3GPP TDocs (written contributions) at meeting
Meeting: R1-54 - 2008-08-18 to 2008-08-22, Jeju Island
meeting id: R1-54 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑082770 | Draft Agenda for RAN1#54 meeting | RAN1 Chairman | Approved |
R1‑082771 | Final report of RAN1#53bis meeting | MCC Support | Approved |
R1‑082772 | Uplink grant format in Random Access Response | RAN2, Qualcomm | Noted |
R1‑082773 | LS on ICIC Signalling | RAN2, Ericsson | Noted |
R1‑082774 | Further questions on Earthquake and Tsunami Warning System | RAN2, NTT DoCoMo | Noted |
R1‑082775 | Basic structure of relaying under multi-antenna eNB | Mitsubishi Electric | Not treated |
R1‑082776 | Uplink Multiple Access for LTE-Advanced | Mitsubishi Electric | Not treated |
R1‑082777 | Comments on Relay Nodes for LTE-Advanced Systems | KDDI | Noted |
R1‑082778 | Proposal of evaluation methodology for LTE-Advanced systems with relay nodes | KDDI | Noted |
R1‑082779 | Proposal of inter cell interference coordination scheme | Hitachi, Ltd. | Not treated |
R1‑082780 | Proposal of resource management cooperation | Hitachi, Ltd. | Not treated |
R1‑082781 | Overhead Reduction for Dynamic Switching of MIMO Modes | Hitachi, Ltd. | Not treated |
R1‑082782 | 25.224 CR0187 (Rel-8, A) Use of Special Bursts for DTX on MBSFN FACH in 1.28 Mcps TDD | Spreadtrum Communications | Agreed |
R1‑082783 | Impact of the PMI/RI Report Drop on the PUCCH CQI Report | SHARP | Revised |
R1‑082784 | [draft] 36.213 CR00xx (Rel-8, F) Corrections to Unspecified UE behaviour for Rank Information, PMI, CQI Reports Drops on PUCCH | SHARP | Not treated |
R1‑082785 | Issue with the value range of P_A | SHARP | Noted |
R1‑082786 | [draft] 36.213 CR00xx (Rel-8, F) Corrections of definition of value indexed by PA | SHARP | Not treated |
R1‑082787 | Uplink Multiple Access Scheme for LTE-Advanced | SHARP | Not treated |
R1‑082788 | Relay Considerations for LTE - Advanced | SHARP | Not treated |
R1‑082789 | Issues on Architecture Alternatives for LTE-Advanced | SHARP | Not treated |
R1‑082790 | Draft CR on PDCCH search space | ASUSTeK | Not treated |
R1‑082791 | UTRAN Rel-8 FDD WG1 work items and UE capabilities | Motorola | Noted |
R1‑082792 | Effect of false positive UL grants | Philips, NXP | Noted |
R1‑082793 | Corrections to TS36.211 | Philips, NXP | Not treated |
R1‑082794 | 36.212 CR0033R1 (Rel-8, F) Corrections to DCI formats | Philips, NXP | Noted - Revised |
R1‑082795 | CQI reference measurement period | Philips, NXP, Ericsson, Panasonic | Noted - Revised |
R1‑082796 | Configuration of CQI modes | Philips, NXP | Not treated |
R1‑082797 | CQI corrections | Philips | Revised |
R1‑082798 | CQI definition for MU-MIMO | Philips, NXP | Noted |
R1‑082799 | Correction to precoding description | Philips, NXP | Revised |
R1‑082800 | Reception of DCI formats | Philips, NXP | Not treated |
R1‑082801 | Analysis of HS-SCCH code monitoring requirements for Dual-Cell HSDPA | Philips, NXP | Noted |
R1‑082802 | HS-SCCH code monitoring requirements for Dual-Cell HSDPA | Philips, NXP | Noted |
R1‑082803 | MU-MIMO for LTE-Advanced | Philips, NXP | Not treated |
R1‑082804 | Interference Management for LTE-Advanced | Philips, NXP | Not treated |
R1‑082805 | Procedures for collisions between periodic and aperiodic CQI/PMI/RI reports and Draft CR to 36.213 | InterDigital Communications LLC | Not treated |
R1‑082806 | Procedures for resolving collisions between SR and periodic CQI reports and Draft CRs to 36.213, 36.212 and 36.211 | InterDigital Communications LLC | Not treated |
R1‑082807 | CM Analysis for UL Transmission for LTE-A | InterDigital Communications LLC | Not treated |
R1‑082808 | Support to co-existence of different UL/DL allocations for LTE TDD | Alcatel Shanghai Bell, Alcatel-Lucent | Missing |
