3GPP TDocs (written contributions) at meeting
Meeting: R1-77 - 2014-05-19 to 2014-05-23, Seoul
meeting id: R1-77 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑141900 | Draft Agenda for RAN1#77 meeting | RAN1 Chairman | Revised |
R1‑141901 | Final Report of RAN1#76bis meeting | MCC | Approved |
R1‑141902 | LS on RAN2 agreements and working assumptions on E-DCH decoupling | RAN2, NSN | Noted |
R1‑141903 | LS on DCH enhancements | RAN2, Qualcomm | Noted |
R1‑141904 | LS on TTI switching indication from UE | RAN2, Ericsson | Noted |
R1‑141905 | LS on TTI switching | RAN2, Ericsson | Noted |
R1‑141906 | Reply LS on identifier in scheduling assignment for D2D communication | RAN2, Ericsson | Noted |
R1‑141907 | LS on prioritizing MCG uplink transmission | RAN2, Samsung | Noted |
R1‑141908 | LS on SFN handling in the dual connectivity | RAN2, Samsung | Noted |
R1‑141909 | LS on Activation/deactivation for Dual Connectivity | RAN2, NSN | Noted |
R1‑141910 | Reply LS on subframe #6 in LTE_TDD_eIMTA | RAN2, CATT | Noted |
R1‑141911 | Reply LS on Identification of TBS/bandwidth limited UE by eNB | RAN3, Huawei | Noted |
R1‑141912 | Reply LS on GCSE QCIs and connected mode DRX | RAN3, Samsung | Noted |
R1‑141913 | Reply LS on consolidated operator view on eCoMP standardization | RAN3, Samsung | Noted |
R1‑141914 | LS on maxumum relative propagation delay difference among the component carriers in intra-band non-contiguous CA | RAN4, NTT DoCoMo | Noted |
R1‑141915 | LS on defining the new RSRQ measurements definition | RAN4, Nokia | Noted |
R1‑141916 | LS on parameter synchronization | SA3, Qualcomm | Noted |
R1‑141917 | RRM measurement procedures with DRS | Huawei, HiSilicon | Not treated |
R1‑141918 | New L1 procedure for small cell on/off transition time further reduction | Huawei, HiSilicon | Noted |
R1‑141919 | Resource allocation for D2D synchronization signals | Huawei, HiSilicon | Not treated |
R1‑141920 | Scheduling assignment design for D2D | Huawei, HiSilicon | Not treated |
R1‑141921 | D2D discovery signal design | Huawei, HiSilicon | Not treated |
R1‑141922 | D2D communication data channel design | Huawei, HiSilicon | Not treated |
R1‑141923 | Resource allocation for type-1 discovery | Huawei, HiSilicon | Not treated |
R1‑141924 | eNB resource allocation for mode-1 D2D communication | Huawei, HiSilicon | Not treated |
R1‑141925 | D2D synchronization procedure for out-of-coverage | Huawei, HiSilicon | Not treated |
R1‑141926 | D2D synchronization procedure for in-coverage | Huawei, HiSilicon | Not treated |
R1‑141927 | Scheduling assignment content for D2D | Huawei, HiSilicon | Revised |
R1‑141928 | Power control for D2D signals | Huawei, HiSilicon | Not treated |
R1‑141929 | Distributed resource allocation from mode-2 | Huawei, HiSilicon | Noted |
R1‑141930 | Timing signaling for D2D communication | Huawei, HiSilicon | Not treated |
R1‑141931 | Power headroom report in dual connectivity | Huawei, Hisilicon | Not treated |
R1‑141932 | CQI/MCS table design for 256QAM | Huawei, HiSilicon | Noted |
R1‑141933 | Discussion on UE category with introduction of 256QAM | Huawei, HiSilicon | Not treated |
R1‑141934 | Summary of performance evaluations of DRS | Huawei, HiSilicon | Noted |
R1‑141935 | DRS functions and design options | Huawei, HiSilicon | Not treated |
R1‑141936 | RSSI measurements for small cell on/off operation | Huawei, HiSilicon | Not treated |
R1‑141937 | Evaluation of listening RS patterns | Huawei, HiSilicon | Noted |
R1‑141938 | Discussion on listening RS design | Huawei, HiSilicon | Noted |
R1‑141939 | Discussion on network listening with eIMTA | Huawei, HiSilicon | Not treated |
R1‑141940 | Discussion on network listening for intra/inter-operator deployment | Huawei, HiSilicon | Not treated |
R1‑141941 | On necessity of differentiating Cat 0 UEs and legacy UEs | Huawei, HiSilicon | Not treated |
R1‑141942 | Discussion on HD-FDD operation of low cost MTC UEs | Huawei, HiSilicon | Noted |
R1‑141943 | Transmission modes supported by low cost MTC UEs | Huawei, HiSilicon | Not treated |
R1‑141944 | The remaining open issues for low cost MTC UEs | Huawei, HiSilicon | Noted |
R1‑141945 | Draft LS to RAN2 on 36.306 for low cost MTC UE | Huawei, HiSilicon | Revised |
R1‑141946 | Discussion on network assistance signalling parameters | Huawei, HiSilicon | Not treated |
R1‑141947 | Discussion on remaining details for HARQ-ACK transmission | Huawei, HiSilicon | Noted |
R1‑141948 | Draft 36.213 CR Clarification on SRS colliding with PUCCH in the same cell under mTAG | Qualcomm Inc., Fujitsu | Noted - Revised |
R1‑141949 | CSI measurement and reporting in eIMTA | Qualcomm Inc. | Noted |
R1‑141950 | HARQ-ACK feedback for eIMTA | Qualcomm Inc. | Not treated |
R1‑141951 | Remaining issues for eIMTA | Qualcomm Inc. | Not treated |
R1‑141952 | Remaining details of UE category type | Qualcomm Inc. | Noted |
R1‑141953 | Half-duplex operation for MTC | Qualcomm Inc. | Not treated |
R1‑141954 | Higher order modulation | Qualcomm Inc. | Not treated |
R1‑141955 | UE Category handling for 256QAM | Qualcomm Inc. | Not treated |
R1‑141956 | Small cell on/off time reduction | Qualcomm Inc. | Not treated |
R1‑141957 | Performance Evaluation on Discovery signals | Qualcomm Inc. | Not treated |
R1‑141958 | Detailed design of DRS | Qualcomm Inc. | Not treated |
R1‑141959 | Discovery signal-based RRM measurement procedures | Qualcomm Inc. | Not treated |
R1‑141960 | Discovery signal-based RSRQ-like measurement | Qualcomm Inc. | Not treated |
R1‑141961 | Network synchronization by network listening | Qualcomm Inc. | Noted |
R1‑141962 | Physical layer aspects of dual-connectivity | Qualcomm Inc. | Not treated |
R1‑141963 | Reference signal design for D2D | Qualcomm Inc. | Noted |
R1‑141964 | Link level simulation results for D2D discovery | Qualcomm Inc. | Not treated |
R1‑141965 | Link level simulation results for D2D broadcast communication | Qualcomm Inc. | Noted |
R1‑141966 | Control for D2D broadcast communication | Qualcomm Inc. | Noted |
R1‑141967 | Resource allocation for Type 1 D2D discovery | Qualcomm Inc. | Not treated |
R1‑141968 | D2D discovery for asynchronous networks | Qualcomm Inc. | Not treated |
R1‑141969 | Resource allocation for Mode 2 D2D broadcast communication | Qualcomm Inc. | Not treated |
R1‑141970 | Resource allocation for Type 2B D2D discovery | Qualcomm Inc. | Not treated |
R1‑141971 | Resource allocation for Mode 1 D2D broadcast communication | Qualcomm Inc. | Noted |
R1‑141972 | On SRS antenna switching | Qualcomm Inc. | Noted |
R1‑141973 | Resource allocation for D2D Synchronization | Qualcomm Inc. | Not treated |
R1‑141974 | Signal Design for D2D Synchronization | Qualcomm Inc. | Noted |
R1‑141975 | Procedures for D2D synchronization | Qualcomm Inc. | Noted |
R1‑141976 | Simulation results for D2D and WAN coexistence | Qualcomm Inc. | Noted |
R1‑141977 | Network assistance signaling | Qualcomm Inc. | Not treated |
R1‑141978 | CSI measurement and reporting for NAICS | Qualcomm Inc. | Not treated |
R1‑141979 | 25.225 CR0103 (Rel-12, C) New E-UTRA RSRQ measurements definition | CATT | Noted - Revised |
R1‑141980 | Discussion on the number of DL HARQ processes for TDD SCell with FDD PCell | CATT | Noted |
R1‑141981 | Remaining details on aperiodic CSI feedback for eIMTA | CATT | Not treated |
R1‑141982 | Remaining details on periodic CSI feedback for eIMTA | CATT | Not treated |
R1‑141983 | Remaining details on HARQ-ACK on PUSCH | CATT | Not treated |
R1‑141984 | Remaining details on HARQ-ACK on PUCCH | CATT | Not treated |
R1‑141985 | Other remaining issues for TDD eIMTA | CATT | Not treated |
R1‑141986 | Other remaining issues on low complexity MTC UEs | CATT | Not treated |
R1‑141987 | Discussion on the transmission modes supported by low complexity MTC UEs | CATT | Not treated |
R1‑141988 | Remaining issues on low complexity HD-FDD UEs | CATT | Noted |
R1‑141989 | Remaining details in support of 256QAM | CATT | Not treated |
R1‑141990 | Procedures for small cell on/off transition time reduction | CATT | Not treated |
R1‑141991 | Evaluation on small cell discovery signal | CATT | Not treated |
R1‑141992 | Design of small cell discovery signal | CATT | Not treated |
R1‑141993 | RSRQ measurement based on discovery signal | CATT | Not treated |
R1‑141994 | Remaining details of RIBS for small cell | CATT | Noted |
R1‑141995 | UL power control for dual connectivity | CATT | Not treated |
R1‑141996 | UL power scaling for dual connectivity | CATT | Not treated |
R1‑141997 | PDCCH common search space in SCG | CATT | Not treated |
R1‑141998 | Data transmission in D2D communication | CATT | Noted |
R1‑141999 | Details of D2D signal design | CATT | Noted |
R1‑142000 | Control signaling in SA | CATT | Not treated |
R1‑142001 | Contention method for mode 2 resource allocation | CATT | Not treated |
R1‑142002 | Linkage between SA and data resource of D2D communication | CATT | Not treated |
R1‑142003 | Resource allocation for Type 1 D2D discovery | CATT | Not treated |
R1‑142004 | On mode 1 resource allocation for broadcast communication | CATT | Noted |
R1‑142005 | Resource pool allocation for D2D communication | CATT | Not treated |
R1‑142006 | Resource allocation for D2D synchronization | CATT | Not treated |
R1‑142007 | Design of D2DSS and PD2DSCH | CATT | Not treated |
R1‑142008 | Discussion on D2D synchronization source | CATT | Not treated |
R1‑142009 | Discussion on D2D synchronization procedure | CATT | Noted |
R1‑142010 | Further consideration on higher-layer signalling for NAICS receiver | CATT | Noted |
R1‑142011 | On CSI enhancement for NAICS receiver | CATT | Not treated |
R1‑142012 | Discussion on the remaining details of MCS / TBS table for 256QAM | Intel Corporation | Revised |
R1‑142013 | Discussion on UE category for 256QAM | Intel Corporation | Not treated |
R1‑142014 | Discussion on higher layer signaling for NAICS | Intel Corporation | Not treated |
R1‑142015 | Discussion on CQI enhancement for NAICS | Intel Corporation | Not treated |
R1‑142016 | Distributed Resource Allocation for D2D Communication | Intel Corporation | Not treated |
R1‑142017 | eNB Controlled Resource Allocation for D2D Communication | Intel Corporation | Noted |
R1‑142018 | On D2D Resource Allocation Modes and In/Edge/Out of Coverage Definition | Intel Corporation | Not treated |
