement Reporting Delay Test Cases | Spirent Communications | - |
R4‑150009 | CR to Correct Implementation Error in FDD RSTD Measurement Reporting Delay Test Case and to Update Io Levels for Certain RSTD Test Cases | Spirent Communications | - |
R4‑150010 | Introduce additional bands of LC MTC | Verizon | - |
R4‑150011 | TP for TR36.860: LTE 2UL CA Band 2(A) and Band 5 (A) | Verizon | - |
R4‑150012 | TP for TR36.860: LTE 2UL CA Band 4(A) and Band 5 (A) | Verizon | - |
R4‑150013 | TRP/TRS Measurement of USB Dongle for UMTS Band I and LTE Band 1 | SGS | - |
R4‑150014 | Remove incorrect note from CA RSTD Accuracy tests | Spirent Communications | - |
R4‑150015 | Remove incorrect note from CA RSTD Accuracy tests | Spirent Communications | - |
R4‑150016 | Remove incorrect note from CA RSTD Accuracy tests | Spirent Communications | - |
R4‑150017 | Change Nprs value for 5MHz CA RSTD Accuracy tests | Spirent Communications | - |
R4‑150018 | Performance Evaluation for High Speed Train Scenario | ITRI | - |
R4‑150019 | Revised WID: LTE Advanced 4 Band Carrier Aggregation (4DL/1UL) of Band 2, Band 2, Band 12 and Band 30 | AT&T | - |
R4‑150020 | Revised WID:LTE Advanced 4 Band Carrier Aggregation (4DL/1UL) of Band 2, Band 2, Band 5 and Band 30 | AT&T | - |
R4‑150021 | Revised WID:LTE Advanced 4 Band Carrier Aggregation (4DL/1UL) of Band 2, Band 2 Band 29 and Band 30 | AT&T | - |
R4‑150022 | Revised WID: LTE Advanced 4 Band Carrier Aggregation (4DL/1UL) of Band 2, Band 4, Band 12 and Band 30 | AT&T | - |
R4‑150023 | Revised WID: LTE Advanced 4 Band Carrier Aggregation (4DL/1UL) of Band 2, Band 5, Band 12 and Band 30 | AT&T | - |
R4‑150024 | Revised WID: LTE Advanced 4 Band Carrier Aggregation (4DL/1UL) of Band 2, Band 4 Band 29 and Band 30 | AT&T | - |
R4‑150025 | On the issues of soft buffer and soft combining for D2D receiver | Microsoft Corporation | - |
R4‑150026 | CR to add missing text in Annex C of TS 36.112 | TruePosition | - |
R4‑150027 | CR on corrections to Dual-Layer Spatial Multiplexing with multiple CSI-RS config Rel-12 | ZTE, Anritsu | - |
R4‑150028 | Corrections and Clarifications of UE specifications in TR 36.844 [FS_LTE_FDD_1670_US] | Lightsquared | - |
R4‑150029 | New WID : LTE Carrier aggregation for bands B2, B4, B4, and B12 | T-Mobile USA | - |
R4‑150030 | New WID : LTE Carrier aggregation for bands B2, B2, B4, and B12 | T-Mobile USA | - |
R4‑150031 | New WID : LTE Carrier aggregation for bands B2, B2, B4, and B4, | T-Mobile USA | - |
R4‑150032 | Some Validation and Comparison Testing Results of Multi-Probe Anechoic Chamber MIMO-OTA Approach | CATR | - |
R4‑150033 | Consideration on possible Pcell limitations | SoftBank Mobile | - |
R4‑150034 | TP for Rel-13 2DL TR36.8xx : IMD/Harmonics Issues on LTE-A Inter-band Carrier Aggregation (2DL/1UL) of Band 8 and Band 28 | SoftBank Mobile | - |
R4‑150035 | TP to REL-13 3DL TR36.8xx: IMD/Harmonics Issues on LTE-A Inter-band Carrier Aggregation (3DL/1UL) of Band 1, Band 8 and Band 28 | SoftBank Mobile | - |
R4‑150036 | TP to REL-13 3DL TR36.8xx: IMD/Harmonics Issues on LTE-A Inter-band Carrier Aggregation (3DL/1UL) of Band 3, Band 8 and Band 28 | SoftBank Mobile | - |
R4‑150037 | TP for Rel-13 2DL TR36.8xx : IMD/Harmonics Issues on LTE-A Inter-band Carrier Aggregation (2DL/1UL) of Band 8 and Band 42 | SoftBank Mobile | - |
R4‑150038 | TP to REL-13 3DL TR36.8xx: IMD/Harmonics Issues on LTE-A Inter-band Carrier Aggregation (3DL/1UL) of Band 8, Band 42 and Band 42 | SoftBank Mobile | - |
R4‑150039 | Maximum allowed layers for multiple monitoring for CA | Alcatel-Lucent | - |
R4‑150040 | Maximum allowed layers for multiple monitoring for CA | Alcatel-Lucent | - |
R4‑150041 | Maximum allowed layers for multiple monitoring for CA | Alcatel-Lucent | - |
R4‑150042 | Clarification of the UE configurations for measurement requirements | Alcatel-Lucent | - |
R4‑150043 | Discussion of SCE RRM Tests | Alcatel-Lucent | - |
R4‑150044 | DRX correction for interruption with dual connectivity | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | - |
R4‑150045 | Correction of Interruptions with RSTD Measurements for 3DL CA | Alcatel-Lucent | - |
R4‑150046 | Maximum Transmission Timing Difference in 3DL CA | Alcatel-Lucent | - |
R4‑150047 | Discussion of RRM Requirements for 4DL/1UL CA | Alcatel-Lucent | - |
R4‑150048 | Equivalent Conducted Emissions. | Alcatel-Lucent and Alcatel-Lucent Shanghai Bell | - |
R4‑150049 | Views on BS Performance Requirements | Alcatel-Lucent and Alcatel-Lucent Shanghai Bell | - |
R4‑150050 | OTA measurement results on delta between BH and BHH for 20 smart-phones, more details. | Sony Mobile | - |
R4‑150051 | Way forward proposal on UE OTA TRP/TRS performance. | Sony Mobile | - |
R4‑150052 | UE TRP/TRS relation to conducted RF performance at Carrier Aggregation. | Sony Mobile | - |
R4‑150053 | Discussion on MTC Device Classes. | Sony Mobile | - |
R4‑150054 | MTC Maximum Transmission Power Level. | Sony Mobile | - |
R4‑150055 | Impairment results for normal demodulation test for 3 DL CA | Qualcomm Incorporated | - |
R4‑150056 | Simulation results for 256QAM CQI tests | Qualcomm Incorporated | - |
R4‑150057 | Simulation results for 256QAM demodulation tests | Qualcomm Incorporated | - |
R4‑150058 | CR for applicability and test rules for DC performance requirements | Qualcomm Incorporated | - |
R4‑150059 | Correction for timing offset test for intraband non-contiguous CA | Qualcomm Incorporated | - |
R4‑150060 | Introduction of timing offset test forn intraband non-contiguous CA | Qualcomm Incorporated | - |
R4‑150061 | CR for applicability and test rules for TDD-FDD CA performance requirements | Qualcomm Incorporated | - |
R4‑150062 | Introduction of CQI tests for TDD-FDD CA | Qualcomm Incorporated | - |
R4‑150063 | Performance requirement for CRS-IM for macro network | Qualcomm Incorporated | - |
R4‑150064 | Sustained data rate test for dual connectivity | Qualcomm Incorporated | - |
R4‑150065 | CSI performance requirements for TDD eIMTA | Qualcomm Incorporated | - |
R4‑150066 | Further simulation results for eIMTA PDSCH demodulation test | Qualcomm Incorporated | - |
R4‑150067 | PDSCH demodulation test in EVA600 | Qualcomm Incorporated | - |
R4‑150068 | Simulation results for LC-MTC CQI test | Qualcomm Incorporated | - |
R4‑150069 | Simulation results for LC-MTC demodulation test | Qualcomm Incorporated | - |
R4‑150070 | Simulation results for SU-MIMO multi-cell test | Qualcomm Incorporated | - |
R4‑150071 | RI test SU-MIMO receiver | Qualcomm Incorporated | - |
R4‑150072 | Impairment results for TDD-FDD CA performance requirements | Qualcomm Incorporated | - |
R4‑150073 | Effect of BS emission on intra-band contiguous CA with minimum channel spacing | Qualcomm Incorporated | - |
R4‑150074 | Scope of demodulation and RRM requirements for 4 Rx UE | Qualcomm Incorporated | - |
R4‑150075 | Initial RLAN regulatory assessment for LAA System | ZTE, Tejet | - |
R4‑150076 | LAA coexistence scenarios | ZTE, Tejet | - |
R4‑150077 | AAS hybrid test methodology | ZTE, Tejet | - |
R4‑150078 | TR 36.8xx: 3DL CA version 0.2..0 | ZTE, Tejet | - |
R4‑150079 | TR 36.8xx: 3DL CA version 0.3.0 | ZTE, Tejet | - |
R4‑150080 | TP for R13 3DL TR36.8xx: Channel bandwidth, UE harmonics and IMD study for CA Band 7, Band 40 and Band 40 | ZTE, CMCC, Tejet | - |
R4‑150081 | TP for Rel-13 2DL TR 36.8xx: operating bands, channel bandwidths for CA 7+40 | ZTE, Tejet | - |
R4‑150082 | TP for R13 2DL TR36.8xx: Co-existence study for CA 7+40 | ZTE, Tejet | - |
R4‑150083 | TP for R13 3DL TR36.8xx: Harmonics and IMD study for CA 7+40+40 | ZTE, Tejet | - |
R4‑150084 | Discussion on LAA occupied channel bandwidth | ZTE, Tejet | - |
R4‑150085 | Some corrections related to single carrier requirements | ZTE, Tejet | - |
R4‑150086 | Some corrections related to single carrier requirements | ZTE, Tejet | - |
R4‑150087 | Some corrections related to single carrier requirements | ZTE, Tejet | - |
R4‑150088 | Some corrections related to single carrier requirements | ZTE, Tejet | - |
R4‑150089 | Preliminary analysis of coexistence between WLAN and LAA systems | ZTE, Tejet | - |
R4‑150090 | Evaluation results for NAICS simulation performance | Huawei, HiSilicon | - |
R4‑150091 | Discussion on demodulation requirement for NAICS | Huawei, HiSilicon | - |
R4‑150092 | Discussion of UE behavior on potential TM10 interference | Huawei, HiSilicon | - |
R4‑150093 | Discussion on CSI requirement for NAICS | Huawei, HiSilicon | - |
R4‑150094 | Discussion and evaluation on eIMTA demodulation requirements | Huawei, HiSilicon | - |
R4‑150095 | Discussion on eIMTA CSI requirements | Huawei, HiSilicon | - |
R4‑150096 | Evaluation performance for D2D links | Huawei, HiSilicon | - |
R4‑150097 | Discussion on time-offset for D2D demodulation requirements | Huawei, HiSilicon | - |
R4‑150098 | Discussion on D2D demodulation requirements | Huawei, HiSilicon | - |
R4‑150099 | Discussion on DL 4RX demodulation requirements | Huawei, HiSilicon | - |
R4‑150100 | Discussion on DL 4RX CSI requirements | Huawei, HiSilicon | - |
R4‑150101 | Framework discussion and simulation assumption discussion on CRS-IM | Huawei, HiSilicon | - |
R4‑150102 | Update on the summary of single cell demodulation alignment and impairment results | Huawei, HiSilicon | - |
R4‑150103 | ON SU-MIMO whitening verification with TM3 | Huawei, HiSilicon | - |
R4‑150104 | Summary of SU-MIMO multi-cell whitening verification alignment and impairment results | Huawei, HiSilicon | - |
R4‑150105 | Introducing the SU-MIMO whitening verification test | Huawei, HiSilicon | - |
R4‑150106 | Remaining issues and simulation results for 3DL CA demodulation and CSI requirements | Huawei, HiSilicon | - |
R4‑150107 | Remaining issues and simulation results for TDD FDD CA demodulation and CSI requirements | Huawei, HiSilicon | - |
R4‑150108 | CR on power imbalance test for 3DL CA. | Huawei, HiSilicon | - |
R4‑150109 | CR on sustained data rate test for TDD FDD CA | Huawei, HiSilicon | - |
R4‑150110 | SCE demodulation requirements | Huawei, HiSilicon | - |
R4‑150111 | SCE CSI requirements | Huawei, HiSilicon | - |
R4‑150112 | CR for introduction of 256QAM demodulation performance requirements | Huawei, HiSilicon | - |
R4‑150113 | CR for introduction of 256QAM CSI requirements | Huawei, HiSilicon | - |
R4‑150114 | On DC UE SDR test | Huawei, HiSilicon | - |
R4‑150115 | CR: DC UE performance requirements | Huawei, HiSilicon | - |
R4‑150116 | Timing offset for DC uplink power control | Huawei, HiSilicon | - |
R4‑150117 | LS on the small overlap for UL power control in Dual-connectivity | Huawei, HiSilicon | - |
R4‑150118 | MTC demodulation performance requirements | Huawei, HiSilicon | - |
R4‑150119 | MTC CSI requirements | Huawei, HiSilicon | - |
R4‑150120 | CR: MTC demodulation performance requirements | Huawei, HiSilicon | - |
R4‑150121 | CR: MTC CSI requirements | Huawei, HiSilicon | - |
R4‑150122 | New channel mode for SFN deployment | Huawei, HiSilicon | - |
R4‑150123 | UE performance evaluation of high speed train under the existing channel model | Huawei, HiSilicon | - |
R4‑150124 | UE performance evaluation of high speed train under the new scenarios | Huawei, HiSilicon | - |
R4‑150125 | BS performance evaluation of high speed train under the existing and new scenario | Huawei, HiSilicon | - |
R4‑150126 | Discussion on the deployment scenarios for Homogeneous network | Huawei | - |
R4‑150127 | Discussion on the deployment scenarios for Heterogeneous deployment | Huawei | - |
R4‑150128 | Discussion on interference model for BS MMSE-IRC | Huawei | - |
R4‑150129 | Discussion on performance requirements for BS MMSE-IRC | Huawei | - |
R4‑150130 | BS conformance test for TDD FDD CA | Huawei | - |
R4‑150131 | Discussion on minimum spacing for CA demodualtion test | Huawei, HiSilicon | - |
R4‑150132 | Evaluation for demodulation performance requirements under EVA600 | Huawei, HiSilicon | - |
R4‑150133 | Issues for 1.4MHz MBMS performance requirement | Huawei, HiSilicon | - |
R4‑150134 | B42 channel offset to fulfil NS_01 | Intel Corporation | - |
R4‑150135 | A-MPR for Band 42 CA and Band 43 UE-UE coexistence | Intel Corporation | - |
R4‑150136 | A-MPR for Band 41 based on revised OOBE requirements | Intel Corporation | - |
R4‑150137 | Receiver harmonic mixing issue in Class A2 | Intel Corporation | - |
R4‑150138 | TP for TR 36.8xx: For LTE_CA_B3_B3_B5 | Intel Corporation | - |
R4‑150139 | 3DL/2UL CA combinations and their RF implementation | Intel Corporation | - |
R4‑150140 | TP to TS 37.144 on a skeleton for MIMO OTA requirements | Intel Corporation | - |
R4‑150141 | MIMO OTA evening adhoc notes | Intel Corporation | - |
R4‑150142 | Way Forward on MIMO OTA | Intel Corporation | - |
R4‑150143 | A figure of merit proposal for MIMO OTA | Intel Corporation | - |
R4‑150144 | CR to TR 37.977 on the figure of merit definition for MIMO OTA | Intel Corporation | - |
R4‑150145 | A signal to interference ratio control proposal for MIMO OTA | Intel Corporation | - |
R4‑150146 | LS to CTIA MUSG on measurement uncertainty development for MIMO OTA | Intel Corporation | - |
R4‑150147 | On the impact of carrier aggregation on OTA performance of UEs | Intel Corporation | - |
R4‑150148 | Analysis of UTRA FDD handset BHH TRP/TRS data in Bands I and VIII | Intel Corporation | - |
R4‑150149 | TP to TS 37.144 on adding UTRA FDD handset BHH TRP/TRS requirements for Bands I and VIII | Intel Corporation | - |
R4‑150150 | LC-MTC demodulation test simulation results | Intel Corporation | - |
R4‑150151 | On potential demodulation test topics applicable to eMTC | Intel Corporation | - |
R4‑150152 | LTE TDD eIMTA PDSCH demodulation test simulation results | Intel Corporation | - |
R4‑150153 | Introduction of the eIMTA functional PDSCH demodulation test | Intel Corporation | - |
R4‑150154 | Discussion on LTE TDD eIMTA CSI reporting requirements | Intel Corporation | - |
R4‑150155 | Discussion on LTE TDD eIMTA EPDCCH demodulation requirements | Intel Corporation | - |
R4‑150156 | Discussion on D2D demodulation performance requirements | Intel Corporation | - |
R4‑150157 | D2D REFSENS demodulation performance | Intel Corporation | - |
R4‑150158 | Discussion on NAICS demodulation test scenarios and receiver assumptions | Intel Corporation | - |
R4‑150159 | Discussion on test cases for verification of NAICS receiver with non-colliding CRS-IC | Intel Corporation | - |
R4‑150160 | NAICS simulation alignment results | Intel Corporation | - |
