3GPP TDocs (written contributions) at meeting
Meeting: R1-57b - 2009-06-29 to 2009-07-03, Los Angeles
meeting id: R1-57b (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑092291 | Draft Agenda for RAN1#57bis meeting | RAN1 Chairman | Approved |
R1‑092292 | Final report of RAN1#57 meeting | MCC Support | Approved |
R1‑092293 | LS on RAN2 understanding of Tx-Rx separation | RAN2, Qualcomm | Noted |
R1‑092294 | LS on RAN2 status on carrier aggregation design | RAN2, Qualcomm | Noted |
R1‑092295 | Response LS on Coordination of work for response to ITU-R WP 5D Request for Information on Femtocells | RAN4, Alcatel-Lucent | Noted |
R1‑092296 | LS on Feasibility of Region 3 Band Combinations for Dual Band DC-HSDPA | RAN4, Ericsson | Noted |
R1‑092297 | Opportunistic uplink coordinated multi-point reception for LTE-A | I2R | Not treated |
R1‑092298 | Definition of Backhaul according to Level of Cooperation in CoMP UL | Alcatel-Lucent | Not treated |
R1‑092299 | Assumptions and Initial Results for U-TDOA Positioning Simulations | TruePosition, Inc. | Noted |
R1‑092300 | Considerations on guard period in backhaul uplink subframe | ETRI | Not treated |
R1‑092301 | DM RS for UL SU-MIMO transmission in LTE-A | ETRI | Not treated |
R1‑092302 | Reference signals for eNB-relay backhaul link | ETRI | Not treated |
R1‑092303 | Multi-cell PMI coordination for downlink CoMP | ETRI | Not treated |
R1‑092304 | UE feedback for downlink CoMP | ETRI | Not treated |
R1‑092305 | Positioning Support for Distributed Network Elements | LG-Nortel | Noted |
R1‑092306 | RN Performance regarding backhaul link capability | LG-Nortel | Not treated |
R1‑092307 | Analysis of UE Subframe Timing Offset Measurement Sensitivity to OTDOA Performance | Alcatel-Lucent | Noted |
R1‑092308 | Power offset in DRS based dual-layer beamforming | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑092309 | High-Level Principles for CSI feedback for DL MIMO and COMP in LTE-A | Alcatel-Lucent, Philips, Qualcomm | Noted |
R1‑092310 | Comparison of CSI feedback schemes | Alcatel-Lucent | Not treated |
R1‑092311 | Consideration of Backhaul Technology Evolution in Support of CoMP | Alcatel-Lucent | Not treated |
R1‑092312 | STBC-II Scheme with Non-Paired Symbols for LTE-Advanced Uplink Transmit Diversity | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑092313 | Codeword Shifting for Clustered DFT-S-OFDM and N x DFT-S-OFDM for LTE-Advanced Uplink SU-MIMO | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑092314 | Uplink coordinated multi-point reception with distributed inter-cell interference suppression for LTE-A | Aclatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑092315 | Efficient uplink coordinated multi-point reception with reduced backhauling cost | Aclatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑092316 | A progressive multi-cell MIMO transmission with sequential linear precoding design in TDD systems | Aclatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑092317 | Multi-cell cooperative RS in CoMP | Aclatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑092318 | DL non-coherent multi-user MIMO joint transmission (MU-MIMO JT) scheme and system performance evaluations in TDD systems | Aclatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑092319 | Generic Configuration of DL CoMP Modes | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑092321 | System design framework to support Type II Relay Operation | Alcatel-Lucent, CHTTL | Not treated |
R1‑092322 | Network coded relay and its chase combining | Aclatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑092323 | Type II relay considerations with the separation of control and data | Aclatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑092324 | Timing synchronization for TDD Type 1 relay | Aclatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑092325 | An Improved Forward Scheme for L2 Relay system with Parity-Check based Network Coding in UL | Aclatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑092326 | Consideration on Type II Relay UE selection and CRS Channel Estimation Performance | Aclatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑092327 | Performance of Cooperative and non-Cooperative Type II Relay | Aclatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑092328 | Interference analysis and simulation for relay | Aclatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑092329 | A Precoded DL cooperative transmission for Type II relay | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑092330 | Component carrier indication for bandwidth extension in LTE-A | Alcatel-Lucent | Not treated |
R1‑092331 | CM/PAPR Reduction of Aggregated Carriers for Uplink of LTE-Advanced | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑092332 | HARQ Bundling with Layer Shifting for LTE-Advanced Uplink SU-MIMO | Aclatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑092333 | Interleaved Antenna Grouping for Clustered DFT-S-OFDM (slides) | Aclatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑092334 | TDD Transmitting adjustment and compensation for the DL coherent COMP | Aclatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑092335 | An Over-the-Air-Calibration Scheme for ZF based SU/MU-MIMO | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑092336 | Channel Quality Measurement to Support Reselection in LTE-A | SHARP | Revised |
R1‑092337 | Simulation Results for SFN and AS-SFN Precoding Schemes for DL | SHARP | Not treated |
R1‑092338 | Control Overhead Analysis on Aperiodic PUSCH | SHARP | Not treated |
R1‑092339 | The Benefits of One PA Mode for UEs Supporting Multiple PAs | SHARP | Noted |
R1‑092340 | LTE-A transmit diversity schemes for PUCCH format 1/1a/1b | SHARP | Not treated |
R1‑092341 | Payload increase for LTE-A PUCCH format 2 achieved by Transmit Diversity | SHARP | Not treated |
R1‑092342 | LTE-A transmit diversity schemes for PUSCH | SHARP | Not treated |
R1‑092343 | Views on PUCCH TxD for LTE-A | SHARP | Not treated |
R1‑092344 | Dual-Layer Beamforming: Extension to MU-MIMO | Philips | Noted |
R1‑092345 | Multi-cell co-operative beamforming: TP for TR36.814 | Philips | Not treated |
R1‑092346 | Enhancements to MU-MIMO for LTE-A | Philips | Noted |
R1‑092347 | DL MIMO extension for LTE-A: interference management aspects and TP for TR36.814 | Philips | Not treated |
R1‑092348 | PDCCH Search Space for Carrier Aggregation | Philips | Not treated |
R1‑092349 | Codebook design issues for COMP | Philips | Not treated |
R1‑092350 | Cell ID collisions | Huawei | Noted |
R1‑092351 | Liaison response to R3-091399 for PCI collision | Huawei | Noted - Revised |
R1‑092352 | 36.213 Draft CR (Rel-8, F) On PUSCH hopping type for UL SPS non-adaptive retransmission | Huawei | Revised |
R1‑092353 | Discussion on subframe collision in the presence of time accumulation | Huawei | Noted |
R1‑092354 | Consideration on PRS pattern design | Huawei | Noted |
R1‑092355 | Discussion on OTDOA based positioning issue | Huawei | Noted |
R1‑092356 | Results for OTDOA/PRS modulation sequence evaluation | Huawei | Noted |
R1‑092357 | Overview of Network Based Positioning in LTE | Huawei | Noted |
R1‑092358 | 36.211 Draft CR (Rel-8, F) Clarification on DMRS sequence for PUSCH | Huawei | Revised |
R1‑092359 | Hardware calibration requirement for dual layer beamforming | Huawei | Not treated |
R1‑092360 | Downlink control signaling for dual-layer beamforming | Huawei | Not treated |
R1‑092361 | DM-RS pattern design for dual-layer beamforming | Huawei | Not treated |
R1‑092362 | the performance evaluation of MU-MIMO in R9 | Huawei | Noted |
R1‑092363 | LTE-A downlink DM-RS pattern design | Huawei | Noted |
R1‑092364 | Consideration on CSI-RS design for CoMP and text proposal to 36.814 | Huawei | Not treated |
R1‑092365 | Performance of DL Coordinated Beam Switching with Bursty traffic | Huawei | Not treated |
R1‑092366 | Feedback capacity analysis for different feedback mechanizms^^ | Huawei | Not treated |
R1‑092367 | Inter-cell interference analysis and evalution of sounding reference signals for UL CoMP | Huawei | Not treated |
R1‑092368 | System modeling and performance evaluation for uplink CoMP considering delay spread issue | Huawei | Not treated |
R1‑092369 | Feedback Design Principles for Downlink CoMP | Huawei | Not treated |
R1‑092370 | Understanding on Type 1 and Type 2 relay | Huawei | Not treated |
R1‑092371 | Discussion on relay in CoMP | Huawei | Not treated |
R1‑092372 | Issues of type 2 relay | Huawei | Not treated |
R1‑092373 | Interference mitigation for control channels and signals of type 1 relays | Huawei | Not treated |