R1‑082809 | Adaptive schedluing of UL ACK/NACK feedback method in LTE TDD | Alcatel Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑082810 | Clarification on HARQ-ACK resource index | Alcatel-Lucent | Not treated |
R1‑082811 | Multi-cell MIMO with distributed inter-cell interference supression for LTE-A uplink | Alcatel Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑082812 | DL Collaborative MIMO for LTE-A | Alcatel Shanghai Bell, Alcatel-Lucent | Noted |
R1‑082813 | M2M Communication | Alcatel-Lucent | Not treated |
R1‑082814 | Achieving LTE-Advanced performance targets with MIMO | Alcatel-Lucent | Not treated |
R1‑082815 | Discussion on Technologies for Further Enhanced MBMS | Alcatel Shanghai Bell, Alcatel-Lucent | Noted |
R1‑082816 | Discussion on LTE-A MBMS | Alcatel Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑082817 | STBC-II Scheme with Non-Paired Symbols for LTE-Advanced Uplink Transmit Diversity | Alcatel Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑082818 | UE Reconfiguration Timing in Enhanced Serving Cell Change | Qualcomm Europe, Huawei | Noted |
R1‑082819 | 25.212 CR0269 (Rel-8, B) Definition of HS-SCCH Order used in HS-PDSCH Serving Cell Change Enhancements | Qualcomm Europe | Not treated |
R1‑082820 | 25.214 CR0500 (Rel-8, D) Clarification of HS-SCCH Order in HS-PDSCH Serving Cell Change Enhancements | Qualcomm Europe | Revised |
R1‑082821 | Sensitivity of DC-HSDPA System performance to total number of HS-SCCH monitiored | Qualcomm Europe | Noted |
R1‑082822 | HS-DPCCH design for CQI feedback cycle > 1 | Qualcomm Europe | Noted |
R1‑082823 | Introducing Dynamic Carrier Switching in DC-HSDPA | Qualcomm Europe | Revised |
R1‑082824 | DC-HSDPA and CPC: Outstanding Issues | Qualcomm Europe | Not treated |
R1‑082825 | 25.211 CR0258 (Rel-8, B) Modification due to DC-HSDPA | Qualcomm Europe | Noted |
R1‑082826 | 25.212 CR0268 (Rel-8, B) Modification due to DC-HSDPA | Qualcomm Europe | Noted |
R1‑082827 | 25.213 CR0096 (Rel-8, B) Modification due to DC-HSDPA | Qualcomm Europe | Noted |
R1‑082828 | 25.214 CR0499 (Rel-8, B) Modification due to DC-HSDPA | Qualcomm Europe | Noted |
R1‑082829 | 25.215 CR0191 (Rel-8, B) Modification due to DC-HSDPA | Qualcomm Europe | Noted |
R1‑082830 | Solutions to Issues on CSG-cell Identification | ZTE, CHTTL | Noted |
R1‑082831 | Single PDCCH Solution against False Positive CRC | ZTE, CHTTL | Not treated |
R1‑082832 | Maximum Sounding Bandwidth for Normal sub-frame | ZTE | Not treated |
R1‑082833 | Consideration on Uplink Multiple Access for LTE-Advanced | ZTE | Revised |
R1‑082834 | Joint coding of delta_shift and delta_offset for PUCCH 1/1a/1b | ZTE, CATT, Nokia, Nokia Siemens Networks | Not treated |
R1‑082835 | Draft CR on dedicated reference signal mapping for PDCCH with 4 symbols | ZTE, Motorola, TI | Revised |
R1‑082836 | Remaining Issues with RI multiplexing on PUCCH | ZTE | Not treated |
R1‑082837 | Format1C Resource Allocation | ZTE | Not treated |
R1‑082838 | Multi-bit HARQ-ACK on PUSCH for TDD | ZTE | Noted |
R1‑082839 | Clarification on the number of OFDM symbols for PDCCH in narrow bandwidths | ZTE | Withdrawn |
R1‑082840 | Suggestion on the ACK/NACK Resource allocation | ZTE | Not treated |
R1‑082841 | draft CR of SRS frquency position | ZTE | Withdrawn |
R1‑082842 | On UE-specific CQI-reporting | ZTE | Missing |
R1‑082843 | Draft CR for correcting Ncs value for PRACH preamble format 0-3 | ZTE | Revised |
R1‑082844 | Discussion on Multi-user BF for LTE-A | ZTE | Not treated |
R1‑082845 | Performance evaluation on some UL SU-MIMO schemes | ZTE | Not treated |
R1‑082846 | Spectrum efficiency for wider bandwidth | ZTE | Not treated |
