The 5G Standard

3GPP TDocs (written contributions) at meeting

Meeting: R1-76b - 2014-03-31 to 2014-04-04, Shenzhen

meeting id: R1-76b (click id for more info on this meeting)

Click on the Tdoc to open its file.

TDoc Title Source Remarks
R1‑141100 Draft Agenda for RAN1#76bis meeting RAN1 Chairman Approved
R1‑141101 Final Report of RAN1#76 meeting MCC Revised
R1‑141102 Highlights from RAN#63 RAN1 Chairman Noted
R1‑141103 LS on improvements to EUL coverage by TTI switching RAN2, Ericsson Noted
R1‑141104 Reply LS on LTE coverage enhancement RAN2, ZTE Noted
R1‑141105 Reply LS to S2-133846 = R2-133066 on GCSE with eMBMS RAN2, Huawei Noted
R1‑141106 LS on RACH Aspects with eIMTA RAN2, CATT Noted
R1‑141107 Liaison to 3GPP RAN, RAN1 and RAN3 on consolidated operator view on eCoMP standardization NGMN Project RAN Evolution, CMCC Noted
R1‑141108 LS on deployment scenario for Intra-band Non-contiguous CA RAN4, NTT DoCoMo Noted
R1‑141109 Reply LS on half duplex FDD operation for Low complexity MTC UE RAN4, Huawei Noted
R1‑141110 LS on BS classes and maximum BS power on 256QAM RAN4, Huawei Noted
R1‑141111 Reply LS to R4-141254 = RP-140024 on BS classes and maximum BS power on 256QAM RAN, Huawei Noted
R1‑141112 LS on GCSE QCIs and connected mode DRX SA2, Vodafone Noted
R1‑141113 LS on Provisioning of ProSe configuration information in a public safety ProSe enabled UE SA2, Deutsche Telekom Noted
R1‑141114 [DRAFT] LS on discovery message Huawei, HiSilicon Noted
R1‑141115 Discussion on discovery message size Huawei, HiSilicon Noted
R1‑141116 Remaining open issues for eIMTA Huawei, HiSilicon Not treated
R1‑141117 Frequency location scheduling for low cost MTC UEs Huawei, HiSilicon Not treated
R1‑141118 HD-FDD operation of low cost UEs based on the LS reply from RAN4 Huawei, HiSilicon Noted
R1‑141119 Discussion on the resource allocation  for low cost MTC UEs Huawei, HiSilicon Not treated
R1‑141120 Further discussions on CQI/MCS table design for 256QAM Huawei, HiSilicon Noted
R1‑141121 TBS table design for 256QAM Huawei, HiSilicon Noted
R1‑141122 Discussion on UE category with introduction of 256QAM Huawei, HiSilicon Not treated
R1‑141123 UE monitoring behavior with DRS configurations Huawei, HiSilicon Not treated
R1‑141124 Reference signals for enhanced cell discovery Huawei, HiSilicon Noted
R1‑141125 Enhanced reference signals for small cell discovery and performance evaluation Huawei, HiSilicon Not treated
R1‑141126 Support for DRS-based RRM measurements Huawei, HiSilicon Not treated
R1‑141127 Network assistance for small cell discovery Huawei, HiSilicon Not treated
R1‑141128 Standards impacts by supporting muting and not turning off listening RS Huawei, HiSilicon Not treated
R1‑141129 Network listening RS design options Huawei, HiSilicon Not treated
R1‑141130 Discussion on network listening with eIMTA Huawei, HiSilicon Not treated
R1‑141131 Power headroom report for dual connectivity Huawei, HiSilicon Not treated
R1‑141132 Physical layer impact of Dual Connectivity - Downlink Huawei, HiSilicon Not treated
R1‑141133 Uplink channel transmission of Dual connectivity Huawei, HiSilicon Not treated
R1‑141134 Uplink Power allocation in Dual connectivity Huawei, HiSilicon Not treated
R1‑141135 Issues in Inter-eNB CoMP with non-ideal backhaul Huawei, HiSilicon Noted
R1‑141136 On the gap definition Huawei, HiSilicon Noted
R1‑141137 Scrambling for D2D Broadcast Communication Huawei, HiSilicon Noted
R1‑141138 Resource allocation for type-1 and type-2B discovery Huawei, HiSilicon Not treated
R1‑141139 Resource allocation for mode-1 communication Huawei, HiSilicon Not treated
R1‑141140 On the need to support type-2A discovery Huawei, HiSilicon Noted
R1‑141141 Definition of coverage zones for D2D communication Huawei, HiSilicon Noted
R1‑141142 D2D Synchronization procedure in partial network coverage Huawei, HiSilicon Not treated
R1‑141143 Discussion on CSI enhancement for NAICS Huawei, HiSilicon Noted
R1‑141144 Discussion on UCI multiplexing on PUSCH in measurement gap Intel Corporation Noted
R1‑141145 (36.212,F,Rel-10) Correction on UCI multiplexing on PUSCH Intel Corporation Noted - Revised
R1‑141146 Remaining issues of HARQ feedback for eIMTA Intel Corporation Not treated
R1‑141147 Details on PDSCH scheduling for low cost MTC UE Intel Corporation Not treated
R1‑141148 On reduced downlink bandwidth of 1.4MHz for low cost MTC UE Intel Corporation Not treated
R1‑141149 Remaining aspects for low cost MTC UE Intel Corporation Noted
R1‑141150 Remaining aspects for TDD-FDD CA supporting Intel Corporation Not treated
R1‑141151 CQI Table for 256QAM Support Intel Corporation Noted
R1‑141152 MCS and TBS Tables for 256QAM Support Intel Corporation Not treated
R1‑141153 Discussion on configuration aspects for 256QAM Intel Corporation Not treated
R1‑141154 Discussion on small cell on/off transition time reduction Intel Corporation Not treated
R1‑141155 Simulation results for small cell discovery signal candidates Intel Corporation Not treated
R1‑141156 Discussion on small cell discovery signal Intel Corporation Not treated
R1‑141157 Physical layer impact due to dual connectivity Intel Corporation Not treated
R1‑141158 Discussion on X2 signalling for downlink CoMP Intel Corporation Not treated
R1‑141159 On D2D Discovery Preamble and Reference Signals Intel Corporation Noted
R1‑141160 Remaining details of D2D physical structure design Intel Corporation Not treated
R1‑141161 On D2D Discovery Resource Size Intel Corporation Not treated
R1‑141162 On Type 1 D2D Discovery Resource Allocation Intel Corporation Not treated
R1‑141163 Discussion on Multiplexing of Cellular and D2D Transmissions from System Perspective Intel Corporation Not treated
R1‑141164 Discussion on D2D Operation within Network Coverage (Mode-1) Intel Corporation Not treated
R1‑141165 On Type 2 D2D Discovery Resource Allocation Intel Corporation Revised
R1‑141166 Discussion on D2DSS Physical Structure Intel Corporation Not treated
R1‑141167 Analysis of the Amount of Timings for D2D Communication Intel Corporation Not treated
R1‑141168 Discussion on D2D Synchronization Procedure Intel Corporation Not treated
R1‑141169 Discussion on higher layer signaling for NAICS Intel Corporation Noted
R1‑141170 Discussion on CQI enhancement for NAICS Intel Corporation Not treated
R1‑141171 Summary of email discussion on Low Cost UE scheduling Options Sierra Wireless Not treated
R1‑141172 Low Complexity UEs PRB Limit Evaluation Sierra Wireless Not treated
R1‑141173 Reduce PDCCH Blind Decoding Options Sierra Wireless Not treated
R1‑141174 Remaining details on aperiodic CSI feedback for transmission mode 1~9 CATT Noted
R1‑141175 Remaining details on aperiodic CSI feedback for transmission mode 10 CATT Not treated
R1‑141176 Remaining details on periodic CSI feedback CATT Not treated
R1‑141177 Remaining details on HARQ-ACK on PUSCH CATT Not treated
R1‑141178 PUCCH Format 3 for eIMTA CATT Not treated
R1‑141179 PUCCH Format 1 with channel selection for eIMTA CATT Not treated
R1‑141180 Other remaining issues for TDD eIMTA CATT Not treated
R1‑141181 Number of HARQ processes for low complexity HD-FDD UEs CATT Noted
R1‑141182 DL bandwidth reduction of low complexity UEs CATT Not treated
R1‑141183 PDSCH HARQ timing of FDD SCell with TDD as PCell CATT Not treated
R1‑141184 Support of 256QAM for small cells CATT Noted
R1‑141185 Procedures for small cell on/off transition time reduction CATT Not treated
R1‑141186 Design of discovery signal for small cells CATT Not treated
R1‑141187 Radio-interface based synchronization for small cells CATT Not treated
R1‑141188 UCI transmission for dual connectivity CATT Noted
R1‑141189 Uplink power control for dual connectivity CATT Not treated
R1‑141190 Details of discovery signal design CATT Not treated
R1‑141191 Channel scrambling and DMRS design for D2D communication CATT Noted
R1‑141192 Physical channel design for D2D communication CATT Noted
R1‑141193 Control for D2D communication CATT Noted
R1‑141194 Resource allocation mechanism in mode 2 CATT Noted
R1‑141195 Resource allocation for type 1 D2D discovery CATT Not treated
R1‑141196 Resource allocation for D2DSS and PD2DSCH CATT Not treated
R1‑141197 Design of D2DSS and PD2DSCH CATT Not treated
R1‑141198 Discussion on D2D synchronization procedure CATT Not treated
R1‑141199 Considerations on higher-layer signalling for NAICS receiver CATT Not treated