R1‑142019 | Analysis of Mutual Impact of WAN and D2D Communication | Intel Corporation | Revised |
R1‑142020 | Discussion on D2D Synchronization Channel (PD2DSCH) | Intel Corporation | Not treated |
R1‑142021 | On Synchronization Signal Design for D2D Communication | Intel Corporation | Not treated |
R1‑142022 | Synchronization Procedure for D2D Communication | Intel Corporation | Not treated |
R1‑142023 | Remaining details on HARQ-ACK and CSI feedback for support of eIMTA | Intel Corporation | Not treated |
R1‑142024 | Remaining issues for low cost MTC UE | Intel Corporation | Noted |
R1‑142025 | HD-FDD for low cost MTC UE | Intel Corporation | Not treated |
R1‑142026 | Transition time reduction for small cell on/off | Intel Corporation | Not treated |
R1‑142027 | Simulation results for small cell discovery signals | Intel Corporation | Noted |
R1‑142028 | Details on small cell discovery signal | Intel Corporation | Noted |
R1‑142029 | RRM measurement for small cell discovery signal | Intel Corporation | Not treated |
R1‑142030 | Discussion on physical layer aspects for support of dual connectivity | Intel Corporation | Revised |
R1‑142031 | Remaining details of D2D physical channel design | Intel Corporation | Not treated |
R1‑142032 | On resource allocation for Type 1 D2D discovery | Intel Corporation | Not treated |
R1‑142033 | Discussion on Type 2 D2D discovery procedure | Intel Corporation | Not treated |
R1‑142034 | Considerations on introducing a second pilot for HetNet SHO | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑142035 | CIO configuration in HetNet | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑142036 | Details on Low Cost MTC UE | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑142037 | Considerations on Low Cost MTC HD-FDD | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑142038 | Some remaining details of MCS/CQI/TBS Tables to support 256QAM | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑142039 | Configurations Supporting 256QAM | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑142040 | UE Categories supporting 256 QAM | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑142041 | System design for transition time reduction for small cell ON/OFF | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑142042 | Consideration of New L1 signaling for transition time reduction of SCell Activation for Small Cell ON/OFF | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑142043 | CRS-based Discovery Signal design | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑142044 | CRS-based Discovery Signal RRM measurement procedure | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑142045 | CRS-based Discovery Signal RSRQ-like measurement | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑142046 | System analysis of Radio Interface Based Synchronization (RIBS) | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Noted |
R1‑142047 | UL power control and power scaling for dual connectivity | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑142048 | Common search space on SeNB for dual connectivity | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑142049 | UE capability sharing between MeNB and SeNB for dual connectivity | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑142050 | Design of Scheduling Assignment | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑142051 | Channel design for D2D discovery | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑142052 | Preamble design for D2D Discovery | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑142053 | System Control and Security for D2D broadcast communication | Alcatel-Lucent, Alcatel-Lucent Shanhai Bell | Not treated |
R1‑142054 | Support of Lawful Intercept of D2D broadcast communication | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑142055 | Resource allocation for D2D Broadcast Communication | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑142056 | Resource allocation for Scheduling Assignment | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Revised |
R1‑142057 | Resource allocation for D2D Discovery | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑142058 | Definition of in-coverage, out-of-coverage, and edge-of-cell coverage | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑142059 | Evaluation of Impact of D2D to WAN system performance | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Noted |
R1‑142060 | Resource allocation for D2D synchronization signals | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑142061 | Considerations for design of D2D Synchronization | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑142062 | D2D Synchronization Procedure | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑142063 | Considerations on higher-layer signalling for NAICS | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑142064 | CSI enhancement for NAICS | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | Not treated |
R1‑142065 | Discussion of on/off transitions and related procedures | Fujitsu | Not treated |
R1‑142066 | Discussion on options for small cell discovery signals | Fujitsu | Not treated |
R1‑142067 | RRM Measurements for small cell on/off | Fujitsu | Not treated |
R1‑142068 | Discussion on RSRQ measurement for small cell on/off | Fujitsu | Not treated |
R1‑142069 | Dynamic power allocation for power limited UE in dual-connectivity | Fujitsu | Not treated |
R1‑142070 | Control signaling for D2D broadcast | Fujitsu | Not treated |
R1‑142071 | Discussion of RRM measurement for D2D communication | Fujitsu | Not treated |
R1‑142072 | Distributed resource allocation for D2D broadcast | Fujitsu | Not treated |
R1‑142073 | eNB controlled resource allocation for D2D broadcast | Fujitsu | Not treated |
R1‑142074 | Interference management between D2D and WAN | Fujitsu | Not treated |
R1‑142075 | Resource Allocation for Type 1 D2D Discovery | Fujitsu | Noted |
R1‑142076 | Discussion on D2D Synchronization Procedure | Fujitsu | Not treated |
R1‑142077 | RPT design for broadcast communication | CATT | Not treated |
R1‑142078 | Public safety perspective on multi-carrier operations for D2D group communications | U.S. Department Of Commerce | Noted |
R1‑142079 | CAT 0 Compatibility Mode Standardization | Sierra Wireless | Not treated |
R1‑142080 | Input on Remaining Details of CAT 0 | Sierra Wireless | Not treated |
R1‑142081 | DL HARQ process for TDD SCell in TDD-FDD CA | Samsung | Not treated |
R1‑142082 | Periodic CSI reporting for TDD-FDD CA | Samsung | Noted |
R1‑142083 | SRS transmission for TDD-FDD CA | Samsung | Noted |
R1‑142084 | Remaining Issues for CSI Reporting | Samsung | Not treated |
R1‑142085 | HARQ-ACK Transmission in PUSCH | Samsung | Not treated |
R1‑142086 | HARQ-ACK feedback procedures for eIMTA | Samsung | Noted |
R1‑142087 | UL Power Control – Remaining Issues | Samsung | Noted |
R1‑142088 | Remaining Issues for New UE Category | Samsung | Not treated |
R1‑142089 | Informing an eNB of New UE Category and Capability | Samsung | Not treated |
R1‑142090 | HD-FDD for New Category UEs | Samsung | Noted |
R1‑142091 | CQI/MCS table design for 256QAM | Samsung | Not treated |
R1‑142092 | UE category/capability for 256QAM | Samsung | Not treated |
R1‑142093 | Discussion on 256QAM related signalling/procedure | Samsung | Noted |
R1‑142094 | Procedures for small cell on/off transition time reduction | Samsung | Not treated |
R1‑142095 | Performance evaluation on discovery signals | Samsung | Not treated |
R1‑142096 | Detailed design of discovery signal | Samsung | Noted |
R1‑142097 | Discovery signal-based RRM measurement procedures | Samsung | Not treated |
R1‑142098 | Discovery signal-based RSRQ-like measurement | Samsung | Not treated |
R1‑142099 | RIBS solutions and potential standards impact | Samsung | Noted |
R1‑142100 | Parallel random access preamble transmissions in dual connectivity | Samsung | Not treated |
R1‑142101 | UL Power Control in Dual Connectivity | Samsung | Not treated |
R1‑142102 | UE Capability for MCG and SCG | Samsung | Not treated |
R1‑142103 | Prioritization of UL Transmissions under Power Limitation | Samsung | Not treated |
R1‑142104 | CP configuration for out-of-coverage | Samsung | Noted |
R1‑142105 | Details on scrambling sequence generation | Samsung | Not treated |
R1‑142106 | Control information needed for D2D broadcast communication | Samsung | Noted |
R1‑142107 | Identifier in scheduling assignment for D2D communication | Samsung | Noted |
R1‑142108 | Resource allocation for type-1 discovery | Samsung | Not treated |
R1‑142109 | Resource pool configuration for type-1 discovery | Samsung | Not treated |
R1‑142110 | WAN and D2D priority handling for type-1 discovery | Samsung | Not treated |
R1‑142111 | Mode 2 resource allocation for D2D broadcast communication | Samsung | Not treated |
R1‑142112 | Mode 1 resource allocation for D2D broadcast communication | Samsung | Noted |
R1‑142113 | Resource allocation for type 2B discovery | Samsung | Not treated |
R1‑142114 | Definitions of in-coverage, out-of-coverage, edge-of-cell coverage | Samsung | Not treated |
R1‑142115 | Evaluation of D2D impact on WAN: PUCCH performance | Samsung | Noted |
R1‑142116 | Evaluation of D2D impact on WAN: DL throughput | Samsung | Noted |
R1‑142117 | D2D PUSCH impact on WAN PUCCH | Samsung | Not treated |
R1‑142118 | TDM resource allocation for D2D synchronization | Samsung | Not treated |
R1‑142119 | D2D synchronization procedure for resource pool configuration | Samsung | Not treated |
R1‑142120 | D2D Synchronization Signal and Channel Design | Samsung | Not treated |
R1‑142121 | D2D synchronization procedure for partial network coverage | Samsung | Not treated |
R1‑142122 | D2D synchronization procedure for out-of-network coverage | Samsung | Revised |
R1‑142123 | Synchronization source UE determination for in-coverage scenario | Samsung | Not treated |
R1‑142124 | Multi-carrier operations for D2D and WAN transmission/reception | Samsung | Not treated |
R1‑142125 | Discussion on higher-layer signalling for NAICS | Samsung | Not treated |
R1‑142126 | Remaining details on transmission parameters for NAICS | Samsung | Not treated |
R1‑142127 | Discussion on CSI enhancement options for NAICS | Samsung | Not treated |