R1‑092374 | Type 1 relay TDD frame structure | Huawei, CATT, ZTE, CMCC | Not treated |
R1‑092375 | Considerations on R-PDCCH for Type 1 relays | Huawei | Not treated |
R1‑092376 | LI Delay Impact on ICIC in type 1 Relay | Huawei | Not treated |
R1‑092377 | Issues in carrier aggregation | Huawei | Noted |
R1‑092378 | Further considerations on PDCCH for carrier aggregation | Huawei | Not treated |
R1‑092379 | Some considerations for efficient carrier aggregation | Huawei | Not treated |
R1‑092380 | CM issues for UL carrier aggregation | Huawei | Not treated |
R1‑092381 | TX diversity scheme criteria for PUSCH | Huawei | Not treated |
R1‑092382 | Comparison of UL TX diversity schemes for PUSCH | Huawei | Not treated |
R1‑092383 | Performance of UL multiple antenna transmission for PUCCH | Huawei | Not treated |
R1‑092384 | Channel interleaver and Codeword-to-layer Mapping for LTE-A Uplink Spatial Multiplexing | Huawei | Not treated |
R1‑092385 | Cubic metric friendly precoding for 4Tx UL MIMO | Huawei | Noted |
R1‑092386 | Further evaluation of the layer shifting and bundling for LTE-A uplink | Huawei | Not treated |
R1‑092387 | Resource mapping in DL MIMO retransmissions | Huawei | Not treated |
R1‑092388 | DL MIMO Codebook for 8 antenna ports | Huawei | Not treated |
R1‑092389 | Adaptive Codebook Designs for DL MU-MIMO | Huawei | Noted |
R1‑092390 | Discussion on DL MU-MIMO in LTE-A | Huawei | Not treated |
R1‑092391 | Evaluation of PMI Feedback Schemes for MU-MIMO Paring | Huawei | Not treated |
R1‑092392 | Evaluation of LTE-A UL features for ITU submission | Huawei | Noted |
R1‑092393 | Mobility evaluation of LTE for ITU submission | Huawei | Noted |
R1‑092394 | TDD DL LTE-A evaluation for ITU submission | Huawei, CMCC | Revised |
R1‑092395 | Feedback Methods for exploiting Channel Correlation in LTE-A DL | Marvell Semiconductor | Noted |
R1‑092396 | CSI Measurement with Downlink Reference Signal | Texas Instruments | Not treated |
R1‑092397 | Further consideration on feedback for DL CoMP | Texas Instruments | Noted |
R1‑092398 | Timing Advance Commands in Support of UL COMP Operation | Texas Instruments | Not treated |
R1‑092399 | Design of the UL Backhaul for a Type I Relay | Texas Instruments | Not treated |
R1‑092400 | Resolving CM and Cell ID Issues Associated with Aggregated Carriers | Texas Instruments | Not treated |
R1‑092401 | On PUCCH for Multiple Component Carriers | Texas Instruments | Not treated |
R1‑092402 | 4Tx Codebook for UL SU-MIMO: Rank-1 and 2 | Texas Instruments | Not treated |
R1‑092403 | 4Tx Codebook for UL SU-MIMO: Rank-3 | Texas Instruments | Revised |
R1‑092404 | Discussion on UL DM RS for SU - MIMO | Texas Instruments | Not treated |
R1‑092405 | HARQ Bundling for Uplink SU-MIMO | Texas Instruments | Not treated |
R1‑092406 | 4Tx Codebook for UL SU-MIMO: Results with Rank Adaptation | Texas Instruments | Not treated |
R1‑092407 | Precoding-Related Issues on 8Tx Downlink SU-MIMO | Texas Instruments | Not treated |
R1‑092408 | Preliminary DL performance evaluation for ITU-R submission | Texas Instruments | Noted |
R1‑092409 | Preliminary UL performance evaluation for ITU-R submission | Texas Instruments | Noted |
R1‑092410 | Link Simulation Assumptions for High Doppler Evaluation | Texas Instruments | Not treated |
R1‑092411 | Doppler Impact of Higher Carrier Frequencies on LTE – A Uplink | Texas Instruments | Not treated |
R1‑092412 | Control Signal Design for Rel-9 Dual-layer BF Transmission | Research In Motion UK Ltd | Not treated |
R1‑092413 | 4-tx Transmission Configuration in LTE-A | Research In Motion UK Ltd | Not treated |
R1‑092414 | Configurations of Transparent Relay using Dual-Layer BF | Research In Motion UK Ltd | Not treated |
R1‑092415 | Uplink Power Control for Carrier Aggregation | Research In Motion UK Ltd | Not treated |
R1‑092416 | Blind Decoding for Carrier Aggregation | Research In Motion UK Ltd | Not treated |
R1‑092417 | Carrier Indication for Carrier Aggregation | Research In Motion UK Ltd | Not treated |
R1‑092418 | Relay Link Control Signaling | Research In Motion UK Ltd | Not treated |
R1‑092419 | Type-II Relay Reference Signal Transmission and UE Association | Research In Motion UK Ltd | Not treated |
R1‑092420 | Type-II Relay DL/UL Transmission Schemes | Research In Motion UK Ltd | Not treated |
R1‑092421 | Relay Link HARQ Operation | Research In Motion UK Ltd | Not treated |
R1‑092422 | Downlink DM-RS Design Considerations for LTE-A | Research In Motion UK Ltd | Not treated |
R1‑092423 | Antenna Selection Entries in LTE-A Uplink 2 Element Codebook | Research In Motion UK Ltd | Not treated |
R1‑092424 | Performance study on LTE-A UL MIMO with TP | Research In Motion UK Ltd | Not treated |
R1‑092426 | CSI-RS and DRS Design for LTE-A System | Fujitsu | Not treated |
R1‑092427 | CSI-RS Design for Virtualized LTE Antenna in LTE-A System | Fujitsu | Not treated |
R1‑092428 | Performance Evaluation for CSI-RS in LTE-A System | Fujitsu | Noted |
R1‑092429 | Different Types of DL CoMP Transmission for LTE-A | Fujitsu | Not treated |
R1‑092430 | Performance Evaluation of Coherent SU and MU CoMP for LTE-A | Fujitsu | Not treated |
R1‑092431 | Efficient HARQ Protocol for SIC based DL CoMP | Fujitsu | Not treated |
R1‑092432 | Relaying with Channel Resource Reuse and SIC for LTE-Advanced | Fujitsu | Not treated |
R1‑092433 | Hierarchical Modulation based DL MIMO for LTE-Advanced | Fujitsu | Not treated |
R1‑092434 | Grouped and Encoded Packet based HARQ for LTE-Advanced | Fujitsu | Not treated |
R1‑092435 | Exploiting channel reciprocity in TDD with asymmetric interference | Mitsubishi Electric | Not treated |
R1‑092436 | Exploiting channel reciprocity in TDD/MIMO with asymmetric interference | Mitsubishi Electric | Not treated |
R1‑092437 | Necessity of checking channel characteristics in TDD | Mitsubishi Electric | Not treated |
R1‑092438 | Over-the-air Inter-node Carrier Phase Synchronization for LTE-advanced | Mitsubishi Electric | Not treated |
R1‑092439 | Discussion on over-the-air communication for CoMP | Mitsubishi Electric | Not treated |
R1‑092440 | Discussion on coordination of relay nodes for LTE-Advanced | Mitsubishi Electric | Not treated |
R1‑092441 | Discussion on Precoded SRS | Mitsubishi Electric | Noted |
R1‑092442 | TR 36.814 v1.1.1 | Rapporteur (NTT DOCOMO) | Noted - Revised |
R1‑092443 | Text proposal on 36.912 | Rapporteur (NTT DOCOMO) | Agreed |
R1‑092444 | TP on Link Budget for ITU-R submission template | Rapporteur (NTT DOCOMO) | Agreed |
R1‑092445 | Working document of ITU-R template toward October submission | Rapporteur (NTT DOCOMO) | Noted |
R1‑092446 | UE positioning based on propagation delay | NTT DOCOMO | Noted |
R1‑092447 | Clarification on precoded UE-specific demodulation RS | NEC Group | Not treated |
R1‑092448 | On the role of Rel-8 cell-specific RS as CSI-RS for LTE-A | NEC Group | Not treated |
R1‑092449 | Preliminary evaluation of DL CoMP joint transmission under Bursty traffic model | NEC group | Not treated |
R1‑092450 | Theoretical analysis of DL CoMP | NEC Group | Not treated |
R1‑092451 | Control Structure for Relay Type 1 nodes | NEC group | Revised |
R1‑092452 | Views on non-backward-compatible component carrier for LTE-A | NEC Group | Not treated |
R1‑092453 | MU-MIMO: Demodulation at the UE | NEC Group | Not treated |
R1‑092454 | Multi-resolution Precoding Codebook | NEC Group | Revised |
R1‑092455 | 25.224 CR0219 (Rel-8, F) Clarification on HS-DSCH procedure when using BCCH specific H-RNTI in CELL_PCH or URA_PCH state for 1.28Mcps TDD | TD Tech | Revised |
R1‑092456 | 25.221 CR0183 (Rel-8, F) Correction on HS-SCCH,HS-DSCH and HS-SICH Association and Timing | TD Tech | Noted |
R1‑092457 | 25.224 CR0220 (Rel-8, F) Correction on HS-DSCH Channel Quality Indication Procedure | TD Tech | Noted |
R1‑092458 | CPC synchronization maintenance for LCR TDD - CR for 25222 | New Postcom, ZTE, Potevio, Spreadtrum | Noted |
R1‑092459 | CPC synchronization maintenance for LCR TDD - CR for 25224 | New Postcom, ZTE, Potevio, Spreadtrum | Noted |
R1‑092460 | E-HICH signature sequence group for LCR TDD | New Postcom | Noted |
R1‑092461 | Timing association between HS-SCCH and SPS HS-PDSCH for LCR TDD | New Postcom | Noted - Revised |
R1‑092462 | Pattern-based PRS Design in LTE R9 | ZTE | Noted |
R1‑092463 | On DL Component Carrier Ambiguity in Initial Random Access Procedure | ZTE | Noted |
R1‑092464 | Uplink Control Channel Design for LTE-Advanced | ZTE | Not treated |
R1‑092465 | Some issues about bandwidth extension for LTE-A | ZTE | Not treated |