R4‑150161 | Discussion on NAICS CSI reporting requirements | Intel Corporation | - |
R4‑150162 | LS on UE capabilities signaling for intra-band contiguous CA | Intel Corporation | - |
R4‑150163 | Discussions on LTE DL 4 Rx antenna ports | Intel Corporation | - |
R4‑150164 | Discussions on CRS Interference Mitigation for Homogenous Network | Intel Corporation | - |
R4‑150165 | Further discussion on interruption requirements for D2D | Intel | - |
R4‑150166 | D2DSS detection delay requirements | Intel | - |
R4‑150167 | Requirements on D2D S-RSRP measurement accuracy | Intel | - |
R4‑150168 | Interruption requirements in Dual connectivity | Intel | - |
R4‑150169 | Discussion on enhancements of high speed scenario | Intel | - |
R4‑150170 | New study item proposal on measurement gap enhancement | Intel | - |
R4‑150171 | Motivation paper for new study item proposal on measurement gap enhancement in Rel-13 | Intel | - |
R4‑150172 | Event triggered reporting on deactivated SCells in non-DRX (FDD CA) | Intel | - |
R4‑150173 | Event triggered reporting on deactivated SCells in non-DRX (TDD CA) | Intel | - |
R4‑150174 | Simulation results of 256QAM demodulation test | Intel | - |
R4‑150175 | Discussion on RI test of SU-MIMO with modified Medium channel | Intel | - |
R4‑150176 | Demodulation requirement of SU-MIMO multi-cell whitening test | Intel | - |
R4‑150177 | Simulation results on SU-MIMO single-cell demodulation test | Intel | - |
R4‑150178 | Text Proposal for TR 36.8xx: harmonics and intermodulation analysis for TDD-FDD CA B3+B41 combination | China Telecom | - |
R4‑150179 | Consideration on inter-band CA of B3 + B41 | China Telecom | - |
R4‑150180 | China regulation requirements for unlicensed spectrum in 5GHz | China Telecom | - |
R4‑150181 | TR 36.862 LTE_1980_2170_REG1 v0.2.0 | DISH Network, Solaris Mobile Ltd. | - |
R4‑150182 | Band plan for 2 GHz band in Region 1 | DISH Network, Solaris Mobile Ltd. | - |
R4‑150183 | Co-existence issues for 2 GHz band in Region 1 | DISH Network, Solaris Mobile Ltd. | - |
R4‑150184 | TP for TR 36.853: Correction of B3+B3+B8 CA | CHTTL | - |
R4‑150185 | TP for TR 36.8xx: Channel Bandwidth and BS coexistence studies of B3+B3+B8 CA | CHTTL | - |
R4‑150186 | TP for TR 36.8xx- UE coexistence studies for B3+B7+B8 CA | CHTTL | - |
R4‑150187 | TR 36.877 v1.1.0 | Qualcomm Incorporated | - |
R4‑150188 | TP for TR 36.877: On agreed D2D RF core requirements | Qualcomm Incorporated | - |
R4‑150189 | D2D Tx Requirements: MPR for SSSS | Qualcomm Incorporated | - |
R4‑150190 | D2D Tx Requirements: Transmit power | Qualcomm Incorporated | - |
R4‑150191 | D2D Tx Requirements: Output power dynamics | Qualcomm Incorporated | - |
R4‑150192 | D2D Tx Requirements: Transmit signal quality | Qualcomm Incorporated | - |
R4‑150193 | D2D Tx Requirements: Output RF spectrum emissions | Qualcomm Incorporated | - |
R4‑150194 | D2D Rx on FDD bands: Remaining details for REFSENS | Qualcomm Incorporated | - |
R4‑150195 | D2D Rx on FDD bands: Receiver selectivity to Jammer | Qualcomm Incorporated | - |
R4‑150196 | D2D Rx on FDD bands: Impact to WAN | Qualcomm Incorporated | - |
R4‑150197 | CR on RF core requirements for D2D | Qualcomm Incorporated | - |
R4‑150198 | CR on RRM requirements for D2D (Resubmission of approved CR) | Qualcomm Incorporated | - |
R4‑150199 | Clarifications on agreed RRM requirements | Qualcomm Incorporated | - |
R4‑150200 | D2D timing error when synchronized to another UE | Qualcomm Incorporated | - |
R4‑150201 | Simulation assumptions for D2D synchronization requirements | Qualcomm Incorporated | - |
R4‑150202 | Simulation results: Absolute S-RSRP measurement accuracy | Qualcomm Incorporated | - |
R4‑150203 | Simulation results: SyncRef UE selection / reselection | Qualcomm Incorporated | - |
R4‑150204 | D2D synchronization requirements | Qualcomm Incorporated | - |
R4‑150205 | Overview of latest RAN1/2 agreements | Qualcomm Incorporated | - |
R4‑150206 | CR on remaining RRM requirements for D2D | Qualcomm Incorporated | - |
R4‑150207 | Demodulation simulation results of D2D RMC for REFSENS | Qualcomm Incorporated | - |
R4‑150208 | Summary of demodulation simulation results of D2D RMC for REFSENS | Qualcomm Incorporated | - |
R4‑150209 | D2D demodulation performance requirements | Qualcomm Incorporated | - |
R4‑150210 | Scaling for AAS BS emission requirements | NEC | - |
R4‑150211 | Conducted Unwanted Emission requirements for AAS BS | NEC | - |
R4‑150212 | Conducted Output power Requirements for AAS BS | NEC | - |
R4‑150213 | Proposal on focused discussion on EIRP accuracy values | NEC | - |
R4‑150214 | TP EIRP Accuracy estimation for AAS BS | NEC | - |
R4‑150215 | Range of EIRP accuracy declaration | NEC | - |
R4‑150216 | TP on AAS OTA Sensitivities | NEC | - |
R4‑150217 | Time Alignment Error in AAS | NEC | - |
R4‑150218 | Proposed modification for per group of transceivers requirements | NEC | - |
R4‑150219 | Way Forward for FS_LTE_1980_2170_Korea | KT | - |
R4‑150220 | UE Reference Architecture Proposal for B1+B3+B40 3DL CA | KT | - |
R4‑150221 | Band definitions for LAA | Qualcomm Incorporated | - |
R4‑150222 | Adjacent channel coexistence aspects for LAA | Qualcomm Incorporated | - |
R4‑150223 | Additional analysis for single carrier Band 42/Band43 A-MPR | Qualcomm Incorporated | - |
R4‑150224 | Band 42/43 CA_NS_08 A-MPR | Qualcomm Incorporated | - |
R4‑150225 | LS on Additional Aspects for MTC | Qualcomm Incorporated | - |
R4‑150226 | LS on Support of Narrowband Operation for MTC | Qualcomm Incorporated | - |
R4‑150227 | RF Consideration for eMTC | Qualcomm Incorporated | - |
R4‑150228 | Consideration on deployment scenarios and network parameters of MMSE-IRC receiver for LTE BS | ZTE | - |
R4‑150229 | Interference Modelling for LTE BS MMSE-IRC Receiver | ZTE | - |
R4‑150230 | Discussion on RSRP and RSRQ relative accuracy requirement under high Doppler | ZTE | - |
R4‑150231 | Discussion on RSRQ requirement of CRS-based DRS measurement for SCE | ZTE | - |
R4‑150232 | Discussion on D2D Synchronization requirements | ZTE | - |
R4‑150233 | Simulation results for D2D demodulation performance for REFSENS | ZTE | - |
R4‑150234 | Discussion on RRM test cases for SCE | ZTE | - |
R4‑150235 | Introduction of test cases for CSI-RS based RSRP accuracy requirements for SCE | ZTE | - |
R4‑150236 | Further discussion on 256QAM demodulation tests | ZTE | - |
R4‑150237 | Discussion on 256QAM CQI tests | ZTE | - |
R4‑150238 | Discussion on NAICS Demodulation Tests | ZTE | - |
R4‑150239 | Modification of CSI reference measurement channel Rel-12 | ZTE | - |
R4‑150240 | Modification of CSI reference measurement channel Rel-11 | ZTE | - |
R4‑150241 | Editorial correction for CA_18A-28A | KDDI | - |
R4‑150242 | Introduction of dual uplink CA into 36.101 | KDDI, Ericsson | - |
R4‑150243 | Introduction of dual uplink CA into 36.307 | KDDI, Ericsson | - |
R4‑150244 | Introduction of dual uplink CA into 36.307 | KDDI, Ericsson | - |
R4‑150245 | Introduction of dual uplink CA into 36.307 | KDDI, Ericsson | - |
R4‑150246 | Removing brackets for CA_1A-28A MSD requirements | KDDI | - |
R4‑150247 | WI handling for dual uplink CA of Band 1 + Band 42 | KDDI | - |
R4‑150248 | CA_41A-42C operational perspective | KDDI | - |
R4‑150249 | Proposals on Class A2 framework | KDDI | - |
R4‑150250 | TP for TR36.xxx: UE RF requirements for dual uplink CA of B1 + B18 | KDDI | - |
R4‑150251 | TP for TR36.xxx: UE RF requirements for dual uplink CA of B1 + B28 | KDDI | - |
R4‑150252 | TP for TR36.xxx: UE RF requirements for dual uplink CA of B1 + B28 | KDDI | - |
R4‑150253 | High-level views on performance requirements of MMSE-IRC receiver for LTE BS | China Telecom | - |
R4‑150254 | Work plan on performance requirements of MMSE-IRC receiver for LTE BS | China Telecom | - |
R4‑150255 | Scenarios and system-level simulation assumptions for PUSCH under synchronous network | China Telecom | - |
R4‑150256 | Inter-cell interference modelling for BS MMSE-IRC receiver | China Telecom | - |
R4‑150257 | On reference receiver structure and link level simulation assumptions for BS MMSE-IRC | China Telecom | - |
R4‑150258 | Revised WI: Performance requirements of MMSE-IRC receiver for LTE BS | China Telecom | - |
R4‑150259 | Editorial correction on symbols for enhanced performance requirements type A | China Telecom | - |
R4‑150260 | Editorial correction on symbols for enhanced performance requirements type A | China Telecom | - |
R4‑150261 | On RSTD measurements when different UL/DL configuration on PCell and SCell | Huawei,HiSilicon | - |
R4‑150262 | Further discussion on CGI reading in CA test cases | Huawei,HiSilicon | - |
R4‑150263 | Further discussion on the requirement applicability for TDD config 0 | Huawei,HiSilicon | - |
R4‑150264 | Updating the requirements applicability for TDD config 0 | Huawei,HiSilicon | - |
R4‑150265 | Simulation assumption of RSRQ evaluation for SCE | Huawei,HiSilicon | - |
R4‑150266 | Evaluation summary on RSRQ requirements for SCE | Huawei,HiSilicon | - |
R4‑150267 | Cleanup for RSRQ measurement requirement for SCE | Huawei,HiSilicon | - |
R4‑150268 | CR on RSRQ accuracy requirement for SCE | Huawei,HiSilicon | - |
R4‑150269 | Discussion on testing methodology for SCE | Huawei,HiSilicon | - |
R4‑150270 | Test case list for SCE | Huawei,HiSilicon | - |
R4‑150271 | Discussion on testing methodology for DC | Huawei,HiSilicon | - |
R4‑150272 | Test case list for DC | Huawei,HiSilicon | - |
R4‑150273 | Discussion on synchronization requirements for D2D | Huawei,HiSilicon | - |
R4‑150274 | Discussion on UE Rx-Tx requirements for D2D | Huawei,HiSilicon | - |
R4‑150275 | Clarification on on UE Rx-Tx requirements for D2D | Huawei,HiSilicon | - |
R4‑150276 | Discussion on new RSRQ definition | Huawei,HiSilicon | - |
R4‑150277 | Reply LS on new RSRQ definition | Huawei,HiSilicon | - |
R4‑150278 | Discussion on testing methodology for new RSRQ requirements | Huawei,HiSilicon | - |
R4‑150279 | Test case list for new RSRQ requirements | Huawei,HiSilicon | - |
R4‑150280 | Discussion on testing methdology for Incmon | Huawei,HiSilicon | - |
R4‑150281 | Testing case list for Incmon | Huawei,HiSilicon | - |
R4‑150282 | Discussion on remaining issues for Incmon | Huawei,HiSilicon | - |
R4‑150283 | Clarification on Incmon requirements | Huawei,HiSilicon | - |
R4‑150284 | On relative RSRP/RSRQ accuracy requirement under high Doppler | Huawei,HiSilicon | - |
R4‑150285 | Wayforward on relative RSRP/RSRQ accuracy requirements under high Doppler | Huawei,HiSilicon | - |
R4‑150286 | CR on relative RSRP/RSRQ requirements for high Doppler | Huawei,HiSilicon | - |
R4‑150287 | Discussion on RSTD measurement testing methodology for 3DL CA | Huawei,HiSilicon | - |
R4‑150288 | Wayforward on RSTD measurement testing methodology for 3DL CA | Huawei,HiSilicon | - |
R4‑150289 | Test case for 3DL CA: PCell in FDD: Event triggered reporting on deactivated SCells and interruption probability (0.5%) without DRX (TDD-FDD CA) | Huawei,HiSilicon | - |
R4‑150290 | Test case for 3DL CA: PCell in TDD: Event triggered reporting on deactivated SCells and interruption probability (0.5%) without DRX (TDD-FDD CA) | Huawei,HiSilicon | - |
R4‑150291 | Test case for 3DL CA: Event triggered reporting on deactivated SCells and interruption probability (0.5%) without DRX (FDD CA) | Huawei,HiSilicon | - |
R4‑150292 | Test case for 3DL CA: Event triggered reporting on deactivated SCells and interruption probability (0.5%) without DRX (TDD 3 DL CA) | Huawei,HiSilicon | - |
R4‑150293 | Discussion on small GAP requirement | Huawei,HiSilicon | - |
R4‑150294 | Motivation on establishment of positioning enhancement WI | Huawei,HiSilicon | - |
R4‑150295 | Correction on R12 CA test cases | Huawei,HiSilicon | - |
R4‑150296 | TR skeleton (v0.0.1) for Study on performance enhancements for high speed scenario in LTE | Huawei,HiSilicon | - |
R4‑150297 | Overview on performance enhancements for high speed scenario in LTE | Huawei,HiSilicon | - |
R4‑150298 | Discussion on RRM performance evaluation for high speed scenario | Huawei,HiSilicon | - |
R4‑150299 | RRM impact for 4 RX antenna ports | Huawei,HiSilicon | - |
R4‑150300 | wayforward on RRM impact for 4 RX antenna ports | Huawei,HiSilicon | - |
R4‑150301 | Discussion on SCE requirement for IncMon UE | Huawei,HiSilicon | - |
R4‑150302 | Wayforward on SCE requirement for IncMon UE | Huawei,HiSilicon | - |
R4‑150303 | Clean up the correction on discovery signal measurements | Huawei,HiSilicon | - |
R4‑150304 | Correction on MBSFN measurements | Huawei,HiSilicon | - |
R4‑150305 | Introduce CA measurement accuracy requirements for SCE | Huawei, HiSilicon | - |
R4‑150306 | Correction on Io in carrier aggregation test cases | Huawei, HiSilicon, Anritsu | - |
R4‑150307 | Uplink Near Field Measurement Method for Active Antennas | Kathrein Werke KG | - |
R4‑150308 | Test procedure update for RAT specific requirements | CATT | - |
R4‑150309 | Test procedure update for RAT specific requirements | CATT | - |
R4‑150310 | Corrections on reference measurement channel | CATT | - |
R4‑150311 | Simulation results for RSRP/RSRQ relative accuracy requirements in high Doppler conditions | CATT | - |
R4‑150312 | Further clarification of MBMS BLER reporting in section 9 | CATT | - |
R4‑150313 | CR for test case of SCell activation and deactivation for known SCells without DRX (FDD 3 DL CA) | CATT | - |
R4‑150314 | CR for test case of SCell activation and deactivation for known SCells without DRX (TDD 3 DL CA) | CATT | - |
R4‑150315 | Discussion on interruption period for SCell (de-)activation with 3DL | CATT | - |
R4‑150316 | Modification for interruption period for SCell (de-)activation | CATT | - |
R4‑150317 | Clarification for EUTRA TDD-TDD inter frequency measurement | CATT | - |
R4‑150318 | Updated simulation results for PDSCH | CATT | - |
R4‑150319 | Further discussion on EPDCCH for TDD eIMTA | CATT | - |
R4‑150320 | CQI requirements for TDD eIMTA | CATT | - |
R4‑150321 | Discussion on RRM test for LTE_UTRA_IncMon | CATT | - |
R4‑150322 | Updated alignment results for multi-cell test for SU-MIMO advanced receiver | CATT | - |
R4‑150323 | Impairment results for multi-cell test SU-MIMO advanced receiver | CATT | - |
R4‑150324 | Discussion on UE RF requirements for D2D | CATT | - |
R4‑150325 | Discussion on NAICS UE demodulation | CATT | - |
R4‑150326 | Discussion on RRM test for DC | CATT | - |