R1‑142128 | Summary of discussion on number of DL HARQ processes | LG Electronics | Noted |
R1‑142129 | Remaining Details on CSI Feedback for TDD eIMTA | LG Electronics | Not treated |
R1‑142130 | Remaining Details on HARQ-ACK Feedback for TDD eIMTA | LG Electronics | Noted |
R1‑142131 | Remaining Issues for TDD eIMTA | LG Electronics | Noted |
R1‑142132 | Remaining details on low-cost MTC | LG Electronics | Not treated |
R1‑142133 | HD-FDD support for low-cost MTC | LG Electronics | Not treated |
R1‑142134 | Remaining issues for supporting downlink 256QAM | LG Electronics | Noted |
R1‑142135 | Detailed discussions on new L1 procedure to support fast time-scale on/off operation | LG Electronics | Not treated |
R1‑142136 | Cell detection performance with discovery signals | LG Electronics | Not treated |
R1‑142137 | DRS design details and considerations | LG Electronics | Not treated |
R1‑142138 | DRS-based measurements with network assistance | LG Electronics | Not treated |
R1‑142139 | Considerations on DRS-based RSRQ measurement | LG Electronics | Not treated |
R1‑142140 | Further discussion on network listening for intra-operator scenarios | LG Electronics | Noted |
R1‑142141 | Uplink power control for dual connectivity | LG Electronics | Not treated |
R1‑142142 | Power headroom reporting for dual connectivity | LG Electronics | Not treated |
R1‑142143 | Remaining RAN1 issues of dual connectivity | LG Electronics | Not treated |
R1‑142144 | Discussion on D2D Communication Physical Layer Design | LG Electronics | Not treated |
R1‑142145 | Discussion on D2D Discovery Physical Layer Design | LG Electronics | Not treated |
R1‑142146 | Control design for D2D broadcast communication | LG Electronics | Not treated |
R1‑142147 | Discussion on signaling for D2D communication resource allocation | LG Electronics | Not treated |
R1‑142148 | Resource allocation mode 2 in D2D communication | LG Electronics | Not treated |
R1‑142149 | Operation in Type 1 Resource Allocation for D2D discovery | LG Electronics | Noted |
R1‑142150 | Operational procedure in Mode 1 for D2D communication | LG Electronics | Not treated |
R1‑142151 | Type 2 resource allocation mechanisms for D2D discovery | LG Electronics | Not treated |
R1‑142152 | Multiplexing issues of WAN and D2D | LG Electronics | Not treated |
R1‑142153 | Coexistence issues of WAN and D2D on multiple carriers | LG Electronics | Not treated |
R1‑142154 | Resource allocation mode decision at D2D UE under eNB controllability | LG Electronics | Not treated |
R1‑142155 | Evaluation Results for D2D and WAN Co-existence | LG Electronics | Noted |
R1‑142156 | Discussion on design of D2D synchronization signal | LG Electronics | Revised |
R1‑142157 | Discussion on resource allocation for D2D synchronization | LG Electronics | Not treated |
R1‑142158 | On the D2D-related information sharing between in-coverage UEs and out-coverage Ues | LG Electronics | Not treated |
R1‑142159 | Discussion on procedures for D2DSS transmission and reception | LG Electronics | Not treated |
R1‑142160 | Discussion on D2D signal transmission and reception timing | LG Electronics | Not treated |
R1‑142161 | Considerations on supporting inter-cell D2D operations | LG Electronics | Not treated |
R1‑142162 | Discussion on higher-layer signalling for NAICS | LG Electronics | Not treated |
R1‑142163 | Discussion on CSI enhancement for NAICS | LG Electronics | Not treated |
R1‑142164 | Remaining issues for HARQ-ACK feedback on PUSCH | NEC | Not treated |
R1‑142165 | Views on remaining issues for Low Cost MTC Ues | NEC | Not treated |
R1‑142166 | Impact analysis of eNB not knowing a Category 0 UE with 1 RX antenna | NEC | Noted |
R1‑142167 | UE category to support 256QAM | NEC | Not treated |
R1‑142168 | Views on DRS measurement timing configuration | NEC | Not treated |
R1‑142169 | UL power allocation scheme in dual connectivity | NEC | Not treated |
R1‑142170 | Channel prioritisation and power scaling for dual connectivity | NEC | Not treated |
R1‑142171 | UL/DL processing capability of UE in Dual Connectivity | NEC | Not treated |
R1‑142172 | Resource selection for Type 1 discovery message transmission | NEC | Not treated |
R1‑142173 | D2D and cellular resource multiplexing configuration | NEC | Not treated |
R1‑142174 | D2D synchronization procedure for out-of-network coverage | NEC | Not treated |
R1‑142175 | Signaling Considerations for NAICS | NEC | Noted |
R1‑142176 | Discussions on network listening for inter-operator scenarios | LG Electronics | Not treated |
R1‑142177 | Summary of Email Discussion for Discovery Preamble for D2D | ITRI | Noted |
R1‑142178 | Draft CR on CQI feedback format table in TS 36.212 | Panasonic | Agreed in principle |
R1‑142179 | Reconfiguration behaviour | Panasonic | Noted |
R1‑142180 | UL Index and DAI bits in DCI format 0/4 | Panasonic | Not treated |
R1‑142181 | Updated views on FFS on new UE category | Panasonic | Not treated |
R1‑142182 | Open issues regarding 256QAM | Panasonic | Not treated |
R1‑142183 | Small cell on/off using DRX procedure | Panasonic | Not treated |
R1‑142184 | Discovery signal based RRM measurement procedures | Panasonic | Not treated |
R1‑142185 | Discussion on RSSI on RSRQ-like measurements | Panasonic | Not treated |
R1‑142186 | TPC on dual connectivity | Panasonic | Not treated |
R1‑142187 | Half duplex issue and solutions in D2D | Panasonic | Not treated |
R1‑142188 | MCS report in mode 1 resource allocation | Panasonic | Not treated |
R1‑142189 | D2D grant design in mode 1 resource allocation | Panasonic | Not treated |
R1‑142190 | D2D coverage definition | Panasonic | Not treated |
R1‑142191 | Evaluation on spatial interference to WAN by D2D | Panasonic | Not treated |
R1‑142192 | Rough synchronization procedure in D2D | Panasonic | Not treated |
R1‑142193 | Relationship between higher-layer signaling restriction and blind detection | Panasonic | Not treated |
R1‑142194 | CSI reference resource for A-CSI reporting for eIMTA | Sharp | Not treated |
R1‑142195 | Remaining issues on periodic CSI reporting during fallback for eIMTA | Sharp | Not treated |
R1‑142196 | HARQ-ACK reporting on PUCCH for eIMTA | Sharp | Not treated |
R1‑142197 | DL HARQ-ACK in TDD-FDD CA with eIMTA | Sharp | Not treated |
R1‑142198 | Details on monitoring subframes for reconfiguration DCI in TDD CA and eIMTA | Sharp | Not treated |
R1‑142199 | L1 procedure for small cell on/off | Sharp | Not treated |
R1‑142200 | On the design of the discovery signal | Sharp | Not treated |
R1‑142201 | UL power control for dual connectivity | Sharp | Not treated |
R1‑142202 | Consideration on Configurable CP Length for D2D Transmission | Sharp | Not treated |
R1‑142203 | Use a UE-specific RNTI with a D2D grant | Sharp | Not treated |
R1‑142204 | CRC scrambling for Scheduling assignment | Sharp | Not treated |
R1‑142205 | Collision Avoidance Mechanism with Cellular Network for D2D Communication | Sharp | Not treated |
R1‑142206 | Physical Channel Design for D2D SA and Data Transmission | Sharp | Not treated |
R1‑142207 | Aspects of resource pool configuration for D2D communication | Sharp | Not treated |
R1‑142208 | D2D Network Coverage Definition & Mode Selection | Sharp | Not treated |
R1‑142209 | Detailed design of Discovery signal(s) | ETRI | Not treated |
R1‑142210 | Uplink power control in dual connectivity | ETRI | Not treated |
R1‑142211 | DMRS Structure for Reducing UE Power Consumption | ETRI | Not treated |
R1‑142212 | On configuration and design of 256QAM tables in downlink | ZTE | Noted |
R1‑142213 | UE category design for 256 QAM | ZTE | Not treated |
R1‑142214 | Parallel random access preamble transmissions in dual connectivity | ZTE | Not treated |
R1‑142215 | UCI feedback mechanism for dual connectivity | ZTE | Not treated |
R1‑142216 | Physical layer aspects of dual connectivity | ZTE | Not treated |
R1‑142217 | Remaining issues for low complexity MTC UEs | ZTE | Not treated |
R1‑142218 | Open areas on HD-FDD operation for low cost MTC UEs | ZTE | Not treated |
R1‑142219 | Consideration on the remaining issues about higher-layer signalling | ZTE | Not treated |
R1‑142220 | Evaluation results of CSI enhancements for NAICS | ZTE | Not treated |
R1‑142221 | Remaining details on CSI feedback for TDD eIMTA | ZTE | Not treated |
R1‑142222 | UE capabilities for TDD eIMTA | ZTE | Not treated |
R1‑142223 | Designing issues of Radio-interface based Synchronization | ZTE | Noted |
R1‑142224 | Detailed design of DRS | ZTE | Not treated |
R1‑142225 | On DS measurement configuration | ZTE | Not treated |
R1‑142226 | On DS based RSRQ-like measurement | ZTE | Not treated |
R1‑142227 | On physical channel design for D2D discovery | ZTE | Not treated |
R1‑142228 | SA design for D2D communication | ZTE | Not treated |
R1‑142229 | Control signaling for D2D communication | ZTE | Withdrawn |
R1‑142230 | SA and data resource allocation for Mode 2 | ZTE | Not treated |
R1‑142231 | Resource Allocation for Type 1 Discovery | ZTE | Not treated |
R1‑142232 | SA and data resource allocation for Mode 1 | ZTE | Not treated |
R1‑142233 | Resource Allocation for Type 2B Discovery | ZTE | Not treated |
R1‑142234 | Performance evaluation of D2D and WAN co-existence | ZTE | Not treated |
R1‑142235 | Resource allocation for synchronization signal and channel | ZTE | Not treated |
R1‑142236 | D2D Synchronization Signal and Channel Design | ZTE | Not treated |
R1‑142237 | D2D Synchronization procedure | ZTE | Noted |
R1‑142238 | Timing and synchronization for D2D Discovery/communication | ZTE | Not treated |
R1‑142239 | Procedures for small cell on/off transition time reduction | ZTE | Not treated |
R1‑142240 | Reply LS on ProSe Lawful Interception | SA3-LI, US Department of Commerce | Noted |
R1‑142241 | Draft Agenda for RAN1#77 meeting | RAN1 Chairman | Approved |
R1‑142242 | Maximum number of DL HARQ processes for TDD serving cell with FDD Pcell | ITRI | Not treated |
R1‑142243 | Performance of small cell on/off with different CSI assumptions | ITRI | Not treated |
R1‑142244 | Radio-interface based synchronization for small cells | ITRI | Noted |
R1‑142245 | Further discussion on the Multiplexing of Cellular and D2D signals | ITRI | Not treated |
R1‑142246 | Discussion on High-Layer Signalling for NAICS | ITRI | Not treated |