R1‑141200 Remaining details on reconfiguration signalling NEC Not treated
R1‑141201 PDSCH scheduling options for low cost MTC UEs not in enhanced coverage mode NEC Not treated
R1‑141202 Views on network assistance for cell discovery NEC Not treated
R1‑141203 Small cell discovery signal design NEC Not treated
R1‑141204 UL power control and splitting in dual connectivity NEC Not treated
R1‑141205 On UE capabilities defined as UE category for dual connectivity NEC Not treated
R1‑141206 Signaling Considerations for Inter-eNB CoMP NEC Not treated
R1‑141207 Timing analysis for D2D transmission gap requirement NEC Noted
R1‑141208 On resource selection for Type 1 discovery message transmission NEC Not treated
R1‑141209 Further considerations on multiplexing D2D and cellular signals NEC Not treated
R1‑141210 UL Index and DAI bits in DCI format 0/4 Panasonic Not treated
R1‑141211 Discussion on MTC scheduling options Panasonic Not treated
R1‑141212 MCS Indication for 256QAM Panasonic Not treated
R1‑141213 CQI Table Design for 256QAM Panasonic Not treated
R1‑141214 The procedure for small cell on/off time transition (handover and DRX) Panasonic Noted
R1‑141215 Discussion on RSSI on RSRQ-like measurements Panasonic Not treated
R1‑141216 Power control on dual connectivity Panasonic Noted
R1‑141217 Control signalling/channel design in D2D communication Panasonic Not treated
R1‑141218 Resource allocation procedure for Mode 2 UE in D2D communication Panasonic Noted
R1‑141219 Resource allocation procedure for Mode1 UE in D2D communication Panasonic Noted
R1‑141220 Rough synchronization procedure in D2D Panasonic Not treated
R1‑141221 Feasibility analysis of blind parameter detection on CRS-based transmission scheme Panasonic Not treated
R1‑141222 UE states and Resource allocation for D2D Communication Panasonic Noted
R1‑141223 Discussion on 256QAM configuration Fujitsu Not treated
R1‑141224 Options for small cell discovery and RRM measurements Fujitsu Not treated
R1‑141225 Discussion on RSRQ measurement for small cell on/off Fujitsu Not treated
R1‑141226 Physical layer issues of dual connectivity Fujitsu Not treated
R1‑141227 Power allocation strategy for power limited UE in dual-connectivity Fujitsu Not treated
R1‑141228 On D2D discovery signal design details Fujitsu Not treated
R1‑141229 Futher analysis on control signal and SA for D2D communication Fujitsu Not treated
R1‑141230 RRM for D2D communication Fujitsu Not treated
R1‑141231 Discussions on D2D resource allocation Fujitsu Noted
R1‑141232 On PD2DSS signal generation Fujitsu Withdrawn
R1‑141233 Conflict between DL WAN reception and D2D reception Fujitsu Withdrawn
R1‑141234 Signaling of PDSCH and PUSCH usage for “CoMP Hypothesis” and “Enhanced RNTP” IAESI, DAC-UPC Noted
R1‑141235 Self-organizing D2D communication using knowledge enforcement IAESI Not treated
R1‑141236 Discussion on the open issues of small cell discovery Coolpad Revised
R1‑141237 Considerations D2D communication scheduling resource Coolpad Not treated
R1‑141238 Considerations D2D Synchronization Coolpad Revised
R1‑141239 Specification impact of schemes to improve reliability of HS-DPCCH Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Noted
R1‑141240 S-UMTS bandwidth detection Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Noted
R1‑141241 Remaining details on CSI feedback for eIMTA Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑141242 Remaining HARQ details for eIMTA Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑141243 Considerations for low cost MTC UE Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑141244 Consideration of 256QAM Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑141245 System Design for transition time reduction for small cell ON/OFF Aclatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑141246 Discovery signals design Aclatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑141247 System analysis of Radio Interface Based Synchronization (RIBS) Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑141248 UL power control and power scaling for dual connectivity Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Revised
R1‑141249 Common search space on SeNB for dual connectivity Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑141250 UE capability sharing between MeNB and SeNB for dual connectivity Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑141251 Signalling details and procedures supporting eCoMP Aclatel-Lucent Shanghai Bell, Alcatel-Lucent Revised
R1‑141252 D2D Channel Design for broadcast communication Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑141253 D2D discovery channel design Aclatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑141254 Preamble design for D2D Discovery Aclatel-Lucent Shanghai Bell, Alcatel-Lucent Noted
R1‑141255 D2D control signaling Aclatel-Lucent Shanghai Bell, Alcatel-Lucent Noted
R1‑141256 Distributed resource allocation for D2D communication Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Noted
R1‑141257 D2D discovery channel resource allocation Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑141258 Discussion on in-coverage, out-of-coverage, and edge-of-cell coverage Aclatel-Lucent, Alcatel-Lucent Shanghai Bell Noted
R1‑141259 Resource allocation for synchronization signals and channels Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑141260 Considerations for design of D2D Synchronization and UE Identification Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑141261 D2D synchronization procedure Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑141262 Considerations on higher-layer signaling for NAICS Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑141263 CQI reporting for NAICS operation Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑141264 D2D Transport Block Retransmission ETRI Not treated
R1‑141265 Remaining issues for TDD-FDD CA ETRI Not treated
R1‑141266 Discovery signal(s) and measurements ETRI Not treated
R1‑141267 Discussion on TDD Pcell DL HARQ timing with self-carrier scheduling on FDD Scell China Telecom Not treated
R1‑141268 Enhanced procedure for activated SCell operating on/off China Telecom Noted
R1‑141269 UL Power transmission for dual connectivity China Telecom Not treated
R1‑141270 Discussion on Resource Allocation for D2D China Telecom Withdrawn
R1‑141271 Remaining Issues for P-CSI Reporting Samsung Not treated
R1‑141272 Discussion on CSI feedback for eIMTA Samsung Not treated
R1‑141273 UCI Transmission in PUSCH Samsung Not treated
R1‑141274 Remaining issues on HARQ timings Samsung Not treated
R1‑141275 HARQ-ACK feedback procedures for eIMTA Samsung Not treated
R1‑141276 Signaling for Adaptation of TDD UL-DL Configurations in CA Samsung Not treated
R1‑141277 Remaining Issues with RRC Impact for eIMTA Samsung Not treated
R1‑141278 Remaining issues of low cost MTC Samsung Not treated
R1‑141279 CSI feedback for TDD-FDD CA Samsung Not treated
R1‑141280 SRS transmission for TDD-FDD CA Samsung Not treated
R1‑141281 DL HARQ timing for FDD Scell in TDD-FDD CA Samsung Not treated
R1‑141282 DCI format designs for TDD-FDD CA Samsung Not treated
R1‑141283 Half-duplex UE operation for TDD-FDD CA Samsung Not treated
R1‑141284 MCS/CQI/TBS table design for 256QAM Samsung Noted
R1‑141285 UE category/capability for 256QAM Samsung Not treated
R1‑141286 Discussion on 256QAM related signalling/procedure Samsung Not treated
R1‑141287 Discussions on small cell on/off scenarios and procedures Samsung Not treated
R1‑141288 UE RRM and synchronization procedures with small cell on/off operation Samsung Noted
R1‑141289 Discussions on small cell discovery procedure Samsung Not treated
R1‑141290 Discussions on discovery reference signal based measurements Samsung Noted
R1‑141291 Discussions on discovery reference signal design Samsung Not treated
R1‑141292 Parallel random access preamble transmissions in dual connectivity Samsung Not treated
R1‑141293 UL Power Control in Dual Connectivity Samsung Noted
R1‑141294 UCI Transmission in Dual Connectivity Samsung Not treated
R1‑141295 Utilization of UE Capabilities in Dual Connectivity Samsung Noted
R1‑141296 Signalling for inter-eNB CS/CB operation Samsung Noted
R1‑141297 Further evaluation results for inter-eNB CoMP Samsung Revised
R1‑141298 D2D broadcast communication physical channel design details Samsung Noted
R1‑141299 Physical channel design for scheduling assignment Samsung Revised