R4‑150327 | Discussion on range of declaration of EIRP | CATT | - |
R4‑150328 | Discussion on minimum specified OTA sensitivity power level | CATT | - |
R4‑150329 | Discussion on declaration of AoA (Angle of Arrival) | CATT | - |
R4‑150330 | TP on coordinate system for AAS radiated requirement | CATT | - |
R4‑150331 | BS requirements for UL 64QAM | CATT | - |
R4‑150332 | Discussion on EVM requirement for UL 64QAM | CATT | - |
R4‑150333 | Rel-13 MTC impact on RF requirements | CATT | - |
R4‑150334 | TR 36.833-5-42 v0.3.0: LTE Advanced Carrier Aggregation in Band 42 for 3DL | CATT | - |
R4‑150335 | Introduction of intra-band CA_42D to TS 36.101 | CATT | - |
R4‑150336 | Introduction of CA_42D to TS 36.307 | CATT | - |
R4‑150337 | Introduction of CA_42D to TS 36.307 | CATT | - |
R4‑150338 | Introduction of CA_42D to TS 36.307 | CATT | - |
R4‑150339 | Introduction of CA_42D to TS 36.307 | CATT | - |
R4‑150340 | Required changes for 36.307. | CATT | - |
R4‑150341 | Impact of DL 4RX on UE RF requirements | CATT | - |
R4‑150342 | Impact of DL 4RX on UE Performance requirements | CATT | - |
R4‑150343 | Discussion on UE demodulation performance for high speed scenario | CATT | - |
R4‑150344 | Accuracy requirements and test cases for new RSRQ | Nokia Networks, Nokia Corporation | - |
R4‑150345 | Introducing accuracy requirement for new RSRQ | Nokia Network, Nokia Corporation | - |
R4‑150346 | RSRQ accuracy requirements for SCE on/off | Nokia Networks, Nokia Corporation | - |
R4‑150347 | TP for Rel-13 3DL TR 36.8xx: UE RF requirements for CA 2+5+29 | Huawei, Hisilicon | - |
R4‑150348 | TR skeleton for Rel-13 2UL inter-band CA TR 36.8xx | Huawei | - |
R4‑150349 | TP for Rel-13 3DL TR 36.8xx: operating bands, channel bandwidths for CA_B1_B7_B28 | Huawei, Hisilicon | - |
R4‑150350 | TP for Rel-13 3DL TR 36.8xx: operating bands, channel bandwidths for CA_B1_B3_B7 | Huawei, Hisilicon | - |
R4‑150351 | Discussion on the impact of DTT on LTE UE | Huawei, Hisilicon | - |
R4‑150352 | TR 36.860-13 v0.1.0 Dual uplink inter-band CA (2015-02) | Huawei | - |
R4‑150353 | Discussion on support of narrowband operation for MTC | Huawei | - |
R4‑150354 | Draft reply LS on support of narrowband operation for MTC | Huawei | - |
R4‑150355 | Correction of the Maximum aggregated bandwidth for LTE_CA_B28_B40_B40 | Huawei, Hisilicon | - |
R4‑150356 | Correction of the Maximum aggregated bandwidth for LTE_CA_B1_B7_B28 | Huawei | - |
R4‑150357 | Removal of bracket for B28 UL MIMO | Huawei, Hisilicon | - |
R4‑150358 | Removal of bracket for B28 UL MIMO | Huawei, Hisilicon | - |
R4‑150359 | Corrections for TS 36.116 cluase 7.6: Blocking characteristics | Huawei | - |
R4‑150360 | Corrections for TS 36.116 cluase 7.6: Blocking characteristics | Huawei | - |
R4‑150361 | Correction of TS 36.101 for the Pcell support of 25+41 | Huawei, Hisilicon | - |
R4‑150362 | Co-location between Band 42 and Band 43 in TS 36.104 | Huawei | - |
R4‑150363 | Co-location between Band 42 and Band 43 in TS 36.141 | Huawei | - |
R4‑150364 | Co-location between Band 42 and Band 43 in TS 37.104 | Huawei | - |
R4‑150365 | Co-location between Band 42 and Band 43 in TS 37.141 | Huawei | - |
R4‑150366 | Discussion on the bracket for TC4 of TS 37.141 | Huawei | - |
R4‑150367 | The applicability of TC4d and TC4e | Huawei | - |
R4‑150368 | Introduction of a new CS for MSR BS without GSM SR | Huawei | - |
R4‑150369 | TP for Rel-13 2DL TR 36.8xx: TIB and RIB values for CA_3-31 | Huawei, Hisilicon | - |
R4‑150370 | TP for Rel-13 2DL TR 36.8xx: operating bands, channel bandwidths for CA_B20_B31 | Huawei, Hisilicon, Orange | - |
R4‑150371 | TP for Rel-13 3DL TR 36.8xx: operating bands, channel bandwidths and co-existence studies for CA 2+5+29 | Huawei, Hisilicon | - |
R4‑150372 | Further discussion on CA_B41_B42_B42 | Huawei, Hisilicon | - |
R4‑150373 | Way forward for CA_B41_B42_B42 | Huawei, Hisilicon | - |
R4‑150374 | TP for Rel-13 3DL TR 36.8xx: co-existence and TIB and RIB values for CA_B1_B7_B28 | Huawei, Hisilicon | - |
R4‑150375 | TP for Rel-13 3DL TR 36.8xx: co-existence and TIB and RIB values for CA_B1_B3_B7 | Huawei, Hisilicon | - |
R4‑150376 | TP for Rel-13 2DL CA TR 36.8xx: operating bands, channel bandwidths and co-existence studies for CA_28A-40A | Huawei, Hisilicon | - |
R4‑150377 | TP for Rel-13 2DL CA TR 36.8xx: UE RF requirements for CA_28A-40A | Huawei, Hisilicon | - |
R4‑150378 | TP for Rel-13 3DL TR 36.8xx: operating bands, channel bandwidths and co-existence studies for CA 3A_40C | Huawei, Hisilicon | - |
R4‑150379 | TP for Rel-13 3DL TR 36.8xx: UE RF requirements for CA 3A_40C | Huawei, Hisilicon | - |
R4‑150380 | Work plan for UL 64QAM | Huawei, Hisilicon | - |
R4‑150381 | TR skeleton: LTE uplink supporting 64QAM | Huawei, Hisilicon | - |
R4‑150382 | On RF requirements for UL 64QAM | Huawei, Hisilicon | - |
R4‑150383 | EVM requirements for UL 64QAM | Huawei, Hisilicon | - |
R4‑150384 | Consideration on MPR/A-MPR requirements for UL 64QAM | Huawei, Hisilicon | - |
R4‑150385 | Discussion of the scope of UE RF requirements for DL 4Rx | Huawei, Hisilicon | - |
R4‑150386 | Work plan for LAA in RAN4 | Huawei, Ericsson, Qualcomm | - |
R4‑150387 | On the importance of licensed spectrum for licensed-assisted access to unlicensed spectrum | Huawei | - |
R4‑150388 | In-device coexistence for LAA and WiFi | Huawei | - |
R4‑150389 | Draft LS on In-device coexistence issue for LAA and WiFi | Huawei | - |
R4‑150390 | Discussion on co-existence scenarios of LAA and WiFi | Huawei | - |
R4‑150391 | Discussion on evaluation methodology for WiFi in co-existence study | Huawei | - |
R4‑150392 | Simulation assumption of co-existence study for LAA and WiFi | Huawei | - |
R4‑150393 | Consideration on defining operating band(s) for LAA | Huawei | - |
R4‑150394 | Discussion on the feasibility of BS and UE operation of 5GHz band in CA | Huawei | - |
R4‑150395 | New WID: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 1, Band 3 and Band 42 | NTT DOCOMO, INC. | - |
R4‑150396 | New WID: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 1, Band 19 and Band 42 | NTT DOCOMO, INC. | - |
R4‑150397 | New WID: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 3, Band 19 and Band 42 | NTT DOCOMO, INC. | - |
R4‑150398 | New WID: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 1, Band 21 and Band 42 | NTT DOCOMO, INC. | - |
R4‑150399 | New WID: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 19, Band 21 and Band 42 | NTT DOCOMO, INC. | - |
R4‑150400 | TP for Rel-13 2DL TR 36.8xx LTE Advanced Carrier Aggregation of Band Combination (19+28) | NTT DOCOMO, INC. | - |
R4‑150401 | TP for Rel-13 3DL TR 36.8xx LTE Advanced Carrier Aggregation of Band Combination (1+19+28) | NTT DOCOMO, INC. | - |
R4‑150402 | TP for Rel-13 2DL TR 36.8xx LTE Advanced Carrier Aggregation of Band Combination (21+42) | NTT DOCOMO, INC. | - |
R4‑150403 | TP for Rel-13 3DL TR 36.8xx LTE Advanced Carrier Aggregation of Band Combination (21+42+42) | NTT DOCOMO, INC. | - |
R4‑150404 | Pcell support in CA | NTT DOCOMO, INC. | - |
R4‑150405 | Tx EVM on UL 64QAM | NTT DOCOMO, INC. | - |
R4‑150406 | Way forward on MSS band | NTT DOCOMO, INC. | - |
R4‑150407 | Out-of-band blocking for 2UL CA | NTT DOCOMO, INC. | - |
R4‑150408 | [DRAFT] LS on Out-of-band blocking for 2UL CA | NTT DOCOMO, INC. | - |
R4‑150409 | RF requirements on 4 Rx antenna ports | NTT DOCOMO, INC. | - |
R4‑150410 | Comparison of TRP between UMTS and LTE | NTT DOCOMO, INC. | - |
R4‑150411 | Discussion of agreeable requirement level for UMTS BHH TRP/TRS | NTT DOCOMO, INC. | - |
R4‑150412 | LME requirement for UMTS Band I and LTE Band 1 | NTT DOCOMO, INC. | - |
R4‑150413 | LEE requirement for UMTS Band VI and XIX | NTT DOCOMO, INC. | - |
R4‑150414 | Measurement results of tablet TRP/TRS for UMTS Band I, XIX | NTT DOCOMO, INC. | - |
R4‑150415 | Comparison test result between anechoic chamber and reverberation chamber for the MIMO OTA testing | NTT DOCOMO, INC. | - |
R4‑150416 | Evaluation result for multi cell demodulation test for SU-MIMO advanced receiver | NTT DOCOMO, INC. | - |
R4‑150417 | Evaluation result for CSI test for SU-MIMO advanced receiver | NTT DOCOMO, INC. | - |
R4‑150418 | CR for single cell demodulation test for SU-MIMO | NTT DOCOMO, INC. | - |
R4‑150419 | View on test scenario for demodulation requirement for NAICS receiver | NTT DOCOMO, INC. | - |
R4‑150420 | Evaluation results for CA single carrier performance | NTT DOCOMO, INC. | - |
R4‑150421 | How to define conducted receiver requirements | NTT DOCOMO, INC. | - |
R4‑150422 | Scaling factor "N" on unwanted emission for AAS BS | NTT DOCOMO, INC. | - |
R4‑150423 | Consideration on where to set EIRP requirements | NTT DOCOMO, INC. | - |
R4‑150424 | Interference level for Co-location transmitter intermodulation | NTT DOCOMO, INC. | - |
R4‑150425 | Intra-system transmitter IMD requirement | NTT DOCOMO, INC. | - |
R4‑150426 | Discussion for multi band BS testing with three or more bands | NTT DOCOMO, INC. | - |
R4‑150427 | Definition of Interfering signal level for TX IM requirement | NTT DOCOMO, INC. | - |
R4‑150428 | CR for TS36.104 clarifying the definition of mean power | NTT DOCOMO, INC. | - |
R4‑150429 | CR for TS36.141 clarifying the definition of mean power | NTT DOCOMO, INC. | - |
R4‑150430 | Work Plan for Dual Connectivity RRM test | NTT DOCOMO, INC. | - |
R4‑150431 | RRM test cases for Dual Connectivity | NTT DOCOMO, INC. | - |
R4‑150432 | Demodulation test requirements for DC | NTT DOCOMO, INC. | - |
R4‑150433 | Scope and objectives of UE performance requirements for 4Rx AP UE | NTT DOCOMO, INC. | - |
R4‑150434 | Scope and objectives of RRM requirements for 4Rx AP UE | NTT DOCOMO, INC. | - |
R4‑150435 | Simulation result for 256QAM demodulation test | NTT DOCOMO, INC. | - |
R4‑150436 | Work Plan for performance enhancements for high speed scenario SI | NTT DOCOMO, INC. | - |
R4‑150437 | Initial discussion of high speed train scenarios | NTT DOCOMO, INC. | - |
R4‑150438 | Introduction of CA_3A-42A and CA_3A-42C into 36.104 | NTT DOCOMO, INC. | - |
R4‑150439 | Introduction of CA_3A-42A and CA_3A-42C into 36.141 | NTT DOCOMO, INC. | - |
R4‑150440 | RRM test requirements for SCE | NTT DOCOMO, INC. | - |
R4‑150441 | Introduction of CA_3A-42A and CA_3A-42C into 36.101 | NTT DOCOMO, INC. | - |
R4‑150442 | Final update of LTE Rel-12 UE feature list (RAN4 part) | NTT DOCOMO, INC. | - |
R4‑150443 | [Draft] LS on LTE Rel-12 UE feature list about RAN4 responsible features | NTT DOCOMO, INC. | - |
R4‑150444 | Multiple NS and P-Max handling | NTT DOCOMO, INC. | - |
R4‑150445 | Proposed for 3DL/2UL CA configuration pairs | NTT DOCOMO, INC. | - |
R4‑150446 | Discussion on IncMon test case | NTT DOCOMO, INC. | - |
R4‑150447 | Test requirements on New RSRQ | NTT DOCOMO, INC. | - |
R4‑150448 | Further consideration on 2nd harmonic | NTT DOCOMO, INC. | - |
R4‑150449 | Example 3 DL CA RRM A.8.x Test case with flexible channel BW | Anritsu | - |
R4‑150450 | Example 3 DL CA RRM A.9.x Test case with flexible channel BW | Anritsu | - |
R4‑150451 | UL HARQ in PDSCH and PDCCH/PCFICH demod test cases for eICIC with MBSFN ABS | Anritsu | - |
R4‑150452 | UL HARQ in PDSCH and PDCCH/PCFICH demod test cases for eICIC/feICIC with MBSFN ABS | Anritsu | - |
R4‑150453 | UL HARQ in PDSCH and PDCCH/PCFICH demod test cases for eICIC/feICIC with MBSFN ABS | Anritsu | - |
R4‑150454 | Correction to eICIC aggressor cell configurations | Anritsu | - |
R4‑150455 | Correction to eICIC aggressor cell configurations | Anritsu | - |
R4‑150456 | Correction to eICIC aggressor cell configurations | Anritsu | - |
R4‑150457 | Time-domain measurement resource restriction pattern for serving cell in feICIC RSRP and RSRQ test cases | Anritsu | - |
R4‑150458 | Time-domain measurement resource restriction pattern for serving cell in feICIC RSRP and RSRQ test cases | Anritsu | - |
R4‑150459 | Skeleton TR 36.833-8-41 | Alcatel-Lucent, Sprint | - |
R4‑150460 | TP for TR 36.833-8-41: Work plan for LTE Advanced intra-band non-contiguous Carrier Aggregation in Band 41 for 4DL | Alcatel-Lucent, Sprint | - |
R4‑150461 | TP for TR 36.833-8-41: Specification changes required for LTE Advanced intra-band non-contiguous Carrier Aggregation in Band 41 for 4DL | Alcatel-Lucent, Sprint | - |
R4‑150462 | TP for Rel-13 2DL TR 36.8xx: TIB and RIB values of LTE-A Inter-band Carrier Aggregation of Band 25A and Band 26A (1UL) | Alcatel-Lucent, Sprint | - |
R4‑150463 | TP for Rel-13 2DL TR 36.8xx: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (25 + 26) | Alcatel-Lucent, Sprint, Nokia Networks | - |
R4‑150464 | TP for TR 36.851: LTE Advanced Carrier Aggregation of Band Combination (25 + 41) | Alcatel-Lucent, Sprint | - |
R4‑150465 | TP for Rel-13 2DL TR 36.8xx: LTE Advanced Carrier Aggregation of Band Combination (25 + 41) | Alcatel-Lucent, Sprint | - |
R4‑150466 | TP for TR 36.851: Coexistence Studies for LTE Advanced Carrier Aggregation of Band Combination (25 + 41) | Alcatel-Lucent, Sprint | - |
R4‑150467 | TP for Rel-13 2DL TR 36.8xx: Coexistence Studies for LTE Advanced Carrier Aggregation of Band Combination (25 + 41) | Alcatel-Lucent, Sprint | - |
R4‑150468 | Addition of 3 Band Carrier Aggregation (3DL/1UL) of Band 25, Band 41 and Band 41 | Alcatel-Lucent, Sprint | - |
R4‑150469 | TP for Rel-13 3DL TR 36.8xx: LTE Advanced Carrier Aggregation of Band Combination (25 + 41 + 41) | Alcatel-Lucent, Sprint | - |
R4‑150470 | Addition of Coexistence Studies for 3 Band Carrier Aggregation (3DL/1UL) of Band 25, Band 41 and Band 41 | Alcatel-Lucent, Sprint | - |
R4‑150471 | TP for Rel-13 3DL TR 36.8xx: Coexistence Studies for LTE Advanced Carrier Aggregation of Band Combination (25 + 41 + 41) | Alcatel-Lucent, Sprint | - |
R4‑150472 | TP for Rel-13 4DL TR 36.8xx: LTE Advanced Carrier Aggregation of Band Combination (25 + 41 + 41 + 41) | Alcatel-Lucent, Sprint | - |
R4‑150473 | TP for Rel-13 4DL TR 36.8xx: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (25 + 41 + 41 + 41) | Alcatel-Lucent, Sprint | - |
R4‑150474 | TP for Rel-13 3DL TR 36.8xx: LTE Advanced Carrier Aggregation of Band Combination (2 + 2 + 12) | Alcatel-Lucent, US Cellular | - |
R4‑150475 | TP for Rel-13 3DL TR 36.8xx: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (2 + 2 + 12) | Alcatel-Lucent, US Cellular | - |
R4‑150476 | Clean-up of 3 Band Carrier Aggregation (3DL/1UL) of Band 2, Band 2 and Band 12 | Alcatel-Lucent, US Cellular | - |