R1‑142247 | Discussion on Mechanism to Support 256QAM in TM 10 | Hitachi Ltd. | Not treated |
R1‑142248 | Indication of cell transmission to UEs | Hitachi Ltd. | Not treated |
R1‑142249 | Discussion on discovery signal candidates | Hitachi Ltd. | Not treated |
R1‑142250 | Listening RS for RIBS | Hitachi Ltd. | Noted |
R1‑142251 | PDCCH common search space on SeNB | Hitachi Ltd. | Not treated |
R1‑142252 | Remaining details of new UE category/type | NTT DOCOMO | Not treated |
R1‑142253 | Views on half duplex-FDD with single oscillator | NTT DOCOMO | Not treated |
R1‑142254 | Remaining issues on 256 CQI/MCS table | NTT DOCOMO | Not treated |
R1‑142255 | Views on UE categories for 256QAM | NTT DOCOMO | Not treated |
R1‑142256 | New L1 procedure for small cell on/off | NTT DOCOMO | Not treated |
R1‑142257 | Views on transition time reduction for small cell on/off | NTT DOCOMO | Not treated |
R1‑142258 | Performance evaluation on DRS-based cell/TP identification and RSRP measurement | NTT DOCOMO | Noted |
R1‑142259 | Views on detailed design of discovery signal for Rel-12 discovery procedure | NTT DOCOMO | Not treated |
R1‑142260 | Views on discovery signal-based RRM measurement procedures | NTT DOCOMO | Not treated |
R1‑142261 | Views on discovery signal-based RSRQ measurement | NTT DOCOMO | Not treated |
R1‑142262 | Open issues on dual connectivity | NTT DOCOMO | Not treated |
R1‑142263 | Summary of email discussion [76b-08] | NTT DOCOMO | Noted |
R1‑142264 | Power-control mechanisms for dual connectivity | NTT DOCOMO | Not treated |
R1‑142265 | RAN1 specification impact of PUCCH on SCell for CA | NTT DOCOMO | Not treated |
R1‑142266 | Views on remaining open issues on dual connectivity | NTT DOCOMO | Not treated |
R1‑142267 | Discussion on resource selection for type 1 discovery | NTT DOCOMO | Not treated |
R1‑142268 | Discussion on Inter-cell type 2B discovery | NTT DOCOMO | Not treated |
R1‑142269 | Evaluation of inband emission impact of D2D discovery | NTT DOCOMO | Not treated |
R1‑142270 | Views on inter-cell and inter-carrier D2D | NTT DOCOMO | Not treated |
R1‑142271 | Remaining issues on higher layer signaling for NAICS | NTT DOCOMO | Not treated |
R1‑142272 | Evaluation results of CSI enhancements for NAICS | NTT DOCOMO | Not treated |
R1‑142273 | Further views on Rel-12 UE capabilities | NTT DOCOMO | Not treated |
R1‑142274 | Remaining Details of 256 QAM | Broadcom Corporation | Not treated |
R1‑142275 | Discussions on UE Category with introduction of 256 QAM | Broadcom Corporation | Not treated |
R1‑142276 | Small Cell On/Off procedures | Broadcom Corporation | Not treated |
R1‑142277 | Performance evaluations for cell detection and RSRP measurement | Broadcom Corporation | Not treated |
R1‑142278 | Discovery signal design | Broadcom Corporation | Not treated |
R1‑142279 | RSRQ calculation for small cell On/Off | Broadcom Corporation | Not treated |
R1‑142280 | Uplink Power Control for Dual Connectivity | Broadcom Corporation | Not treated |
R1‑142281 | Power Headroom Reporting to Support UL Power Control in Dual Connectivity | Broadcom Corporation | Not treated |
R1‑142282 | D2DSS design | Broadcom Corporation | Not treated |
R1‑142283 | Higher-layer signaling for NAICS | Broadcom Corporation | Not treated |
R1‑142284 | CSI Enhancements for NAICS | Broadcom Corporation | Not treated |
R1‑142285 | Discussion on RSSI definition for DRS based RRM measurement | FiberHome | Not treated |
R1‑142286 | Design of discovery signal for small cells | FiberHome | Not treated |
R1‑142287 | Discussion on Dynamic Power-sharing of DC UL transmission | FiberHome | Not treated |
R1‑142288 | Remaining Details of UL/DL Reconfiguration for eIMTA | HTC | Not treated |
R1‑142289 | Discussion on L1 procedure to further reduce the transition time of small cell on/off | HTC | Not treated |
R1‑142290 | UL Dynamic Power-Sharing in Dual Connectivity | HTC | Not treated |
R1‑142291 | UL Power Control in Unsynchronized Dual Connectivity | HTC | Not treated |
R1‑142292 | D2D Synchronization procedure for in and out of coverage UEs | HTC | Not treated |
R1‑142293 | Resource allocation scheme for in-coverage D2D communication to support Mode 1 and Mode 2 | III | Not treated |
R1‑142294 | Decision metric for D2D communication | Czech Technical University in Prague, IAESI | Not treated |
R1‑142295 | D2D physical channels and signals | CEA, IAESI | Not treated |
R1‑142296 | Remaining issues for low cost MTC | MediaTek Inc. | Not treated |
R1‑142297 | Remaining Issues of Low Cost HD-FDD Operation | MediaTek Inc. | Noted |
R1‑142298 | Layer-1 procedure enhancements for fast small cell on/off operation | MediaTek Inc. | Noted |
R1‑142299 | Performance evaluation of cell detection and RSRP measurement for discovery signal designs | MediaTek Inc. | Noted |
R1‑142300 | Discovery signal designs for small cell discovery enhancements | MediaTek Inc. | Not treated |
R1‑142301 | On discovery signal based RRM measurements | MediaTek Inc. | Not treated |
R1‑142302 | Analysis and evaluation of discovery signal based RSRQ measurement definitions | MediaTek Inc. | Not treated |
R1‑142303 | Higher-layer signaling of interference parameters for NAICS | MediaTek Inc. | Noted |
R1‑142304 | Discussion on CSI feedback for NAICS receivers | MediaTek Inc. | Not treated |
R1‑142305 | UL TFCI Discussion | MediaTek Inc. | Noted |
R1‑142306 | Remaining Design Details of DL 10ms Mode Transmission | MediaTek Inc. | Noted |
R1‑142307 | Uplink ACK Transmission in Compressed Mode | MediaTek Inc. | Noted |
R1‑142308 | UE category definitions for 256QAM | NVIDIA | Not treated |
R1‑142309 | Small cell on/off transition time reduction | NVIDIA | Not treated |
R1‑142310 | Evaluation of discovery signals for RRM measurements | NVIDIA | Noted |
R1‑142311 | Details of discovery signal design | NVIDIA | Not treated |
R1‑142312 | Remaining aspects of higher-layer signaling for NAICS | NVIDIA | Revised |
R1‑142313 | Specifying CQI for NAICS | NVIDIA | Noted |
R1‑142314 | On CSI feedback enhancements in support of NAICS | NVIDIA | Not treated |
R1‑142315 | Resource Allocation for D2D Synchronization | Intel Corporation | Not treated |
R1‑142316 | Discussion on D2D Multicarrier Capabilities | Intel Corporation | Not treated |
R1‑142317 | Analysis of Multi-hop Synchronization Procedures with Prioritized Hop Count | Intel Corporation | Not treated |
R1‑142318 | Discussion on D2D Control Channel | Intel Corporation | Not treated |
R1‑142319 | [DRAFT] LS on UE receiver capability based CIO configuration in UMTS HetNet | Alcatel-Lucent | Not treated |
R1‑142320 | Higher-layer signaling for NAICS | Ericsson | Revised |
R1‑142321 | 4 CRS Port Specification Impact and Performance for NAICS | Ericsson | Not treated |
R1‑142322 | NAICS functionality, robustness, and configurability | Ericsson | Noted |
R1‑142323 | Higher Layer Signaling of TM10 DMRS Properties for NAICS | Ericsson | Not treated |
R1‑142324 | On CSI enhancements for NAICS | Ericsson | Noted |
R1‑142325 | Discussion on reference resource for TM 10 | Huawei, HiSilicon, Panasonic, Samsung | Noted |
R1‑142326 | Correction on reference resource for TM 10 | Huawei, HiSilicon | Noted |
R1‑142327 | Discussion on Rel-12 UE capabilities | Huawei, HiSilicon | Noted |
R1‑142328 | 36.212 DraftCR (Rel-12, B) Introduction of Rel 12 features of TDD-FDD CA and eIMTA | Huawei | Noted - Revised |
R1‑142329 | Editor's document for the 36.212 specification for rel-12 | Huawei | Noted |
R1‑142330 | Draft CR on clarification of DL subframes | Huawei, HiSilicon | Noted |
R1‑142331 | Maximum number of DL HARQ processes for TDD SCell with FDD PCell | Huawei, HiSilicon | Not treated |
R1‑142332 | Discussion on remaining details for CSI feedback | Huawei, HiSilicon | Not treated |
R1‑142333 | Other aspects related to small cell on/off and discovery | Huawei, HiSilicon | Not treated |
R1‑142334 | Timing information for energy-efficient small cell discovery and measurements | Huawei, HiSilicon | Not treated |
R1‑142335 | Discussion on the UE processing capabilities in dual connectivity | Huawei, Hisilicon | Not treated |
R1‑142336 | Discussion on the Transmission power control in dual connectivity | Huawei, Hisilicon | Not treated |
R1‑142337 | Extending PUCCH on PCell and pSCell to Carrier Aggregation | Huawei, HiSilicon | Not treated |
R1‑142338 | Gap for D2D transmissions | Huawei, HiSilicon | Not treated |
R1‑142339 | Evaluation of D2D and cellular coexistence | Huawei, HiSilicon | Not treated |
R1‑142340 | D2DSS design | Huawei, HiSilicon | Noted |
R1‑142341 | Discussion on CSI enhancement for NAICS | Huawei, HiSilicon | Not treated |
R1‑142342 | Remaining Details on LC-MTC UE | InterDigital | Not treated |
R1‑142343 | Discussion on LC-MTC HD-FDD UE | InterDigital | Not treated |
R1‑142344 | Small cell on/off transition time reduction | InterDigital | Not treated |
R1‑142345 | System-level performance evaluation of discovery signals | InterDigital | Not treated |
R1‑142346 | RSSI measurements with small cell on/off operation | InterDigital | Not treated |
R1‑142347 | Power sharing in dual connectivity | InterDigital | Not treated |
R1‑142348 | Power headroom reporting in dual connectivity | InterDigital | Not treated |
R1‑142349 | On CSI Enhancement for NAICS | InterDigital | Not treated |
R1‑142350 | On control signaling and scheduling assignments for D2D | InterDigital | Not treated |
R1‑142351 | Distributed resource allocation for D2D | InterDigital | Not treated |
R1‑142352 | Synchronization signal and channel design for D2D | InterDigital | Not treated |
R1‑142353 | Remaining Issues for 256 QAM Configuration and Signalling | BlackBerry UK Limited | Not treated |
R1‑142354 | On UE Category/Capability Handling to Support 256 QAM | BlackBerry UK Limited | Not treated |
R1‑142355 | UL Transmit Power Control for Dual Connectivity | BlackBerry UK Limited | Not treated |
R1‑142356 | UE measurement based on discover signal | ASUSTeK | Not treated |
R1‑142357 | UL Power Control for Simultaneous UCI Transmission | ASUSTeK | Not treated |
R1‑142358 | Discussion of mode 2 resource allocation for D2D communication | ASUSTeK | Noted |
R1‑142359 | Resource allocation/utilization for type-1 discovery | ASUSTeK | Not treated |
R1‑142360 | Resource Hopping Mechanism for Type 2B Discovery | ASUSTeK | Not treated |