R1‑082847 | One Consideration for CoMP in LTE-A | ZTE | Not treated |
R1‑082848 | General Control channel design for LTE-A | ZTE | Not treated |
R1‑082849 | Futher discussions on report format for overload indicator | ZTE CHTTL | Not treated |
R1‑082850 | Two-threshold RSRP trigger mechanism | ZTE | Not treated |
R1‑082851 | Considerations on the Usage of the 450MHz~470MHz/ 698MHz~862MHz Bands | ZTE | Not treated |
R1‑082852 | Some comments on carrier aggregation in LTE-A | ZTE | Not treated |
R1‑082853 | Discussion on various scenarios of Relay | ZTE | Noted |
R1‑082854 | 25.221 CR0158 (Rel-5, F) Modification of the timing requirement between HS-SCCH and HS-PDSCH for 1.28Mcps TDD | ZTE, RITT, CATT, TD-TECH, Spreadtrum Communications | Agreed |
R1‑082855 | 25.221 CR0159 (Rel-6, A) Modification of the timing requirement between HS-SCCH and HS-PDSCH for 1.28Mcps TDD | ZTE, RITT, CATT, TD-TECH, Spreadtrum Communications | Agreed |
R1‑082856 | 25.221 CR0160 (Rel-7, A) Modification of the timing requirement between HS-SCCH and HS-PDSCH for 1.28Mcps TDD | ZTE, RITT, CATT, TD-TECH, Spreadtrum Communications | Agreed |
R1‑082857 | 25.221 CR0161 (Rel-8, A) Modification of the timing requirement between HS-SCCH and HS-PDSCH for 1.28Mcps TDD | ZTE, RITT, CATT, TD-TECH, Spreadtrum Communications | Agreed |
R1‑082858 | Consideration on the downlink VOIP solution for 1.28Mcps TDD | ZTE | Noted |
R1‑082859 | UL sounding based on different midamble code | ZTE | Noted |
R1‑082860 | 36.211 CR0058 (Rel-8, F) Control region in a cell with 4 Tx antennas | Samsung | Revised |
R1‑082861 | 4 bits ACK/NACK generation for TDD configuration 5 | Samsung, CATT | Not treated |
R1‑082862 | ACK/NACK PUCCH resource compression in TDD | Samsung | Noted |
R1‑082863 | 36.211 CR0059 (Rel-8, F) Corrections to Rank information scrambling in Uplink Shared Channel | Samsung, LG Electronics, Nokia Siemens Networks, Nokia | Agreed |
R1‑082864 | 36.212 CR0036 (Rel-8, F) Rank scrambling in PUSCH | Samsung, LG Electronics, Nokia Siemens Networks, Nokia | Agreed |
R1‑082865 | 36.212 CR0037 (Rel-8, F) Clarification of TPC commands signaled in DCI formats 3/3A | Samsung | Noted - Revised |
R1‑082866 | 36.212 CR0038 (Rel-8, F) Clarification on UE transmit antenna selection mask | Samsung | Agreed |
R1‑082867 | 36.212 CR0039 (Rel-8, F) Linking of control resources in PUSCH to data MCS | Samsung | Noted - Revised |
R1‑082868 | 36.213 CR0051 (Rel-8, F) Completion of the table specifing the number of bits for the periodic feedback | Samsung | Agreed |
R1‑082869 | 36.213 CR0043R2 (Rel-8, F) Clarification on tree structure of CCE aggregations | Samsung, Ericsson | Agreed |
R1‑082870 | 36.213 CR0053 (Rel-8, F) Correction of the equation for PUCCH power control | Samsung | Revised |
R1‑082871 | Further restriction of RB allocation in format 1C | Samsung | Not treated |
R1‑082872 | 36.213 CR0054 (Rel-8, F) Clarification of RNTI for PUSCH/PUCCH power control with DCI formats 3/3A | Samsung | Agreed |
R1‑082873 | 36.213 CR0039r1 (Rel-8, F) Clarification on uplink power control | Samsung | Noted - Revised |
R1‑082874 | CQI Reporting for MU-MIMO in LTE | Samsung | Not treated |
R1‑082875 | Finalization of MU-MIMO in LTE | Samsung | Not treated |
R1‑082876 | 36.213 CR0055 (Rel-8, F) Clarification on mapping of Differential CQI fields | Samsung | Noted - Revised |
R1‑082877 | 36.213 CR0056 (Rel-8, F) CQI report for transmission mode 5,6,7 and clarification of value y in CQI report | Samsung | Noted |
R1‑082878 | 36.213 CR0057 (Rel-8, F) Correction of open-loop SM Equation in 36.213 | Samsung | Not treated |
R1‑082879 | 36.213 CR0058 (Rel-8, F) Correction on Calculation of ΔTF(i) for UL-PC | Samsung | Not treated |