R1‑092466 | Impact of insufficient link adaptation in type II relay | ZTE | Not treated |
R1‑092467 | Performance of type II relay with 2x2 MIMO backhau | ZTE | Not treated |
R1‑092468 | Control channel of backhaul link | ZTE | Not treated |
R1‑092469 | Consideration on UL backhaul resource configuration and indication | ZTE | Not treated |
R1‑092470 | Consideration on UL access link in LTE-A FDD system | ZTE | Not treated |
R1‑092471 | Measurement of access downlink of type II relay | ZTE | Not treated |
R1‑092472 | DM RS Design for downlink transmission | ZTE | Noted |
R1‑092473 | DMRS Design with v-shift Enabled | ZTE | Not treated |
R1‑092474 | Performance Evaluation for the Impact of CSI RS on Rel8 PDSCH | ZTE | Revised |
R1‑092475 | Investigation on explicit channel matrix feedback in CoMP | ZTE | Not treated |
R1‑092476 | DL Codebook Design for 8 Tx MIMO in LTE-A | ZTE | Not treated |
R1‑092477 | Considerations on Precoding for UL 4 Tx SU-MIMO in LTE-A | ZTE | Revised |
R1‑092478 | Transmit diversity for PUCCH in LTE-A | ZTE | Not treated |
R1‑092479 | Performance Estimate on CoMP Joint Transmission | ZTE | Not treated |
R1‑092480 | 25.221 CR0184 (Rel-8, F) Clarification of the transmission of SS and TPC in CPC for 1.28Mcs TDD | ZTE, CATT, TD-TECH, RITT, Potevio, Newpostcom | Agreed |
R1‑092481 | 25.222 CR0178 (Rel-8, F) Correction to the channel mapping and rate matching for HS-DSCH in CPC for 1.28Mcs TDD | ZTE, CATT, TD-TECH, RITT, Potevio, Newpostcom | Revised |
R1‑092482 | Details on PRS Pattern | LG Electronics | Noted |
R1‑092483 | Details on PRS Sequence | LG Electronics | Noted |
R1‑092484 | Consideration on dual-layer beamforming | LG Electronics | Not treated |
R1‑092485 | CSI-RS Design for LTE-Advanced | LG Electronics | Noted |
R1‑092486 | DM-RS Design for Higher Order MIMO | LG Electronics | Not treated |
R1‑092487 | Views on Downlink RS for LTE-Advanced | LG Electronics | Not treated |
R1‑092488 | Multi-layered Rate Control for SIC-based CoMP | LG Electronics | Not treated |
R1‑092489 | Multi-layered Rate Control for Uplink CoMP | LG Electronics | Not treated |
R1‑092490 | Feedback Design for DL CoMP | LG Electronics | Not treated |
R1‑092491 | Feedback information for downlink coordinated scheduling/beamforming | LG Electronics | Not treated |
R1‑092492 | Resource Allocation and Downlink Control Channel Structure for Relay Backhaul Link | LG Electronics | Not treated |
R1‑092493 | Subframe allocation for Backhaul HARQ operation | LG Electronics | Revised |
R1‑092494 | Guard time handling in backhaul link design | LG Electronics | Revised |
R1‑092495 | PUSCH Forwarding in Type II Relay | LG Electronics | Revised |
R1‑092496 | On the complementariness of TDD in-band relaying methods | LG Electronics | Not treated |
R1‑092497 | Specification Issues of eNB-to-RN Backhauling in UL Resource | LG Electronics | Noted |
R1‑092498 | Regulatory Issues of eNB-to-RN Backhauling in UL Resource | LG Electronics | Noted |
R1‑092499 | Physical cell ID allocation to the aggregated component carriers | LG Electronics | Revised |
R1‑092500 | Component carrier indication by PDCCH for multiple carrier aggregation in LTE-Advanced | LG Electronics | Not treated |
R1‑092501 | ACK/NACK PUCCH for LTE-Advanced | LG Electronics | Not treated |
R1‑092502 | UCI transmission in case of transmit power limitation | LG Electronics | Not treated |
R1‑092503 | Uplink transmission under UE transmit power limitation | LG Electronics | Not treated |
R1‑092504 | Issues on DL/UL Control Signalling in Asymmetric Carrier Aggregation | LG Electronics | Not treated |
R1‑092505 | UE-specific Carrier Assignment for LTE-Advanced | LG Electronics | Not treated |
R1‑092506 | Initial Random Access in LTE-Advanced | LG Electronics | Noted |
R1‑092507 | Uplink Codebook for 4Tx SU-MIMO | LG Electronics | Noted |
R1‑092508 | Comparison between uplink frequency selective and non-selective precoding | LG Electronics | Not treated |
R1‑092509 | PUCCH TxD Schemes for LTE-A | LG Electronics | Not treated |
R1‑092510 | Performance evaluation of PUSCH 2Tx transmit diversity schemes in LTE-A | LG Electronics | Not treated |
R1‑092511 | Performance evaluation of PUSCH 4Tx transmit diversity schemes in LTE-A | LG Electronics | Not treated |
R1‑092512 | Discussion on Fall-back Mode with Multiple Transmit Antennas | LG Electronics | Noted |
R1‑092513 | Further details on layer shifting for UL SU-MIMO in LTE-A | LG Electronics | Not treated |
R1‑092514 | Consideration on DMRS design for UL SU-MIMO in LTE-A | LG Electronics | Not treated |
R1‑092515 | Consideration on UL sounding RS for multiple antennas | LG Electronics | Noted |
R1‑092516 | Remaining Issues on Higher Order MIMO | LG Electronics | Not treated |
R1‑092517 | Consideration on MU-MIMO for LTE-Advanced | LG Electronics | Not treated |
R1‑092518 | Evaluation for 8Tx CL-MIMO | LG Electronics | Not treated |
R1‑092519 | DL codebook design for 8Tx precoding | LG Electronics | Not treated |
R1‑092520 | Baseline performance evaluation result for LTE system | LG Electronics | Revised |
R1‑092521 | Comments on LS(RAN2) for carrier aggregation | Panasonic | Noted |
R1‑092522 | Discussion regarding "LS on RAN2 understanding of Tx-Rx separation" | Panasonic | Noted |
R1‑092523 | MU Transparency and Possible Impact on Spec | Panasonic | Noted |
R1‑092525 | Views on downlink RS | Panasonic | Not treated |
R1‑092526 | Downlink DM-RS with inter-cell considerations | Panasonic | Not treated |
R1‑092528 | Discussion on Combined/Non-Combined CoMP Reporting | Panasonic | Not treated |
R1‑092529 | Comparison of Orthogonal/Non-orthogonal CoMP transmission for PUCCH | Panasonic | Not treated |
R1‑092530 | Required Information at the UE in CoMP | Panasonic | Not treated |
R1‑092531 | Control Signalling for Relay Nodes | Panasonic | Revised |
R1‑092532 | Control signalling placement design for Relay Nodes | Panasonic | Not treated |
R1‑092533 | Further discussion on PDCCH for carrier aggregation | Panasonic | Not treated |
R1‑092534 | Further considerations on PHICH Linkage for carrier aggregation | Panasonic | Not treated |
R1‑092535 | UL ACK/NACK transmission on PUCCH for carrier aggregation | Panasonic | Not treated |
R1‑092536 | Synchronization channel and system information for carrier aggregation | Panasonic | Not treated |
R1‑092537 | Performance comparison of TxD schemes for PUCCH | Panasonic | Not treated |
R1‑092538 | Precoded SRS for LTE-Advance | Panasonic | Noted |
R1‑092539 | Support of carrier aggregation for FDD and related control signalling with blind ^^decoding reduction | Alcatel-Lucent | Not treated |
R1‑092540 | Estimation of extended PMI feedback signalling required for user intra-cell and^^inter-cell coordination | Alcatel-Lucent | Not treated |
R1‑092541 | Consideration on performance of coordinated beamforming with PMI feedback | Alcatel-Lucent | Not treated |
R1‑092542 | Uplink multi-point reception performance results for LTE-A | Alcatel-Lucent | Revised |
R1‑092543 | DL MIMO Precoding and Feedback Issues | Alcatel-Lucent | Revised |
R1‑092544 | Grid of Beams: A realization for downloadable codebooks | Alcatel-Lucent | Not treated |
R1‑092545 | Improving MIMO for LTE-Advanced via Downloadable Codebooks | Alcatel-Lucent | Not treated |
R1‑092546 | Best Companion reporting for improved single-cell MU-MIMO pairing | Alcatel-Lucent | Not treated |
R1‑092547 | CQI and CSI Feedback Compression | Alcatel-Lucent | Not treated |
R1‑092550 | Performance study on Tx/Rx mismatch in LTE TDD Dual-layer beamforming | Nokia, Nokia Siemens Networks, CATT, ZTE | Not treated |
R1‑092551 | Considerations on MU-Beamforming | Nokia, Nokia Siemens Networks | Noted |
R1‑092552 | Reporting of CQI/PMI/RI for LTE TDD Dual-layer beamforming | Nokia, Nokia Siemens Networks | Noted |
R1‑092553 | DL Control Signalling for Dual-layer Beamforming in Rel’9 | Nokia, Nokia Siemens Networks | Not treated |
R1‑092554 | UE-specific reference symbols for dual-layer beamforming | Nokia, Nokia Siemens Networks | Not treated |
R1‑092555 | Performance of layer-shifting for dual-layer beamforming | Nokia, Nokia Siemens Networks | Not treated |
R1‑092556 | UE-specific reference symbol multiplexing for LTE-Advanced downlink | Nokia, Nokia Siemens Networks | Not treated |
R1‑092557 | On the impact of CSI-RS puncturing to Rel’8 PDSCH performance | Nokia, Nokia Siemens Networks | Noted |
R1‑092558 | CSI payload extension using PUCCH and periodic PUSCH | Nokia Siemens Networks,Nokia | Not treated |
R1‑092559 | Uplink DM RS performance evaluation from CoMP viewpoint | Nokia Siemens Networks,Nokia | Not treated |