R4‑150477 | Required BS studies of Harmonics and Intermodulation Products caused by LTE Advanced 4DL/1UL Carrier Aggregation with 3 or 4 bands | Alcatel-Lucent, AT&T | - |
R4‑150478 | Proposals on multi-band BS testing with three or more bands | Alcatel-Lucent | - |
R4‑150479 | UE Capabilities for MIMO layer and CSI processes | Qualcomm Incorporated | - |
R4‑150480 | LS on UE Capabilities for MIMO layers and CSI processes | Qualcomm Incorporated | - |
R4‑150481 | RF Requirements on Minimum channel spacing | Qualcomm Incorporated | - |
R4‑150482 | PCell Support in Carrier Aggregation | Qualcomm Incorporated | - |
R4‑150483 | Test Cases for Cell Discovery | Qualcomm Incorporated | - |
R4‑150484 | Simulation results for multi-cell whitening verification | LG Electronics | - |
R4‑150485 | Simulation result for initial alignment of NAICS demodulation performance | LG Electronics | - |
R4‑150486 | Discussion on NAICS demodulation test for performance requirement | LG Electronics | - |
R4‑150487 | CR on Nfreq of measurement in RRC_CONNECTED State | LG Electronics | - |
R4‑150488 | CR on Nfreq of measurement in RRC_CONNECTED State | LG Electronics | - |
R4‑150489 | CR on Nfreq of measurement in RRC_CONNECTED State | LG Electronics | - |
R4‑150490 | CR on Nfreq of measurement in RRC_CONNECTED State | LG Electronics | - |
R4‑150491 | CR on typo of referencing section name in CA measurements | LG Electronics | - |
R4‑150492 | CR on typo of referencing section name in CA measurements | LG Electronics | - |
R4‑150493 | CR on Nfreq of measurement in RRC_CONNECTED State | LG Electronics | - |
R4‑150494 | CR on typo of referencing clause in discovery signal measurements for CA | LG Electronics | - |
R4‑150495 | CR on Nfreq and DMTC periodicity in discovery signal measurements | LG Electronics | - |
R4‑150496 | Discussion on identification delay and measurement period for discovery signal measurements | LG Electronics | - |
R4‑150497 | Simulation results of DRS based RSRQ measurement accuracy | LG Electronics | - |
R4‑150498 | CR on FDD-FDD inter-frequency absolute and relative CRS RSRP accuracies | LG Electronics | - |
R4‑150499 | CR on TDD-TDD inter-frequency absolute and relative CRS RSRP accuracies | LG Electronics | - |
R4‑150500 | Discussion on synchronization requirement | LG Electronics | - |
R4‑150501 | Simulation results of absolute S-RSRP measurement accuracy | LG Electronics | - |
R4‑150502 | R4-73AH-0112: Correction of UE RF requirements for dual uplik to TS 36.307 Rel-11 | LG Electronics, Nokia Corporation, T-Mobile USA, Huawei and Ericsson | - |
R4‑150503 | R4-73AH-0113: Correction of UE RF requirements for dual uplik to TS 36.307 Rel-12 | LG Electronics, Nokia Corporation, T-Mobile USA, Huawei and Ericsson | - |
R4‑150504 | R4-73AH-0040: Correction for uplik CA configuration in TS 36.101 Rel-12 | LG Electronics | - |
R4‑150505 | Correction of MSD levels for CA_1A-3A and CA_1A-8A in TS36.101 Rl-12 | LG Electronics, KT | - |
R4‑150506 | Consideration on D2D Transmitter requirements | LG Electronics | - |
R4‑150507 | TP for configured Transmitted power and ON/OFF time mask for D2D UE | LG Electronics | - |
R4‑150508 | Consideration on coexistence analysis in co-channel sharing scenarios between inter-operators | LG Electronics | - |
R4‑150509 | New WI proposal: LTE Advanced 3DL/2UL inter-band Carrier Aggregation | Nokia Corporation, LG Electronics | - |
R4‑150510 | Simulation results for 256QAM demodulation | LG Electronics | - |
R4‑150511 | Initial simulation results of D2D REFSENS demodulation | LG Electronics | - |
R4‑150512 | Alignment simulation result for eIMTA PDSCH demodulation test | LG Electronics | - |
R4‑150513 | Discussion about UE demodulation test scope for high speed scenario | LG Electronics | - |
R4‑150514 | UE requirements for the Antenna Test Function (ATF) | Keysight Technologies | - |
R4‑150515 | Draft CR to 36.978 Antenna Test Function: Addition of UE requirements for RSAP and RSARP | Keysight Technologies | - |
R4‑150516 | Draft LS to RAN WG5 on requirements for the Antenna Test Function (ATF) | Keysight Technologies | - |
R4‑150517 | Scaling of emission requirements for AAS BS | SEI | - |
R4‑150518 | Measurement Campaign for Studying Harmonization among MIMO OTA Test Methodologies | Bluetest, CTTC | - |
R4‑150519 | Clarification including PSCell in Note 1 for Ecat | Nokia Corporation, Nokia Networks | - |
R4‑150520 | Discussion on interrupts caused by ProSe Discovery | Nokia Corporation, Nokia Networks | - |
R4‑150521 | On the NAICS UE testability framework | Nokia Networks, Nokia Corporation | - |
R4‑150522 | On the NAICS UE robustness testability | Nokia Networks, Nokia Corporation | - |
R4‑150523 | Link level performance for NAICS receiver | Nokia Networks, Nokia Corporation | - |
R4‑150524 | On the NAICS UE CSI feedback performance requirements | Nokia Networks, Nokia Corporation | - |
R4‑150525 | On the 4Rx AP operation in LTE DL | Nokia Networks, Nokia Corporation | - |
R4‑150526 | Removal of eDL-MIMO term from specification | Nokia Corporation | - |
R4‑150527 | Removal of eDL-MIMO term from specification | Nokia Corporation | - |
R4‑150528 | Removal of eDL-MIMO term from specification | Nokia Corporation | - |
R4‑150529 | Harmonization of harmonic exception notes REL-10 | Nokia Corporation, Microsoft Corporation, Anritsu | - |
R4‑150530 | Harmonization of harmonic exception notes REL-11 | Nokia Corporation, Microsoft Corporation, Anritsu | - |
R4‑150531 | Harmonization of harmonic exception notes REL-12 | Nokia Corporation, Microsoft Corporation, Anritsu | - |
R4‑150532 | LTE Advanced dual uplink inter-band Carrier Aggregation Class A4 | Nokia Corporation | - |
R4‑150533 | Clarification of 2UL/3DL contiguous intraband CA REFSENS test | Nokia Corporation | - |
R4‑150534 | Clarification of 2UL/3DL contiguous intraband CA REFSENS test | Nokia Corporation, Sprint | - |
R4‑150535 | Skeleton TR 36.854-13 | Nokia Corporation | - |
R4‑150536 | 4DL TR 36.854-13 scope | Nokia Corporation | - |
R4‑150537 | DRAFT Reply LS on NS values in system information broadcast | Nokia Corporation | - |
R4‑150538 | Way Forward on pairing UL and DL CA configurations | Nokia Corporation | - |
R4‑150539 | 3+38 36.101 CR | Nokia Corporation | - |
R4‑150540 | Channel model for high speed train | MediaTek | - |
R4‑150541 | Discussion on PDSCH demodulation test for 256QAM | MediaTek | - |
R4‑150542 | Discussion on CSI tests for 256QAM | MediaTek | - |
R4‑150543 | Discussion on the PDSCH demodulation and CSI tests for 4 Rx UEs | MediaTek | - |
R4‑150544 | RLM for LC-MTC | MediaTek | - |
R4‑150545 | Link level simulations for LC-MTC demodulation tests | MediaTek | - |
R4‑150546 | Interference model for NAICS demodulation requirements | NVIDIA | - |
R4‑150547 | UE behavior for NAICS CSI | NVIDIA | - |
R4‑150548 | Scope and objectives of UE demodulation and CSI work for LTE downlink 4 Rx | NVIDIA | - |
R4‑150549 | Further consideration on tightening RSRP requirements | CMCC | - |
R4‑150550 | CA power imbalance test | CMCC | - |
R4‑150551 | CR on TM4 normal demodulation test for 3DL CA | CMCC | - |
R4‑150552 | CR on introducing new DL referece measurement channels | CMCC | - |
R4‑150553 | CR on normal demodulation test for TDD-FDD CA | CMCC | - |
R4‑150554 | High speed train scenarios | CMCC | - |
R4‑150555 | Updated simulation results for small cell 256QAM demodulation | CMCC | - |
R4‑150556 | UE RF for LTE CA of B7+B40+B40 | CMCC | - |
R4‑150557 | UL pairing for CA of B39+B41+B41 and B39+B39+41 | CMCC | - |
R4‑150558 | WID for LTE-Advanced intra-band contiguous CA in Band 8 for 2DL | CMCC | - |
R4‑150559 | Preliminary consideration on LAA | CMCC | - |
R4‑150560 | Discussion on UL 64QAM open issues | CMCC | - |
R4‑150561 | Pcell support | Samsung | - |
R4‑150562 | TP for Rel-13 3DL TR 36.8XX-dTib and dRib for LTE_CA_B38-B40-B40 | Samsung | - |
R4‑150563 | Overview on CRS-IC performamce requirements in Homogenous Deployments | Samsung | - |
R4‑150564 | A wayforward on 90MHz band plan | Nokia Networks, Nokia Corporation | - |
R4‑150565 | UE coexistence requirement for 2x90MHz band plan | Nokia Networks, Nokia Corporation | - |
R4‑150566 | TP to TR 36.862: BS spurious emission and blocking requirement for the co-existence with 3GPP bands | Nokia Networks | - |
R4‑150567 | New WID: additional bandwidth combination set for LTE Advanced inter-band Carrier Aggregation of Band 5 and Band 7 | Nokia Networks | - |
R4‑150568 | Additions of bandwidth combination set reference | Nokia Networks, Nokia Corporation | - |
R4‑150569 | Correction of band number in Table 5.6A.1-2a for LTE_CA_B4_B12_B30 | Nokia Networks, Nokia Corporation | - |
R4‑150570 | Introduction of CA_3A-38A into 36.307 | Nokia Networks, Nokia Corporation | - |
R4‑150571 | Introduction of CA_3A-38A into 36.307 | Nokia Networks, Nokia Corporation | - |
R4‑150572 | TP to TR36.8xx on CA of Band 1, Band 3 and Band 28 (BS co-existence studies) | Nokia Networks | - |
R4‑150573 | TP to TR36.8xx on CA of Band 1, Band 3 and Band 28 | Nokia Networks, Nokia Corporation, Vodafone | - |
R4‑150574 | Specification changes for multi-band operation with more than two bands | Nokia Networks | - |
R4‑150575 | Multi-band manufacturers declarations and test configurations corrections | Nokia Networks | - |
R4‑150576 | Multi-band manufacturers declarations and test configurations corrections | Nokia Networks | - |
R4‑150577 | Multi-band manufacturers declarations and test configurations corrections | Nokia Networks | - |
R4‑150578 | Multi-band manufacturers declarations and test configurations corrections | Nokia Networks | - |
R4‑150579 | Multi-band manufacturers declarations and test configurations corrections | Nokia Networks | - |
R4‑150580 | Multi-band manufacturers declarations and test configurations corrections | Nokia Networks | - |
R4‑150581 | Introduction of 2DL CA combinations | Nokia Networks | - |
R4‑150582 | Introduction of 2DL CA combinations | Nokia Networks | - |
R4‑150583 | Introduction of 3DL CA combinations | Nokia Networks | - |
R4‑150584 | Introduction of 3DL CA combinations | Nokia Networks | - |
R4‑150585 | Introduction of 4DL CA combinations | Nokia Networks | - |
R4‑150586 | Introduction of 4DL CA combinations | Nokia Networks | - |
R4‑150587 | Introduction of CA combination for bands 3+38 | Nokia Networks | - |
R4‑150588 | Introduction of CA combination for bands 3+38 | Nokia Networks | - |
R4‑150589 | TC7b test configuration corrections | Nokia Networks | - |
R4‑150590 | TC7b test configuration corrections | Nokia Networks | - |
R4‑150591 | On additional test configuration for new Capability Set | Nokia Networks | - |
R4‑150592 | Discussion on requirements clarification for IncMon | Nokia Networks, Nokia Corporation | - |
R4‑150593 | Clarification of IncMon requirements for UTRA idle/CELL_PCH/URA_PCH states | Nokia Networks, Nokia Corporation | - |
R4‑150594 | Clarification of IncMon requirements for UTRA CELL_FACH/CELL_DCH states | Nokia Networks, Nokia Corporation | - |
R4‑150595 | Clarification of IncMon requirements for E-UTRA idle state | Nokia Networks, Nokia Corporation | - |
R4‑150596 | Clarification of IncMon requirements for E-UTRA connected state | Nokia Networks, Nokia Corporation | - |
R4‑150597 | Applicability of IncMon scaling for non-gap-assisted measurements | Nokia Corporation, Nokia Networks | - |
R4‑150598 | Clarification concerning IncMon scaling for non-gap-assisted measurements | Nokia Corporation, Nokia Networks | - |
R4‑150599 | Discussion on RRM test cases for IncMon | Nokia Networks, Nokia Corporation | - |
R4‑150600 | Proposal of RRM test case #9 for 3DL CA | Nokia Networks, Nokia Corporation | - |
R4‑150601 | Proposal of RRM test case #10 for 3DL CA | Nokia Networks, Nokia Corporation | - |
R4‑150602 | Initial considerations for the HSPA multi-carrier dual-band DL/UL configurations | Nokia Networks, Nokia Corporation | - |
R4‑150603 | Impact of HSPA Dual-Band UL carrier aggregation on RF requirements of UE | Nokia Networks, Nokia Corporation | - |
R4‑150604 | Impact of HSPA Dual-Band UL carrier aggregation on BS requirements | Nokia Networks, Nokia Corporation | - |
R4‑150605 | Parameters for MSD calculation | TeliaSonera AB | - |
R4‑150606 | Pcell WF | TeliaSonera AB | - |
R4‑150607 | TP for TR 2 DL TR 36.8xx v0.3.0 Inter-band Carrier Aggregation (1UL), Rel-13: Parameters for MSD calculation | TeliaSonera AB | - |
R4‑150608 | TP for TR 36.8xx V0.0.1 Dual Uplink Inter-band Carrier Aggregation Rel-13:Parameters for MSD calculation | TeliaSonera AB | - |
R4‑150609 | B42 and B43 A-MPR simulation results for Case 4 with 2ULs | TeliaSonera AB | - |
R4‑150610 | UE to UE co-existence between B42/B43 | TeliaSonera | - |
R4‑150611 | UE to UE co-existence between B42/B43 | TeliaSonera | - |
R4‑150612 | UE to UE co-existence between B42/B43 | TeliaSonera | - |
R4‑150613 | Corrections to CA in-band emissions requirement | Rohde & Schwarz | - |
R4‑150614 | Corrections to CA in-band emissions requirement | Rohde & Schwarz | - |
R4‑150615 | Corrections to CA in-band emissions requirement | Rohde & Schwarz | - |
R4‑150616 | Correction of RMC and OCNG pattern in event triggered tests without measurement gap | Rohde & Schwarz | - |
R4‑150617 | Correction of RMC and OCNG pattern in event triggered tests without measurement gap | Rohde & Schwarz | - |
R4‑150618 | Correction of RMC and OCNG pattern in event triggered tests without measurement gap | Rohde & Schwarz | - |
R4‑150619 | PMCH Requirement for 1.4 MHz BW | Rohde & Schwarz | - |
R4‑150620 | PMCH Requirement for 1.4 MHz BW | Rohde & Schwarz | - |
R4‑150621 | PMCH Requirement for 1.4 MHz BW | Rohde & Schwarz | - |
R4‑150622 | PMCH Requirement for 1.4 MHz BW | Rohde & Schwarz | - |
R4‑150623 | Uplink RMCs for sustained data rate test | Rohde & Schwarz | - |
R4‑150624 | Uplink RMCs for sustained data rate test | Rohde & Schwarz | - |
R4‑150625 | Uplink RMCs for sustained data rate test | Rohde & Schwarz | - |
R4‑150626 | Uplink RMCs for sustained data rate test | Rohde & Schwarz | - |
R4‑150627 | RAN73-AH UE RF adhoc meeting | Chaiman | - |
R4‑150628 | Corrections to the CA power imbalance test | Rohde & Schwarz | - |
R4‑150629 | Corrections to the CA power imbalance test | Rohde & Schwarz | - |
R4‑150630 | Corrections to the CA power imbalance test | Rohde & Schwarz | - |
R4‑150631 | Test system complexity for 3DL CA RRM tests | Rohde & Schwarz | - |
R4‑150632 | LAA blocking requirements | Nokia Corporation | - |