R1‑141300 Discussion on CP length for D2D PUSCH Samsung Noted
R1‑141301 Discussion on guard perion in D2D PUSCH Samsung Noted
R1‑141302 Control information for D2D broadcast communication Samsung Noted
R1‑141303 Resource pool configuration for type-1 discovery Samsung Not treated
R1‑141304 Resource allocation for type-1 discovery and WAN impact Samsung Not treated
R1‑141305 Collision avoidance mechanism for D2D broadcast communication Samsung Revised
R1‑141306 Mode 2 resource allocation for D2D broadcast communication Samsung Noted
R1‑141307 Mode 1 resource allocation for D2D broadcast communication Samsung Noted
R1‑141308 Resource allocation for type 2B discovery Samsung Not treated
R1‑141309 Definitions of in-coverage, out-of-coverage, edge-of-cell coverage Samsung Not treated
R1‑141310 Resource allocation for synchronization signals enabling inter-cluster synchronization Samsung Revised
R1‑141311 Synchronization signal design for inter-cluster synchronization Samsung Revised
R1‑141312 Signal and channel design for synchronization source selection Samsung Not treated
R1‑141313 Inter-cluster synchronization procedure Samsung Not treated
R1‑141314 D2D Synchronization signal relay by UE Samsung Not treated
R1‑141315 Discussion on transmission parameters for NAICS Samsung Not treated
R1‑141316 Discussion on CSI enhancement for NAICS Samsung Noted
R1‑141317 Aperiodic CSI reporting in TM1-9 for eIMTA Sharp Not treated
R1‑141318 Remaining issues on periodic CSI reporting during fallback for eIMTA Sharp Not treated
R1‑141319 PUCCH resource allocation for dynamic HARQ-ACK in eIMTA Sharp Not treated
R1‑141320 HARQ-ACK reporting on PUCCH for eIMTA Sharp Not treated
R1‑141321 UL and DL reference UL-DL configurations in TDD CA with eIMTA Sharp Not treated
R1‑141322 Details on monitoring subframes for recnfiguration DCI in TDD CA and eIMTA Sharp Not treated
R1‑141323 PDSCH scheduling for low-cost MTC UEs Sharp Not treated
R1‑141324 DL HARQ-ACK for TDD-FDD CA with TDD Pcell Sharp Not treated
R1‑141325 Remaining details of Periodic CSI reporting for Rel-12 TDD-FDD Carrier Aggregation Sharp Not treated
R1‑141326 Discovery signal design for small cell Sharp Not treated
R1‑141327 Aspects of eNB Scheduling Assignment in D2D for Mode 1 Transmission Sharp Not treated
R1‑141328 D2D Coverage Definition Sharp Not treated
R1‑141329 Remaining Details on CSI Measurement and Report for TDD eIMTA LG Electronics Not treated
R1‑141330 Remaining Details on HARQ Feedback for TDD eIMTA LG Electronics Not treated
R1‑141331 Other Remaining Issues for TDD eIMTA LG Electronics Not treated
R1‑141332 Scheduling method for supporting low-cost MTC LG Electronics Not treated
R1‑141333 (E)PDCCH related issues for low-cost MTC LG Electronics Not treated
R1‑141334 HD-FDD support for low-cost MTC LG Electronics Noted
R1‑141335 Options of DL HARQ timing for TDD PCell self scheduling case LG Electronics Not treated
R1‑141336 Remaining RAN1 specification details for TDD-FDD CA LG Electronics Not treated
R1‑141337 CQI/MCS/TBS table design for 256QAM support LG Electronics Noted
R1‑141338 Further details on 256QAM operation LG Electronics Not treated
R1‑141339 Detailed design of small cell on/off operation LG Electronics Not treated
R1‑141340 Discovery signal design choices and considerations LG Electronics Not treated
R1‑141341 Performance analysis on discovery signal candidates LG Electronics Not treated
R1‑141342 Design of radio-based network synchronization for intra-operator scenarios LG Electronics Not treated
R1‑141343 Design of radio-based network synchronization for inter-operator scenarios LG Electronics Not treated
R1‑141344 Power control for dual connectivity LG Electronics Not treated
R1‑141345 Remaining RAN1 issues of dual connectivity LG Electronics Not treated
R1‑141346 Inter-eNB CoMP signaling with non-ideal backhaul LG Electronics Revised
R1‑141347 Discussion on D2D communication physical layer design LG Electronics Not treated
R1‑141348 Discussion on D2D discovery physical layer design LG Electronics Revised
R1‑141349 Control design for D2D broadcast communication LG Electronics Not treated
R1‑141350 Operation in Mode 2 resource allocation for D2D communication LG Electronics Not treated
R1‑141351 Operation in Type 1 resource allocation for D2D discovery LG Electronics Not treated
R1‑141352 Operation in Mode 1 resource allocation for D2D communication LG Electronics Noted
R1‑141353 Operation in Type 2 resource allocation for D2D discovery LG Electronics Not treated
R1‑141354 Issues on multiplexing between WAN and D2D LG Electronics Not treated
R1‑141355 Definition of coverage in D2D operation perspective LG Electronics Not treated
R1‑141356 Discussion on resource allocation for D2D synchronization LG Electronics Not treated
R1‑141357 Discussion on design of D2DSS and PD2DSCH LG Electronics Not treated
R1‑141358 Discussion on D2D synchronization procedure LG Electronics Not treated
R1‑141359 Discussion on D2D signal transmission and reception timing LG Electronics Not treated
R1‑141360 Considerations on supporting inter-cell D2D operations LG Electronics Not treated
R1‑141361 Discussion on higher-layer signalling for NAICS LG Electronics Not treated
R1‑141362 Discussion on CSI enhancement for NAICS LG Electronics Noted
R1‑141363 PDCCH common search space in SCG CATT Not treated
R1‑141364 UE category related L1 processing capability for dual connectivity CATT Not treated
R1‑141365 UE monitoring behaviour with cell on/off operations FiberHome Not treated
R1‑141366 Discussion on CQI/MCS table design for 256QAM FiberHome Not treated
R1‑141367 Small cell on-off switching and muting in radio interface based synchronization FiberHome Not treated
R1‑141368 DL HARQ timing for TDD-FDD CA with self-carrier scheduling when TDD is PCell FiberHome Not treated
R1‑141369 Discussion on RRC impact of TDD eIMTA New Postcom Not treated
R1‑141370 Discussion on small cell on off transition time reduction New Postcom Not treated
R1‑141371 PDSCH scheduling for low cost MTC UE New Postcom Not treated
R1‑141372 Discussion on physical layer functionalities for Dual Connectivity New Postcom Not treated
R1‑141373 Consideration on TDD-FDD joint operation New Postcom Not treated
R1‑141374 Signalling information for inter-eNB CoMP with NIB New Postcom Not treated
R1‑141375 Remaining Details of UL/DL Reconfiguration for eIMTA HTC Not treated
R1‑141376 Higher Order Modulation for Small Cell Enhancement HTC Not treated
R1‑141377 Discussion on small cell on/off HTC Withdrawn
R1‑141378 Physical Layer Aspects of Dual Connectivity HTC Not treated
R1‑141379 D2D Synchronization procedure between in and out of coverage UEs HTC Not treated
R1‑141380 Synchronization Signals and Channel Design for D2D Discovery and Communication Ericsson Not treated
R1‑141381 Synchronization Procedures for D2D Discovery and Communication Ericsson Not treated
R1‑141382 On Scrambling of D2D Physical Channels Ericsson Noted
R1‑141383 Discussion on the Association Threshold for D2D Communication Ericsson, Qualcomm, US Department of Commerce Not treated
R1‑141384 D2D Physical Channels Design Ericsson Noted
R1‑141385 Simulation Results for Multihop Synchronization Ericsson Not treated
R1‑141386 Inter-Carrier and Inter-Cell Aspects of D2D Discovery and Communication Ericsson Not treated
R1‑141387 Frame Structure for D2D-Enabled LTE Carriers Ericsson Noted
R1‑141388 Discovery Resource Allocation Ericsson Noted
R1‑141389 On Metric and Procedures for In/Out of NW coverage detection for D2D Ericsson Not treated
R1‑141390 On resource allocation for D2D communication Ericsson Not treated
R1‑141391 On Scheduling Assignments and Receiver Behaviour Ericsson Noted
R1‑141392 Timing Aspects in D2D Discovery and Communication Ericsson Not treated
R1‑141393 Discussion on Mechanism to Support 256QAM in TM 10 Hitachi Ltd. Not treated
R1‑141394 Explicit signaling of cell states to UEs Hitachi Ltd. Not treated
R1‑141395 Discussion on discovery signal candidates Hitachi Ltd. Not treated
R1‑141396 Discovery Signal for Small Cells Hitachi Ltd. Not treated
R1‑141397 Further discussion on CoMP signaling with Non-ideal Backhaul Hitachi Ltd. Not treated
R1‑141398 Discussion on D2D transmission timing in network coverage KDDI Not treated
R1‑141399 On standard impacts of 256QAM in downlink ZTE Revised
R1‑141400 Remaining Issues for TDD-FDD CA ZTE Not treated
R1‑141401 Physical layer aspects of dual connectivity ZTE Not treated