R1‑092560 | Uplink CoMP link level performance evaluation | Nokia Siemens Networks,Nokia | Not treated |
R1‑092561 | CoMP cell set selection and performance evaluation considerations | Nokia Siemens Networks, Nokia | Not treated |
R1‑092562 | Effect of Relaying on Coverage | Nokia Siemens Networks, Nokia | Not treated |
R1‑092563 | Selection criteria for relay site planning | Nokia Siemens Networks, Nokia | Not treated |
R1‑092564 | Text proposal on eNB-RN channel model | Nokia Siemens Networks, Nokia | Not treated |
R1‑092565 | Further aspects of Control Channel for relay backhaul link | Nokia Siemens Networks, Nokia | Not treated |
R1‑092566 | Interference mitigation for configuration pairing in TDD relay | Nokia, Nokia Siemens Networks | Not treated |
R1‑092567 | Improved Access-backhaul Partition Scheme for TDD Relay | Nokia, Nokia Siemens Networks | Not treated |
R1‑092568 | Use of Special Sub-frame for backhaul link in TDD relay | Nokia, Nokia Siemens Networks | Not treated |
R1‑092570 | Handling DCI formats and blind decoding in LTE-Advanced | Nokia, Nokia Siemens Networks | Not treated |
R1‑092571 | PHICH in LTE-Advanced | Nokia, Nokia Siemens Networks | Not treated |
R1‑092572 | UL control signalling for carrier aggregation | Nokia Siemens Networks,Nokia | Not treated |
R1‑092573 | Mechanism for Cell Specific Component Carrier Usage | Nokia Siemens Networks, Nokia, Qualcomm Europe | Not treated |
R1‑092574 | PUSCH Power Control for LTE-Advanced | Nokia Siemens Networks, Nokia | Not treated |
R1‑092575 | Summary of email discussion on carrier aggregation terminology | Nokia | Noted |
R1‑092576 | Precoding for 4 Tx UE in LTE-Advanced UL | Nokia Siemens Networks,Nokia | Noted |
R1‑092577 | LTE-Advanced SU-MIMO UE Transmission in LTE Release 8 Network | Nokia Siemens Networks,Nokia | Noted |
R1‑092578 | Tx Diversity for LTE-Advanced PUCCH | Nokia Siemens Networks,Nokia | Not treated |
R1‑092579 | Tx Diversity for LTE-Advanced PUSCH | Nokia Siemens Networks,Nokia | Not treated |
R1‑092580 | LTE-Advanced evaluation in 3GPP Macro Case 1 | Nokia, Nokia Siemens Networks | Noted |
R1‑092581 | ITU VoIP results | Nokia, Nokia Siemens Networks | Noted |
R1‑092582 | TDD HeNB synchronization with macro layer eNB | Nokia, Nokia Siemens Networks | Not treated |
R1‑092583 | Assumptions for LTE-Advanced Heterogeneous Deployment Studies | Nokia Siemens Networks, Nokia | Not treated |
R1‑092584 | Downlink Multi-Cell Demodulation Reference Signal Design | WOASis | Not treated |
R1‑092585 | Analysis of feedback mechanisms for COMP | InterDigital | Not treated |
R1‑092586 | OTDOA design considerations | InterDigital | Noted |
R1‑092587 | Relay Type I Backhaul and HARQ issues | InterDigital | Not treated |
R1‑092588 | Relay Type II Proposed Way Forward | InterDigital | Not treated |
R1‑092589 | Multiple Component Carriers and Carrier Indication | InterDigital | Not treated |
R1‑092590 | PRS design for LTE Rel-9 positioning | Pantech&Curitel | Noted |
R1‑092591 | Considerations on sequence design for CSI-RS | Pantech&Curitel | Not treated |
R1‑092592 | Consideration on Cell Selection in CoMP network including Relay Nodes | Pantech&Curitel | Not treated |
R1‑092593 | Consideration on determining cooperative eNBs in Joint Transmission CoMP scheme | Pantech&Curitel | Not treated |
R1‑092595 | Feedback requirement for codebook based MU-MIMO | Pantech&Curitel | Not treated |
R1‑092596 | Comparisons of OTDOA and RTT Location Methods in LTE | Polaris Wireless | Noted |
R1‑092597 | Blank subframes for LTE evolution | Vodafone Group | Revised |
R1‑092598 | Cell Synchronisation for OTDOA | Vodafone Group, NTT DoCoMo | Noted |
R1‑092599 | Power Scaling for Data and Control Channels for DC-HSUPA | InterDigital Communications LLC | Noted |
R1‑092600 | Further Analysis on Carrier Power Imbalance for DC-HSUPA | InterDigital Communications LLC | Noted |
R1‑092601 | Physical Channel Establishment Considerations for DC-HSUPA Operation | InterDigital Communications LLC | Noted |
R1‑092602 | Additional Considerations for EUL Coverage Extension | InterDigital Communications LLC | Noted |
R1‑092603 | DL Passive Open Loop CoMP and Performance | Motorola | Not treated |
R1‑092604 | Optimization of resource assignment for UL backhaul | Motorola | Not treated |
R1‑092605 | In-Band Backhauling on DL System Performance with Relays | Motorola | Not treated |
R1‑092606 | Downlink System performance with In-Band Backhauling Using Four Transmit Antennas | Motorola | Not treated |
R1‑092607 | Initial Random Access Procedure for Asymmetric Carrier Aggregation | Motorola | Noted |
R1‑092608 | 4Tx UL codebook: Antenna turn-off elements and unitary structure/CM-preserving | Motorola | Not treated |
R1‑092609 | DL Codebook design for 8 TX antennas for LTE-A | Motorola | Not treated |
R1‑092610 | Initial LTE Release-8 DL Performance for ITU Scenarios | Motorola | Revised |
R1‑092611 | Initial LTE Release-8 UL Performance for ITU Scenarios | Motorola | Noted |
R1‑092612 | Summary of Phase-1c calibration | Motorola | Noted |
R1‑092613 | A-GANSS/A-GPS and ECID Measurements for Positioning Support | Alcatel-Lucent | Noted |
R1‑092614 | Out-of-synchronisation handling for DC-HSUPA | Alcatel-Lucent | Noted |
R1‑092615 | Transmit Diversity for F-DPCH | Alcatel-Lucent | Noted |
R1‑092616 | Applicability of TX diversity in MIMO | Qualcomm Europe | Noted |
R1‑092617 | 25.211 CR0267 (Rel-7, F) Clarification to applicability of TX diversity in MIMO | Qualcomm Europe | Noted |
R1‑092618 | Clarification of CQI transmission when CQI priority changes from low to high | Qualcomm Europe | Noted |
R1‑092619 | 25.214 CR0549 (Rel-7, F) Clarification of CQI transmission when CQI priority changes from low to high | Qualcomm Europe | Noted - Revised |
R1‑092620 | 25.214 CR0550 (Rel-8, A) Clarification of CQI transmission when CQI priority changes from low to high | Qualcomm Europe | Noted - Revised |
R1‑092621 | 25.214 CR0551 (Rel-9, A) Clarification of CQI transmission when CQI priority changes from low to high | Qualcomm Europe | Noted |
R1‑092622 | Searcher Impact to DC-HSDPA Type 3i UEs when SCH is absent on secondary carrier | Qualcomm Europe | Noted |
R1‑092623 | Maximum Power Scaling for DC-HSUPA | Qualcomm Europe | Noted |
R1‑092625 | Initial DPCCH transmit power setting in DC-HSUPA | Qualcomm Europe, Huawei | Noted |
R1‑092626 | Out of Sync Handling at UE in DC-HSUPA | Qualcomm Europe | Noted |
R1‑092627 | Link Analysis of 2ms TTI uplink repetitions sent across different H-ARQ transmission attempts with and without ACK/NACK feedback | Qualcomm Europe | Noted |
R1‑092628 | On Serving Cell Muting for OTDOA Measurements | Motorola | Noted |
R1‑092629 | Positioning Accuracy Simulation Results for FDM/TDM PRS | Motorola | Noted |
R1‑092630 | Updated Results for OTDOA Using MBSFN and Normal Subframes | Motorola | Noted |
R1‑092631 | On UE Single Transmit Antenna Sounding for LTE Rel-9 Enhanced DL Transmission | Motorola | Not treated |
R1‑092632 | Control Signaling for LTE Rel-9 Enhanced DL transmission | Motorola | Not treated |
R1‑092633 | DRS Design for LTE Rel-9 Enhanced DL transmission and Extension to LTE-A | Motorola | Noted |
R1‑092634 | CoMP Operation Based on Spatial Covariance Feedback and Performance Results of Coordinated SU/MU Beamforming | Motorola | Revised |
R1‑092635 | Feedback Comparison in Supporting LTE-A MU-MIMO and CoMP Operations | Motorola | Not treated |
R1‑092636 | Backhaul options for Type 1 Relays for TDD LTE-A | Motorola | Not treated |
R1‑092637 | Relay System Simulation results with coverage boosting and control channel modeling | Motorola | Not treated |
R1‑092638 | Relay Backhaul Design | Motorola | Not treated |
R1‑092639 | Relay Impact on LTE System Performance | Motorola | Not treated |
R1‑092640 | Heterogeneous Support for Reliable DL Control | Motorola | Not treated |
R1‑092641 | PDCCH Design for Carrier Aggregation and post Rel8 features | Motorola | Not treated |
R1‑092642 | PDCCH False Detection | Motorola | Not treated |
R1‑092643 | Further Results on Layer Shifting Issue in UL-MIMO and Simulation Alignment Discussion | Motorola | Not treated |
R1‑092644 | Multi-Antenna Support in UL PUSCH/PUCCH/PRACH/SRS Transmission | Motorola | Noted |
R1‑092645 | 4-Tx Codebook Performance Comparison: CM Preserving and Rel8 Unitary Codebook | Motorola | Noted |
R1‑092646 | Dynamic SU/MU Mode Selection and Rank Adaptation | Motorola | Noted |
R1‑092647 | DCI Formats for uplink non-contiguous RB allocations | Motorola | Not treated |
R1‑092648 | Heterogenous System Simulation: Modeling Fast Fading Using IMT.EVAL Channel Models | Motorola | Not treated |