R4‑150633 | Adjacent channel leakage in unlicensed band | Nokia Corporation | - |
R4‑150634 | Channel spacing and channel bandwidth for LAA in 5GHz unlicensed band | Nokia Corporation | - |
R4‑150635 | LAA operating band considerations for 5GHz unlicensed band | Nokia Corporation | - |
R4‑150636 | MSD for 2UL CA_1A_3A | Nokia Corporation | - |
R4‑150637 | MSD for 2UL CA_1A_8A | Nokia Corporation | - |
R4‑150638 | B42 and B43 UE to UE co-existence frequency offset to meet spurious emission spec | Nokia Corporation | - |
R4‑150639 | B42 (43) 2CC A-MPR | Nokia Corporation | - |
R4‑150640 | Proposal for an additional ad-hoc | Telecom Italia, Ericsson, Huawei, Vodafone, Verizo | - |
R4‑150641 | Proposed new WI: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 2, Band 7 and Band 12 | Rogers Communications | - |
R4‑150642 | Proposed new WI: Additional bandwidth combination set for LTE Advanced inter-band Carrier Aggregation of Band 4, Band 7 and Band 12 | Rogers Communications | - |
R4‑150643 | Proposed new WI: Additional bandwidth combination set for LTE Advanced inter-band Carrier Aggregation of Band 4, Band 4 and Band 7 | Rogers Communications | - |
R4‑150644 | RSRQ accuracy requirements for CRS based discovery signal | Ericsson | - |
R4‑150645 | CR on RSRQ requirements for CRS based discovery signal | Ericsson | - |
R4‑150646 | General structure of RRM tests cases for SCE | Ericsson | - |
R4‑150647 | RRM tests for SCE for CRS based measurements | Ericsson | - |
R4‑150648 | RRM tests for SCE for CSI-RS based measurements | Ericsson | - |
R4‑150649 | Applicability of inter-frequency measurement requirements for TDD configuration 0 | Ericsson | - |
R4‑150650 | CR on inter-frequency measurements for TDD configuration 0 | Ericsson | - |
R4‑150651 | PCell Interruption in 3 DL CA | Ericsson | - |
R4‑150652 | UE Behaviour after Measurement Gap | Ericsson | - |
R4‑150653 | Correction to RRM test cases | Ericsson | - |
R4‑150654 | CA Testing with Different Band Combinations | Ericsson | - |
R4‑150655 | Correction to CA Testing with Different CA Configurations | Ericsson | - |
R4‑150656 | Event triggered reporting tests on deactivated SCells in non-DRX | Ericsson | - |
R4‑150657 | Different TDD configurations for OTDOA in CA | Ericsson | - |
R4‑150658 | Requirements with different TDD configurations for OTDOA in CA | Ericsson | - |
R4‑150659 | Testing of synchronous and asynchronous DC requirements | Ericsson | - |
R4‑150660 | Principle to test synchronous and asynchronous DC requirements | Ericsson | - |
R4‑150661 | Support of Narrowband Operation for MTC | Ericsson | - |
R4‑150662 | Additional Aspects for MTC | Ericsson | - |
R4‑150663 | LS on Support of Narrowband Operation for MTC | Ericsson | - |
R4‑150664 | LS on Additional Aspects for MTC | Ericsson | - |
R4‑150665 | D2D In-band emission requirements | Ericsson | - |
R4‑150666 | Impact of D2D Out of coverage Transmissions on adjacent carriers | Ericsson | - |
R4‑150667 | Impact of D2D on UE RF RX requirements | Ericsson | - |
R4‑150668 | Impact of D2D on UE RF TX requirements | Ericsson | - |
R4‑150669 | TP to TR 36.877 | Ericsson | - |
R4‑150670 | D2D Multi-carrier Issues | Ericsson | - |
R4‑150671 | Maximum Power Backoff for SD2DSS | Ericsson | - |
R4‑150672 | Work Plan for MTC | Ericsson | - |
R4‑150673 | Consideration on simulation setup for CRS-IM CSI | Ericsson | - |
R4‑150674 | Overview for CRS-IM WI | Ericsson | - |
R4‑150675 | Consideration on simulation setup for CRS-IM demodulation (non-TM10) | Ericsson | - |
R4‑150676 | Link level simulation results for CRS-IM | Ericsson | - |
R4‑150677 | Consideration on simulation setup for CRS-IM demodulation (TM10) | Ericsson | - |
R4‑150678 | Link level simulation assumption for MTC RLM | Ericsson | - |
R4‑150679 | Link level results for D2D RMC | Ericsson | - |
R4‑150680 | Further discussion on D2D demodulation | Ericsson | - |
R4‑150681 | Test setup for EPDCCH | Ericsson | - |
R4‑150682 | UE demodulation simulation results for PDSCH | Ericsson | - |
R4‑150683 | Details on CSI requirements | Ericsson | - |
R4‑150684 | Discussion on test set up for NAICS | Ericsson | - |
R4‑150685 | Discussion on UE behaviour when computing CQI under NAICS | Ericsson | - |
R4‑150686 | System level simulations for CQI reporting under NAICS | Ericsson | - |
R4‑150687 | CSI tests under NAICS | Ericsson | - |
R4‑150688 | CRS-IC test discussion | Ericsson | - |
R4‑150689 | NAICS: Simulation results for calibration purposes | Ericsson | - |
R4‑150690 | Discussion on interference model for NAICS | Ericsson | - |
R4‑150691 | Draft LS for RAN 1 about CSI reporting for NAICS | Ericsson | - |
R4‑150692 | Initial analysis of DB-DC-HSUPA impact | Ericsson | - |
R4‑150693 | Initial analysis of DB-DC-HSUPA band combination harmonics and intermodulation products | Ericsson | - |
R4‑150694 | Draft LS on clarification of Tx EVM from RAN4 to RAN5 | Ericsson | - |
R4‑150695 | Impairment results for SU-MIMO demodulation tests | Ericsson | - |
R4‑150696 | Evaluation for SU-MIMO RI tests | Ericsson | - |
R4‑150697 | Evaluation for SU-MIMO whitening functionality tests | Ericsson | - |
R4‑150698 | Discussion for Dual Connectivity UE demodulation and CSI test | Ericsson | - |
R4‑150699 | CR for updating CA applicability rule in 36.101 in Rel-10 | Ericsson | - |
R4‑150700 | CR for updating CA applicability rule in 36.101 in Rel-11 | Ericsson | - |
R4‑150701 | CR for updating CA applicability rule in 36.101 in Rel-12 | Ericsson | - |
R4‑150702 | CR for applicability rule for TDD-FDD CA in 36.101 in Rel-12 | Ericsson | - |
R4‑150703 | CR for applicability rule for Dual Connectivity in 36.101 in Rel-12 | Ericsson | - |
R4‑150704 | CR for soft buffer tests for TDD-FDD CA in 36.101 in Rel-12 | Ericsson | - |
R4‑150705 | Editorial CR for CA UE performance tests in 36.101 in Rel-10 | Ericsson | - |
R4‑150706 | Editorial CR for CA UE performance tests in 36.101 in Rel-11 | Ericsson | - |
R4‑150707 | Editorial CR for CA UE performance tests in 36.101 in Rel-12 | Ericsson | - |
R4‑150708 | CR for 36.307 on CA UE performance requirement in Rel-10 | Ericsson | - |
R4‑150709 | CR for 36.307 on CA UE performance requirement in Rel-11 | Ericsson | - |
R4‑150710 | CR for 36.307 on CA UE performance requirement in Rel-12 | Ericsson | - |
R4‑150711 | Alignment and impairment results for single carrier requirement for DL CA with 2 and 3 CCs and TDD-FDD CA | Ericsson | - |
R4‑150712 | Evaluation on power imbalance tests for 2 CCs | Ericsson | - |
R4‑150713 | Alignment and impairment results for soft buffer tests for TDD-FDD CA with 2 CCs | Ericsson | - |
R4‑150714 | Alignment and impairment results for UE performance tests for intra-band contiguous CA with minimum channel spacing | Ericsson | - |
R4‑150715 | System acquisition under intra-band contiguous CA deployment with minimum channel spacing | Ericsson | - |
R4‑150716 | Way forward for intra-band contiguous CA with minimum channel spacing in Rel-12 | Ericsson | - |
R4‑150717 | Summary of alignment results for intra-band contiguous CA with minimum channel spacing | Ericsson | - |
R4‑150718 | CR for UE performance tests for intra-band contiguous CA with minimum channel spacing | Ericsson | - |
R4‑150719 | Alignment and impairment results for PDSCH under EVA600 for Rel-12 | Ericsson | - |
R4‑150720 | TR.36.8xx: TR Template | Ericsson | - |
R4‑150721 | TP for TR 36.8xx: General Aspects | Ericsson | - |
R4‑150722 | TP for TR 36.8xx: Scope of UE demodulation Requirements | Ericsson | - |
R4‑150723 | TP for TR 36.8xx: Scope of CSI Requirements | Ericsson | - |
R4‑150724 | WI objections for SNR and MIMO channel correlation with 4rx | Ericsson | - |
R4‑150725 | WI objections for PDSCH requirement with 4 Rx | Ericsson | - |
R4‑150726 | WI objections for control channels requirement with 4 Rx | Ericsson | - |
R4‑150727 | WI objections for UE CSI requirement with 4 Rx | Ericsson | - |
R4‑150728 | Consideration for high speed scenarios on UE demodulation requirement under 350km/h | Ericsson | - |
R4‑150729 | TP for Rel-13 2DL TR 36.8xx: Harmonics and intermodulation analysis of TDD-FDD CA for B20+B40 combination (CA_20A-40A) | Ericsson | - |
R4‑150730 | Specification of MSD and/or avoiding harmonic mixing for TDD-FDD CA combination CA_20A-40A | Ericsson | - |
R4‑150731 | RRM test cases for dual connectivity | Ericsson | - |
R4‑150732 | UE RF Rx requirements for LTE DL 4 Rx antenna ports | Ericsson | - |
R4‑150733 | TP for TR 36.8xx: Scope of UE RF Requirements for 4RX LTE DL receiver | Ericsson | - |
R4‑150734 | Potential LAA band plan for CA with licensed band | Ericsson | - |
R4‑150735 | Feasibility of UE and BS operation of 5GHz band in conjunction with licensed bands | Ericsson | - |
R4‑150736 | Protection of other wireless systems in 5 GHz from LAA operation | Ericsson | - |
R4‑150737 | LS on protection of 5 GHz wireless systems in LAA operation | Ericsson | - |
R4‑150738 | Simulation assumptions and scenarios for adjacent channel coexistence studies in LAA operation | Ericsson | - |
R4‑150739 | Measurements for UE capable of ProSe direct communication in any cell selection state | Ericsson | - |
R4‑150740 | Conducted emissions requirements | Ericsson | - |
R4‑150741 | Range(s) of angles of arrival for the OTA sensitivity requirement | Ericsson | - |
R4‑150742 | EIRP accuracy validity | Ericsson | - |
R4‑150743 | Text proposal capturing EIRP agreements from RAN4#73 | Ericsson | - |
R4‑150744 | OTA Sensitivity requirement | Ericsson | - |
R4‑150745 | TP on EIRP accuracy validity | Ericsson | - |
R4‑150746 | Other AAS conducted requirements | Ericsson | - |
R4‑150747 | AAS specification structure | Ericsson | - |
R4‑150748 | Example AAS SR and MSR requirements implementation in a single AAS spec | Ericsson | - |
R4‑150749 | Analysis of different AAS specification structure options | Ericsson | - |
R4‑150750 | Simulation assumptions for S-RSRP measurements for D2D | Ericsson | - |
R4‑150751 | Simulation results for S-RSRP measurement for D2D | Ericsson | - |
R4‑150752 | S-RSRP measurement accuracy requirements for D2D | Ericsson | - |
R4‑150753 | Requirements for becoming a ProSe Synchronization Source | Ericsson | - |
R4‑150754 | D2D UE requirements during Out-of-Coverage | Ericsson | - |
R4‑150755 | Requirements during OoC state and reselection of new sync source for D2D | Ericsson | - |
R4‑150756 | Discussion on RRM test cases for UE category 0 | Ericsson | - |
R4‑150757 | Pattern of subframe for HD-FDD test case for UE category 0 | Ericsson | - |
R4‑150758 | RRM test case list for UE category 0 | Ericsson | - |
R4‑150759 | Requirements for selecting and reselecting a Synchronization Reference while in Out of Coverage | Ericsson | - |
R4‑150760 | On co-location reverse intermodulation emission for AAS base stations | Ericsson | - |
R4‑150761 | On how to test EIS in the context of the OTA sensitivity requirement | Ericsson | - |
R4‑150762 | On intra-system reverse intermodulation emission requirement for AAS base stations | Ericsson | - |
R4‑150763 | On AAS base station UL receiver sensitivity | Ericsson | - |
R4‑150764 | TP for TR 37.842: Addition of background for transmitter intermodulation for AAS in section 8.1.5 | Ericsson | - |
R4‑150765 | TP for TR 37.842: Update and correction text to section 8.1.5.1 for co-location TX IM | Ericsson | - |
R4‑150766 | TP for TR 37.842: Addition of background for intra-system TX IMD requirement in section 8.1.5.2 | Ericsson | - |
R4‑150767 | On OTA Test Methodology Uncertainty Budget | Ericsson | - |
R4‑150768 | Out-of-band blocking at 3.5GHz | Ericsson | - |
R4‑150769 | 3.5GHz A-MPR results | Ericsson | - |
R4‑150770 | Operating band unwanted emissions for 3.5 GHz bands in Region 1 | Ericsson, TeliaSonera, Telefnica, Orange | - |
R4‑150771 | Operating band unwanted emissions for 3.5 GHz bands in Region 1 | Ericsson, TeliaSonera, Telefnica, Orange | - |
R4‑150772 | Operating band unwanted emissions for 3.5 GHz bands in Region 1 | Ericsson, TeliaSonera, Telefnica, Orange | - |
R4‑150773 | Operating band unwanted emissions for 3.5 GHz bands in Region 1 | Ericsson, TeliaSonera, Telefnica, Orange | - |
R4‑150774 | Operating band unwanted emissions for 3.5 GHz bands in Region 1 | Ericsson, TeliaSonera, Telefnica, Orange | - |
R4‑150775 | Operating band unwanted emissions for 3.5 GHz bands in Region 1 | Ericsson, TeliaSonera, Telefnica, Orange | - |
R4‑150776 | Band 28 UE emissions correction | Ericsson, Nokia Corporation, Sony Mobile Communica | - |
R4‑150777 | On TDD synchronized operation | Ericsson | - |
R4‑150778 | UE spurious emissions for TDD operation | Ericsson | - |
R4‑150779 | TP for TR 36.862: dual duplexer implementation for the MSS | Ericsson | - |
R4‑150780 | Motivation on AWS extension WID | Ericsson | - |
R4‑150781 | Draft WID on AWS extension | Ericsson | - |
R4‑150782 | Rel-13 4DL WIs | Ericsson | - |
R4‑150783 | Rel-13 2DL WIs | Ericsson | - |
R4‑150784 | Rel-13 2DL WIs | Ericsson | - |
R4‑150785 | Rel-13 2DL WIs | Ericsson | - |
R4‑150786 | Rel-13 2DL WIs | Ericsson | - |
R4‑150787 | UE spurious emissions structure correction for CA | Ericsson, Rohde & Schwarz | - |
R4‑150788 | UE spurious emissions structure correction for CA | Ericsson, Rohde & Schwarz | - |
R4‑150789 | UE spurious emissions structure correction for CA | Ericsson, Rohde & Schwarz | - |
R4‑150790 | TX UE spurious emissions alignment with 36.101 | Ericsson | - |
R4‑150791 | RX UE spurious emissions simplification | Ericsson | - |
R4‑150792 | TP for Rel-13 2DL TR 36.8xx: Introduction BS harmonics and IMD calculations for 2DL fallback of inter-band CA of Band 3+Band 7+Band 28 | Ericsson | - |
R4‑150793 | TP for Rel-13 3DL TR 36.8xx: Introduction of BS harmonics and IMD calculations for inter-band CA of Band 3+Band 7+Band 28 | Ericsson | - |
R4‑150794 | TP for Rel-13 3DL TR 36.8xx: Introduction of band, bandwidth combination and UE requirements for inter-band CA of Band 3+Band 7+Band 28 | Ericsson | - |
R4‑150795 | TP for Rel-13 2DL TR 36.8xx: Introduction of band, bandwidth combination and harmonics for 2DL fallback of inter-band CA of Band 3+Band 7+Band 28 | Ericsson | - |
R4‑150796 | TP for Rel-13 3DL TR 36.8xx: Introduction of band, bandwidth combination and UE requirements for inter-band CA of Band 3+Band 7+Band 7 | Ericsson | - |
R4‑150797 | TP for Rel-13 3DL TR 36.8xx: Introduction of band, bandwidth combination and UE requirements for inter-band CA of Band 7+Band 7+ Band 28 | Ericsson | - |