R1‑142361 | Coexistence issues between D2D discovery and WAN | CATR | Not treated |
R1‑142362 | Evaluation on D2D distributed resource allocation for discovery | CATR | Noted |
R1‑142363 | Consideration on higher layer signalling of NAIC | CATR | Not treated |
R1‑142364 | Considerations on radio-interface based synchronization | CATR | Noted |
R1‑142365 | Discussions on 256QAM | CATR | Not treated |
R1‑142366 | Small cell on/off time reduction for activated SCell | CATR | Not treated |
R1‑142367 | Views on the design of DRS | CATR | Not treated |
R1‑142368 | Enhanced L1 procedure for activated SCell operating on/off | China Telecom | Not treated |
R1‑142369 | UL Power transmission for dual connectivity | China Telecom | Not treated |
R1‑142370 | UE category parameters for low complexity UE | Ericsson | Not treated |
R1‑142371 | Downlink transmission modes for low complexity UE | Ericsson | Not treated |
R1‑142372 | Base station knowledge of low complexity UEs | Ericsson | Not treated |
R1‑142373 | Guard period for low complexity UE in half-duplex FDD | Ericsson | Not treated |
R1‑142374 | Subframe timing conflict in half-duplex FDD | Ericsson | Not treated |
R1‑142375 | CQI and MCS table design for downlink 256QAM | Ericsson | Noted |
R1‑142376 | TBS table design for downlink 256QAM | Ericsson | Not treated |
R1‑142377 | Gray mapping for 256QAM | Ericsson | Not treated |
R1‑142378 | UE category solution for 256QAM support | Ericsson | Not treated |
R1‑142379 | On 256QAM configuration | Ericsson | Not treated |
R1‑142380 | 256QAM for PMCH transmissions | Ericsson | Not treated |
R1‑142381 | Comparison between different New L1 Procedures | Ericsson | Not treated |
R1‑142382 | Performance Evaluations of different New L1 Procedures | Ericsson | Not treated |
R1‑142383 | Standardization impact to support on/off based on CA activation/deactivation | Ericsson | Not treated |
R1‑142384 | Standardization impact to support on/off based on Handover | Ericsson | Not treated |
R1‑142385 | Performance evaluations for discovery signals | Ericsson | Not treated |
R1‑142386 | Design of discovery signals and procedures | Ericsson | Not treated |
R1‑142387 | Discovery signals and small cell on/off | Ericsson | Not treated |
R1‑142388 | On network assistance and gap information | Ericsson | Not treated |
R1‑142389 | RSSI measurements for discovery signals | Ericsson | Not treated |
R1‑142390 | On radio-interface based small cell synchronization | Ericsson | Noted |
R1‑142391 | UE Capability Handling in Dual Connectivity | Ericsson | Not treated |
R1‑142392 | Further Discussion on UL Power Control in Dual Connectivity | Ericsson | Not treated |
R1‑142393 | Power headroom reporting for dual connectivity | Ericsson | Revised |
R1‑142394 | Simultaneous Rx/Tx support for dual connectivity | Ericsson | Not treated |
R1‑142395 | Initialization of TA values | Ericsson | Not treated |
R1‑142396 | On Timing and D2D Signals Multiplexing | Ericsson | Not treated |
R1‑142397 | On Scrambling of D2D Physical Channels | Ericsson | Noted |
R1‑142398 | D2D Physical Channels Design | Ericsson | Noted |
R1‑142399 | Transmission resource allocation control for D2D communication | Ericsson | Not treated |
R1‑142400 | On scheduling assignments | Ericsson | Noted |
R1‑142401 | D2D Broadcast Control Information and Related Procedures | Ericsson | Not treated |
R1‑142402 | On resource allocation for communication in Mode 1 and Mode 2 | Ericsson | Not treated |
R1‑142403 | Discovery Resource Allocation | Ericsson | Not treated |
R1‑142404 | On Metric and Procedures for In/Out of NW coverage detection for D2D | Ericsson | Not treated |
R1‑142405 | On inband co-existence of cellular and D2D UEs | Ericsson | Not treated |
R1‑142406 | Inter-Carrier and Inter-Cell Aspects of D2D Discovery and Communication | Ericsson | Not treated |
R1‑142407 | Discussion on UE Multi-Carrier D2D Capabilities | Ericsson | Not treated |
R1‑142408 | Frame Structure for D2D-Enabled LTE Carriers | Ericsson | Not treated |
R1‑142409 | Synchronization Signals and Channel Design for D2D | Ericsson | Noted |
R1‑142410 | Synchronization Procedures for D2D | Ericsson | Noted |
R1‑142411 | Draft LS reply on identifier in scheduling assignment for D2D communication | Ericsson | Noted |
R1‑142412 | Discussion on small cell on/off transition time reduction | Coolpad | Not treated |
R1‑142413 | Discussion on the DS-based RRM measurement | Coolpad | Not treated |
R1‑142414 | On Control Channel Robustness for Secondary Pilot and ILPC Restriction Schemes | Ericsson | Noted |
R1‑142415 | System Level Simulations on Improving the Power Control after DTX on Secondary Carriers | Ericsson | Noted |
R1‑142416 | Link Level Simulations on Improving the Power Control after DTX on Secondary Carriers | Ericsson | Noted |
R1‑142417 | 25.212 CR0327 (Rel-12, B) Introduction of Further EUL Enhancements | Ericsson | Noted |
R1‑142418 | 25.214 CR0713 (Rel-12, B) Introduction of Further EUL Enhancements | Ericsson | Noted |
R1‑142419 | 25.211 CR0315 (Rel-12, B) Introduction of Enhanced Broadcast of System Information | Ericsson | Noted - Revised |
R1‑142420 | 25.212 CR0328 (Rel-12, B) Introduction of Enhanced Broadcast of System Information | Ericsson | Noted - Revised |
R1‑142421 | 25.213 CR0117 (Rel-12, B) Introduction of Enhanced Broadcast of System Information | Ericsson | Noted - Revised |
R1‑142422 | 25.214 CR0714 (Rel-12, B) Introduction of Enhanced Broadcast of System Information | Ericsson | Noted |
R1‑142423 | On the Support of UMTS Features by Scalable UMTS | Ericsson | Noted |
R1‑142424 | Text Proposal on Uplink Signal Characteristics for Scalable UMTS | Ericsson | Agreed |
R1‑142425 | Details on CQI/MCS Table Design for 256QAM | Microsoft Corporation | Noted |
R1‑142426 | UE Category Adjustment with 256QAM | Microsoft Corporation | Not treated |
R1‑142427 | Issues in D2D Signal Design | Microsoft Corporation | Not treated |
R1‑142428 | SA content for D2D broadcast communication | Microsoft Corporation | Noted |
R1‑142429 | Resource allocation for D2D Mode 1 communication | Microsoft Corporation | Not treated |
R1‑142430 | Draft 36.214 CR on additional RSRQ measurement definition | Nokia, NSN | Noted - Revised |
R1‑142431 | Draft 25.215 CR on additional RSRQ measurement definition | Nokia, NSN | Noted - Revised |
R1‑142432 | HARQ-ACK bits ordering for PUCCH format 1b with channel selection | NSN, Nokia | Not treated |
R1‑142433 | Usage of UL DAI and UL Index with UL reference configuration #0 | NSN, Nokia | Not treated |
R1‑142434 | Remaining Details of Category-0 UE | NSN, Nokia | Not treated |
R1‑142435 | Benefits of Knowing about Cat-0 UE during RAR/Paging | NSN, Nokia | Noted |
R1‑142436 | Details of Half-Duplex Cat-0 UE | NSN, Nokia | Not treated |
R1‑142437 | On the final CQI table design details | Nokia, NSN | Not treated |
R1‑142438 | On UE categories for 256QAM support | Nokia, NSN | Not treated |
R1‑142439 | On procedures for small cell on/off transition time reduction | NSN, Nokia | Not treated |
R1‑142440 | Small Cell Detection Statistics and Related Considerations | NSN, Nokia | Not treated |
R1‑142441 | Discovery Signal Design | NSN, Nokia | Noted |
R1‑142442 | RRM-measurement and related procedures for small cell on/off and discovery | NSN, Nokia | Not treated |
R1‑142443 | Remaining design issues of RIBS | NSN, Nokia | Not treated |
R1‑142444 | RIBS with Synchronization Accuracy Indication | NSN, Nokia | Noted |
R1‑142445 | Uplink Power Control for Dual Connectivity | NSN, Nokia | Not treated |
R1‑142446 | Remaining RAN1 Issues of Dual Connectivity | NSN, Nokia | Not treated |
R1‑142447 | Scheduling assignment and related data transmissions | Nokia, NSN | Not treated |
R1‑142448 | Timing and resource pools of Type 2B discovery signals | Nokia, NSN | Not treated |
R1‑142449 | Dynamic control of D2D discovery resources | Nokia, NSN | Not treated |
R1‑142450 | Pattern design and resource allocation for discovery Type 2B | NSN, Nokia | Not treated |
R1‑142451 | Relationship between coverage conditions and D2D operation | Nokia, NSN | Not treated |
R1‑142452 | D2D synchronization signal design | Nokia, NSN | Noted |
R1‑142453 | Synchronization procedure for D2D communication and discovery | Nokia, NSN | Not treated |
R1‑142454 | WAN protection by configurable D2D transmission power control | NSN, Nokia | Not treated |
R1‑142455 | Network assistance for NAICS receivers | NSN, Nokia | Not treated |
R1‑142456 | On NAICS signalling operation | NSN, Nokia | Noted |
R1‑142457 | On NAICS CSI feedback | NSN, Nokia | Not treated |
R1‑142458 | 25.214 CR0716 (Rel-11, F) Clarifications to Multiflow Operation | Qualcomm Incorporated | Noted - Revised |
R1‑142459 | Summary of email discussions in RAN1#76bis on DCH enhancements | Qualcomm Incorporated | Noted |
R1‑142460 | Remaining aspects of DCH enhancements | Qualcomm Incorporated | Revised |
R1‑142461 | DL Compressed mode operation without SF reduction | Qualcomm Incorporated | Noted |
R1‑142462 | UL FET operation for DCH enhancements | Qualcomm Incorporated | Noted |
R1‑142463 | Basic UE Capability Mode of Operation | Qualcomm Incorporated | Revised |
R1‑142464 | 25.211 CR0316 (Rel-12, B) Introduction of DCH Enhancements | Qualcomm Incorporated | Noted |
R1‑142465 | 25.212 CR0329 (Rel-12, B) Introduction of DCH Enhancements | Qualcomm Incorporated | Revised |
R1‑142466 | 25.214 CR0715 (Rel-12, B) Introduction of DCH Enhancements | Qualcomm Incorporated | Noted |
R1‑142467 | 25.300 CR Introduction of DCH Enhancements | Qualcomm Incorporated | Not treated |
R1‑142468 | Link Simulation Results for Secondary Pilot | Qualcomm Incorporated | Noted |
R1‑142469 | Common RGCH for Mitigating Interference for Ues not in Soft Handover | Qualcomm Incorporated | Noted |
R1‑142470 | Signaling for CIO Adaptation | Qualcomm Incorporated | Noted |
R1‑142471 | Power Control Enhancements for TDM Operation with DTX | Qualcomm Incorporated | Noted |
R1‑142472 | HARQ Mechanism for TDM Operation | Qualcomm Incorporated | Noted |
R1‑142473 | Low-complexity UE single RX indication | Sony | Not treated |
R1‑142474 | Discussion on RRM measurement procedures in small cell on/off operation | Sony | Not treated |
R1‑142475 | Synchronisation design for D2D communication and discovery | Sony | Not treated |
R1‑142476 | Views on small cell on/off procedures | CHTTL | Not treated |