R1‑141402 UCI feedback mechanism for dual connectivity ZTE Not treated
R1‑141403 Parallel random access preamble transmissions in dual connectivity ZTE Not treated
R1‑141404 Enhanced small cell onoff mechanisms ZTE Not treated
R1‑141405 Discussion on open issues of small cell on/off and discovery ZTE Not treated
R1‑141406 Solutions and standard impacts for RIBS ZTE Noted
R1‑141407 Issues regarding radio-interface based synchronization ZTE Not treated
R1‑141408 Remaining issue on inter-eNB CoMP Signalling ZTE Not treated
R1‑141409 Discussion on Higher-layer signalling for NAICS ZTE Not treated
R1‑141410 Discussion on CSI enhancement for NAICS ZTE Noted
R1‑141411 Analysis on low cost MTC UEs ZTE Not treated
R1‑141412 PDSCH PRB locations for common and unicast channels for low cost MTC UEs ZTE Not treated
R1‑141413 On DS design - Including SSS as part of the DS signal ZTE Not treated
R1‑141414 On DS design - Frequency division multiplexing ZTE Not treated
R1‑141415 Autonomous time difference detection for extended small cell On/OFF use cases ZTE Not treated
R1‑141416 Discovery burst indicator for autonomous time difference detection ZTE Not treated
R1‑141417 On network assisted DS transmissions under uncertain relative time differences ZTE Not treated
R1‑141418 Inconsistency between reconfiguration signaling and UL grant/PHICH ZTE Not treated
R1‑141419 Remaining issues in UL power control ZTE Not treated
R1‑141420 Remaining details of CSI feedback for TDD eIMTA ZTE Not treated
R1‑141421 Impact of RACH procedure to TDD eIMTA reconfiguration ZTE Noted
R1‑141422 Design details of discovery signal and channel ZTE Not treated
R1‑141423 D2D physical channel design for broadcast communication based on PUSCH structure ZTE Noted
R1‑141424 Control signaling for D2D broadcast communication ZTE Not treated
R1‑141425 Distributed resource allocation for D2D communication ZTE Not treated
R1‑141426 Resource Allocation for D2D Discovery ZTE Not treated
R1‑141427 Scheduling-based D2D communication resource allocation ZTE Noted
R1‑141428 Discussion on definitions of coverage scenarios ZTE Not treated
R1‑141429 Resource allocation for D2D synchronization ZTE Withdrawn
R1‑141430 D2D Synchronization Signal and Channel Design ZTE Not treated
R1‑141431 Multi-hop Synchronization Procedure ZTE Revised
R1‑141432 Synchronization for D2D discovery ZTE Not treated
R1‑141433 Draft Rel-12 CR on Clarification on UE port based CRC masking Qualcomm Inc. Noted - Revised
R1‑141434 CSI measurement and reporting in eIMTA Qualcomm Inc. Not treated
R1‑141435 HARQ-ACK feedback for eIMTA Qualcomm Inc. Not treated
R1‑141436 Remaining issues for eIMTA Qualcomm Inc. Not treated
R1‑141437 SPS operation in TDD eIMTA Qualcomm Inc. Not treated
R1‑141438 Remaining details of UE category type Qualcomm Inc. Not treated
R1‑141439 Solution for TDD-FDD CA Qualcomm Inc. Not treated
R1‑141440 Higher order modulation Qualcomm Inc. Not treated
R1‑141441 Small cell on/off time reduction Qualcomm Inc. Not treated
R1‑141442 Small cell discovery Qualcomm Inc. Not treated
R1‑141443 Network synchronization by network listening Qualcomm Inc. Noted
R1‑141444 Physical layer aspects of dual-connectivity Qualcomm Inc. Not treated
R1‑141445 Parameters for backhaul signaling Qualcomm Inc. Noted
R1‑141446 Signal Design for D2D Discovery and Broadcast Qualcomm Inc. Revised
R1‑141447 Link level simulation results for D2D broadcast communication Qualcomm Inc. Noted
R1‑141448 Control for D2D broadcast communication Qualcomm Inc. Noted
R1‑141449 Resource allocation for D2D discovery Qualcomm Inc. Revised
R1‑141450 Distributed resource allocation for D2D broadcast communication Qualcomm Inc. Noted
R1‑141451 eNB resource allocation for D2D broadcast communication Qualcomm Inc. Noted
R1‑141452 Definitions of coverage states and mode switching for D2D Qualcomm Inc. Noted
R1‑141453 Signal Design for D2D Synchronization Qualcomm Inc. Not treated
R1‑141454 Resource allocation for D2D Synchronization Qualcomm Inc. Not treated
R1‑141455 Procedures for D2D synchronization Qualcomm Inc. Noted
R1‑141456 Coexistence of D2D discovery and WAN Qualcomm Inc. Noted
R1‑141457 Network assistance signaling Qualcomm Inc. Not treated
R1‑141458 CSI measurement and reporting for NAICS Qualcomm Inc. Noted
R1‑141459 Design details of scheduling assignments Kyocera Not treated
R1‑141460 Resource allocation for Type 1 discovery Kyocera Not treated
R1‑141461 Update Views on FFS on new UE category/type Panasonic Noted
R1‑141462 Remaining details of bandwidth reduction for low cost MTC NTT DOCOMO Not treated
R1‑141463 Further design of CQI/MCS table for 256 QAM NTT DOCOMO Not treated
R1‑141464 Views on transition time reduction for small cell on/off NTT DOCOMO Not treated
R1‑141465 Views on network assistance for Rel-12 discovery procedure NTT DOCOMO Not treated
R1‑141466 Views on discovery signal design for Rel-12 discovery procedure NTT DOCOMO Not treated
R1‑141467 Views on discovery signal-based RSRQ measurement NTT DOCOMO Not treated
R1‑141468 Open issues on dual connectivity NTT DOCOMO Not treated
R1‑141469 Transmit power control for dual connectivity NTT DOCOMO Not treated
R1‑141470 Views on remaining open issues on dual connectivity NTT DOCOMO Not treated
R1‑141471 Details on Backhaul Signaling for Inter-eNB CoMP NTT DOCOMO Noted
R1‑141472 Discussion on resource selection for type 1 discovery NTT DOCOMO Not treated
R1‑141473 Discussion on resource allocation for Type 2B discovery NTT DOCOMO Noted
R1‑141474 Views on Higher Layer Signaling for NAICS NTT DOCOMO Noted
R1‑141475 Evaluation results of CSI enhancements for NAICS NTT DOCOMO Not treated
R1‑141476 DL HARQ Timing for self-carrier scheduling when PCell is TDD and SCell is FDD ITRI Not treated
R1‑141477 Further discussion on radio-interface based synchronization ITRI Not treated
R1‑141478 Discussion on the multiplexing of D2D and Cellular signals ITRI Not treated
R1‑141479 Discovery Preamble Design for AGC Consideration in SC-FDM systems ITRI Noted
R1‑141480 Definition of in-coverage, out-of-coverage and edge-of-cell coverage ITRI Not treated
R1‑141481 D2DSS Timing Misalignment for UE on Edge-of-Cell Coverage ITRI Not treated
R1‑141482 Analysis on PDSCH resource allocation for low cost MTC MediaTek Inc. Not treated
R1‑141483 On CA enhancements for fast small cell on/off operation MediaTek Inc. Noted
R1‑141484 On dual connectivity enhancements for fast small cell on/off operation MediaTek Inc. Not treated
R1‑141485 On enhancements for small cell discovery and RRM measureements MediaTek Inc. Not treated
R1‑141486 Performance evaluation of small cell discovery signal designs MediaTek Inc. Not treated
R1‑141487 On physical layer support for dual connectivity MediaTek Inc. Not treated
R1‑141488 Higher-layer signaling for NAICS and system impact analysis MediaTek Inc. Noted
R1‑141489 CSI feedback for NAICS receivers MediaTek Inc. Not treated
R1‑141490 Downlink compressed mode considerations MediaTek Inc. Noted
R1‑141491 UL DCH Enhancement solution comparison MediaTek Inc. Noted
R1‑141492 System simulation results for uplink FET-less transmission mode switching MediaTek Inc. Noted
R1‑141493 Uplink compressed mode design for DCH enhancements MediaTek Inc. Noted
R1‑141494 UL ACK design comparison for DL-FET MediaTek Inc. Noted
R1‑141495 Uplink TFCI coding considerations MediaTek Inc. Not treated
R1‑141496 Discussion on small cell on/off transition time reduction III Not treated
R1‑141497 On the signal design and resource allocation of reply signal for D2D discovery III Not treated
R1‑141498 Performance of D2D synchronization source selection and D2DSS transmission III Not treated
R1‑141499 Integrated resource scheduling for in-coverage D2D communication to support Mode 1 and Mode 2 III Not treated
R1‑141500 Discussions on UE Categories with introduction of 256 QAM Broadcom Corporation Revised
R1‑141501 MCS table design for 256 QAM Broadcom Corporation Not treated
R1‑141502 Small cell On/off procedures Broadcom Corporation Revised
R1‑141503 Small cell discovery signal design Broadcom Corporation Noted
R1‑141504 System level evaluations for aligned discovery Broadcom Corporation Not treated
R1‑141505 RSRQ calculation for small cell On/Off Broadcom Corporation Not treated
R1‑141506 Power scaling for dual connectivity Broadcom Corporation Not treated
R1‑141507 Uplink power control for dual connectivity Broadcom Corporation Not treated