R4‑150798 | Response LS on DL fallback modes | Ericsson | - |
R4‑150799 | TP for TR 36.8xx for 3DL WI: UE requirements for CA_3-7-8 | Ericsson | - |
R4‑150800 | Multiple NS values in a cell and modification of these | Ericsson | - |
R4‑150801 | Removal of Pcmax requirements for UL inter-band CA in early release | Ericsson | - |
R4‑150802 | Removal of Pcmax requirements for UL inter-band CA in early release | Ericsson | - |
R4‑150803 | Correction of PCMAX for uplink inter-band and intra-band carrier aggregation | Ericsson | - |
R4‑150804 | Allowed exceptions for spurious response for UL CA | Ericsson | - |
R4‑150805 | Exceptions for spurious response for UL CA | Ericsson | - |
R4‑150806 | Correction of REFSENS and out-of-band blocking for 3DL/1UL CA | Ericsson | - |
R4‑150807 | Specification of 4DL/1UL inter-band CA: test configurations and requirements for agreed band combinations | Ericsson | - |
R4‑150808 | Regulatory requirements for unlicensed spectrum deployment in the 5GHz bands | Ericsson | - |
R4‑150809 | Draft LS to RAN1: considerations of introducing licensed-assisted access to unlicensed spectrum and importance of licensed spectrum | Ericsson | - |
R4‑150810 | Introduction of additional band combinations for 2DL inter-band CA | Ericsson | - |
R4‑150811 | Introduction of additional band combinations for 3DL inter-band CA | Ericsson | - |
R4‑150812 | Introduction of additional band combinations for 3DL inter-band CA | Ericsson | - |
R4‑150813 | Introduction of additional band combinations for 3DL inter-band CA | Ericsson | - |
R4‑150814 | Introduction of additional band combinations for 3DL inter-band CA | Ericsson | - |
R4‑150815 | Introduction of additional band combinations for 3DL inter-band CA | Ericsson | - |
R4‑150816 | MB and TDD+FDD | Ericsson | - |
R4‑150817 | MB and TDD+FDD | Ericsson | - |
R4‑150818 | MB and TDD+FDD | Ericsson | - |
R4‑150819 | MB and TDD+FDD | Ericsson | - |
R4‑150820 | MB and TDD+FDD | Ericsson | - |
R4‑150821 | MB for 3 or more bands | Ericsson | - |
R4‑150822 | Cell search measurement | Ericsson | - |
R4‑150823 | TP for Rel-13 3DL TR 36.8xx: Harmonics and intermodulation products generated by the BS supporting LTE-A CA of Band 3, Band 7 and Band 7 | Ericsson | - |
R4‑150824 | TP for Rel-13 3DL TR 36.8xx: Harmonics and intermodulation products generated by the BS supporting LTE-A CA of Band 7, Band 7 and Band 28 | Ericsson | - |
R4‑150825 | TP for Rel-13 3DL TR 36.8xx: Harmonics and intermodulation products generated by the BS supporting LTE-A CA of Band 3, Band 7 and Band 8 | Ericsson | - |
R4‑150826 | BS Spec improvements: Alignment and corrections to BS conformance testing specifications | Ericsson | - |
R4‑150827 | BS Spec improvements: TS 25.104 Corrections | Ericsson | - |
R4‑150828 | BS Spec improvements: TS 25.104 Corrections | Ericsson | - |
R4‑150829 | BS Spec improvements: TS 25.141 Corrections | Ericsson | - |
R4‑150830 | BS Spec improvements: TS 25.141 Corrections | Ericsson | - |
R4‑150831 | BS Spec improvements: TS 36.104 Corrections | Ericsson | - |
R4‑150832 | BS Spec improvements: TS 36.104 Corrections | Ericsson | - |
R4‑150833 | BS Spec improvements: TS 36.141 Corrections | Ericsson | - |
R4‑150834 | BS Spec improvements: TS 36.141 Corrections | Ericsson | - |
R4‑150835 | BS Spec improvements: TS 37.104 Corrections | Ericsson | - |
R4‑150836 | BS Spec improvements: TS 37.104 Corrections | Ericsson | - |
R4‑150837 | BS Spec improvements: TS 37.141 Corrections | Ericsson | - |
R4‑150838 | BS Spec improvements: TS 37.141 Corrections | Ericsson | - |
R4‑150839 | Impact on RAN4 specifications due to new ETSI Drafting Rules | Ericsson | - |
R4‑150840 | Test procedure for Increased UE carrier monitoring | Ericsson | - |
R4‑150841 | Test case scenarios for IncMon in UTRA | Ericsson | - |
R4‑150842 | Test case scenarios for IncMon in E-UTRA | Ericsson | - |
R4‑150843 | Test case list for IncMon in UTRA | Ericsson | - |
R4‑150844 | Test case list for IncMon in E-UTRA | Ericsson | - |
R4‑150845 | Discussion on corrections for further enhanced cell FACH tests with DRX | Ericsson | - |
R4‑150846 | Corrections to FE-FACH DRX tests and core requirement | Ericsson | - |
R4‑150847 | Corrections to FE-FACH DRX tests and core requirement | Ericsson | - |
R4‑150848 | Analysis of RRM impacts of HSPA Dual-Band UL carrier aggregation | Ericsson | - |
R4‑150849 | Simulation assumptions for radio link monitoring in high speed train scenarios | Ericsson | - |
R4‑150850 | Simulation assumptions for measurement accuracy in high speed train scenarios | Ericsson | - |
R4‑150851 | Simulation assumptions for cell identification in high speed train scenarios | Ericsson | - |
R4‑150852 | RRM and RLM requirements overview at 350 km/hr | Ericsson | - |
R4‑150853 | Further considerations on RSRP requirement for release 12 | Ericsson | - |
R4‑150854 | Further revision of RSRP requirement for 36.307 release 12 | Ericsson | - |
R4‑150855 | Further revision of RSRP requirement for 36.133 release 12 | Ericsson | - |
R4‑150856 | Test case for new RSRQ definition | Ericsson | - |
R4‑150857 | Additional bandwidths for EUTRAN activation and deactivation of known and unknown SCell in non-DRX | Ericsson | - |
R4‑150858 | High Doppler measurement accuracy requirements | Ericsson | - |
R4‑150859 | Propagation conditions and relative accuracy requirements for high Doppler RRM measurements | Ericsson | - |
R4‑150860 | Scope of RRM core requirements for LTE DL 4 Rx antenna ports | Ericsson | - |
R4‑150861 | Scope of RRM performance requirements for LTE DL 4 Rx antenna ports | Ericsson | - |
R4‑150862 | Text proposal on scope of RRM core requirements for LTE DL 4 Rx antenna ports | Ericsson | - |
R4‑150863 | Text proposal on scope of RRM performance requirements for LTE DL 4 Rx antenna ports | Ericsson | - |
R4‑150864 | Test on UPH L3 filtering | Ericsson | - |
R4‑150865 | Corrections of table 8.0b | Ericsson | - |
R4‑150866 | Simulation results for Cat 0 UE demodulation requirements | Ericsson | - |
R4‑150867 | Discussion on Cat 0 UE CQI requirements | Ericsson | - |
R4‑150868 | SNR definition for category 0 UE | Ericsson | - |
R4‑150869 | FRC for category 0 UE PDSCH performance requirements | Ericsson | - |
R4‑150870 | Introduction of new PHICH and PBCH performance requirements for category 0 UE | Ericsson | - |
R4‑150871 | Introduction of category 0 UE PDSCH performance requirements | Ericsson | - |
R4‑150872 | Simulation results of PDSCH supporting 256QAM | Ericsson | - |
R4‑150873 | Sustained downlink data rate requirements for 256QAM | Ericsson | - |
R4‑150874 | CQI test requirements for 256QAM | Ericsson | - |
R4‑150875 | Discussion on cubic metric (MPR) for UMTS HetNet Enhancements impact on | Ericsson | - |
R4‑150876 | Removal of square brackets of cubic metric (MPR) for UMTS HetNet Enhancements | Ericsson | - |
R4‑150877 | TR 36.851 V0.15.0: Rel-12 Inter-band Carrier Aggregation | Ericsson | - |
R4‑150878 | Rel-13 2DL TR 36.8xx v0.3.0: Rel-13 Inter-band Carrier Aggregation | Ericsson | - |
R4‑150879 | Discussion on TC4D and TC4E in TS 37.141 | Ericsson | - |
R4‑150880 | CR on Corrections for TC4D and TC4E in TS 37.141 | Ericsson | - |
R4‑150881 | Discussion on TX intermodulation requirement | Ericsson | - |
R4‑150882 | Correction of TX intermodulation requirement (36.141) | Ericsson | - |
R4‑150883 | Correction of TX intermodulation requirement (36.141) | Ericsson | - |
R4‑150884 | Correction of TX intermodulation requirement (36.104) | Ericsson | - |
R4‑150885 | Correction of TX intermodulation requirement (36.104) | Ericsson | - |
R4‑150886 | Corrections on MB TC (ETC4 & ETC5) in TS 36.141 | Ericsson | - |
R4‑150887 | Corrections on MB TC (ETC4 & ETC5) in TS 36.141 | Ericsson | - |
R4‑150888 | Corrections on MB TC (TC7) in TS 37.141 | Ericsson | - |
R4‑150889 | Corrections on MB TC (TC7) in TS 37.141 | Ericsson | - |
R4‑150890 | Protection of exclusively licensed bands | Sprint | - |
R4‑150891 | Applicability of commercial core requirements to critical communications. | Sprint | - |
R4‑150892 | Impact of OOC D2D operations on commercial systems | Sprint | - |
R4‑150893 | Liaison to SA-2 on the need to make location mandatory for OOC D2D operations | Sprint | - |
R4‑150894 | Simulation results for Rel-12 LC MTC | Nokia Networks, Nokia Corporation | - |
R4‑150895 | On the re-tuning time and DC subcarrier and other issues for MTC | Nokia Networks, Nokia Corporation | - |
R4‑150896 | Discussion on the phase continuity and new power class for MTC | Nokia Networks, Nokia Corporation | - |
R4‑150897 | Evaluation methodologies on UL interference for LTE BS MMSE-IRC | Nokia Networks | - |
R4‑150898 | System simulation assumptions for LTE-BS MMSE-IRC | Nokia Networks | - |
R4‑150899 | CRS-IM specification impact | Nokia Networks, Nokia Corporation | - |
R4‑150900 | General discussion on Rel-13 high speed SI | Nokia Networks, Nokia Corporation | - |
R4‑150901 | CR Correction on fallback note | Vodafone | - |
R4‑150902 | Requirements for Pcell support in LTE CA band combinations | Vodafone | - |
R4‑150903 | WF on Pcell clarification | Vodafone | - |
R4‑150904 | 36.101 CR on requirements for Pcell support in LTE CA band combinations | Vodafone | - |
R4‑150905 | 36.306 CR on requirements for Pcell support in LTE CA band combinations | Vodafone | - |
R4‑150906 | New WID Proposal LTE CA_B7-B20-B38 | Vodafone | - |
R4‑150907 | TRP/TRS derivation methodology and UMTS BHH example | Telecom Italia | - |
R4‑150908 | NAICS Simulation Results | Mediatek | - |
R4‑150909 | CSI handling for NAICS | Mediatek | - |
R4‑150910 | Performance Plan for NAICS | Mediatek | - |
R4‑150911 | Proposed new WI: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 2, Band 4 and Band 7 | Rogers Communications | - |
R4‑150912 | B42 B43 multicluster A-MPR simulation results | Nokia Corporation | - |
R4‑150913 | HSPA Dual Band Uplink Carrier Aggregation Overview and RFFE Reference Architecture | Qualcomm Incorporated | - |
R4‑150914 | Work plan for HSPA Dual Band Uplink Carrier Aggregation | Qualcomm Incorporated | - |
R4‑150915 | UE Transmitter requirements analysis due to introduction of Dual Band UL CA | Qualcomm Incorporated | - |
R4‑150916 | UE Receiver requirements analysis due to introduction of Dual Band UL CA | Qualcomm Incorporated | - |
R4‑150917 | UE RRM requirements analysis due to introduction of Dual Band UL CA | Qualcomm Incorporated | - |
R4‑150918 | Performance test case for increased carrier monitoring | Qualcomm Incorporated | - |
R4‑150919 | 25.133 CR to correct DL_DCH_FET_Config reference number to point to 25.212 | Qualcomm Inc. | - |
R4‑150920 | 36.133 CR to correct CPICH Ec/No to CPICH Ec/Io in EUTRA FDD to UTRA FDD HO test cases | Qualcomm Incorporated | - |
R4‑150921 | 36.133 CR to change CPICH Ec/No to CPICH Ec/Io in EUTRA FDD to UTRA FDD HO test cases | Qualcomm Inc. | - |
R4‑150922 | 36.133 CR to correct CPICH Ec/No to CPICH Ec/Io in EUTRA FDD to UTRA FDD HO test cases | Qualcomm Incorporated | - |
R4‑150923 | 36.133 CR to correct CPICH Ec/No to CPICH Ec/Io in EUTRA FDD to UTRA FDD HO test cases | Qualcomm Incorporated | - |
R4‑150924 | 36.133 CR to correct CPICH Ec/No to CPICH Ec/Io in EUTRA FDD to UTRA FDD HO test cases | Qualcomm Incorporated | - |
R4‑150925 | A-MPR for CA with Almost-Contiguous Resource Allocations and CA_NS signalling | Motorola Mobility | - |
R4‑150926 | TR 37.842 version 1.3.0 | Huawei | - |
R4‑150927 | Specification Skeleton | Huawei | - |
R4‑150928 | Specification organization | Huawei | - |
R4‑150929 | TP on Conducted test point definition | Huawei | - |
R4‑150930 | EIRP accuracy at steering angles. | Huawei | - |
R4‑150931 | EIRP accuracy with different fixed beam shapes | Huawei | - |
R4‑150932 | Analysis on EIRP accuracy on system throughput | Huawei | - |
R4‑150933 | EIRP declarations and coverage area | Huawei | - |
R4‑150934 | TP on EIRP accuracy | Huawei | - |
R4‑150935 | EIRP accuracy testing example | Huawei | - |
R4‑150936 | Beam parameter definitions | Huawei | - |
R4‑150937 | TP on Beam parameter definitions | Huawei | - |
R4‑150938 | Further discussion on UEM and definition of N | Huawei | - |
R4‑150939 | On polarisation in OTA requirements. | Huawei | - |
R4‑150940 | Discussion on FFS conducted requirements | Huawei | - |
R4‑150941 | Discussion on definition of output power | Huawei | - |
R4‑150942 | Discussion on ALCR per TRX requirement | Huawei | - |
R4‑150943 | TP on ALCR requirement definition | Huawei | - |
R4‑150944 | Discussion on intra AAS coupling | Huawei | - |
R4‑150945 | TP on intra AAS coupling | Huawei | - |
R4‑150946 | Discussion on co-location IMD | Huawei | - |
R4‑150947 | Terms and definitions | Huawei | - |
R4‑150948 | Manufacturer declarations supporting the OTA sensitivity requirement. | Huawei | - |
R4‑150949 | OTA basic sensitivity level identification. Part1 | Huawei | - |
R4‑150950 | OTA basic sensitivity level identification. Part 2 | Huawei | - |
R4‑150951 | TP: OTA sensitivity | Huawei | - |
R4‑150952 | OTA sensitivity testing example | Huawei | - |
R4‑150953 | Impedance in the transceiver boundary | Huawei | - |
R4‑150954 | TP Manufacturer declaration matrix | Huawei | - |
R4‑150955 | Band 41 A-MPR Simulations | MediaTek Inc. | - |
R4‑150956 | Way forward proposal for inter-band CA consisting of B41 | MediaTek Inc. | - |
R4‑150957 | MSD analysis for B42 in class A2 CA B8_B42 | MediaTek Inc. | - |
R4‑150958 | 2UL inter-band CA out-of-band blocking test consideration | MediaTek Inc. | - |
R4‑150959 | Mechanics of AAS EIRP Declaration | Nokia Networks | - |
R4‑150960 | AAS EIRP accuracy window | Nokia Networks | - |
R4‑150961 | AAS OTA sensitivity | Nokia Networks | - |
R4‑150962 | Proposal for AAS UEM scaling factor | Nokia Networks | - |
R4‑150963 | AAS co-location IMD requirement | Nokia Networks | - |
R4‑150964 | AAS intra-system IMD requirement | Nokia Networks | - |
R4‑150965 | Time alignment error requirement for AAS | Nokia Networks | - |
R4‑150966 | Conformance test aspects of AAS EIRP requirement | Nokia Networks | - |
R4‑150967 | Conformance test aspects of AAS sensitivity requirements | Nokia Networks | - |
R4‑150968 | Selection of AAS conformance test methodology | Nokia Networks | - |
R4‑150969 | Clarification of parameter P for emission requirements | Alcatel-Lucent | - |
R4‑150970 | Clarification of parameter P for emission requirements | Alcatel-Lucent | - |
R4‑150971 | Clarification of parameter P for emission requirements | Alcatel-Lucent | - |