R1‑092649 | Performance evaluation results for enhanced DL beamforming | Samsung | Not treated |
R1‑092650 | Discussion on DCI formats for enhanced DL beamforming | Samsung | Revised |
R1‑092651 | Discussion on CSI-RS for LTE-Advanced | Samsung | Noted |
R1‑092652 | Discussion on DM-RS for LTE-Advanced | Samsung | Not treated |
R1‑092653 | Design considerations for COMP Joint Transmission | Samsung | Not treated |
R1‑092654 | CoMP Implicit CQI Feedback Discussions | Samsung | Not treated |
R1‑092655 | Comparison between Explicit and Implicit Feedbacks for CoMP | Samsung | Not treated |
R1‑092656 | Multiplexing CSI Feedback in LTE-A | Samsung | Not treated |
R1‑092657 | Impact of propagation attenuations and delays of CoMP composite channels | Samsung | Not treated |
R1‑092658 | Discussion on open-loop CoMP schemes | Samsung | Not treated |
R1‑092659 | Antenna calibrations for TDD CoMP | Samsung | Not treated |
R1‑092660 | Some considerations on Downlink Backhaul Control Design in type I relay | Samsung | Not treated |
R1‑092661 | Guard period in UL backhaul subframes and DL/UL timing design | Samsung | Not treated |
R1‑092662 | PHICH mapping in Asymmetric Carrier aggregation | Samsung | Not treated |
R1‑092663 | PHICH Transmission in LTE-A | Samsung | Not treated |
R1‑092664 | Initial access in DL and UL of LTE-A with carrier aggregation | Samsung | Not treated |
R1‑092665 | Initial random access in asymmetric carrier aggregation | Samsung | Noted |
R1‑092666 | LTE-A PDCCH: Number of Blind Decoding Operations and CRC Length Issues | Samsung | Not treated |
R1‑092667 | Control Signaling for Non-Contiguous UL Resource Allocations | Samsung | Not treated |
R1‑092668 | UL ACK/NAK Transmission in LTE-A | Samsung | Not treated |
R1‑092669 | Concurrent PUSCH and PUCCH Transmissions | Samsung | Not treated |
R1‑092670 | UL Transmission Power Control in LTE-A | Samsung | Not treated |
R1‑092671 | Discussions on UL PUSCH 2Tx Transmit Diversity Schemes in LTE-A | Samsung | Not treated |
R1‑092672 | UL PUSCH 4Tx Transmit Diversity Schemes in LTE-A | Samsung | Not treated |
R1‑092673 | Rank 3 codebook design for 4 Tx UL SU-MIMO | Samsung | Noted |
R1‑092674 | UL Transmit diversity for PUCCH format 1/1a/1b in LTE-A | Samsung | Not treated |
R1‑092675 | Transmit Diversity and Frequency Hopping Aspects for PUCCH Formats 2/2a/2b | Samsung | Not treated |
R1‑092676 | Performance evaluation on layer shifting and HARQ spatial bundling for LTE-A UL MIMO^^ | Samsung | Not treated |
R1‑092677 | SRS Transmission Issues in LTE-A | Samsung | Not treated |
R1‑092678 | Codebook Design for 8 Tx Transmission in LTE-A | Samsung | Not treated |
R1‑092679 | Transmit diversity in MBSFN subframes | Samsung | Not treated |
R1‑092680 | Multi-user MIMO enhancement in LTE-A | Samsung | Noted |
R1‑092681 | LTE and LTE-Advanced performance | Samsung | Noted |
R1‑092682 | Further Performance Enhancement using Priority Allocation (PA) on^^codeword-to-layer mapping for dual-layer beamforming | ITRI | Not treated |
R1‑092683 | Carrier Identification in PDCCH | ITRI | Not treated |
R1‑092684 | Draft LS reply on unavoidability of PCI Collision in the presence of HeNBs | Qualcomm Europe | Noted |
R1‑092685 | PRS Design – Remaining Open Issues | Qualcomm Europe | Noted |
R1‑092686 | Link analyses of different reference signal designs for dual-stream beamforming | Qualcomm Europe | Not treated |
R1‑092688 | CSI RS function in LTE-A | Qualcomm Europe | Not treated |
R1‑092689 | DM-RS patterns for LTE-A | Qualcomm Europe | Not treated |
R1‑092690 | RS patterns vs. peak data rate | Qualcomm Europe | Not treated |
R1‑092691 | Preliminary CoMP gains for ITU micro scenario | Qualcomm Europe | Not treated |
R1‑092692 | CoMP Cooperative Silencing Hotzone DL Performance | Qualcomm Europe | Not treated |
R1‑092693 | CoMP cooperative Silencing Hotzone UL Performance | Qualcomm Europe | Not treated |
R1‑092694 | Advantages of CoMP operation for delay sensitive traffic in CSG environment | Qualcomm Europe | Not treated |
R1‑092695 | Feedback considerations for DL MIMO and CoMP | Qualcomm Europe | Not treated |
R1‑092696 | Hierarchical feedback in support of DL CoMP operation | Qualcomm Europe | Not treated |
R1‑092697 | Signaling for Spatial Coordination in DL CoMP | Qualcomm Europe | Not treated |
R1‑092698 | Comparison between MDC and MLC feedback compression techniques | Qualcomm Europe | Revised |
R1‑092699 | Challenges with Type II relay operation | Qualcomm Europe | Not treated |
R1‑092700 | Techniques to maximize the Type 1 relay gains | Qualcomm Europe | Not treated |
R1‑092702 | Backhaul link design in support of relaying operation | Qualcomm Europe | Not treated |
R1‑092703 | Multi-carrier control for LTE-A | Qualcomm Europe | Not treated |
R1‑092704 | Notions of segment and backwards/non-backwards compatible carriers | Qualcomm Europe | Not treated |
R1‑092705 | Carrier aggregation in heterogeneous networks | Qualcomm Europe | Not treated |
R1‑092706 | UL carrier aggregation performance with range expansion | Qualcomm Europe | Not treated |
R1‑092707 | PHICH for MC operation | Qualcomm Europe | Not treated |
R1‑092708 | CQI for MC operation | Qualcomm Europe | Not treated |
R1‑092709 | UL ACK for MC operation | Qualcomm Europe | Not treated |
R1‑092710 | Cubic Metric with Carrier Aggregation | Qualcomm Europe | Not treated |
R1‑092711 | PUCCH transmit diversity | Qualcomm Europe | Not treated |
R1‑092712 | PUSCH transmit diversity | Qualcomm Europe | Not treated |
R1‑092713 | Further Link Analyses of SU-MIMO operation for UL of LTE-A | Qualcomm Europe | Not treated |
R1‑092714 | Link and system analysis for UL beamforming | Qualcomm Europe | Not treated |
R1‑092715 | DMRS in support of UL MIMO and TxD | Qualcomm Europe | Not treated |
R1‑092716 | Open loop MIMO transmission in LTE-A | Qualcomm Europe | Not treated |
R1‑092717 | DL MU-MIMO operation in LTE-A | Qualcomm Europe | Noted |
R1‑092718 | DL MIMO transmission modes | Qualcomm Europe | Not treated |
R1‑092719 | DL performance of LTE-A | Qualcomm Europe | Noted |
R1‑092721 | Measurements in support of various LTE-A techniques | Qualcomm Europe | Not treated |
R1‑092722 | Time synchronization requirements for different LTE-A techniques | Qualcomm Europe | Not treated |
R1‑092723 | Flexible Data and Reference Signal Multiplexing for LTE-Advanced Uplink | Qualcomm Europe | Not treated |
R1‑092724 | Modification of Type II relay for measuring RN-UE channel | Hitachi, Ltd. | Not treated |
R1‑092725 | 25.214 CR0552 (Rel-7, F) Clarification to UL DPCCH burst pattern transmission due to DTX cycle pattern change | Infineon Technologies | Noted - Revised |
R1‑092726 | 25.214 CR0553 (Rel-8, A) Clarification to UL DPCCH burst pattern transmission due to DTX cycle pattern change | Infineon Technologies | Noted - Revised |
R1‑092727 | Comparison of uplink 2-TX transmit diversity schemes for LTE-Advanced | Mitsubishi Electric | Not treated |
R1‑092728 | Comparison of uplink 4-TX transmit diversity schemes for LTE-Advanced | Mitsubishi Electric | Not treated |
R1‑092729 | Impact of relays on system performance | Mitsubishi Electric | Not treated |
R1‑092730 | Non-contiguous uplink resource allocation for LTE-A | ASUSTeK | Not treated |
R1‑092731 | Remaining issues on OTDOA positioning | Ericsson, ST-Ericsson | Noted |
R1‑092732 | Some considerations on dual layer beamforming | Ericsson, ST-Ericsson | Not treated |
R1‑092733 | CQI for dual layer beamforming | Ericsson, ST-Ericsson | Noted |
R1‑092734 | Downlink demodulation RS design for Rel-9 and beyond | Ericsson, ST-Ericsson | Noted |
R1‑092736 | PDSCH mapping for CoMP | Ericsson, ST-Ericsson | Noted |
R1‑092737 | On CSI feedback for IMT-Advanced fulfilling CoMP schemes | Ericsson, ST-Ericsson | Noted |
R1‑092738 | UL SU-MIMO in LTE Advanced | Ericsson, ST-Ericsson | Not treated |
R1‑092739 | LTE Rel8/10 performance and IMT-Advanced Requirements | Ericsson, ST-Ericsson | Noted |
R1‑092740 | Antenna mechanical tilt model | Ericsson, ST-Ericsson | Revised |
R1‑092741 | Modelling of cross polarized antennas | Ericsson, ST-Ericsson | Noted |
R1‑092742 | Email discussion summary on calibration step 1c | Ericsson, ST-Ericsson | Noted |
R1‑092743 | Email discussion summary on calibration step 2 | Ericsson, ST-Ericsson | Revised |
R1‑092744 | 25.211 CR0268 (Rel-8, F) Clarification on STTD encoding description for AICH | Huawei | Agreed |
R1‑092745 | Performance evaluation of 2 TX antennas network | Huawei | Noted |
R1‑092746 | Draft 25.214 CR for introduction of DC-HSUPA | Huawei | Noted |
R1‑092747 | Remaining issues on secondary UL carrier activation/deactivation | Huawei | Noted |