R1‑141508 RRC signaling for NAICS Broadcom Corporation Not treated
R1‑141509 CSI reporting for NAICS Broadcom Corporation Not treated
R1‑141510 Resource Allocation for Type 1 D2D Discovery Fujitsu Not treated
R1‑141511 DL HARQ timing for FDD SCell in case of TDD PCell NVIDIA Not treated
R1‑141512 CQI table design for downlink 256QAM NVIDIA Not treated
R1‑141513 Procedures for reducing small cell on/off transition time NVIDIA Not treated
R1‑141514 Discovery signal design NVIDIA Not treated
R1‑141515 Discussion on higher-layer signaling for NAICS NVIDIA Noted
R1‑141516 On CSI feedback in support of NAICS NVIDIA Not treated
R1‑141517 Synchronization Procedure for D2D Broadcast Communication China Telecom Withdrawn
R1‑141518 Remaining issues for TDD-FDD CA ITL Inc. Not treated
R1‑141519 Discussion on the open issues of the enhanced small Cell on/off procedure ITL Inc. Not treated
R1‑141520 Considerations on D2D synchronization signal design ITL Inc. Not treated
R1‑141521 HARQ timing determination in the case of CA NSN, Nokia Not treated
R1‑141522 Usage of UL DAI and UL Index with UL reference configuration #0 NSN, Nokia Not treated
R1‑141523 Summary of email discussion [76-06] NSN Not treated
R1‑141524 PDSCH PRB Limitation for Low Cost MTC UE NSN, Nokia Not treated
R1‑141525 PDSCH Scheduling for Low Cost MTC UE NSN, Nokia Not treated
R1‑141526 HD-FDD Low Cost MTC UE NSN, Nokia Noted
R1‑141527 DL HARQ timing for self-scheduled FDD Scell in case of TDD Pcell Nokia, NSN Not treated
R1‑141528 Remaining issues on TDD-FDD CA DCI format Nokia, NSN Noted
R1‑141529 Further details on CQI table design Nokia, NSN Noted
R1‑141530 On 256QAM PDSCH support scheduled by compact DCI formats Nokia, NSN Not treated
R1‑141531 On UE categories for 256QAM support Nokia, NSN Not treated
R1‑141532 Small Cell Detection Statistics and Related Considerations NSN, Nokia Not treated
R1‑141533 Discovery Signals and Measurements NSN, Nokia Not treated
R1‑141534 Designing issues of Radio-interface based Synchronization NSN, Nokia Not treated
R1‑141535 RIBS with Synchronization Accuracy Indication NSN, Nokia Not treated
R1‑141536 UL power control and power headroom reporting for dual connectivity NSN, Nokia Not treated
R1‑141537 Control signalling for dual connectivity NSN, Nokia Noted
R1‑141538 Inter-eNB signaling design for eCoMP NSN, Nokia Not treated
R1‑141539 Issues in D2D Discovery Signal Design Nokia, NSN Noted
R1‑141540 Control of ProSe resource use Nokia, NSN Not treated
R1‑141541 D2D synchronization signal design Nokia, NSN Not treated
R1‑141542 Discussion on D2D synchronization procedure for communication and discovery Nokia, NSN Not treated
R1‑141543 Network assistance for NAICS receivers NSN, Nokia Not treated
R1‑141544 On NAICS CSI feedback NSN, Nokia Revised
R1‑141545 Discussion on D2D Control Channel Intel Corporation Not treated
R1‑141546 Discussion on D2D Operation Outside of Network Coverage (Mode-2) Intel Corporation Not treated
R1‑141547 Discussion on Out of Coverage Definition Intel Corporation Not treated
R1‑141548 Discussion on D2D Synchronization Channel (PD2DSCH) Intel Corporation Not treated
R1‑141549 Analysis of different RSRP thresholds for design and evaluation of D2D communication Intel Corporation Not treated
R1‑141550 On Reduction of Synchronization Source Density Intel Corporation Not treated
R1‑141551 Discussion on the remaining details of CSI Feedback  for eIMTA Intel Corporation Not treated
R1‑141552 On PDSCH scheduling for LC MTC UE InterDigital Not treated
R1‑141553 Design considerations for 256QAM InterDigital Not treated
R1‑141554 Small cell On/Off mechanism InterDigital Not treated
R1‑141555 RSSI measurements in Small cell On/Off operation InterDigital Not treated
R1‑141556 Power scaling in Dual Connectivity InterDigital Not treated
R1‑141557 On physical channel design for D2D broadcast communication and discovery InterDigital Noted
R1‑141558 On control signaling for D2D broadcast communication InterDigital Noted
R1‑141559 Determination of in-coverage, out-of-coverage, edge-of-coverage for D2D UEs InterDigital Not treated
R1‑141560 eNB resource allocation for D2D InterDigital Withdrawn
R1‑141561 Synchronization signal and channel design for D2D InterDigital Not treated
R1‑141562 Synchronization procedure for D2D InterDigital Not treated
R1‑141563 Draft TP on eIMTA for TS 36.300 NSN, Nokia, CATT Noted
R1‑141564 Discussion on D2DSS design Broadcom Corporation Not treated
R1‑141565 CQI table and feedback design for 256 QAM Broadcom Corporation Noted
R1‑141566 On forward compatibility of Rel-12 low complexity MTC specification Sony Not treated
R1‑141567 Views on PDSCH buffering options for low-complexity MTC UEs Sony Not treated
R1‑141568 Support for contiguous and non-contiguous resource allocation for low-complexity MTC UEs Sony Not treated
R1‑141569 On reduced baseband bandwidth support of low-complexity MTC UEs Sony Not treated
R1‑141570 Discussion on small cell discovery signal design Sony Not treated
R1‑141571 D2D Resource Pool and Scheduling Assignments Sony Noted
R1‑141572 D2D Resource Allocation Mode Selection Sony Noted
R1‑141573 Synchronization design for D2D discovery and communication Sony Not treated
R1‑141574 UE measurement based on discover signal ASUSTeK Not treated
R1‑141575 UL Power Control for Simultaneous UCI Transmission ASUSTeK Not treated
R1‑141576 D2D communication resource scheduling ASUSTeK Not treated
R1‑141577 Resource allocation/utilization for type-1 discovery ASUSTeK Not treated
R1‑141578 Consideration on Remaining Issue to Configure 256 QAM BlackBerry UK Limited Not treated
R1‑141579 New UE Category to Support 256 QAM BlackBerry UK Limited Not treated
R1‑141580 UL Power Control for Dual Connectivity BlackBerry UK Limited Not treated
R1‑141581 Discussion on PUCCH reporting payload size Huawei, HiSilicon Noted
R1‑141582 Correction on PUCCH reporting payload size Huawei, HiSilicon Noted - Revised
R1‑141583 Discussion on remaining details for CSI feedback for eIMTA Huawei, HiSilicon Not treated
R1‑141584 Remaining issues for HARQ-ACK feedback on PUCCH Huawei, HiSilicon Not treated
R1‑141585 HARQ-ACK feedback bits on PUSCH for eIMTA Huawei, HiSilicon Not treated
R1‑141586 Support of TDD as Primary Cell for TDD-FDD CA in Rel-12 Huawei, HiSilicon Not treated
R1‑141587 Other aspects related to small cell on/off and discovery Huawei, HiSilicon Not treated
R1‑141588 New L1 procedure for small cell on/off transition time further reduction Huawei, HiSilicon Not treated
R1‑141589 Mechanisms for energy-efficient small cell discovery and measurements Huawei, HiSilicon Not treated
R1‑141590 Discussion on network listening for intra/inter-operator deployment Huawei, HiSilicon, CATR Not treated
R1‑141591 Co-existence of Normal CP OFDM symbol and Extended CP OFDM symbol in D2D communication/discovery Huawei, HiSilicon Noted
R1‑141592 Control information for D2D communication Huawei, HiSilicon Noted
R1‑141593 Consideration on Mode 2 resource allocation Huawei, HiSilicon Noted
R1‑141594 Views on resource allocation for D2D synchronization signals Huawei, HiSilicon Not treated
R1‑141595 Design considerations for D2DSS Huawei, HiSilicon Noted
R1‑141596 Timing signaling for D2D communication Huawei, HiSilicon Not treated
R1‑141597 Impact of D2D on cellular Huawei, HiSilicon Not treated
R1‑141598 Discussion on network assistance signalling parameters Huawei, HiSilicon Noted
R1‑141599 Consideration onf higher layer signalling of NAIC CATR Not treated
R1‑141600 Evaluation on D2D distributed resource allocation for discovery CATR Revised
R1‑141601 On control information of D2D communication CATR Not treated
R1‑141602 Remaining details of HARQ self-scheduling for TDD-FDD CA Texas Instruments Not treated
R1‑141603 Procedures for small cell on/off transition time reduction Texas Instruments Not treated
R1‑141604 UL Power Control Considerations for Dual Connectivity Texas Instruments Not treated
R1‑141605 On signalling for CoMP with non-ideal backhaul Texas Instruments Not treated
R1‑141606 Remaining details of low complexity MTC UE Motorola Mobility Not treated
R1‑141607 MCS and TBS signaling for support of 256-QAM Motorola Mobility Not treated
R1‑141608 UE category in support of 256-QAM Motorola Mobility Not treated
R1‑141609 Further discussion on procedures for small cell on/off Motorola Mobility Noted