R1‑142477 | Discussion on small cell discovery signal design | CHTTL | Not treated |
R1‑142478 | Remaining issues on D2D physical channel design | Kyocera | Not treated |
R1‑142479 | Physical resource design for D2D discovery | Kyocera | Not treated |
R1‑142480 | Design details of scheduling assignments | Kyocera | Noted |
R1‑142481 | Mode 2 resource allocation for D2D communication | Kyocera | Not treated |
R1‑142482 | Resource allocation for Type 1 discovery | Kyocera | Not treated |
R1‑142483 | Mode 1 resource allocation for D2D communication | Kyocera | Not treated |
R1‑142484 | Multi carrier operations for D2D | Kyocera | Not treated |
R1‑142485 | Coexistence of D2D discovery and WAN | Kyocera | Not treated |
R1‑142486 | Simulation result on WAN impact of D2D communication | Kyocera | Not treated |
R1‑142487 | Synchronization resource allocation | Kyocera | Not treated |
R1‑142488 | Synchronization signal and channel design | Kyocera | Not treated |
R1‑142489 | Synchronization procedure | Kyocera | Not treated |
R1‑142490 | CQI table design for 256QAM | KT Corp. | Revised |
R1‑142491 | MCS/TBS table design for 256QAM | KT Corp. | Revised |
R1‑142492 | Uplink Power Control for Dual Connectivity | KT Corp. | Not treated |
R1‑142493 | Remaining issue on UCI transmission for Dual Connectivity | KT Corp. | Not treated |
R1‑142494 | Gray mapping for 256QAM | Texas Instruments | Noted |
R1‑142495 | On UL Power Control for Dual Connectivity | Texas Instruments | Not treated |
R1‑142496 | Remaining details of MTC UE category | Motorola Mobility | Not treated |
R1‑142497 | Remaining details of MCS and TBS signaling for support of 256-QAM | Motorola Mobility | Not treated |
R1‑142498 | UE category in support of 256-QAM | Motorola Mobility | Not treated |
R1‑142499 | Further discussion on procedures for small cell ON/OFF | Motorola Mobility | Revised |
R1‑142500 | Measurement Gaps for Small cell on/off | Motorola Mobility | Not treated |
R1‑142501 | 36.213 Draft CR for Introduction of Rel-12 LTE-Advanced features in 36.213 | Motorola Mobility | Noted - Revised |
R1‑142502 | TP on uplink performance for F-UMTS | China Unicom, Huawei | Noted |
R1‑142503 | TP on conclusions of filtered Scalable UMTS | China Unicom, Huawei | Noted - Revised |
R1‑142504 | Discussion on Rel-12 UE capabilities | CMCC | Noted |
R1‑142505 | Discussions on UE categories supporting 256QAM | CMCC | Not treated |
R1‑142506 | TBS design for 256QAM | CMCC | Not treated |
R1‑142507 | Performance evaluation of discovery reference signals | CMCC | Not treated |
R1‑142508 | Listening RS design for radio interface based small cell synchronization | CMCC | Noted |
R1‑142509 | RIBS for inter-operator scenario | CMCC | Noted |
R1‑142510 | Discussion on NAICS signaling and operation | CMCC | Not treated |
R1‑142511 | Discussion on CSI feedback for NAICS receivers | CMCC | Not treated |
R1‑142512 | Resource allocation Mode 2 for D2D communication | Potevio | Not treated |
R1‑142513 | 25.214 CR0717 (Rel-11, F) Compressed mode in Multiflow assisting (secondary) serving cell | NSN | Noted - Revised |
R1‑142514 | Hamming distance analysis of Uplink TFCI code variants | NSN | Noted |
R1‑142515 | 25.212 Draft CR (Rel-12, B) Introduction of target HS-SCCH override order in enhanced Serving Cell Change based on Event 1C | NSN | Not treated |
R1‑142516 | [draft] RAN1 response to LS on RAN2 agreements and working assumptions on E-DCH decoupling | NSN | Noted |
R1‑142517 | HS-SCCH override order for event 1C | NSN | Noted |
R1‑142518 | Simualation results for Power Control for Long DTX Cycle | NSN | Noted |
R1‑142519 | TDM Operation for multiple simultaneous transmissions | NSN | Noted |
R1‑142520 | Grant Detection and DL DRX | NSN | Noted |
R1‑142521 | Specification Impact for Grant Detection TDM operation | NSN | Noted |
R1‑142522 | Update on HARQ solutions for TDM operation | NSN | Noted |
R1‑142523 | UL TTI switch indication from the UE | NSN | Noted |
R1‑142524 | TP to TR25.701 on PRACH handling | NSN | Noted - Revised |
R1‑142525 | TP to TR25.701 on AICH and PICH processing | NSN | Agreed |
R1‑142526 | TP to TS25.701 on SCH | NSN | Withdrawn |
R1‑142527 | On RRC filter for S-UMTS | NSN | Revised |
R1‑142528 | Discussion on the number of DL HARQ processes for TDD serving cell with FDD Pcell | ITL Inc. | Not treated |
R1‑142529 | The small cell on/off state indication by DCI format | ITL Inc. | Revised |
R1‑142530 | Considerations on D2D synchronization signal design | ITL Inc. | Not treated |
R1‑142531 | ProSe device-to-device coverage definitions | General Dynamics UK | Not treated |
R1‑142532 | ProSe device-to-device synchronisation signal and channel design | General Dynamics UK | Noted |
R1‑142533 | On dynamic interpretation of UL index and UL DAI | Ericsson | Not treated |
R1‑142534 | Remaining issues on CSI feedback for eIMTA | Ericsson | Not treated |
R1‑142535 | Considerations on UE capabilities in DuCo | Broadcom Corporation | Not treated |
R1‑142536 | Low-complexity and coverage extended MTC in Rel-13 | Sony | Not treated |
R1‑142537 | eNB resource allocation for D2D Communication Mode 1 | InterDigital | Not treated |
R1‑142538 | 36.211 Draft CR (Rel-12, B) Inclusion of eIMTA, TDD-FDD CA, and coverage enhancements | Ericsson | Noted - Revised |
R1‑142539 | 36.211 CR0190 (Rel-12, F) Clarification of downlink subframes | Ericsson | Noted - Revised |
R1‑142540 | Further Enhancements for MTC in LTE Rel-13 | Ericsson, NSN | Not treated |
R1‑142541 | On Reduced UE Bandwidth and Enhanced Coverage for MTC | Ericsson, NSN | Not treated |
R1‑142542 | Small Cell On Off using UL sensing | CEWiT | Not treated |
R1‑142543 | Definition of coverage zones for D2D communication | Huawei, HiSilicon | Not treated |
R1‑142544 | Resource allocation for type-2B discovery | Huawei, HiSilicon | Not treated |
R1‑142545 | Discussion on DRX operation for Multiflow | Huawei, HiSilicon | Noted |
R1‑142546 | 25.214 CR0718 (Rel-11, F) Correction of DRX operation for Multiflow | Huawei, HiSilicon | Noted - Revised |
R1‑142547 | 25.214 CR0719 (Rel-11, F) Clarification of the power scaling for MIMO dual transport block transmission | Huawei, HiSilicon | Noted - Revised |
R1‑142548 | Coding for Uplink TFCI | Huawei, HiSilicon | Noted |
R1‑142549 | Evaluation of HS-DPCCH solutions | Huawei, HiSilicon | Noted |
R1‑142550 | Considerations on dynamic rate and power adjustment solution | Huawei, HiSilicon | Noted |
R1‑142551 | Further considerations on extended E-HICH solution | Huawei, HiSilicon | Noted |
R1‑142552 | Further discussion on offloading and CIO adaptation in Hetnet | Huawei, HiSilicon | Noted |
R1‑142553 | Response to LS on E-DCH decoupling | Huawei, HiSilicon | Not treated |
R1‑142554 | 25.211 Draft CR (Rel-12, B) Introduction of UMTS Heterogeneous Networks Enhancements | Huawei, HiSilicon | Revised |
R1‑142555 | 25.212 Draft CR (Rel-12, B) Introduction of UMTS Heterogeneous Networks Enhancements | Huawei, HiSilicon | Withdrawn |
R1‑142556 | 25.213 Draft CR (Rel-12, B) Introduction of UMTS Heterogeneous Networks Enhancements | Huawei, HiSilicon | Revised |
R1‑142557 | 25.214 Draft CR (Rel-12, B) Introduction of UMTS Heterogeneous Networks Enhancements | Huawei, HiSilicon | Revised |
R1‑142558 | Considerations on improved power control for TDM operation | Huawei, HiSilicon | Not treated |
R1‑142559 | Further considerations on transmitting DL control channels for the secondary carrier on the primary carrier | Huawei, HiSilicon | Noted |
R1‑142560 | Removal of synchronization procedure when the secondary carrier is activated | Huawei, HiSilicon | Noted |
R1‑142561 | Support of multi-user scheduling based on grant detection solution | Huawei, HiSilicon | Noted |
R1‑142562 | Retransmission for improved granting for TDM operation | Huawei, HiSilicon | Noted |
R1‑142563 | Remaining details for HS-DPCCH overhead reduction | Huawei, HiSilicon | Noted |
R1‑142564 | TP on cross carrier scheduling for CZ-UMTS carrier aggregation | Huawei, HiSilicon | Noted - Revised |
R1‑142565 | Introduction of enhancement to uplink power control algorithm 2 to reduce power consumption of DL TPC commands | Huawei, HiSilicon | Noted |
R1‑142566 | 25.214 Draft CR (Rel-12, B) Introduction of enhancement to uplink power control algorithm 2 to reduce power consumption of DL TPC commands | Huawei, HiSilicon | Not treated |
R1‑142567 | UL FET design considerations | Qualcomm Incorporated | Not treated |
R1‑142568 | Ack channel design for UL FET | Qualcomm Incorporated | Not treated |
R1‑142569 | Discussion on physical layer aspects for support of dual connectivity | Intel Corporation | Not treated |
R1‑142570 | On RRC filter for S-UMTS | NSN | Noted |
R1‑142571 | Higher-layer signaling for NAICS | Ericsson | Not treated |
R1‑142572 | Remaining aspects of DCH enhancements | Qualcomm Incorporated | Noted |
R1‑142573 | Basic UE Capability Mode of Operation | Qualcomm Incorporated | Noted |
R1‑142574 | Resource allocation for Scheduling Assignment | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑142575 | Summary of Email discussion [76b-09] D2D signal gap | LG Electronics | Noted |
R1‑142576 | Discussion on design of D2D synchronization signal | LG Electronics | Not treated |
R1‑142577 | Power headroom reporting for dual connectivity | Ericsson | Not treated |
R1‑142578 | Discussion on the remaining details of MCS / TBS table for 256QAM | Intel Corporation | Noted |
R1‑142579 | Summary of Email Discussion [76b-12] on Multi Carrier Operation for D2D | Ericsson | Noted |
R1‑142580 | LS on discovery message format for ProSe/D2D | SA3, Qualcomm | Noted |
R1‑142581 | Reply LS on Provisioning of ProSe configuration information in a public safety ProSe enabled UE | SA3, Qualcomm | Noted |
R1‑142582 | LS on introducing the EVS codec in MTSI | SA4, Panasonic | Noted |
R1‑142583 | CQI table design for 256QAM | KT Corp. | Noted |
R1‑142584 | MCS/TBS table design for 256QAM | KT Corp. | Not treated |
R1‑142585 | 36.213 CR0460 (Rel-11, F) Clarification on SRS colliding with PUCCH in the same cell when the UE is configured with multiple TAGs | Qualcomm Inc., Fujitsu | Agreed |
R1‑142586 | 36.213 CR0461 (Rel-12, A) Clarification on SRS colliding with PUCCH in the same cell when the UE is configured with multiple TAGs | Qualcomm Inc., Fujitsu | Agreed |