R1‑092748 | CodeBook Design for the ACK/NACK in DC-HSDPA MIMO | Huawei | Noted |
R1‑092749 | Discussion on Schemes of 2ms TTI EUL Coverage | Huawei | Noted |
R1‑092750 | Simulation results and delay calculations for 2ms TTI EUL coverage enhancement | Huawei | Noted |
R1‑092752 | Discussion on Backhaul link of Type-1 Relay for LTE-A TDD | Fujitsu | Not treated |
R1‑092753 | Considerations on using Type II relay for UL transmission | Fujitsu | Not treated |
R1‑092754 | DL backhaul-link sub-frame for Type-1 relay in FDD system | Fujitsu | Not treated |
R1‑092755 | Cross-carrier assignment non-applicable DL transmission | Fujitsu | Not treated |
R1‑092756 | TDD PRACH transmission | IPWireless | Not treated |
R1‑092757 | 25.211 CR265R2 (Rel-7, F) Clarification to applicability of TX diversity in MIMO | Ericsson, Nokia, Nokia Siemens Networks, ST-Ericsson | Noted |
R1‑092758 | Clarifications on CPC DTX/DRX | Ericsson, ST-Ericsson | Noted |
R1‑092759 | Optionality of HS-SCCH-related Rel-8 features | Ericsson, ST-Ericsson | Noted |
R1‑092760 | 25.214 CR draft (Rel-9, B) Introduction of DC-HSUPA | Ericsson, Qualcomm Europe, ST-Ericsson | Noted |
R1‑092761 | DC-HSUPA - Specification improvements | Ericsson, ST-Ericsson | Noted |
R1‑092762 | DC-HSUPA - E-TFC selection system simulation results | Ericsson, ST-Ericsson | Noted |
R1‑092763 | DC-HSUPA - Power scaling at UE power limitation | Ericsson, ST-Ericsson | Noted |
R1‑092764 | DC-HSUPA - DPCCH power limit for secondary carrier | Ericsson, ST-Ericsson | Noted |
R1‑092765 | DC-HSUPA - Measurement definitions | Ericsson, ST-Ericsson | Noted |
R1‑092766 | 25.214 CR draft (Rel-9, B) Combination of DC-HSDPA with MIMO | Ericsson, Qualcomm Europe, ST-Ericsson | Noted |
R1‑092767 | UE categories for combination of DC-HSDPA with MIMO | Ericsson, ST-Ericsson | Noted |
R1‑092768 | Draft Reply LS on carrier aggregation design | CATT | Noted |
R1‑092769 | Draft CR36.214 Clarification on reference point of RSRP and RSRQ for EUTRA | CATT | Noted - Revised |
R1‑092770 | UE-specific RS for Dual-layer BF | CATT, Potevio | Not treated |
R1‑092771 | Beamforming based MU-MIMO | CATT, CMCC, RITT, ZTE | Noted |
R1‑092772 | Feedback mechanism analysis of dual layer beamforming for TDD system | CATT | Noted |
R1‑092773 | Performance of Layer Shifting for Dual-layer Beamforming | CATT | Not treated |
R1‑092774 | Further investigation on the multiplexing of CSI-RS for LTE-A | CATT | Not treated |
R1‑092775 | Consideration on Rel-8 CRS and Rel-10 CSI RS in LTE-A | CATT | Not treated |
R1‑092776 | Analysis of SRS scheme for CoMP | CATT, Potevio | Noted |
R1‑092777 | Performance Evaluation of Downlink CoMP | CATT | Not treated |
R1‑092779 | UL Backhaul Subframe for Type I Relay in LTE-A | CATT, CMCC, Huawei, RITT, Potevio, ZTE | Not treated |
R1‑092780 | Draft Text Proposal on Type I Relay UL Backhaul Subframes in LTE-A | CATT, CMCC, Huawei, ITRI, LGE, Motorola, Nokia, Nokia Siemens Networks, Potevio, Qualcomm, RITT, Samsung, Texas Instruments, ZTE | Agreed |
R1‑092781 | Design of Backhaul Control Channel for Type I Relay in LTE-A | CATT | Not treated |
R1‑092782 | Application of Type II Relay in LTE-A | CATT | Not treated |
R1‑092783 | Consideration on TDD Relay Frame Structure | CATT | Not treated |
R1‑092784 | Consideration on Relay Backhaul Link Quality | CATT | Not treated |
R1‑092785 | Design of DL Control Channel for LTE-A with Carrier Aggregation | CATT, RITT, Potevio | Not treated |
R1‑092786 | Benefits of Carrier Indicator on Multi-Channel ACK/NACK Transmission | CATT, Potevio | Revised |
R1‑092787 | PHICH for LTE-A | CATT | Not treated |
R1‑092788 | Multi-channel Transmission for UL ACK/NACK in LTE-A | CATT | Not treated |
R1‑092789 | UL ACK/NACK transmission scheme for LTE-A | CATT | Not treated |
R1‑092790 | Discussion on UE behavior during initial access with carrier aggregation | CATT, ZTE | Not treated |
R1‑092791 | Initial Random Access Procedure for LTE-A | CATT | Noted |
R1‑092792 | Analysis of Layer Mapping for Uplink SU-MIMO | CATT | Not treated |
R1‑092793 | Noncodebook based downlink transmission in LTE-A | CATT | Not treated |
R1‑092794 | Discussion on precoding granularity for downlink MIMO | CATT | Not treated |
R1‑092795 | Way forwayd for polarized antenna response modeling | CATT, CMCC, Huawei, MOTOROLA, Potevio, RITT, ZTE | Noted |
R1‑092796 | LTE-TDD performance in ITU scenarioes | CATT | Noted |
R1‑092797 | DL DM-RS Design for Rel-9 LTE | NTT DOCOMO | Not treated |
R1‑092798 | DL DM-RS Design for LTE-Advanced | NTT DOCOMO | Not treated |
R1‑092799 | Investigation on Advanced CoMP Gain with MU-MIMO Techniques for LTE-Advanced Downlink | NTT DOCOMO | Not treated |
R1‑092800 | Inter-cell Radio Resource Management for Heterogeneous Networks | NTT DOCOMO | Not treated |
R1‑092801 | UL RS Enhancement for LTE-Advanced | NTT DOCOMO | Not treated |
R1‑092802 | Initial Access Procedure for Asymmetric Wider Bandwidth in LTE-Advanced | NTT DOCOMO | Noted |
R1‑092803 | UL Transmit Diversity Schemes in LTE-Advanced | NTT DOCOMO | Not treated |
R1‑092804 | Investigation on DL 8-Tx MIMO Codebook Precoding for LTE-Advanced | NTT DOCOMO | Not treated |
R1‑092806 | 25.222 CR0179 (Rel-8, F) Modification of CCS information mapping for HS-SCCH type 8 for LCR TDD | CATT | Noted - Revised |
R1‑092807 | 25.224 CR0221 (Rel-8, F) Clarification of establishment of uplink synchronization in CELL_FACH state for LCR TDD | CATT | Noted - Revised |
R1‑092810 | Definition of cell portion and related measurements in UTRAN | CATT, ZTE | Agreed in principle |
R1‑092811 | PMI Feedback mechanism analysis of dual layer beamforming for TDD system | Potevio | Noted |
R1‑092812 | Dual-layer beamforming for TDD MU-MIMO downlink | Potevio | Not treated |
R1‑092813 | Impact of UE calibration error on CQI and throughput | Potevio | Revised |
R1‑092814 | Considerations on the Selection of the DL-UL Subframes for Backhaul | Potevio, CATT, Newpostcom | Not treated |
R1‑092815 | 25.221 CR0185 (Rel-8, F) Change of the timing definition in CELL-PCH for 1.28Mcps TDD | Potevio, CATT, ZTE, Newpostcom, TD-TECH | Revised |
R1‑092816 | 25.224 CR0224 (Rel-8,F) Change of the timing definition in CELL-PCH for 1.28Mcps TDD | Potevio, CATT, ZTE, Newpostcom, TD-TECH | Revised |
R1‑092817 | Coping with the multi-cell timing issues in uplink COMP joint processing | Alcatel-Lucent | Not treated |
R1‑092818 | Draft Text Proposal on Relay backhaul channel model for 36.814 | CMCC, Huawei, Ericsson, Nokia, Nokia Siemens Network, ST-Ericsson, CATT | Noted |
R1‑092819 | Draft Text Proposal on Relay evaluation methodologies for 36.814 | CMCC | Noted |
R1‑092820 | Proposal for Macro-relay pathloss model based on measurement results | CMCC | Not treated |
R1‑092821 | Discussion on the issues in LS from RAN2 | CMCC | Noted |
R1‑092822 | Views on the relationship among CoMP sets | CMCC | Not treated |
R1‑092823 | Discussions on DM-RS Design with Rank Grouping | CMCC | Not treated |
R1‑092824 | Performance evaluation of multi-user dual-layer beamforming | CMCC | Not treated |
R1‑092825 | Some consideration on MU-MIMO in Dual-layer beamforming in LTE R9 | CMCC | Noted |
R1‑092827 | Dealing with UTRA UEs in 2-Tx antenna environment | Nokia Siemens Networks, Nokia | Noted |
R1‑092828 | Power scaling in DC HSUPA | Nokia, Nokia Siemens Networks | Noted |
R1‑092829 | TTI repetition for improved performance in large cells | Nokia Siemens Networks, Nokia | Noted |
R1‑092830 | 25212 CR0276R2 (Rel-9, B) "Introduction of TxAA extension for non-MIMO UEs" | Nokia, Nokia Siemens Networks | Noted |
R1‑092831 | 25214 CR0548R2 (Rel-9, B) "Introduction of TxAA extension for non-MIMO UEs" | Nokia, Nokia Siemens Networks | Noted |
R1‑092832 | Simulation results for LTE positioning accuracy | Nokia, Nokia Siemens Networks | Noted |
R1‑092833 | Discussions on CoMP Cooperating Set | CHTTL | Not treated |
R1‑092834 | UL Control Channel Transmission in LTE-A | CHTTL | Not treated |
R1‑092835 | Prioritisation of relay deployment scenarios for performance evaluations | Orange, SK Telecom, T-Mobile | Revised |
R1‑092838 | Adaptive Cell Clustering for CoMP in LTE-A | Hitachi Ltd | Not treated |
R1‑092839 | Dual Layer Beamforming Issues | ZTE | Not treated |
R1‑092840 | Performance Evaluation for the Impact of CSI RS on Rel8 PDSCH | ZTE | Noted |
R1‑092841 | Cognitive Interference Management for Type I Relays | CEWiT | Not treated |
R1‑092842 | Downlink CoMP based on Cooperative Precoding | CEWiT | Not treated |
R1‑092843 | Impact of UE calibration error on CQI and throughput | Potevio | Not treated |