R1‑141610 Discussion on supporting of TDD Pcell and DL HARQ timing for TDD Pcell CMCC Not treated
R1‑141611 Configuration and MCS table design for higher order modulation CMCC Not treated
R1‑141612 Considerations on UE category supporting 256QAM CMCC Not treated
R1‑141613 Discussion on small cell architectures and procedures for small cell on/off and discovery CMCC Not treated
R1‑141614 Discussion on discovery signal design CMCC Revised
R1‑141615 Radio-interface based synchronization for intra-operator small cells CMCC Not treated
R1‑141616 Discussion on radio interface based inter-operator synchronization CMCC Noted
R1‑141617 Backhaul signaling for CoMP-NIB operation CMCC Not treated
R1‑141618 Performance analysis of coordination based on RSRP CMCC Noted
R1‑141619 CSI enhancement for NAICS receivers CMCC Not treated
R1‑141620 Discussion on Aperiodic CSI in TM1-9 for eIMTA^^ Potevio Not treated
R1‑141621 Discussion on self-scheduling PDSCH timing in TDD-FDD CA Potevio Not treated
R1‑141622 Discussion on multiplexing D2D and cellular signal Potevio Not treated
R1‑141623 Impact of D2D on cellular traffic - Necessary further evaluations Orange Not treated
R1‑141624 Design impact of PDCCH and PDSCH scheduling of Rel-12 low complexity MTC UEs Vodafone Not treated
R1‑141625 Signaling of SRS scheduling for “CoMP Hypothesis” IAESI, DAC-UPC Not treated
R1‑141626 DL HARQ timing for self-scheduling in case of TDD PCell KT Corp. Not treated
R1‑141627 Design of CQI/MCS/TBS table for 256QAM KT Corp. Revised
R1‑141628 Aperiodic CSI reporting for eIMTA Ericsson Not treated
R1‑141629 Remaining issues on CSI feedback for eIMTA Ericsson Not treated
R1‑141630 On the need of new RRC parameters for eIMTA Ericsson Not treated
R1‑141631 Half duplex FDD for low cost MTC UE Ericsson Noted
R1‑141632 Impacts of PRB restriction for low cost MTC UE Ericsson Noted
R1‑141633 Resource allocation for low cost MTC UE Ericsson Noted
R1‑141634 Views on HARQ timing for TDD Pcell Ericsson Not treated
R1‑141635 Gray mapping for 256QAM Ericsson Noted
R1‑141636 CQI and MCS table design for downlink 256QAM Ericsson Noted
R1‑141637 TBS table design for downlink 256QAM Ericsson Not treated
R1‑141638 On 256QAM UE category handling Ericsson Not treated
R1‑141639 256QAM configuration and signaling Ericsson Noted
R1‑141640 On transition time reduction for small cell on/off Ericsson Noted
R1‑141641 Performance of small cell on/off with different transition times Ericsson Not treated
R1‑141642 Design of discovery bursts and procedures Ericsson Not treated
R1‑141643 Performance of discovery burst options Ericsson Not treated
R1‑141644 Scenarios and solutions for radio-interface based synchronization Ericsson Not treated
R1‑141645 UL Power control in dual connectivity Ericsson Not treated
R1‑141646 UE Capability in Dual Connectivity Ericsson Not treated
R1‑141647 Power headroom reporting for dual connectivity Ericsson Not treated
R1‑141648 Simultaneous Rx/Tx support for dual connectivity Ericsson Not treated
R1‑141649 Signaling for Inter-eNB Operation of CoMP Ericsson Revised
R1‑141650 Draft CR to 36.211 (Rel-12) Ericsson Noted
R1‑141651 ProSe device-to-device discovery link performance General Dynamics Not treated
R1‑141652 ProSe device-to-device synchronisation signal and channel design General Dynamics Not treated
R1‑141653 Scenarios and higher-layer signaling for NAICS Ericsson Not treated
R1‑141654 4 Tx Antenna Support for NAICS Ericsson Not treated
R1‑141655 Higher Layer Signaling of TM10 DMRS Properties for NAICS Ericsson Not treated
R1‑141656 On CSI enhancements for NAICS Ericsson Noted
R1‑141657 Compressed mode for enhanced DCH NSN Noted
R1‑141658 Analysis on the Solutions for HS-DPCCH Reception Reliability Issue in HetNet NSN Noted
R1‑141659 HARQ Solutions for TDM operation NSN Noted
R1‑141660 Solution for improved grant handling for TDM operation NSN, Huawei Revised
R1‑141661 LLS results for DTX Power Control with Long DTX Cycles NSN Noted
R1‑141662 On HS-DPCCH overhead reduction NSN Not treated
R1‑141663 Link level simulation results for different transport block options for the secondary BCH channel NSN Noted
R1‑141664 Achieving coverage with soft combining for BCH2 NSN Noted
R1‑141665 PRACH preamble analysis for S-UMTS NSN Noted
R1‑141666 On DL processing of AICH, PICH and multiantenna techniques for S-UMTS NSN Noted
R1‑141667 SCH for S-UMTS NSN Noted
R1‑141668 Consideration on UL ACK for DL Frame Early Termination Huawei, HiSilicon Noted
R1‑141669 Evaluation of HS-DPCCH solutions Huawei, HiSilicon Noted
R1‑141670 Impact on specifications of HS-DPCCH solutions Huawei, HiSilicon Noted
R1‑141671 Discussion on solutions to mitigate interference from non-SHO users Huawei, HiSilicon Noted
R1‑141672 Consideration on CIO adaptation Huawei, HiSilicon Noted
R1‑141673 Further considerations on DTX enhancements Huawei, HiSilicon Noted
R1‑141674 Further considerations on DRX enhancements Huawei, HiSilicon Noted
R1‑141675 Considerations on transmitting F-DPCH for the secondary carrier on the primary carrier Huawei, HiSilicon Noted
R1‑141676 Solutions for HS-DPCCH overhead reduction to improve capacity and coverage Huawei, HiSilicon Not treated
R1‑141677 Way Forward on HS-DPCCH Overhead reduction for multi-RAB scenario Huawei, HiSilicon, China Unicom Noted
R1‑141678 RAN1 Specification Impact for the introduction of HS-DPCCH overhead reduction Huawei, HiSilicon Not treated
R1‑141679 Considerations on S-CCPCH design carrying BCH2 Huawei, HiSilicon Noted
R1‑141680 Uplink performance for F-UMTS Huawei,HiSilicon Noted
R1‑141681 PRACH design for F-UMTS Huawei,HiSilicon Noted
R1‑141682 Design for cross carrier scheduling for F-UMTS carrier aggregation Huawei,HiSilicon Noted
R1‑141683 On the need of introducing cross carrier scheduling for F-UMTS carrier aggregation Huawei,HiSilicon Noted
R1‑141684 Further considerations on enhancement to uplink power control algorithm 2 to reduce power consumption of DL TPC commands Huawei, HiSilicon Noted
R1‑141685 On Scheduling Assignment Message Design CEWiT Not treated
R1‑141686 Transition Time Reduction for Small Cell On/Off CEWiT Not treated
R1‑141687 On Reliability of Uplink Control Channels in Heterogeneous Network Deployments Ericsson Noted
R1‑141688 HS-DPCCH Performance with Secondary Pilot – System Level Results Ericsson Noted
R1‑141689 E-DPCCH Performance with Secondary Pilot – Link Level Results Ericsson Noted
R1‑141690 On the DTX Parameterization for Secondary Carriers Ericsson Noted
R1‑141691 On Increasing the DRX Cycle for Single and Multicarriers Ericsson Noted
R1‑141692 Comparative Analysis of TDM Scheduler Schemes for Secondary Carriers Ericsson Noted
R1‑141693 On Improving the Power Control for Secondary Carrier after Transmission Gap Ericsson Noted
R1‑141694 HS-DPCCH Overhead Reduction for Multi-RAB Coverage Improvement Ericsson Noted
R1‑141695 CR on the HS-SCCH Order to Inform the UE to Perform the TTI Switch Ericsson Noted
R1‑141696 BCH Enhancements - Detailed Design of BCH2 Mapping to S-CCPCH Ericsson Noted
R1‑141697 Scalable UMTS – Uplink Aspects Ericsson Noted
R1‑141698 Scalable UMTS – Text Proposal on Uplink Signal Characteristics Ericsson Not treated
R1‑141699 Draft Rel-12 CR on antenna port definitions Qualcomm Inc., Panasonic Noted - Revised
R1‑141700 Mechanisms for UL 10ms/20ms TTI switching Qualcomm Incorporated Noted
R1‑141701 Design of UL DPCCH ACK channel for DL FET Qualcomm Incorporated Noted
R1‑141702 Compressed Mode Aspects of DCH Enhancements Qualcomm Incorporated Noted
R1‑141703 UE capabilities and sub-feature dependencies for DCH enhancements Qualcomm Incorporated Noted
R1‑141704 DCH Enhancements and CPC Qualcomm Incorporated Noted
R1‑141705 Remaining Aspects of DCH Enhancements Qualcomm Incorporated Noted
R1‑141706 25.211 DRAFT CR (Rel-12, B) Introduction of DCH Enhancements Qualcomm Incorporated Revised
R1‑141707 25.212 DRAFT CR (Rel-12, B) Introduction of DCH Enhancements Qualcomm Incorporated Revised
R1‑141708 25.213 DRAFT CR (Rel-12, B) Introduction of DCH Enhancements Qualcomm Incorporated Not treated
R1‑141709 25.214 DRAFT CR (Rel-12, B) Introduction of DCH Enhancements Qualcomm Incorporated Revised
R1‑141710 25.300 DRAFT CR (Rel-12, B) Introduction of DCH Enhancements Qualcomm Incorporated Not treated
R1‑141711 Lab Results on E-DCH Decoupling Qualcomm Incorporated Not treated
R1‑141712 Configuration of CIO based on UE receiver capability Qualcomm Incorporated Noted