R1‑142587 | The small cell on/off state indication by DCI format | ITL Inc. | Not treated |
R1‑142588 | Remaining aspects of higher-layer signaling for NAICS | NVIDIA | Not treated |
R1‑142589 | WF on power sharing for dual connectivity | InterDigital, Ericsson, Nokia, Nokia Siemens Networks, NTT DoCoMo, Panasonic, Sharp | Noted |
R1‑142590 | WF on channel priority for dual connectivity | Ericsson | Withdrawn |
R1‑142591 | void | - | Withdrawn |
R1‑142592 | Scheduling assignment content for D2D | Huawei, HiSilicon | Noted |
R1‑142593 | WF on discovery signal | NTT DOCOMO, Samsung, Sharp, LG Electronics, Panasonic, Fujitsu, ZTE, ETRI, Huawei, HiSilicon, Sony | Noted |
R1‑142594 | Summary on performance evaluation results | NTT DOCOMO, Huawei, HiSilicon | Noted |
R1‑142595 | WF on network assistance for discovery procedure | LG Electronics, Fujitsu, NTT DOCOMO, Sony, ZTE | Not treated |
R1‑142596 | Way Forward on Discovery based RRM | Broadcom, NVIDIA, CATT, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, NSN, Nokia, Qualcomm, Intel | Not treated |
R1‑142597 | WF on PD2DSCH | LG Electronics | Withdrawn |
R1‑142598 | WF on Mode 1 D2D Grant | Qualcomm Incorporated, Huawei, HiSilicon, LGE, General Dynamics, ZTE | Noted |
R1‑142599 | WF on Relaying Synchronization Signals for Discovery | Qualcomm Incorporated, LGE, General Dynamics, ZTE, DoCoMo | Noted |
R1‑142600 | 25.212 CR0329R1 (Rel-12, B) Introduction of DCH Enhancements | Qualcomm Incorporated | Noted |
R1‑142601 | On PD2DSS Design and Impact of Large Initial Carrier Frequency Offset | Intel Corporation | Not treated |
R1‑142602 | WF on UE feedback in mode 1 resource allocation | Panasonic, LG Electronics | Noted |
R1‑142603 | 25.214 CR0716R1 (Rel-11, F) Clarifications to Multiflow Operation | Qualcomm Incorporated | Noted - Revised |
R1‑142604 | 25.214 CR0717R1 (Rel-11, F) Compressed mode in Multiflow assisting (secondary) serving cell | NSN | Agreed |
R1‑142605 | TP to TR25.701 on PRACH handling | NSN | Noted - Revised |
R1‑142606 | TP on cross carrier scheduling for CZ-UMTS carrier aggregation | Huawei, HiSilicon | Agreed |
R1‑142607 | TP on conclusions of filtered Scalable UMTS | China Unicom, Huawei | Agreed |
R1‑142608 | TP to TR25.701 on PRACH handling | NSN | Noted - Revised |
R1‑142609 | Text proposal on the impact of supporting UMTS Features by Scalable UMTS | Ericsson | Noted - Revised |
R1‑142610 | TP to TR25.701 on PRACH handling | NSN | Agreed |
R1‑142611 | Text proposal on the impact of supporting UMTS Features by Scalable UMTS | Ericsson | Agreed |
R1‑142612 | 25.701 CR008 (Rel-12, B) Update of the TR based on agreements done on RAN1#77 meeting | NSN | Agreed |
R1‑142613 | LS on interference management techniques in Hetnet | RAN1, Huawei | Agreed |
R1‑142614 | RAN1 response to LS on RAN2 agreements and working assumptions on E-DCH decoupling | RAN1, NSN | Agreed |
R1‑142615 | Response LS on TTI switching indication | Qualcomm | Noted - Revised |
R1‑142616 | LS on HS-DPCCH overhead reduction | RAN1, Huawei | Agreed |
R1‑142617 | LS on Further EUL Enhancements | RAN1, Ericsson | Agreed |
R1‑142618 | LS on Progress in RAN1 #77 for the UMTS Heterogeneous Networks Enhancements WI | RAN1, Huawei | Agreed |
R1‑142619 | 25.211 Draft CR (Rel-12, B) Introduction of UMTS Heterogeneous Networks Enhancements | Huawei, HiSilicon | Noted - Revised |
R1‑142620 | 25.212 Draft CR (Rel-12, B) Introduction of UMTS Heterogeneous Networks enhancements in 25.212 | Huawei, HiSilicon | Noted - Revised |
R1‑142621 | 25.213 Draft CR (Rel-12, B) Introduction of UMTS Heterogeneous Networks Enhancements | Huawei, HiSilicon | Noted - Revised |
R1‑142622 | 25.214 Draft CR (Rel-12, B) Introduction of UMTS Heterogeneous Networks Enhancements | Huawei, HiSilicon | Noted - Revised |
R1‑142623 | WF on D2D Power Control | Qualcomm Incorporated, LGE, Samsung, ITRI, III | Noted |
R1‑142624 | WF on D2D Transmission Timing for Communication | Qualcomm Incorporated, ZTE, Kyocera, III | Noted |
R1‑142625 | Way forward on the usage of UL DAI or UL index in DCI format 0/4 | Huawei, HiSilicon, Panasonic, NEC | Noted |
R1‑142626 | D2D synchronization procedure for out-of-network coverage | Samsung | Noted |
R1‑142627 | Reply LS on ProSe Lawful Interception | SA5, Qualcomm | Not treated |
R1‑142628 | WF on D2D synchronization source for partial coverage | LG Electronics, Huawei, HiSilicon | Noted |
R1‑142629 | Evaluation of listening RS patterns | Huawei, HiSilicon | Withdrawn |
R1‑142630 | WF on Synchronization Signal | Qualcomm Incorporated, General Dynamics, LGE, III | Revised |
R1‑142631 | WF on I_MCS range for P-, SI- and RA- RNTIs | Intel Corporation, Nokia, NSN, CATT, Huawei, HiSilicon | Noted |
R1‑142632 | WF on multiplexing UL HARQ-ACK TX and D2D TX/RX | LG Electronics, Huawei, HiSilicon, Potevio, NEC | Noted |
R1‑142633 | Further discussion on procedures for small cell ON/OFF | Motorola Mobility | Not treated |
R1‑142634 | WF on Sensing for mode 2 communication | Huawei, HiSilicon, CATT, Panasonic, Potevio, ALU, ALU-Shanghai, Broadcom, Samsung, Fujitsu, LGE | Noted - Revised |
R1‑142635 | WF on Discovery Resource Size | Qualcomm Incorporated, Samsung, ZTE, General Dynamics | Noted |
R1‑142636 | WF on Discovery Period | Qualcomm Incorporated, ITRI, General Dynamics, Huawei, HiSilicon | Noted |
R1‑142637 | WF on 256QAM UE category handling | Ericsson, CATT, III, Huawei, HiSilicon, Microsoft, AT&T, CMCC, ZTE | Revised |
R1‑142638 | WF on 256QAM CQI table design | Huawei, HiSilicon, CATR, Panasonic, III, CATT, Broadcom, Nokia, NSN, Microsoft, CMCC, CTC, Intel, Ericsson | Noted |
R1‑142639 | WF on 256QAM MCS table design | Huawei, HiSilicon, CATR, Panasonic, Microsoft, III, CATT, ZTE, CMCC, CTC, KT, Nokia, NSN, ZTE | Noted |
R1‑142640 | WF on TBS design for 256QAM | CMCC, Huawei, Hisilicon, CHTTL, ZTE | Not treated |
R1‑142641 | WF on UE processing capability | CMCC, CATT | Not treated |
R1‑142642 | WF on D2D power control for communication Mode 1 | LG Electronics, Qualcomm, Panasonic, Kyocera | Noted |
R1‑142643 | WF on DMRS cyclic shift for Type 1 discovery | LG Electronics, Qualcomm, ZTE | Not treated |
R1‑142644 | WF on resource grouping for D2D type-1 discovery | Samsung, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, LGE | Noted |
R1‑142645 | WF on 256QAM CQI/MCS table configuration | ZTE, Qualcomm, Blackberry, LGE, Samsung, China Telcomm | Revised |
R1‑142646 | [Draft] LS on D2D Multicarrier Capabilities | Ericsson | Noted - Revised |
R1‑142647 | Way Forward on 256QAM for PMCH | Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, AT&T | Noted |
R1‑142648 | Way Forward of 256QAM configuration | Ericsson, Nokia, NSN, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Fujitsu, CATT | Noted |
R1‑142649 | WF on resource allocation for SA and D2D data | LG Electronics, Ericsson, ZTE, Kyocera | Noted |
R1‑142650 | WF on D2D Signal Design | Qualcomm Incorporated, Kyocera, ZTE, General Dynamics | Noted |
R1‑142651 | WF on Lawful Interception for D2D Discovery and Communication | Qualcomm Incorporated, ITRI, III, General Dynamics | Not treated |
R1‑142652 | LS on D2D Multicarrier Capabilities | RAN1, Ericsson | Agreed |
R1‑142653 | WF on SA content and design | Qualcomm Incorporated, General Dynamics, III | Noted |
R1‑142654 | Report of offline discussion on dynamic power sharing | InterDigital | Not treated |
R1‑142655 | WF on Synchronization Signal | Qualcomm Incorporated, General Dynamics, LG Electronics, Huawei, HiSilicon | Noted |
R1‑142656 | Offline Discussion on D2D CP Length | Qualcomm Incorporated (Rapporteur) | Not treated |
R1‑142657 | Offline discussion summary on RPT | Qualcomm Incorporated (Rapporteur) | Noted |
R1‑142658 | Offline Discussion on SA Transmission | Qualcomm Incorporated (Rapporteur) | Noted |
R1‑142659 | Summary of Offline Discussion Regarding the LS from RAN2 on the L1 ID in the SA | Ericsson | Noted |
R1‑142660 | WF on Type 2B hopping pattern | Huawei, HiSilicon, Intel, Qualcomm | Noted |
R1‑142661 | WF on Triggering Condition(s) of D2DSS Transmission | Samsung, Nokia, NSN, Intel | Noted |
R1‑142662 | WF on Selection and Reselection of Synchronization Source | Samsung, LGE | Noted |
R1‑142663 | WF on Mode 2 Resource Selection | Qualcomm Incorporated (Rapporteur) | Noted |
R1‑142664 | Proposal from offline discussion on D2D synchronization | LG Electronics | Noted |
R1‑142665 | Summary of design goals on Type 2B discovery | NSN | Noted |
R1‑142666 | void | - | Withdrawn |
R1‑142667 | void | - | Withdrawn |
R1‑142668 | void | - | Withdrawn |
R1‑142669 | void | - | Withdrawn |
R1‑142670 | void | - | Withdrawn |
R1‑142671 | void | - | Withdrawn |
R1‑142672 | void | - | Withdrawn |
R1‑142673 | void | - | Withdrawn |
R1‑142674 | void | - | Withdrawn |
R1‑142675 | WF on Power Control for Dual Connectivity | LG Electronics, NTT DOCOMO, Panasonic | Noted |
R1‑142676 | WF on PHR for Dual Connectivity | NTT DOCOMO, Panasonic | Noted |
R1‑142677 | WF on DL-SCH Soft Channel Bits in Dual-Connectivity | Ericsson, ALU | Agreed |
R1‑142678 | WF on Maximum number of TB bits in a TTI in Dual-Connectivity | Ericsson, Samsung | Noted |
R1‑142679 | WF on PUCH on Scell | Huawei, HiSilicon, NTT DOCOMO | Noted - Revised |
R1‑142680 | [Draft] Reply LS on DL-SCH Soft Channel Bits in Dual-Connectivity | Ericsson | Noted - Revised |
R1‑142681 | WF on higher layer signaling for NAICS | NTT DOCOMO, Huawei, HiSilicon, LGE, MediaTek, Nvidia, Qualcomm, Samsung, Verizon, CMCC, Broadcom | Noted |
R1‑142682 | WF on CSI enhancement for NAICS | NTT DOCOMO, ALU, ASB, Huawei, HiSilicon, LGE, MediaTek, Qualcomm, Samsung, Verizon, CMCC | Noted |
R1‑142683 | WF on NAICS Support for 4 Tx Antenna Ports | Ericsson, NSN, Nokia, Alcatel Lucent, Alcatel Lucent Shanghai Bell, CATT, Sprint | Noted |
R1‑142684 | LS on NAICS Parameters | RAN4, Qualcomm | Noted |
R1‑142685 | Analysis of Mutual Impact of WAN and D2D Communication | Intel Corporation | Noted |
R1‑142686 | Reply LS on DL-SCH Soft Channel Bits in Dual-Connectivity | RAN1, Ericsson | Agreed |
R1‑142687 | WF on configuration for discovery procedure | LG Electronics, Fujitsu, NTT DOCOMO, Sony, ZTE | Noted |
R1‑142688 | WF on discovery signal | NTT DOCOMO, Sharp, Panasonic, ZTE, NSN, Nokia, Huawei, HiSilicon, LG Electronics, Ericsson, Fujitsu, Sony | Noted |