R4‑150972 | Clarification of parameter P for emission requirements | Alcatel-Lucent | - |
R4‑150973 | 2UL inter-band CA out-of-band blocking requirements | Qualcomm Incorporated | - |
R4‑150974 | Consideration of 4 Rx UE RF core requirements | Qualcomm Incorporated | - |
R4‑150975 | EVM and MPR requirements in support of 64QAM UL | Qualcomm Incorporated | - |
R4‑150976 | 3.5 GHz out-of-band blocking | Qualcomm Incorporated | - |
R4‑150977 | 3.5 GHz out-of-band blocking | Qualcomm Incorporated | - |
R4‑150978 | 3.5 GHz out-of-band blocking | Qualcomm Incorporated | - |
R4‑150979 | Dual quadplexer for B8+B28 | Qualcomm Incorporated | - |
R4‑150980 | B8+B42 4th harmonic related MSD | Qualcomm Incorporated | - |
R4‑150981 | B19+B28 CA and B28 sensitivity | Qualcomm Incorporated | - |
R4‑150982 | B41+B42 CA and B42 sensitivity | Qualcomm Incorporated | - |
R4‑150983 | TP to TS 37.144 on adding UTRA FDD handset BHH TRP/TRS requirements for Bands I and VIII | Intel Corporation, Sony Mobile Communications Japa | - |
R4‑150984 | SD2DSS power back off analysis | Intel Corporation | - |
R4‑150985 | On the scope and objectives of UE RF requirements | Intel Corporation | - |
R4‑150986 | Simulation Results for D2D Co-existence | Alcatel-Lucent | - |
R4‑150987 | Overview of BS Specifications Impacted by LAA | Alcatel-Lucent | - |
R4‑150988 | Feasibility of proposed carrier aggregation CA_7A-20A-38A | Qualcomm Incorporated | - |
R4‑150989 | Correction to FOOB reference in definition of MPR for contiguous CA with non-contiguous resource allocation | Motorola Mobility | - |
R4‑150990 | Root Mean Square Delay Spread | CTTC | - |
R4‑150991 | On UE Demodulation Test Setup for NAICS | Qualcomm Incorporated | - |
R4‑150992 | NAICS: Evaluations for Calibration for the TM9 Scenario | Qualcomm Incorporated | - |
R4‑150993 | Further Link Level Results for NAICS UE demodulation | Qualcomm Incorporated | - |
R4‑150994 | On CSI Reporting for NAICS | Qualcomm Incorporated | - |
R4‑150995 | Band 31 coexistence in Europe | Orange | - |
R4‑150996 | Band 31 update | Orange, Huawei, Nokia Corporation | - |
R4‑150997 | CR to TS36.104: Band 31 update | Orange | - |
R4‑150998 | CR to TS36.141: Band 31 update | Orange | - |
R4‑150999 | Revised WID: LTE Advanced Carrier Aggregation of Band 20 and Band 31 | Orange, Huawei | - |
R4‑151000 | Revised WID: LTE Advanced Carrier Aggregation of Band 3 and Band 31 | Orange, Huawei | - |
R4‑151001 | TP for Rel-13 2DL TR 36.8xx: MSD in LTE_CA_B4_B28 | Huawei | - |
R4‑151002 | BS Spec improvements: LTE TC for contiguous spectrum | Huawei | - |
R4‑151003 | BS Spec improvements: On the co-location scenario causing reverse IM test case. | Huawei | - |
R4‑151004 | BS Spec improvements :CR forTS25.141 regarding clarification to manufacturer declarations | Huawei | - |
R4‑151005 | BS Spec improvements: CR forTS25.141 regarding clarification to manufacturer declarations | Huawei | - |
R4‑151006 | BS Spec improvements: CR forTS25.141 regarding clarification to manufacturer declarations | Huawei | - |
R4‑151007 | BS Spec improvements :CR forTS25.141 removal of incorrect clarification regarding "air combining" | Huawei | - |
R4‑151008 | BS Spec improvements: CR forTS25.141 removal of incorrect clarification regarding "air combining" | Huawei | - |
R4‑151009 | BS Spec improvements: CR forTS25.141 removal of incorrect clarification regarding "air combining" | Huawei | - |
R4‑151010 | BS Spec improvements: On the applicability of the ACLR requirement in TS25.141 | Huawei | - |
R4‑151011 | New WI proposal: New MB-MSR BS configurations for common antenna case | ZTE, Tejet | - |
R4‑151012 | AAS: UEM requirements | ZTE, Tejet | - |
R4‑151013 | AAS: Specification structure | ZTE, Tejet | - |
R4‑151014 | Introduction of 256QAM for wide-area BS | ZTE, Tejet | - |
R4‑151015 | Introduction of 256QAM for wide-area BS | ZTE, Tejet | - |
R4‑151016 | Release independent requirements for CA_42C | CATT | - |
R4‑151017 | Release independent requirements for CA_42C | CATT | - |
R4‑151018 | LS to 3GPP TSG RAN WG4 – MIMO OTA Harmonization process (COST_IC1004_LS_141201_to_3GPP_RAN4 Source: COST IC1004 TWGO, To: TSG RAN WG4, Cc: ) | COST IC1004 TWGO | - |
R4‑151019 | LS on D2D Synchronization (R1-145419 Source: TSG RAN WG1, To: TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑151020 | LS on Support of Narrowband Operation for MTC (R1-145451 Source: TSG RAN WG1, To: TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑151021 | LS on Additional Aspects for MTC (R1-145455 Source: TSG RAN WG1, To: TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑151022 | LS on agreements on Licensed-Assisted Access using LTE (R1-145475 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑151023 | LS on D2D Synchronization Signal Design and Procedure (R1-145478 Source: TSG RAN WG1, To: TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑151024 | Reply LS on introducing the new RSRQ measurement definition (R2-145394 Source: TSG RAN WG2, To: TSG RAN WG4,TSG SA WG5, Cc: ) | TSG RAN WG2 | - |
R4‑151025 | LS on prioritization of WAN Rx over ProSe discovery Rx (R2-145401 Source: TSG RAN WG2, To: TSG RAN WG1, Cc: TSG RAN WG4) | TSG RAN WG2 | - |
R4‑151026 | reply LS to GCF LS (RP-141740) on GCF OTA Test Requirements (RP-142276 Source: TSG RAN, To: GCF Technical Operations ManagerGCF OTA Task Force #3, Cc: TSG RAN WG4,TSG RAN WG5) | TSG RAN | - |
R4‑151027 | LS to CTIA on OTA Test Requirement Work Plan (RP-142317 Source: TSG RAN, To: TSG CT,TSG CT, Cc: TSG RAN WG4,TSG RAN WG5) | TSG RAN | - |
R4‑151028 | Reply LS on S1-U tunnel switch for Dual Connectivity (S2-144363 Source: TSG SA WG2, To: TSG RAN WG3,TSG CT WG4, Cc: TSG CT) | TSG SA WG2 | - |
R4‑151029 | Reply LS on MBSFN MDT (S5-146355 Source: TSG SA WG5, To: TSG RAN WG2, Cc: TSG RAN WG3,TSG RAN WG4) | TSG SA WG5 | - |
R4‑151030 | TP for Rel-13 3DL TR 36.8XX: LTE_CA_B1_B3_B3 Introduction | China Unicom | - |
R4‑151031 | UE RF considerations for B3+B41 combination | China Unicom | - |
R4‑151032 | Text Proposal on Coexistence Studies of Harmonics and intermodulation products analysis supporting LTE-A CA of B1+B3+B3 | China Unicom | - |
R4‑151033 | Way forward on Pcell support in LTE CA | TeliaSonera AB | - |
R4‑151034 | TP for Rel-13 2DL TR 36.8xx: Harmonics and intermodulation analysis of TDD-FDD CA for B20+B40 combination (CA_20A-40A) | Unknown | - |
R4‑151035 | Proposal for work plan for MIMO OTA | Vodafone | - |
R4‑151036 | Text Proposal for Rel-13 2DL TR 36.8xx- channel bandwidth for TDD-FDD CA for B8+B41 | CMCC | - |
R4‑151037 | Text Proposal for Rel-13 3DL TR 36.8xx- channel bandwidth for TDD-FDD CA for B8+B41+B41 | CMCC | - |
R4‑151038 | Investigation of B8+B28 carrier aggregation | Qualcomm Incorporated | - |
R4‑151039 | CURRENT IMPLEMENTATION OF 700 MHz BANDPLAN WITHIN 3GPP SPECIFICATION ( Source: ITU Working Party 5D, To: RAN4, Cc: ) | ITU Working Party 5D | - |
R4‑151040 | LS to 3GPP RAN4/RAN5 Regarding CTIA MIMO OTA Test Plan Development ( Source: CTIA, To: RAN4, RAN5, Cc: RAN) | CTIA | - |
R4‑151041 | Reply LS to OTA Test Requirement Work Plan ( Source: CTIA OTA Working Group, To: RAN, Cc: RAN4) | CTIA OTA Working Group | - |
R4‑151042 | Request for information sharing between ATIS COAST SYNC and 3GPP RAN on timing requirements for wireless base stations in the United States ( Source: , To: , Cc: ) | ATIS | - |
R4‑151043 | Response LS on DL fallback modes | Ericsson | - |
R4‑151044 | LS on LTE Rel-12 UE feature list about RAN4 responsible features | NTT DOCOMO, INC. | - |
R4‑151045 | Introduce additional bands of LC MTC | Intel, Verizon | - |
R4‑151046 | Simulation results for 256QAM demodulation | LG Electronics | - |
R4‑151047 | Alignment simulation result for eIMTA PDSCH demodulation test | LG Electronics | - |
R4‑151048 | LTE TDD eIMTA PDSCH demodulation test simulation results | Intel Corporation | - |
R4‑151049 | Summary of simulation results for LC-MTC demodulation requirements | Ericsson | - |
R4‑151050 | Link level simulation assumption for MTC RLM | Ericsson | - |
R4‑151051 | FRC for category 0 UE PDSCH performance requirements | Ericsson, Anritsu, Huawei, HiSilicon, Qualcomm, MediaTek | - |
R4‑151052 | Introduction of new PHICH and PBCH performance requirements for category 0 UE | Ericsson | - |
R4‑151053 | CR: MTC demodulation performance requirements | Huawei, HiSilicon, Ericsson, Qualcomm | - |
R4‑151054 | CR: MTC CSI requirements | Huawei, HiSilicon, Qualcomm, Ericsson | - |
R4‑151055 | Updating the requirements applicability for TDD config 0 | Huawei, HiSilicon, Ericsson, CATT | - |
R4‑151056 | Summary of eIMTA demodulation simulations | Huawei | - |
R4‑151057 | WF for eIMTA CSI simulation assumption | CATT | - |
R4‑151058 | Introduction of the eIMTA functional PDSCH demodulation test | Intel Corporation, CATT | - |
R4‑151059 | Cleanup for RSRQ measurement requirement for SCE | Huawei, HiSilicon, Ericsson | - |
R4‑151060 | Clarification on on UE Rx-Tx requirements for D2D | Huawei,HiSilicon | - |
R4‑151061 | S-RSRP measurement accuracy requirements for D2D | Ericsson | - |
R4‑151062 | Summary of demodulation simulation results of D2D RMC for REFSENS | Qualcomm Incorporated | - |
R4‑151063 | Clarification including PSCell in Note 1 for Ecat | Nokia Corporation, Nokia Networks | - |
R4‑151064 | Link level performance for NAICS receiver | Nokia Networks, Nokia Corporation | - |
R4‑151065 | On the 4Rx AP operation in LTE DL | Nokia Networks, Nokia Corporation | - |
R4‑151066 | Way forward on D2D RMC performance evaluation for future meetings | Qualcomm | - |
R4‑151067 | Reply LS on timing uncertainty | Huawei | - |
R4‑151068 | CR on RRM requirements for D2D (Resubmission of approved CR) | Qualcomm Incorporated | - |
R4‑151069 | Ad hoc minutes for SCE | Huawei | - |
R4‑151070 | Summary of simulation results for 256QAM | Huawei | - |
R4‑151071 | NAICS: Evaluations for Calibration for the TM9 Scenario | Qualcomm Incorporated | - |
R4‑151072 | On CSI Reporting for NAICS | Qualcomm Incorporated | - |
R4‑151073 | Ad hoc miutes for dual connectivity | Huawei | - |
R4‑151074 | Clean up the correction on discovery signal measurements | Huawei, HiSilicon | - |
R4‑151075 | Test case list for IncMon in UTRA | Ericsson | - |
R4‑151076 | Test case list for IncMon in E-UTRA | Ericsson | - |
R4‑151077 | CR for introduction of 256QAM demodulation performance requirements | Huawei, HiSilicon, Qualcomm | - |
R4‑151078 | Wayforward on 256QAM Demod and CSI tests | Huawei | - |
R4‑151079 | Test case list for SCE | Huawei,HiSilicon | - |
R4‑151080 | Wayforward on SCE requirement for IncMon UE | Huawei,HiSilicon | - |
R4‑151081 | CR to introduce the SU-MIMO whitening verification test | Huawei, HiSilicon | - |
R4‑151082 | CR for single cell demodulation test for SU-MIMO | NTT DOCOMO, INC., Huawei, HiSilicon | - |
R4‑151083 | Test case list for DC | Huawei,HiSilicon | - |
R4‑151084 | CR: DC UE performance requirements | Huawei, HiSilicon, Qualcomm, Ericsson | - |
R4‑151085 | CR on TM4 normal demodulation test for 3DL CA | CMCC | - |
R4‑151086 | CR on power imbalance test for 3DL CA | Huawei, HiSilicon | - |
R4‑151087 | CR on normal demodulation test for TDD-FDD CA | CMCC | - |
R4‑151088 | CR for soft buffer tests for TDD-FDD CA in 36.101 in Rel-12 | Ericsson | - |
R4‑151089 | Simulation results for single cell of 3DL CA test | CMCC | - |
R4‑151090 | Simulation results for TDD-FDD CA soft buffer test | CMCC | - |
R4‑151091 | Way forward on MMSE-IRC for LTE BS | ZTE | - |
R4‑151092 | Scope of RRM performance requirements for LTE DL 4 Rx antenna ports | Ericsson | - |
R4‑151093 | Meeting minutes for D2D RRM ad hoc session | Qualcomm | - |
R4‑151094 | Way forward on new high speed train scenarios | Huawei | - |
R4‑151095 | Way forward on CRS-IM demodulation | Ericcson | - |
R4‑151096 | Summary of SU-MIMO multi-cell whitening verification alignment and impairment results | Huawei, HiSilicon | - |
R4‑151097 | Simulation assumptions for TDD SU-MIMO multi-cell test | CATT | - |
R4‑151098 | Meeting minutes for NAICS ad hoc | MediaTek | - |
R4‑151099 | Corrections to FE-FACH DRX tests and core requirement | Ericsson | - |
R4‑151100 | 36.133 CR to change CPICH Ec/No to CPICH Ec/Io in EUTRA FDD to UTRA FDD HO test cases | Qualcomm Inc. | - |
R4‑151101 | Clarification of the UE configurations for measurement requirements | Alcatel-Lucent | - |
R4‑151102 | Wayforward on RSTD measurement testing methodology for 3DL CA | Huawei,HiSilicon | - |
R4‑151103 | Reply LS on new RSRQ definition | Huawei,HiSilicon | - |
R4‑151104 | Further clarification of MBMS BLER reporting in section 9 | CATT | - |
R4‑151105 | Maximum allowed layers for multiple monitoring for CA | Alcatel-Lucent, Ericsson, Huawei, HiSilicon | - |
R4‑151106 | WF for CSI-IM demodulation (TM10) | Ericcson | - |
R4‑151107 | Link level simulation assumptions for CSI-IM TM10 | Ericcson | - |
R4‑151108 | Example 3 DL CA RRM A.8.x Test case with flexible channel BW | Anritsu | - |
R4‑151109 | WF on NAICS performance | MediaTek | - |
R4‑151110 | NAICS alignment simulation results | MediaTek | - |
R4‑151111 | Way forward on requirements and test cases for new RSRQ | NTT DOCOMO | - |
R4‑151112 | Clarification concerning IncMon scaling for non-gap-assisted measurements | Nokia Corporation, Nokia Networks, Qualcomm Incorporated | - |
R4‑151113 | Way forward on 4Rx Demod and RRM | Ericcson | - |
R4‑151114 | Correction on MBSFN measurements | Huawei, HiSilicon | - |
R4‑151115 | WF on DC SDR test | NTT DOCOMO | - |
R4‑151116 | WF on evaliuation for high speed train scenarios | NTT DOCOMO | - |
R4‑151117 | WF for CSI computation for NAICS | Ericcson | - |
R4‑151118 | Meeting minutes for 4Rx ad hoc | Ericcson | - |
R4‑151119 | Meeting minutes for MMSE-IRC for LTE BS ad hoc | Huawei | - |
R4‑151120 | Wayforward on testing methodology for IncMon | Huawei, HiSilicon, Ericsson, Anritsu | - |
R4‑151121 | CR for introduction of 256QAM CSI requirements | Huawei, HiSilicon | - |
R4‑151122 | Wayfoward on DC SDR test | Huawei | - |
R4‑151123 | Ad hoc minutes for HST discussion | Huawei | - |
R4‑151124 | way forward on D2D interruption | Intel | - |
R4‑151125 | High Doppler measurement accuracy requirements | Ericsson, ZTE | - |
R4‑151126 | RRM requirements for ProSe | Ericcson, Qualcomm | - |
R4‑151127 | WF on ProSe Discovery UE interruption due to dual receivers | Ericcson | - |
R4‑151128 | RRM test case list for UE category 0 | Ericcson | - |
R4‑151129 | TR.36.8xx: TR Template | Ericsson | - |