R1‑141713 Details of DTX/DRX Improvements Qualcomm Incorporated Noted
R1‑141714 Power Control Performance due to Long DTX/DRX Cycles Qualcomm Incorporated Noted
R1‑141715 HS-DPCCH Overhead Reduction Qualcomm Incorporated Noted
R1‑141716 Design Aspects of BCH2 Channel Qualcomm Incorporated Noted
R1‑141717 On cross carrier scheduling for S-UMTS carrier aggregation NSN Noted
R1‑141718 On standard impacts of 256QAM in downlink ZTE Not treated
R1‑141719 Discussion on discovery signal design CMCC Noted
R1‑141720 Discussion on the open issues of small cell discovery Coolpad Not treated
R1‑141721 Considerations D2D Synchronization Coolpad Not treated
R1‑141722 Solution for improved grant handling for TDM operation NSN, Huawei Noted
R1‑141723 Multi-hop Synchronization Procedure ZTE Not treated
R1‑141724 BCH Enhancements – Turbo Coding vs Convolutional Coding Ericsson Noted
R1‑141725 Signalling details and procedures supporting eCoMP Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Noted
R1‑141726 Draft CR to 36.212 (Rel-12) Huawei Noted
R1‑141727 Signal Design for D2D Discovery and Broadcast Qualcomm Inc. Noted
R1‑141728 Design of CQI/MCS/TBS table for 256QAM KT Corp. Not treated
R1‑141729 Evaluation on D2D distributed resource allocation for discovery CATR Not treated
R1‑141730 Final Report of RAN1#76 meeting MCC Approved
R1‑141731 Small cell On/off procedures Broadcom Corporation Not treated
R1‑141732 25.211 DRAFT CR (Rel-12, B) Introduction of DCH Enhancements Qualcomm Incorporated Withdrawn
R1‑141733 25.212 DRAFT CR (Rel-12, B) Introduction of DCH Enhancements Qualcomm Incorporated Withdrawn
R1‑141734 25.214 DRAFT CR (Rel-12, B) Introduction of DCH Enhancements Qualcomm Incorporated Withdrawn
R1‑141735 Resource allocation for D2D discovery Qualcomm Inc. Not treated
R1‑141736 Draft CR to 36.213 (Rel-12) Motorola Mobility Noted
R1‑141737 UL power control and power scaling for dual connectivity Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑141738 Discussion on D2D discovery physical layer design LG Electronics Not treated
R1‑141739 RAN1 excel sheet draft on LTE Rel-12 UE capabilities NTT DoCoMo Noted - Revised
R1‑141740 36.212 CR0156 (Rel-12, F) Clarification on UE port based CRC masking Qualcomm Agreed
R1‑141741 WF on power control for Dual Connectivity LGE, Fujitsu, NEC Noted
R1‑141742 WF on D2D Coverage Definitions Ericsson, Huawei, HiSilicon, ZTE Noted
R1‑141743 WF on Definition on In-Coverage, Edge-of-Cell Coverage and Out-of-Coverage ITRI, KDDI, Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Noted
R1‑141744 WF on Type 2B discovery resource allocation NTT DOCOMO, Ericsson, ZTE, Samsung, Intel, CATT, ITRI Noted - Revised
R1‑141745 WF on HARQ timing for TDD-FDD CA LG, NTT, NTT DOCOMO, Ericsson, ETRI, KDDI, Samsung, Sharp, NEC, Nokia, NSN, Hitachi, KT Corp., Orange, Telefonica, ZTE, Texas Instruments, Inter Digital, NVIDIA, Telecom Italia, LG Uplus, Vodafone Agreed
R1‑141746 WF on D2D and Cellular Coexistence Ericsson, Orange, Telecom Italia, Huawei Noted
R1‑141747 Collision avoidance mechanism for D2D broadcast communication Samsung Not treated
R1‑141748 Summary of offline discussion on low complexity MTC UE Vodafone Noted
R1‑141749 On Type 2 D2D Discovery Resource Allocation Intel Corporation Noted
R1‑141750 WF on WAN protection LG Electronics, NTT Docomo, Samsung, Huawei, HiSilicon, KDDI Noted
R1‑141751 WF on multiplexing D2D transmission and reception LG Electronics, Potevio, ETRI Noted
R1‑141752 WF on D2D Multicarrier UE Capabilities Assumptions Ericsson, ALU, ASB, ITRI, Panasonic, IDCC Noted
R1‑141753 WF on D2D CP length configuration Huawei, HiSilicon, Ericsson, Fujitsu, General Dynamics, LGE, Potevio, Qualcomm, Blackberry, Samsung Noted
R1‑141754 WF on eNB (Mode 1) resource allocation for communication Qualcomm Incorporated, LG, ZTE, III, General Dynamics Noted
R1‑141755 LS on Enhanced BCH parameters RAN1, Ericsson Agreed
R1‑141756 LS on Further EUL Enhancements RAN1, Ericsson Agreed
R1‑141757 LS on RAN1 Decisions for Enhanced DCH Work Item RAN1, Qualcomm Agreed
R1‑141758 [DRAFT] LS on Progress in RAN1 #76bis for the UMTS Heterogeneous Networks WI Huawei Noted - Revised
R1‑141759 Chairpersons’ summary of the UMTS sessions UMTS Session Chairpersons (Karri Ranta-aho, NSN, Carmela Cozzo, Huawei, Matthew Baker, Alcatel-Lucent) Endorsed
R1‑141760 Way Forward on Aspects of DCH Enhancements Qualcomm, MediaTek Noted
R1‑141761 LS on Progress in RAN1 #76bis for the UMTS Heterogeneous Networks WI RAN1, Huawei Agreed
R1‑141762 Evaluation scenarios for Further EUL Enhancements Ericsson Agreed
R1‑141763 void - Withdrawn
R1‑141764 void - Withdrawn
R1‑141765 void - Withdrawn
R1‑141766 void - Withdrawn
R1‑141767 void - Withdrawn
R1‑141768 void - Withdrawn
R1‑141769 void - Withdrawn
R1‑141770 void - Withdrawn
R1‑141771 void - Withdrawn
R1‑141772 void - Withdrawn
R1‑141773 void - Withdrawn
R1‑141774 void - Withdrawn
R1‑141775 void - Withdrawn
R1‑141776 void - Withdrawn
R1‑141777 void - Withdrawn
R1‑141778 void - Withdrawn
R1‑141779 void - Withdrawn
R1‑141780 void - Withdrawn
R1‑141781 void - Withdrawn
R1‑141782 void - Withdrawn
R1‑141783 void - Withdrawn
R1‑141784 void - Withdrawn
R1‑141785 Way Forward on TDD-FDD CA with TDD Pcell Huawei, HiSilicon, CATT, CMCC Noted
R1‑141786 WF on MCS indexing for 256QAM Modulation and TBS index table Intel Corporation, Motorola Mobility, CATT, Samsung Noted
R1‑141787 WF on SA Resource Allocation Qualcomm Incorporated, Kyocera, III, General Dynamics, ZTE Not treated
R1‑141788 WF on D2D synchronization signal format LG Electronics, Qualcomm, CATT Noted
R1‑141789 WF on PD2DSCH LG Electronics, Qualcomm, CATT, InterDigital Noted
R1‑141790 Signaling for Inter-eNB Operation of CoMP Ericsson Noted
R1‑141791 WF on Type 2B discovery resource allocation NTT DOCOMO, Ericsson, ZTE, Samsung, Intel, CATT, ITRI Noted
R1‑141792 WF on 256QAM configuration LG Electronics, Fujitsu, [RIM], Qualcomm, Alcatel-Lucent, Hitachi, Huawei, HiSilicon, Samsung, Broadcom, Panasonic, InterDigital Revised
R1‑141793 [Draft] LS on remaining open RAN1 TDD-FDD CA issues Nokia Withdrawn
R1‑141794 WF on Type 1 Discovery and WAN Coexistence Qualcomm Incorporated, ZTE, Huawei, HiSilicon, Fujistu, III Noted
R1‑141795 WF on Time Randomization for D2D Transmissions Qualcomm Incorporated, CATT, Ericsson, ALU, ASB, InterDigital Noted
R1‑141796 WF on 256QAM UE Category handling Ericsson, CMCC, CATR, Huawei, HiSilicon, Samsung, Blackberry, Fujitsu Revised
R1‑141797 WF on 256QAM table design Huawei, HiSilicon, CATR, LGE, Fujitsu, Ericsson, Broadcom, Blackberry, InterDigital, Samsung, CMCC Noted
R1‑141798 Resource allocation for synchronization signals enabling inter-cluster synchronization Samsung Not treated
R1‑141799 Synchronization signal design for inter-cluster synchronization Samsung Not treated
R1‑141800 Discussions on UE Categories with introduction of 256 QAM Broadcom Corporation Not treated
R1‑141801 Way Forward on RIBS ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, CHTTL, Ericsson, FiberHome, ITRI, NSN, Samsung Noted
R1‑141802 WF on Content of Scheduling Assignment Qualcomm Incorporated, III, CATT, General Dynamics Noted
R1‑141803 WF on 256QAM configuration LG Electronics, Fujitsu, Blackberry, Qualcomm, Hitachi, Huawei, HiSilicon, Samsung, Broadcom, Panasonic, InterDigital Noted
R1‑141804 WF on Synchronization Procedure Qualcomm Incorporated, LG, III, General Dynamics, CATT, Fujistu Noted
R1‑141805 WF on multi-hop for synchronization ZTE, ALU, ASB, Qualcomm Noted
R1‑141806 Further evaluation results for inter-eNB CoMP Samsung Noted
R1‑141807 WF on CoMP-NIB signalling NSN, Nokia, Ericsson, Hitachi Noted
R1‑141808 WF on 256QAM UE Category handling Ericsson, CMCC, CATR, Huawei, HiSilicon, Samsung, Blackberry, Fujitsu, III, FiberHome, CATT Revised
R1‑141809 WF on Inter-eNB CoMP for LTE Samsung,Alcatel-Lucent,Alcatel-LucentShanghaiBell,AT&T,CATR,ChinaTelecom,ChinaUnicom,CHTTL,CMCC,DeutscheTelekom,ETRI,KDDI,KTCorp,LGElectronics,LGUplus,NewPostcom, NEC, NTTDOCOMO,Potevio,Qualcomm, SKTelecom,TelecomItalia,ZTE Noted
R1‑141810 [draft] LS on Inter-eNB CoMP for LTE Samsung Noted - Revised
R1‑141811 WF on D2D Discovery Preamble ITRI, ALU, ASB, LG Electronics, III, Nokia, NSN, Broadcom, Fujitsu Noted
R1‑141812 Draft LS on identifier in scheduling assignment for D2D communication Qualcomm Noted - Revised
R1‑141813 LS on identifier in scheduling assignment for D2D communication RAN1, Qualcomm Agreed