R1‑092844 | 25.221 CR0185 (Rel-8,F) Change of the timing definition in CELL-PCH for 1.28Mcps TDD | Potevio, CATT, ZTE, Newpostcom, TD-TECH | Noted - Revised |
R1‑092845 | 25.224 CR0224 (Rel-8,F) Change of the timing definition in CELL-PCH for 1.28Mcps TDD | Potevio, CATT, ZTE, Newpostcom, TD-TECH | Noted - Revised |
R1‑092846 | Benefits of Carrier Indicator on Multi-Channel ACK/NACK Transmission | CATT, Potevio | Not treated |
R1‑092847 | Further Consideration on Feedback for Downlink CoMP in LTE-A with Draft Text Proposal | CATT, CMCC, Huawei, Potevio, RITT | Not treated |
R1‑092848 | Dual layer beamforming based on partial channel information | CATT | Not treated |
R1‑092849 | Detailed assumptions used in the evaluation of LTE-A TDD for ITU submission | CMCC, CATT, Huawei, RITT, ZTE | Revised |
R1‑092850 | Text proposal for LTE-Advanced submission template | RITT, Nokia, Nokia Siemens Networks | Agreed |
R1‑092851 | Subframe allocation for Backhaul HARQ operation | LG Electronics | Revised |
R1‑092852 | PUSCH Forwarding in Type II Relay | LG Electronics | Not treated |
R1‑092853 | Multi-resolution Precoding Codebook | NEC Group | Not treated |
R1‑092854 | Draft CR 36.211 Introduction of LTE positioning | Ericsson, ST-Ericsson, Motorola, Qualcomm, LG, Nokia, Nokia Siemens Networks, Alcatel-Lucent, InterDigital, Samsung, Huawei, Pantech & Curitel, ZTE | Agreed |
R1‑092856 | Draft CR 36.214 Introduction of LTE positioning | Ericsson, ST-Ericsson, Alcatel-Lucent, Motorola, Qualcomm, LG, InterDigital, Samsung, Huawei, Pantech & Curitel, ZTE | Agreed |
R1‑092857 | UE behaviour during UL ACK/NACK repetition | LG Electronics | Noted |
R1‑092858 | Two clarifications on the Rel-8 UE behaviour | LG Electronics | Noted |
R1‑092859 | Baseline performance evaluation result for LTE system | LG Electronics | Noted |
R1‑092860 | Discussion on power scaling for DC-HSUPA | Huawei | Noted |
R1‑092861 | UE categories for DC-HSDPA with MIMO | Huawei | Noted |
R1‑092862 | Initial LTE Release-8 DL Performance for ITU Scenarios | Motorola | Noted |
R1‑092863 | LS Request for Link Level Trace Files | SA4, Nokia | Noted |
R1‑092864 | Liaison response to R3-091399 for PCI collision | RAN1, Huawei | Agreed |
R1‑092865 | Considerations on Precoding for UL 4 Tx SU-MIMO in LTE-A | ZTE | Not treated |
R1‑092866 | 25.222 CR0178R1 (Rel-8, F) Correction to the channel mapping and rate matching for HS-DSCH in CPC for 1.28Mcs TDD | ZTE, CATT, TD-TECH, RITT, Potevio, Newpostcom | Noted - Revised |
R1‑092867 | Draft LS on definition of cell portion and related measurements for 1.28Mcps TDD | CATT | Noted - Revised |
R1‑092868 | Effective IoT | Ericsson | Noted |
R1‑092869 | 25.214 CR0554 (Rel-7, F) Clarification of start of DTX Cycle 2 to Cycle 1 Transition | Qualcomm Europe | Noted - Revised |
R1‑092870 | 25.214 CR0555 (Rel-8, A) Clarification of start of DTX Cycle 2 to Cycle 1 Transition | Qualcomm Europe | Noted - Revised |
R1‑092871 | Link Analysis of non-TxD Type 2/3 receivers in 2 transmit antenna environment | Qualcomm Europe | Noted |
R1‑092872 | Analysis of Carrier Imbalance in DC-HSUPA | Qualcomm Europe | Noted |
R1‑092873 | DL MIMO Precoding and Feedback Issues | Alcatel-Lucent | Not treated |
R1‑092874 | LTE-A self evaluation and preparation for ITU submission in RAN1 | RAN1 Chairman, LTE-Advanced rapporteur | Agreed |
R1‑092875 | Physical cell ID allocation to the aggregated component carriers | LG Electronics | Not treated |
R1‑092876 | Cell spectrum efficiency evaluation of LTE R8 FDD for ITU submission (step 2) | Huawei | Not treated |
R1‑092877 | Email discussion summary on calibration step 2 | Ericsson | Noted |
R1‑092878 | Comparison between MDC and MLC feedback compression techniques | Qualcomm Europe | Not treated |
R1‑092879 | Blank subframes for LTE evolution | Vodafone Group, Orange, AT&T | Noted |
R1‑092880 | 36.213 CR0245 (Rel-8, F) Correction to PUSCH hopping and PHICH mapping procedures | Huawei, LGE, Panasonic, Qualcomm Europe, Samsung, Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑092881 | 36.211 CR0137 (Rel-8, F) Clarification on DMRS sequence for PUSCH | Huawei, LGE, Panasonic, Qualcomm Europe, Samsung, Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑092882 | 36.211 CR0138 (Rel-8,F) Correction to PHICH resource mapping for TDD | Huawei, CATT, LGE | Noted - Revised |
R1‑092883 | Channel Quality Measurement to Support Reselection in LTE-A | SHARP | Not treated |
R1‑092884 | Current status on 4Tx transmission | LTE Rapporteur (NTT DOCOMO) | Noted |
R1‑092885 | 25.214 CR0552R1 (Rel-7, F) Clarification to support of HS-DSCH related procedures according to MAC-ehs | Infineon Technologies | Agreed |
R1‑092886 | 25.214 CR0553R1 (Rel-8, A) Clarification to support of HS-DSCH related procedures according to MAC-ehs | Infineon Technologies | Agreed |
R1‑092887 | 25.214 CR0549R1 (Rel-7, F) Clarification of CQI transmission when CQI priority changes | Qualcomm Europe | Agreed |
R1‑092888 | 25.214 CR0550R1 (Rel-8, A) Clarification of CQI transmission when CQI priority changes | Qualcomm Europe | Agreed |
R1‑092889 | 25.214 CR0556 (Rel-7, F) Clarification of CPC Enabling Delay | Ericsson, ST-Ericsson | Noted - Revised |
R1‑092890 | 25.214 CR0557 (Rel-8, A) Clarification of CPC Enabling Delay | Ericsson, ST-Ericsson | Noted - Revised |
R1‑092891 | 25.212 CR0277 (Rel-7, F) Reservation of HS-SCCH order combination not used by CPC | Ericsson, ST-Ericsson | Noted - Revised |
R1‑092892 | 25.212 CR0278 (Rel-8, A) Reservation of HS-SCCH order combination not used by CPC | Ericsson, ST-Ericsson | Noted - Revised |
R1‑092893 | 25.214 CR0554R1 (Rel-7, F) Clarification of start of DTX Cycle 2 to Cycle 1 Transition | Qualcomm Europe | Noted - Revised |
R1‑092894 | 25.214 CR0555R1 (Rel-8, A) Clarification of start of DTX Cycle 2 to Cycle 1 Transition | Qualcomm Europe | Noted - Revised |
R1‑092895 | [Draft] LS on RAN1 view on optionality of HSPA Rel-8 features | Ericsson, ST-Ericsson | Noted - Revised |
R1‑092896 | 25.224 CR0219R2 (Rel-8, F) Clarification on HS-DSCH procedure when using BCCH specific H-RNTI in CELL_PCH or URA_PCH state for 1.28Mcps TDD | TD Tech | Noted |
R1‑092897 | 25.221 Draft CR (Rel-8, F) Timing association between HS-SCCH and SPS HS-PDSCH for LCR TDD | New Postcom, ZTE, Potevio | Not treated |
R1‑092898 | 25.222 CR0178R2 (Rel-8, F) Correction to the channel mapping and rate matching for HS-DSCH in CPC for 1.28Mcs TDD | ZTE, CATT, TD-TECH, RITT, Potevio, Newpostcom | Agreed |
R1‑092899 | 25.222 CR0179R1 (Rel-8, F) Modification of CCS information mapping for HS-SCCH type 8 for LCR TDD | CATT | Not treated |
R1‑092900 | 25.224 CR0221R1 (Rel-8, F) Clarification of establishment of uplink synchronization in CELL_FACH state for LCR TDD | CATT | Noted - Revised |
R1‑092901 | 25.221 CR0185R1 (Rel-8, F) Change of the timing definition in CELL-PCH for 1.28Mcps TDD | Potevio, CATT, ZTE, Newpostcom, TD-TECH | Agreed |
R1‑092902 | 25.224 CR0224R1 (Rel-8,F) Change of the timing definition in CELL-PCH for 1.28Mcps TDD | Potevio, CATT, ZTE, Newpostcom, TD-TECH | Agreed |
R1‑092903 | [Draft] LS on DC-HSUPA agreements | Nokia Siemens Networks | Noted - Revised |
R1‑092905 | 25.215 Draft CR (Rel-8, B) Introduction of DC-HSUPA | Ericsson, ST-Ericsson | Agreed |
R1‑092906 | 25.212 Draft CR (Rel-9, B) Combination of DC-HSDPA with MIMO | Ericsson, Huawei, Nokia, Nokia Siemens Networks, ST-Ericsson | Agreed |
R1‑092907 | [Draft] LS on UE categories for combination of DC-HSDPA with MIMO | Ericsson, ST-Ericsson | Noted - Revised |
R1‑092908 | 25.214 Draft CR (Rel-9, B) Combination of DC-HSDPA with MIMO | Ericsson, Huawei, Nokia, Nokia Siemens Networks, ST-Ericsson | Agreed |
R1‑092909 | 25.214 CR0554R2 (Rel-7, F) Clarification of start of DTX Cycle 2 to Cycle 1 Transition | Qualcomm Europe | Agreed in principle |
R1‑092910 | 25.214 CR0555R2 (Rel-8, A) Clarification of start of DTX Cycle 2 to Cycle 1 Transition | Qualcomm Europe | Agreed in principle |
R1‑092911 | [Draft] LS on UE categories for combination of DC-HSDPA with MIMO | Ericsson, ST-Ericsson, Huawei | Noted - Revised |
R1‑092912 | [Draft] LS on HSDPA MIMO cell reference configuration | Nokia Siemens Networks | Noted - Revised |
R1‑092913 | 25.214 CR0556R1 (Rel-7, F) Clarification of CPC Enabling Delay | Ericsson, ST-Ericsson | Agreed |
R1‑092914 | 25.214 CR0557R1 (Rel-8, A) Clarification of CPC Enabling Delay | Ericsson, ST-Ericsson | Agreed |
R1‑092915 | 25.212 CR0277R1 (Rel-7, F) Reservation of HS-SCCH order combination not used by CPC | Ericsson, ST-Ericsson | Agreed |
R1‑092916 | 25.212 CR0278R1 (Rel-8, A) Reservation of HS-SCCH order combination not used by CPC | Ericsson, ST-Ericsson | Agreed |