R4‑151130 | TP for TR 36.8xx: General Aspects | Ericsson | - |
R4‑151131 | TP for TR 36.8xx: Scope of UE demodulation Requirements | Ericsson | - |
R4‑151132 | TR skeleton (v0.0.2) for Study on performance enhancements for high speed scenario in LTE | Huawei,HiSilicon | - |
R4‑151133 | Clarification of IncMon requirements for UTRA idle/CELL_PCH/URA_PCH states | Nokia Networks, Nokia Corporation | - |
R4‑151134 | Clarification of IncMon requirements for UTRA CELL_FACH/CELL_DCH states | Nokia Networks, Nokia Corporation | - |
R4‑151135 | Clarification of IncMon requirements for E-UTRA idle state | Nokia Networks, Nokia Corporation | - |
R4‑151136 | Clarification of IncMon requirements for E-UTRA connected state | Nokia Networks, Nokia Corporation | - |
R4‑151137 | WF on DC SDR test | NTT DOCOMO | - |
R4‑151138 | CR for applicability and test rules for TDD-FDD CA performance requirements | Qualcomm Incorporated | - |
R4‑151139 | System level simulation assumptions for homogeneous deployment for BS MMSE-IRC | ZTE, CT, HW, Samsung | - |
R4‑151140 | System level simulation assumptions for heterogeneous deployment for BS MMSE-IRC | ZTE, CT, HW, Samsung | - |
R4‑151141 | Background of D2D interruption during ProSe Direct Communications | Intel | - |
R4‑151142 | WF on evaliuation for high speed train scenarios | NTT DOCOMO | - |
R4‑151143 | Way forward on D2D RMC performance evaluation for future meetings | Qualcomm | - |
R4‑151144 | TP for TR 36.8xx: Scope of UE demodulation Requirements | Ericsson | - |
R4‑151145 | Booked for RRM session | Unknown | - |
R4‑151146 | B42 and B43 A-MPR simulation results for Case 4 with 2ULs | TeliaSonera AB, Nokia Corporation | - |
R4‑151147 | Release independent requirements for CA_42C | CATT | - |
R4‑151148 | BS Spec improvements :CR forTS25.141 regarding clarification to manufacturer declarations | Huawei | - |
R4‑151149 | BS Spec improvements: CR forTS25.141 regarding clarification to manufacturer declarations | Huawei | - |
R4‑151150 | BS Spec improvements: CR forTS25.141 regarding clarification to manufacturer declarations | Huawei | - |
R4‑151151 | Test procedure update for RAT specific requirements | CATT | - |
R4‑151152 | BS Spec improvements: TS 37.104 Corrections | Ericsson | - |
R4‑151153 | BS Spec improvements: TS 37.141 Corrections | Ericsson | - |
R4‑151154 | CR on Corrections for TC4D and TC4E in TS 37.141 | Ericsson | - |
R4‑151155 | Band 28 UE emissions correction | Ericsson, TeliaSonera, Orange, Telecom Italia, Nokia Corporation, Sony Mobile Communications Japan Inc | - |
R4‑151156 | CR Correction on fallback note | Vodafone | - |
R4‑151157 | Pcell WF | TeliaSonera AB | - |
R4‑151158 | MSD for 2UL CA_B1_B3 and CA_B1_B8 | Mediatek | - |
R4‑151159 | MSD for 2UL CA_B1_B3 and CA_B1_B3 | LG Elctronics | - |
R4‑151160 | Correction of MSD levels for CA_1A-8A in TS 36.101 rel-12 | LG Electronics, KT | - |
R4‑151161 | Simulation results for 2UL CA_B1_B3 and CA_B1_B8 | LG Electronics | - |
R4‑151162 | Correction of REFSENS, OOBB and uplink configuration for 3DL/1UL CA | Ericsson | - |
R4‑151163 | LS on timing uncertainty (R1-150771 Source: TSG RAN WG1, To: TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑151164 | LS on sidelink transmission power (R1-150774 Source: TSG RAN WG1, To: TSG RAN WG4, Cc: TSG RAN WG2) | TSG RAN WG1 | - |
R4‑151165 | Update annex C.2 to match Release 11. | TruePosition | - |
R4‑151166 | Out-of-band blocking for 2UL CA | NTT DOCOMO, INC. | - |
R4‑151167 | way forward on TRP/TRS derivation methodology | Telecom Italaia | - |
R4‑151168 | TP to TS 37.144 on adding UTRA FDD handset BHH TRP/TRS requirements for Bands I and VIII | Intel Corporation, Sony Mobile Communications Japa | - |
R4‑151169 | Way forward Protection of exclusively licensed bands | Sprint | - |
R4‑151170 | Liaison to SA-2 on the need to make location mandatory for OOC D2D operations | Sprint | - |
R4‑151171 | TP: Consideration on D2D Transmitter requirements | LG Electronics | - |
R4‑151172 | Impact of D2D on UE RF TX requirements | Ericsson | - |
R4‑151173 | D2D Tx Requirements: Transmit power | Qualcomm Incorporated | - |
R4‑151174 | D2D Tx Requirements: Output power dynamics | Qualcomm Incorporated | - |
R4‑151175 | D2D Tx Requirements: Output RF spectrum emissions | Qualcomm Incorporated | - |
R4‑151176 | D2D Tx Requirements: Transmit signal quality | Qualcomm Incorporated | - |
R4‑151177 | D2D Rx on FDD bands: Remaining details for REFSENS | Qualcomm Incorporated | - |
R4‑151178 | TP for TR 36.877: On agreed D2D RF core requirements | Qualcomm Incorporated | - |
R4‑151179 | TP to TR 36.877 | Ericsson | - |
R4‑151180 | TP to TR 36.862: BS spurious emission and blocking requirement for the co-existence with 3GPP bands | Nokia Networks | - |
R4‑151181 | Way forward on MSS band | NTT DOCOMO, INC. | - |
R4‑151182 | TP for TR 36.862: dual duplexer implementation for the MSS | Ericsson | - |
R4‑151183 | Introduction of intra-band CA_42D to TS 36.101 | CATT | - |
R4‑151184 | Introduction of CA_42D to TS 36.307 | CATT | - |
R4‑151185 | Introduction of CA_42D to TS 36.307 | CATT | - |
R4‑151186 | Introduction of CA_42D to TS 36.307 | CATT | - |
R4‑151187 | TP for TR 36.833-8-41: Specification changes required for LTE Advanced intra-band non-contiguous Carrier Aggregation in Band 41 for 4DL | Alcatel-Lucent, Sprint | - |
R4‑151188 | Way forward proposal for inter-band CA consisting of B41 | MediaTek Inc. | - |
R4‑151189 | Introduction of additional band combinations for 2DL inter-band CA | Ericsson | - |
R4‑151190 | Introduction of 2DL CA combinations | Nokia Networks | - |
R4‑151191 | Introduction of 2DL CA combinations | Nokia Networks | - |
R4‑151192 | Rel-13 2DL WIs | Ericsson | - |
R4‑151193 | Rel-13 2DL WIs | Ericsson | - |
R4‑151194 | Rel-13 2DL WIs | Ericsson | - |
R4‑151195 | Rel-13 2DL WIs | Ericsson | - |
R4‑151196 | Introduce additional bands of LC MTC | Intel, Verizon, AT&T, T-Mobile, Qualcomm, Ericsson, ALU, MediaTek, LGE, Sequans | - |
R4‑151197 | Revised WID: LTE Advanced inter-band Carrier Aggregation of Band 25 and Band 26 | Sprint | - |
R4‑151198 | Agenda and meeting minutes for Monday evening ad hoc | Huawei | - |
R4‑151199 | BS Spec improvements :CR forTS25.141 regarding clarification to manufacturer declarations | Huawei | - |
R4‑151200 | BS Spec improvements: CR forTS25.141 regarding clarification to manufacturer declarations | Huawei | - |
R4‑151201 | BS Spec improvements: CR forTS25.141 regarding clarification to manufacturer declarations | Huawei | - |
R4‑151202 | Way forward on EIRP | Ericsson | - |
R4‑151203 | Way forward on OTA sensitivity specification | Nokia Networks | - |
R4‑151204 | Removal of Pcmax requirements for UL inter-band CA in early release | Ericsson | - |
R4‑151205 | Minutes of the ad hoc meeting on BS Spec improvements | Ericsson | - |
R4‑151206 | way forward on UEM | Huawei | - |
R4‑151207 | Interference level for Co-location transmitter intermodulation | NTT DOCOMO, INC. | - |
R4‑151208 | TP for TR 37.842: Addition of background for transmitter intermodulation for AAS in section 8.1.5 | Ericsson | - |
R4‑151209 | TP for TR 37.842: Update and correction text to section 8.1.5.1 for co-location TX IM | Ericsson | - |
R4‑151210 | TP for TR 37.842: Addition of background for intra-system TX IMD requirement in section 8.1.5.2 | Ericsson | - |
R4‑151211 | Implementation of CA configurations specified in later releases | Ericsson | - |
R4‑151212 | Implementation of CA configurations specified in later releases | Ericsson | - |
R4‑151213 | Way forward on DB-Dc-HSUPA | Ericsson | - |
R4‑151214 | Initial analysis of DB-DC-HSUPA band combination harmonics and intermodulation products | Ericsson | - |
R4‑151215 | TP to TS 37.144 on a skeleton for MIMO OTA requirements | Intel Corporation | - |
R4‑151216 | Work plan for HSPA Dual Band Uplink Carrier Aggregation | Qualcomm Incorporated | - |
R4‑151217 | Introduction of additional band combinations for 3DL inter-band CA | Ericsson | - |
R4‑151218 | Introduction of 3DL CA combinations | Nokia Networks | - |
R4‑151219 | Introduction of 3DL CA combinations | Nokia Networks | - |
R4‑151220 | Introduction of additional band combinations for 3DL inter-band CA | Ericsson | - |
R4‑151221 | Introduction of additional band combinations for 3DL inter-band CA | Ericsson | - |
R4‑151222 | Introduction of additional band combinations for 3DL inter-band CA | Ericsson | - |
R4‑151223 | Introduction of additional band combinations for 3DL inter-band CA | Ericsson | - |
R4‑151224 | TP for Rel-13 2DL TR36.8xx : IMD/Harmonics Issues on LTE-A Inter-band Carrier Aggregation (2DL/1UL) of Band 8 and Band 28 | SoftBank Mobile | - |
R4‑151225 | TP for Rel-13 2DL TR 36.8xx LTE Advanced Carrier Aggregation of Band Combination (19+28) | NTT DOCOMO, INC. | - |
R4‑151226 | TP for Rel-13 3DL TR 36.8xx: co-existence and TIB and RIB values for CA_B1_B3_B7 | Huawei, Hisilicon | - |
R4‑151227 | TP to REL-13 3DL TR36.8xx: IMD/Harmonics Issues on LTE-A Inter-band Carrier Aggregation (3DL/1UL) of Band 1, Band 8 and Band 28 | SoftBank Mobile | - |
R4‑151228 | TP for Rel-13 3DL TR 36.8xx LTE Advanced Carrier Aggregation of Band Combination (1+19+28) | NTT DOCOMO, INC. | - |
R4‑151229 | Band Combinations (1+19) and (1+19+28) | NTT Docomo | - |
R4‑151230 | TP to REL-13 3DL TR36.8xx: IMD/Harmonics Issues on LTE-A Inter-band Carrier Aggregation (3DL/1UL) of Band 3, Band 8 and Band 28 | SoftBank Mobile | - |
R4‑151231 | TP for Rel-13 3DL TR 36.8xx: Harmonics and intermodulation products generated by the BS supporting LTE-A CA of Band 7, Band 7 and Band 28 | Ericsson | - |
R4‑151232 | TP for Rel-13 2DL TR 36.8xx: Harmonics and intermodulation analysis of TDD-FDD CA for B20+B40 combination (CA_20A-40A) | Ericsson | - |
R4‑151233 | Text Proposal for TR 36.8xx: harmonics and intermodulation analysis for TDD-FDD CA B3+B41 combination | China Telecom | - |
R4‑151234 | TP for Rel-13 2DL TR36.8xx : IMD/Harmonics Issues on LTE-A Inter-band Carrier Aggregation (2DL/1UL) of Band 8 and Band 42 | SoftBank Mobile | - |
R4‑151235 | TP for Rel-13 2DL TR 36.8xx LTE Advanced Carrier Aggregation of Band Combination (21+42) | NTT DOCOMO, INC. | - |
R4‑151236 | TP for Rel-13 2DL CA TR 36.8xx: operating bands, channel bandwidths and co-existence studies for CA_28A-40A | Huawei, Hisilicon | - |
R4‑151237 | TP to REL-13 3DL TR36.8xx: IMD/Harmonics Issues on LTE-A Inter-band Carrier Aggregation (3DL/1UL) of Band 8, Band 42 and Band 42 | SoftBank Mobile | - |
R4‑151238 | TP for Rel-13 3DL TR 36.8xx LTE Advanced Carrier Aggregation of Band Combination (21+42+42) | NTT DOCOMO, INC. | - |
R4‑151239 | Response LS on ATIS COAST SYNC and 3GPP RAN timing requirements for wireless base | RAN4 chairman | - |
R4‑151240 | Minutes of LTE D2D RF Ad-Hoc | Qualcomm Incorporated, Intel Corporation | - |
R4‑151241 | Minutes of UE CA RF Ad-Hoc | Qualcomm Incorporated, Intel Corporation | - |
R4‑151242 | Answer on the current implementation of 700MHz bandplan within 3GPP specifications to WP5D | Ericson | - |
R4‑151243 | Way forward on UL 64QAM | Huawei, Hisilicon | - |
R4‑151244 | CR on RF core requirements for D2D | Qualcomm Incorporated | - |
R4‑151245 | UL pairing for CA of B39+B41+B41 and B39+B39+41 | CMCC | - |
R4‑151246 | Way Forward on UL/DL paring for CA without the need for a WI | CMCC, Nokia Corporation | - |
R4‑151247 | LS on Additional Aspects for MTC | Qualcomm Incorporated | - |
R4‑151248 | LS on Support of Narrowband Operation for MTC | Ericsson | - |
R4‑151249 | LS on PSBCH reserved field size (R1-150740 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑151250 | LS on CSI feedback for dual connectivity (R1-150775 Source: TSG RAN WG1, To: TSG RAN WG2, Cc: TSG RAN WG4) | TSG RAN WG1 | - |
R4‑151251 | LS on UE Configurations in Dual Connectivity (R1-150777 Source: TSG RAN WG1, To: TSG RAN WG2, Cc: TSG RAN WG4) | TSG RAN WG1 | - |
R4‑151252 | LS on Reselection of SyncRef UE (R2-150652 Source: TSG RAN WG2, To: TSG RAN WG4, Cc: TSG RAN WG1) | TSG RAN WG2 | - |
R4‑151253 | TP for TR 36.8xx: Scope of UE RF Requirements for 4RX LTE DL receiver | Ericsson | - |
R4‑151254 | D2D Tx Requirements: MPR for SSSS | Qualcomm Incorporated | - |
R4‑151255 | D2D Rx on FDD bands: Receiver selectivity to Jammer | Qualcomm Incorporated | - |
R4‑151256 | Way forward on Adjacent channel coexistence evalaution parameters and methodology for LAA | Ericsson | - |
R4‑151257 | LS to RAN1: considerations of introducing licensed-assisted access to unlicensed spectrum and importance of licensed spectrum | Huawei | - |
R4‑151258 | WF on LAA operating bands fro 5GHz and unlicensed spectrum. | Nokia Corporation | - |
R4‑151259 | Way forward for LTE DL 4Rx AP SI on RF | Ericsson | - |
R4‑151260 | Meeting minutes of adhoc on RF requirements for 4RX AP | Ericsson | - |
R4‑151261 | Way forward on detailed similution methodology for LAA | Huawei | - |
R4‑151262 | Handling of inter band 2UL CA out of band blocking | NTT DOCOMO, INC. | - |
R4‑151263 | TP for Rel-13 2DL TR 36.8xx: MSD in LTE_CA_B4_B28 | Huawei | - |
R4‑151264 | Way forward on AAS Ad-Hoc | Telecom Italia | - |
R4‑151265 | 36.833-5-42 v0.4.0: LTE Advanced Carrier Aggregation in Band 42 for 3DL | CATT | - |
R4‑151266 | Way forward on the impact to WAN operation from D2D support | Vodafone | - |
R4‑151267 | Clarification on RAN4 adjacent channel studies for D2D | Vodafone | - |
R4‑151268 | CR on RF core requirements for D2D | Qualcomm Incorporated | - |
R4‑151269 | Introduction of dual uplink CA into 36.101 | KDDI, Ericsson | - |
R4‑151270 | Way forward on Adjacent channel coexistence evalaution parameters and methodology for LAA | Ericsson | - |
R4‑151271 | Way forward on detailed similution methodology for LAA | Huawei | - |
R4‑151272 | Way forward on EIRP | Ericsson | - |
R4‑151273 | CR on RF core requirements for D2D | Qualcomm Incorporated, Microsoft Corporation, Samsung, LG Electronics, U.S. Department of Commerce (U.S. DOC) | - |
R4‑151274 | Draft LS to RAN1 Proposal for relaxations for HST Doppler | Keysight Technologies | - |
R4‑151275 | Clarification on RAN4 adjacent channel studies for D2D | Vodafone | - |
R4‑151276 | Way forward on MSS band | NTT DOCOMO, INC. | - |
R4‑151277 | TP for TR 36.862: dual duplexer implementation for the MSS | Ericsson | - |
R4‑151278 | Way forward on Adjacent channel coexistence evalaution parameters and methodology for LAA | Ericsson | - |
page generated from database: 2024-04-13 13:51:47