R1‑142689 | DRS Evaluation Observation | Huawei, HiSilicon, NTT DOCOMO | Noted |
R1‑142690 | WF on small cell on/off transition time reduction for Scells | Ericsson, Panasonic, NTT DOCOMO, Fujitsu, LG Electronics | Noted - Revised |
R1‑142691 | WF on 256QAM CQI/MCS table configuration | ZTE, Qualcomm, Blackberry, LGE, Samsung, China Telecomm., Hitachi, CMCC | Noted |
R1‑142692 | WF on 256QAM UE category handling | Ericsson, CATT, III, Huawei, HiSilicon, Microsoft, AT&T, CMCC, ZTE, China Telecom, CATR, Blackberry | Noted |
R1‑142693 | LS on Introducing the ProSe Authorized IE | RAN3, Ericsson | Not treated |
R1‑142694 | [Draft] LS on small cell discovery signal | NTT DOCOMO | Noted - Revised |
R1‑142695 | Way Forward on New L1 Procedure for Small Cell ON/OFF | NSN, Nokia, Broadcom, Motorola Mobility, NVIDIA | Noted |
R1‑142696 | Conclusion from NAICS offline discussion | MediaTek Inc. | Noted |
R1‑142697 | LS on response SFN handling issue in dual connectivity | RAN4, Huawei | Not treated |
R1‑142698 | LS on small cell discovery signal | RAN1, NTT DOCOMO | Agreed |
R1‑142699 | Summary of offline discussion on low complexity MTC UE | Vodafone | Noted |
R1‑142700 | Summary of eIMTA offline discussion | CATT | Noted |
R1‑142701 | Draft LS to RAN2 on 36.306 for low cost MTC UE | Huawei, HiSilicon | Noted - Revised |
R1‑142702 | LS on NAICS High Layer Signaling | MediaTek Inc. | Agreed |
R1‑142703 | Draft LS on eNB knowledge of low complexity UEs | Ericsson | Revised |
R1‑142704 | Offline discussion on TBS table design for 256QAM | Huawei, HiSilicon | Noted |
R1‑142705 | Draft LS on eNB knowledge of low complexity UEs | Ericsson | Noted - Revised |
R1‑142706 | 25.214 CR0719r1 (Rel-11, F) Clarification of the power scaling for MIMO dual transport block transmission | Huawei, HiSilicon | Agreed |
R1‑142707 | Agreements based on email discussions after RAN1#76bis on DCH enhancements | Qualcomm | Agreed |
R1‑142708 | LS on RAN1 Decisions for Enhanced DCH Work Item | RAN1, Qualcomm | Agreed |
R1‑142709 | Response LS on TTI switching indication | RAN1, Qualcomm | Agreed |
R1‑142710 | Chairpersons’ summary of the UMTS sessions | UMTS Session Chairpersons (NSN, Huawei, Alcatel-Lucent) | Endorsed |
R1‑142711 | 25.214 CR0718R1 (Rel-11, F) Correction of DRX operation for Multiflow | Huawei, HiSilicon | Agreed |
R1‑142712 | 25.211 CR0317 (Rel-11, F) Correction of DRX operation for Multiflow | Huawei, HiSilicon | Agreed |
R1‑142713 | 25.214 CR0716R2 (Rel-11, F) Clarifications to Multiflow Operation | Qualcomm Incorporated | Agreed |
R1‑142714 | void | - | Withdrawn |
R1‑142715 | void | - | Withdrawn |
R1‑142716 | Proposals on Radio Interface based synchronization | Huawei, HiSilicon | Noted |
R1‑142717 | void | - | Withdrawn |
R1‑142718 | Offline discussion summary for discovery signal details | LG Electronics, NTT DOCOMO, Ericsson, Fujitsu, NEC, Sharp | Noted |
R1‑142719 | Summary of Ad-hoc session on Further Enhancements to LTE TDD for DL-UL Interference Management and Traffic Adaptation | Ad-Hoc Chairman (Qualcomm) | Not treated |
R1‑142720 | Summary of Ad-hoc session on Low Cost & Enhanced Coverage MTC UE for LTE | Ad-Hoc Chairman (Qualcomm) | Revised |
R1‑142721 | Summary of Ad-hoc session on Study on LTE Device to Device Proximity Services | Ad-Hoc Chairman (Alcatel Lucent) | Endorsed |
R1‑142722 | WF on small cell on/off transition time reduction for Scells | Ericsson | Noted |
R1‑142723 | Draft LS on eNB knowledge of low complexity UEs | Ericsson | Revised |
R1‑142724 | 36.211 CR0190R1 (Rel-12, F) Clarification of downlink subframes | Ericsson | Agreed |
R1‑142725 | [DRAFT] LS on discovery signal details | LGE | Noted - Revised |
R1‑142726 | 36.213 CR0462 (Rel-12, F) Clarification on SRS antenna switching | Qualcomm | Noted - Revised |
R1‑142727 | Summary of offline discussion on PHR for dual connectivity | NTT DOCOMO | Noted |
R1‑142728 | WF on PHR for Dual Connectivity | NTT DOCOMO, Panasonic | Noted |
R1‑142729 | WF on Sensing for mode 2 communication | Huawei, HiSilicon, Panasonic, Potevio, ALU, ALU-Shanghai, Broadcom, Samsung, Fujitsu, LGE, QC, CATR, Coolpad, [CATT] | Noted |
R1‑142730 | [DRAFT] LS on RAN1 agreements on Physical layer functionalities required for operation of Dual Connectivity in RAN1#77 | NTT DOCOMO | Noted - Revised |
R1‑142731 | Draft WF on DRS RSSI and RSRQ | Huawei, HiSilicon, NTT DOCOMO | Revised |
R1‑142732 | WF on PHR triggerer | Broadcom, InterDigital | Noted |
R1‑142733 | LS on discovery signal details | RAN1, LGE | Agreed |
R1‑142734 | Summary of Ad-hoc session on Low Cost & Enhanced Coverage MTC UE for LTE | Ad-Hoc Chairman (Qualcomm) | Not treated |
R1‑142735 | 256QAM TBS table design | Huawei, HiSilicon | Noted |
R1‑142736 | Reply LS on SFN handling in the dual connectivity | RAN3, NSN | Not treated |
R1‑142737 | WF on additional network assistance information | NTT DOCOMO, Fujitsu, Sony | Noted |
R1‑142738 | WF on TA in SA | LG Electronics, Ericsson, ALU, ASB, US DoC, Intel, Huawei, HiSilicon, Nokia, NSN, Fujitsu, Samsung, ZTE, General Dynamics, CATT, Broadcom, NEC, Panasonic | Noted |
R1‑142739 | 36.214 CR0021 (Rel-12, C) New E-UTRA RSRQ measurement definition | Nokia, NSN, CATT | Noted |
R1‑142740 | 25.215 CR0200 (Rel-12, C) New E-UTRA RSRQ measurement definition | Nokia, NSN, CATT | Noted |
R1‑142741 | 25.225 CR0103r1 (Rel-12, C) New E-UTRA RSRQ measurement definition | CATT, Nokia, NSN | Noted |
R1‑142742 | Summary of offline discussion on EPRE assumption for CSI derivation in TM10 without PMI/RI configured | Huawei, HiSilicon | Noted |
R1‑142743 | Way forward on PUCCH on Scell | Huawei, HiSilicon, NTT DOCOMO | Noted |
R1‑142744 | WF on DRS RSSI and RSRQ | Huawei, HiSilicon, NTT DOCOMO, Sharp, Broadcom, Samsung, Hitachi | Noted |
R1‑142745 | LS to RAN2 on 36.306 for low cost MTC UE | RAN1, HiSilicon | Agreed |
R1‑142746 | Offline discussion on SRS transmission for TDD/FDD CA | Samsung | Noted |
R1‑142747 | Offline discussion on CQI/PMI reporting period for TDD/FDD CA | Samsung | Noted |
R1‑142748 | LS on eNB knowledge of low complexity UEs | RAN1, Ericsson | Agreed |
R1‑142749 | [DRAFT] LS on simultaneous reception of low complexity UEs | Vodafone | Not treated |
R1‑142750 | LS on simultaneous reception of low complexity UEs | RAN1, Vodafone | Agreed |
R1‑142751 | WF on the remaining TBS table design for 256QAM | CMCC, Huawei, Hisilicon, CHTTL, ZTE, CATT, CATR, MediaTek | Not treated |
R1‑142752 | WF on details on discovery signal design | LG Electronics, NTT DOCOMO, Huawei, HiSilicon, Samsung | Noted |
R1‑142753 | WF on Type 2B Transmission Timing | Qualcomm Incorporated, DoCoMo, Intel, General Dynamics | Not treated |
R1‑142754 | Draft LS on radio interface based synchronization | Huawei, HiSilicon, CMCC, CATT, ZTE, IAESI | Noted - Revised |
R1‑142755 | LS on RAN1 agreements on Physical layer functionalities required for operation of Dual Connectivity in RAN1#77 | RAN1, NTT DOCOMO | Agreed |
R1‑142756 | WF on TDD-FDD CA support in dual connectivity | Huawei, HiSilicon, LG Electronics, NTT DOCOMO | Noted |
R1‑142757 | [DRAFT] LS on the support of TDD/FDD CA in Dual Connectivity | Huawei | Noted - Revised |
R1‑142758 | [DRAFT] LS on 256QAM | Huawei | Noted - Revised |
R1‑142759 | Update on RAN1 Excel sheet on LTE Rel-12 UE Capabilities | NTT DOCOMO | Noted - Revised |
R1‑142760 | Summary of low complexity LC_MTC_UE agreements after RAN1#77 | Vodafone | Not treated |
R1‑142761 | [DRAFT] LS on the support of PUCCH on two serving cells in CA | Huawei | Noted - Revised |
R1‑142762 | LS on radio interface based synchronization | RAN1, Huawei | Agreed |
R1‑142763 | 36.212 DraftCR (Rel-12, B) Introduction of Rel 12 features of TDD-FDD CA and eIMTA | Huawei | Noted - Revised |
R1‑142764 | Draft rel-11 CR for Clarification on determination on soft buffer size | Huawei | Noted - Revised |
R1‑142765 | 36.212 CR0159 (Rel-12, F) Clarification of downlink subframes | Huawei, HiSilicon | Agreed |
R1‑142766 | 36.212 CR0160 (Rel-11, D) Clarification on determination on soft buffer size | Huawei, HiSilicon | Agreed |
R1‑142767 | LS on 256QAM | RAN1, Huawei | Agreed |
R1‑142768 | LS on the support of TDD/FDD CA in Dual Connectivity | RAN1, Huawei | Agreed |
R1‑142769 | LS on the support of PUCCH on two serving cells in CA | RAN1, Huawei | Agreed |
R1‑142770 | 36.213 CR0462R1 (Rel-12, F) Clarification on SRS antenna switching | Qualcomm | Agreed |
R1‑142771 | 36.211 CR0191 (Rel-12, B) Inclusion of eIMTA, TDD-FDD CA, and coverage enhancements | Ericsson | Agreed |
R1‑142772 | 36.212 CR0158 (Rel-12, B) Introduction of Rel 12 features of TDD-FDD CA and eIMTA | Huawei | Agreed |
R1‑142773 | 36.213 CR0463 (Rel-12, B) Introduction of Rel-12 LTE-Advanced features in 36.213 | Motorola Mobility | Agreed |
R1‑142774 | Update on RAN1 Excel sheet on LTE Rel-12 UE Capabilities | NTT DOCOMO | Agreed |
R1‑142775 | LS on RAN1 agreements on DRS design | RAN1, LGE | Agreed |
R1‑142776 | Summary of email discussion [77-11]: Details of prority rule based on UCI type across CGs for dual connectivity power control | LG Electronics | Agreed |
R1‑142777 | LS on updated LTE Rel-12 UE feature list | RAN1, NTT DOCOMO | Agreed |
R1‑142778 | Summary of email discussion [77-13]: Details of PxeNB for power-control of dual connectivity | NTT DOCOMO | Agreed |
R1‑142779 | Summary of proposed schemes for small cells on/off transition time reduction | Ericsson | Noted |
R1‑142780 | Summary of email discussion [77-15]: PHR for dual connectivity | NTT DOCOMO | Agreed |
R1‑142781 | Summary of Email Discussion [77-17]: UE Capabilities for Dual Connectivity | Ericsson | Agreed |
R1‑142782 | [Draft] LS on Maximum Number of Transport Block Bits in Dual-Connectivity | Ericsson | Noted - Revised |
R1‑142783 | Summary of Email Discussion [77-12]: "look-ahead" aspect for Dual Connectivity power control | Panasonic | Agreed |
R1‑142784 | LS on Maximum Number of Transport Block Bits in Dual-Connectivity | RAN1, Ericsson | Agreed |
R1‑142785 | Summary of RAN1 agreements for 256QAM after RAN1 #77 | Huawei, HiSilicon | Noted |
R1‑142786 | Spreadsheet on RRC parameters for ProSe LTE D2D | Qualcomm | Agreed |
R1‑142787 | LS on RRC parameters for ProSe LTE D2D | RAN1, Qualcomm | Agreed |
R1‑142788 | LS on L1 parameters for SCE-PHY on efficient operation | RAN1, Huawei | Agreed |
page generated from database: 2024-04-22 07:58:53