R1‑141814 WF on D2D Synchronization Source Qualcomm Incorporated, LG, III, Huawei, HiSilicon, General Dynamics, Kyocera Noted
R1‑141815 WF on D2D Synchronization Resources Qualcomm Incorporated, LG, Kyocera, General Dynamics Noted
R1‑141816 LS on Inter-eNB CoMP for LTE RAN1, Samsung Agreed
R1‑141817 LS to RAN2 on Modes 1&2 Ericsson Noted - Revised
R1‑141818 LS to RAN2 on D2D resource allocation Modes 1&2 RAN1, Ericsson Agreed
R1‑141819 WF on Distributed (Mode 2) resource allocation for communication Qualcomm Incorporated, Kyocera, General Dynamics Noted
R1‑141820 Simulation assumptions for impact of D2D on WAN - agreements from [76b-11] Qualcomm Incorporated (rapporteur) Agreed
R1‑141821 void - Withdrawn
R1‑141822 void - Withdrawn
R1‑141823 void - Withdrawn
R1‑141824 void - Withdrawn
R1‑141825 Draft TP on eIMTA for TS 36.300 NSN, Nokia, CATT Endorsed
R1‑141826 LS on TP on eIMTA for TS 36.300 RAN1, NSN Agreed
R1‑141827 LS on RAN1 TDD-FDD CA outcome RAN1, Nokia Agreed
R1‑141828 LS on updates of RRC parameters for LTE_TDD_eIMTA RAN1, CATT Agreed
R1‑141829 void - Withdrawn
R1‑141830 void - Withdrawn
R1‑141831 void - Withdrawn
R1‑141832 void - Withdrawn
R1‑141833 void - Withdrawn
R1‑141834 void - Withdrawn
R1‑141835 LS on parameter synchronization SA3, Qualcomm Withdrawn
R1‑141836 Inter-eNB CoMP signaling with non-ideal backhaul LG Electronics Not treated
R1‑141837 Summary of D2D ad-hoc session Ericsson Noted
R1‑141838 On NAICS CSI feedback NSN, Nokia Not treated
R1‑141839 Way Forward on CSI process and CSI-IMR for TDD eIMTA ZTE, Ericsson, Intel Not treated
R1‑141840 WF on D2D Coverage Definitions Ericsson, ALU, ASB, ITRI, Huawei, HiSilicon, Qualcomm, ZTE, LGE, USDoC, IDCC, GDB, DT Noted
R1‑141841 WF on CSI enhancement for NAICS LG Electronics, Ericsson, Intel, NTT DoCoMo Noted
R1‑141842 Outcome of the offline discussion on eIMTA CATT Noted
R1‑141843 WF on NAICS Functionality Definition Ericsson, NSN, Nokia, CATT, Nvidia, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Noted
R1‑141844 WF on NAICS Signaling for 4 CRS Ports Ericsson, Sprint, NSN, Nokia, CATT, NTT DoCoMo Noted
R1‑141845 WF on CSI reference definition for eIMTA LG Electronics, Ericsson, Samsung, CATT, Potevio Not treated
R1‑141846 Way Forward on aperiodic CSI feedback for TM10 with eIMTA Huawei, HiSilicon, Qualcomm, Samsung Not treated
R1‑141847 WF on Discovery Preamble for Asynchronous Deployments Qualcomm Incorporated, General Dynamics, Fujistu, ZTE Noted
R1‑141848 WF on D2D PUSCH Structure Qualcomm Incorporated, ZTE, General Dynamics, CATT Noted
R1‑141849 WF on D2D Signal Gap Qualcomm Incorporated, General Dynamics, CATT, Fujistu Noted
R1‑141850 Summary of eIMTA open issues CATT Noted
R1‑141851 Physical channel design for scheduling assignment Samsung Not treated
R1‑141852 WF on measurement assumptions with network assistance LG Electronics, Broadcom, CMCC, Coolpad, ETRI, InterDigital, NEC, NTT DOCOMO, Panasonic, Qualcomm, ZTE Noted
R1‑141853 Summary of D2D ad-hoc session Ericsson Revised
R1‑141854 WF on Small Cell Discovery Reference Signals Intel, NSN, Nokia, MediaTek, ETRI, NVIDIA, NEC, InterDigital, Fujitsu, BlackBerry, Qualcomm, CATT Noted - Revised
R1‑141855 LS on RAN1 progress on NAICS higher-layer signalling RAN1, MediaTek Agreed
R1‑141856 Way forward on RIBS Huawei, HiSilicon, CMCC, Deutsche Telekom, AT&T, Telecom Italia, CATR, IAESI, T-Mobile USA Noted
R1‑141857 Summary of offline discussions on CSI enhancement evaluations Ericsson Noted
R1‑141858 WF on Reduced Transition Times for Small Cells on/off Ericsson, Qualcomm , InterDigital, CATT, NTT DoCoMo, LG Electronics Noted - Revised
R1‑141859 WF on discovery signal design and network assistance NTT DOCOMO, Huawei, HiSilicon, Samsung, Sony, Sharp, ZTE, LG Electronics, Hitachi, ETRI, MediaTek Noted
R1‑141860 Conclusions of the offline discussion on SR on pSCell PUCCH NSN Noted
R1‑141861 Proposal on maximum power definition in dual connectivity LG Electronics Noted
R1‑141862 Resource allocation restriction and identification of low complexity MTC Ues RAN2, Vodafone Not treated
R1‑141863 Outcome of the offline discussion on TPC aspects of Dual Connectivity NTT DoCoMo Noted
R1‑141864 [Draft] LS on the scheduling request transmission on the pSCell NSN Noted - Revised
R1‑141865 WF on DRS measurement configuration LG Electronics, CATT, ETRI, NEC, Qualcomm, ZTE Noted
R1‑141866 Reply LS on Resource allocation restriction and identification of low complexity MTC UEs Vodafone Noted - Revised
R1‑141867 Further evaluation study and IMR configuration for inter-eNB CoMP Samsung Noted
R1‑141868 WF on Small Cell on/off and Discovery enhancements Huawei, HiSilicon, NTT DOCOMO, Samsung, ZTE, Sony, Sharp, Hitachi, ETRI, Mediatek Noted
R1‑141869 LS on the scheduling request transmission on the pSCell RAN1, NSN Agreed
R1‑141870 WF on Small Cell Discovery Reference Signals Intel, NSN, Nokia, MediaTek, ETRI, NVIDIA, NEC, InterDigital, Fujitsu, BlackBerry, Qualcomm, CATT, Broadcom Noted
R1‑141871 Summary of Ad-hoc session on Further Enhancements to LTE TDD for DL-UL Interference Management and Traffic Adaptation Ad-Hoc Chairman (Qualcomm) Endorsed
R1‑141872 Summary of Ad-hoc session on Low Cost & Enhanced Coverage MTC UE for LTE Ad-Hoc Chairman (Qualcomm) Endorsed
R1‑141873 Summary of Ad-hoc session on Inter-eNB CoMP for LTE Ad-Hoc Chairman (Alcatel Lucent) Endorsed
R1‑141874 Summary of Ad-hoc session on Study on LTE Device to Device Proximity Services Ad-Hoc Chairman (Alcatel Lucent) Endorsed
R1‑141875 Draft Rel-12 CR on antenna port definitions Qualcomm Inc., Panasonic, Ericsson, Fujitsu Noted - Revised
R1‑141876 WF on TDD FDD CA CATT Noted
R1‑141877 WF on HARQ timing for TDD-FDD CA LGE Withdrawn
R1‑141878 WF on Reduced Transition Times for Small Cells on/off Ericsson, Qualcomm , InterDigital, CATT, NTT DoCoMo, LG Electronics, ITL. Inc. Noted - Revised
R1‑141879 WF on 256QAM UE Category handling Ericsson, CMCC, CATR, Huawei, HiSilicon, Samsung, Blackberry, Fujitsu, III, FiberHome, CATT, Coolpad, China Unicom Noted
R1‑141880 Proposals on RIBS for inter-operator synchronization CMCC, Huawei, HiSilicon, Potevio, Deutsche Telekom, CATR, IAESI, CHTTL Noted
R1‑141881 WF on Discovery Signals functions Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Broadcom, CATT,CHTTL, Intel, Nokia, NSN, NVIDIA, Qualcomm Noted
R1‑141882 WF on DRS design NTT DOCOMO, Huawei, HiSilicon, Samsung, Hitachi, ETRI, Sharp, Sony, NTT, New Postcom, CATR, ZTE, InterDigital, KCME Noted
R1‑141883 [DRAFT] LS on status of Radio-interface based synchronization ZTE, Huawei Noted - Revised
R1‑141884 WF on Reduced Transition Times for Small Cells on/off Ericsson, Qualcomm , InterDigital, CATT, NTT DoCoMo, LG Electronics, ITL. Inc Noted
R1‑141885 Summary of D2D ad-hoc session Ericsson Noted
R1‑141886 36.213 CR0459 (Rel-12, F) Clarification on PUCCH reporting type payload size Huawei, HiSilicon, Ericsson Noted - Revised
R1‑141887 Summary of Thursday offline eIMTA discussion CATT Noted
R1‑141888 [Draft] LS on LTE Rel-12 UE feature list NTT DoCoMo Noted - Revised
R1‑141889 RAN1 excel sheet draft on LTE Rel-12 UE capabilities NTT DoCoMo Noted - Revised
R1‑141890 Reply LS on Resource allocation restriction and identification of low complexity MTC UEs RAN1, Vodafone Agreed
R1‑141891 36.212 CR0157 (Rel-12, F) Correction on UCI multiplexing on PUSCH Intel Corporation Revised
R1‑141892 LS on status of Radio-interface based synchronization RAN1, ZTE, Huawei Agreed
R1‑141893 RAN1 excel sheet draft on LTE Rel-12 UE capabilities - Agreed
R1‑141894 36.213 CR0459r1 (Rel-12, F) Clarification on PUCCH reporting type payload size Huawei, HiSilicon, Ericsson Agreed
R1‑141895 36.211 CR0189 (Rel-12, F) CR on antenna port definitions Qualcomm Incorporated, Panasonic, Ericsson, Fujitsu Agreed
R1‑141896 RAN1 excel sheet draft on LTE Rel-12 UE capabilities NTT DoCoMo Noted - Revised
R1‑141897 LS on LTE Rel-12 UE feature list RAN1, NTT DoCoMo Agreed
R1‑141898 36.212 CR0157r1 (Rel-12, F) Correction on UCI multiplexing on PUSCH Intel Corporation, NEC, Qualcomm Inc., Texas Instruments, Panasonic Agreed
R1‑141899 Outcome of the email discussion [76b-08] on TPC aspects of Dual Connectivity NTT DoCoMo Agreed

page generated from database: 2024-04-22 07:58:53

Get news. Get knowledge. Get involved
Get news.
Get knowledge.
Get involved.
Image
The 5G Standard
3GPP General Enquiries:
info@3gpp.org 


Connect:

Quick Links