R1‑092917 | [Draft] LS on RAN1 view on optionality of HSPA Rel-8 features | Ericsson, ST-Ericsson | Noted - Revised |
R1‑092918 | 25.211 Draft CR (Rel-9, B) Introduction of DC-HSUPA | Ericsson, ST-Ericsson, Qualcomm Europe, Huawei | Agreed |
R1‑092919 | 25.212 Draft CR (Rel-9, B) Introduction of DC-HSUPA | Ericsson, ST-Ericsson, Qualcomm Europe, Huawei | Agreed |
R1‑092920 | 25.213 Draft CR (Rel-9, B) Introduction of DC-HSUPA | Ericsson, ST-Ericsson, Qualcomm Europe, Huawei | Agreed |
R1‑092921 | LTE and LTE-A TDD system downlink cell spectrum efficiency evaluation for ITU submission | CMCC, Huawei, CATT, RITT | Noted |
R1‑092922 | Detailed assumptions used in the evaluation of LTE-A TDD for ITU submission | CMCC, CATT, Huawei, RITT, ZTE | Noted |
R1‑092923 | 36.211 CR0137R1 (Rel-8, F) Clarification on DMRS sequence for PUSCH | Huawei, LGE, Panasonic, Qualcomm Europe, Samsung, Nokia Siemens Networks, Nokia, Ericsson, ST-Ericsson, InterDigital | Agreed |
R1‑092924 | 36.213 CR0245R1 (Rel-8, F) Correction to PUSCH hopping and PHICH mapping procedures | Huawei, LGE, Panasonic, Qualcomm Europe, Samsung, Nokia Siemens Networks, Nokia, Ericsson, ST-Ericsson, InterDigital | Agreed |
R1‑092925 | 36.214 CR0010 (Rel-8, F) Clarification on reference point of RSRP and RSRQ for EUTRA | CATT, Ericsson, ST-Ericsson | Agreed |
R1‑092926 | 25.215 CR0195 (Rel-8, F) Clarification on reference point of RSRP and RSRQ for EUTRA | Ericsson, ST-Ericsson, CATT | Agreed |
R1‑092927 | 25.225 CR0092 (Rel-8, F) Clarification on reference point of RSRP and RSRQ for EUTRA | CATT, Ericsson, ST-Ericsson | Agreed |
R1‑092928 | 36.211 CR0138R1 (Rel-8,F) Correction to PHICH resource mapping for TDD and to PHICH scrambling | Huawei, CATT, LGE, Nokia Siemens Networks, Nokia | Agreed |
R1‑092929 | 25.224 CR0219R1 (Rel-8, F) Clarification on HS-DSCH procedure when using BCCH specific H-RNTI in CELL_PCH or URA_PCH state for 1.28Mcps TDD | TD Tech | Noted - Revised |
R1‑092930 | Draft TP for evaluation assumption for TR36.912 | LTE-A Rapporteur (NTT DoCoMo) | Noted - Revised |
R1‑092931 | TP on evaluation assumptions for ITU-R template | LTE-A Rapporteur (NTT DoCoMo) | Noted |
R1‑092932 | Antenna mechanical tilt model | Ericsson, ST-Ericsson | Noted |
R1‑092933 | TR 36.814 v1.2.0 | Rapporteur (NTT DOCOMO) | Endorsed |
R1‑092935 | Summary of the preliminary performance evaluation results in RAN1#57bis | LTE-A Rapporteur (NTT DoCoMo) | Noted |
R1‑092936 | Text proposal for Effective IoT for TR 36.814 | Ericsson | Agreed |
R1‑092937 | Summary of ad-hoc on evaluation | Ad-hoc chair (Ericsson) | Endorsed |
R1‑092938 | Implicit feedback in support of DL MU-MIMO beamforming | Texas Instruments | Not treated |
R1‑092939 | Control Signalling for Relay Nodes | Panasonic | Not treated |
R1‑092940 | Uplink SU-MIMO Rank-1 and Rank-2 Codebook Designs | Texas Instruments, Nokia Siemens Networks, Nokia, Ericsson, ST-Ericsson, LG Electronics, CEWiT, NTT DoCoMo, Panasonic, Qualcomm, RIM, Samsung, Sharp | Noted |
R1‑092941 | Further Comparison of Rank-1 and Rank-2 Codebook Designs | Texas Instruments | Not treated |
R1‑092943 | CoMP Operation Based on Spatial Covariance Feedback and Performance Results of Coordinated SU/MU Beamforming | Motorola | Not treated |
R1‑092944 | Uplink multi-point reception performance results for LTE-A | Alcatel-Lucent | Not treated |
R1‑092945 | Methodology and format for evaluation of VoIP and mobility | Ericsson | Noted - Revised |
R1‑092946 | CoMP email summary | Qualcomm Europe | Noted |
R1‑092947 | Text proposal for evaluation assumption for TR 36.912 | LTE-A Rapporteur (NTT DoCoMo) | Noted - Revised |
R1‑092948 | Baseline assumption for performance evaluation for ITU submission | LTE-A Rapporteur (NTT DoCoMo) | Endorsed |
R1‑092949 | 4Tx Codebook for UL SU-MIMO: Rank-3 | Texas Instruments | Noted |
R1‑092950 | Subframe allocation for Backhaul HARQ operation | LG Electronics | Not treated |
R1‑092951 | Guard time handling in backhaul link design | LG Electronics | Not treated |
R1‑092952 | Methodology and format for evaluation of VoIP and mobility | Ericsson | Agreed |
R1‑092953 | Text proposal for evaluation assumption for TR 36.912 | LTE-A Rapporteur (NTT DoCoMo) | Noted - Revised |
R1‑092954 | Way forward on LTE-A UL PC | Nokia Siemens Networks, Nokia, Samsung, LGE, RIM | Not treated |
R1‑092955 | Text proposal for evaluation assumption for TR 36.912 | LTE-A Rapporteur (NTT DoCoMo) | Agreed |
R1‑092956 | Way forward for PUCCH Transmit diversity scheme | LG Electronics, Samsung, Huawei, Nokia, Nokia Siemens Network, Texas Instruments, Sharp, ETRI, NEC, Motorola, ZTE, NTT DoCoMo | Noted |
R1‑092957 | Text proposal of relay backhauling channel model | Huawei, Nokia Siemens Networks, Nokia, Ericsson, ST-Ericsson | Noted |
R1‑092958 | Way forward on PDCCH in LTE-A | Alcatel-Lucent, ASUSTeK, CATT, CEWiT, CHTTL, CMCC, Huawei, Interdigital, ITRI, Motorola, NEC, Nokia, Nokia Siemens Networks, Panasonic, Philips, Potevio, Qualcomm, RIM, RITT, Samsung, Texas Instruments, Vodafone | Not treated |
R1‑092959 | Text proposal to support Type II relay | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, CMCC, CHTTL, HTC, InterDigital, ITRI, Qualcomm, RIM, RITT, Vodafone, ZTE | Noted |
R1‑092960 | Type 1 backhaul link | Ericsson, NEC, Samsung, Motorola, Panasonic, RIM, LGE, Nokia, Nokia Siemens Networks, Qualcomm, Huawei, Alcatel-Lucent, CATT, Texas Instruments | Noted - Revised |
R1‑092961 | TR 36.912 v0.1.1 | LTE-A Rapporteur (NTT DoCoMo) | Noted |
R1‑092964 | Prioritisation of relay deployment scenarios for performance evaluations | Orange, AT&T, CMCC, T-Mobile, Vodafone | Noted |
R1‑092965 | Control Structure for Relay Type 1 nodes | NEC group | Not treated |
R1‑092966 | Baseline assumption on uplink for performance evaluation for ITU submission | LTE-A Rapporteur (NTT DoCoMo) | Endorsed |
R1‑092967 | TP for baseline assumption on performance evaluation for ITU submission | LTE-A Rapporteur (NTT DoCoMo) | Agreed |
R1‑092968 | Relay propagation model | Qualcomm Europe, ZTE, CMCC, Huawei | Noted |
R1‑092969 | Type 1 backhaul link | Ericsson, NEC, Samsung, Motorola, Panasonic, RIM, LGE, Nokia, Nokia Siemens Networks, Qualcomm, Huawei, Alcatel-Lucent, CATT, Texas Instruments, ZTE, Potevio | Agreed |
R1‑092970 | 25.214 Draft CR (Rel-9, B) Introduction of DC-HSUPA | Ericsson, ST-Ericsson, Qualcomm Europe, Huawei | Agreed |
R1‑092971 | MIMO Ad-hoc summary | Ad-hoc chair (Samsung) | Endorsed |
R1‑092972 | Discussion on DCI formats for enhanced DL beamforming | Samsung | Not treated |
R1‑092973 | HSPA Ad-hoc summary | Ad-hoc chair (Ericsson) | Endorsed |
R1‑092974 | Draft LS on regulatory issues of eNB-to RN backhauling in UL resource | LGE | Noted - Revised |
R1‑092975 | 36.213 CR0246 (Rel-8, F) Clarification on suband indexing in periodic CQI reporting | LGE, NEC, Pabnasonic, Alcatel-Lucent, Ercisson, ST-Ericsson | Agreed |
R1‑092976 | Summary of ad-hoc on Relay channel model and Relay evaluation methodologies | Ad-hoc chair (CMCC) | Agreed |
R1‑092977 | Proposed baseline assumption on CSI availability | Ericsson, ST-Ericsson, Nokia, Nokia Siemens Networks, NTT DOCOMO, Qualcomm, Texas Instruments, Motorola, Samsung, Alcatel-Lucent, RITT, Huawei | Agreed |
R1‑092978 | Text proposal for antenna modelling | Ericsson, ST-Ericsson, CATT, Huawei, Motorola, Nokia, Nokia Siemens Networks, ZTE | Agreed |
R1‑092979 | Text proposal on RS for TR36.816 | LTE-A Rapporteur (NTT DoCoMo) | Agreed |
R1‑092980 | Detailed proposed baseline assumption on CSI availability for LTE-A DL features in ITU evaluation | - | Noted |
R1‑092981 | LS on regulatory issues of eNB-to RN backhauling in UL resource | RAN1, LGE | Agreed |
R1‑092982 | Draft LS on definition of cell portion and related measurements for 1.28Mcps TDD | CATT | Noted - Revised |
R1‑092983 | Draft LS on power amplifier configurations for UEs with multiple transmit antennas in LTE-A | Qualcomm Europe | Noted - Revised |
R1‑092984 | LS on power amplifier configurations for UEs with multiple transmit antennas in LTE-A | RAN1, Qualcomm Europe | Agreed |
R1‑092985 | LS on HSDPA MIMO cell reference configuration | RAN1, Nokia Siemens Networks | Agreed |
R1‑092986 | LS on RAN1 view on optionality of HSPA Rel-8 features | RAN1, Ericsson | Agreed |
R1‑092987 | LS on DC-HSUPA agreements | RAN1, Nokia Siemens Networks | Agreed |
R1‑092988 | LS on UE categories for combination of DC-HSDPA with MIMO | RAN1, Ericsson | Agreed |
R1‑092989 | LS on definition of cell portion and related measurements for 1.28Mcps TDD | RAN1, CATT | Agreed |
page generated from database: 2024-07-20 12:15:34