R1‑082880 | Proposed update for CR to 25.214 | Samsung, Qualcomm | Not treated |
R1‑082881 | CQI transmission supporting dual-cell HSDPA | Samsung | Revised |
R1‑082882 | Discussion on activation/deactivation of dual-cell HSDPA | Samsung | Revised |
R1‑082883 | Superposition of Unicast and Broadcast | Samsung | Not treated |
R1‑082884 | Discussions on 8-Tx Diversity Schemes in LTE-A Downlink | Samsung | Not treated |
R1‑082885 | Discussions on L3 Relay for LTE-A | Samsung | Not treated |
R1‑082886 | Inter-Cell Interference Mitigation Through Limited Coordination | Samsung | Noted |
R1‑082887 | Codebook based Precoding for 8 Tx Transmission in LTE-A | Samsung | Not treated |
R1‑082888 | Carrier aggregation in LTE-A DL | Samsung | Not treated |
R1‑082889 | 25.224 CR0185R2 (Rel-7, F) HS-SCCH and HS-SICH power control clarification for 1.28Mcps TDD | TD Tech | Revised |
R1‑082890 | 25.224 CR0186R2 (Rel-8, A) HS-SCCH and HS-SICH power control clarification for 1.28Mcps TDD | TD Tech | Revised |
R1‑082891 | 25.222 CR0151 (Rel-8, A) Clarification on E-HICH coding for 1.28Mcps TDD | TD Tech | Noted - Revised |
R1‑082892 | 25.224 CR0193 (Rel-8, A) EUL power control clarification for 1.28Mcps TDD | TD Tech | Agreed |
R1‑082893 | 25.224 CR0194 (Rel-8, A) EUL power control improvement for 1.28Mcps TDD | TD Tech | Noted - Revised |
R1‑082894 | 25.222 CR0152 (Rel-7, F) Clarification of E-UCCH Number indicator on E-AGCH for 1.28Mcps TDD | TD Tech | Noted - Revised |
R1‑082895 | 25.222 CR0153 (Rel-8, A) Clarification of E-UCCH Number indicator on E-AGCH for 1.28Mcps TDD | TD Tech | Noted - Revised |
R1‑082896 | Coordinated multi-cell transmission for LTE-Advanced downlink | ETRI | Not treated |
R1‑082897 | Consideration on DTX for Continuous Connectivity | ZTE | Noted |
R1‑082898 | Consideration on DRX for Continuous Connectivity | ZTE | Withdrawn |
R1‑082899 | Legacy support of LTE-Advanced Relay Nodes | Infineon Technologies | Noted |
R1‑082900 | TS36.212 CR0024 (Rel-8, F) Further clarifications on confirmation field in DCI format 2 | LG Electronics | Noted |
R1‑082901 | Uplink Channel Estimation for LCR TDD MIMO System | TD Tech | Noted |
R1‑082902 | Link Level Simulation Results for MIMO HS-SCCH Structure in 1.28Mcps TDD | TD Tech | Noted |
R1‑082903 | Flexible time slot allocation in LCR TDD MIMO system | TD Tech | Noted |
R1‑082904 | On the TDM framing between Home cell and macro cell signals | Spreadtrum Communications | Not treated |
R1‑082905 | On the PAPR/ESM properties between clustered DFT-S-OFDM and NxSC-FDMA | Spreadtrum Communications | Missing |
R1‑082906 | On the extension to asymmetric transmissions for LTE-advanced | Spreadtrum Communications | Not treated |
R1‑082907 | Exploiting improved spectrum efficiency for the broadcast eMBMS | Spreadtrum Communications | Withdrawn |
R1‑082908 | On synchronization signals in Advanced E-UTRA | Spreadtrum Communications | Not treated |
R1‑082909 | Consideration on TTI Bundling for LTE TDD | Spreadtrum Communications | Missing |
R1‑082910 | Discussion on the SI transmission | LGE | Revised |
R1‑082911 | CSG Flag in Physical Cell ID | LGE | Noted |
R1‑082912 | 36.211 CR0049 (Rel-8, F) Correction of PHICH to RE mapping in extended CP subframe | LGE, NEC, Nortel, Samsung | Revised |
R1‑082913 | 36.211 CR0050 (Rel-8, F) Corrections to for handling remaining REs | LGE | Agreed |
R1‑082914 | 36.211 CR0054 (Rel-8, F) Correction of mapping of ACK/NAK to binary bit values | LGE, Ericsson, TI | Agreed |
R1‑082915 | 36.211 CR0052R2 (Rel-8, F) Correction of PUCCH index generation formula | LGE, Nokia, NSN, Panasonic, Ericsson, TI and Samsung | Agreed |
R1‑082916 | Correction to the downlink/uplink timing in TS36.211 | LGE, Panasonic, Ericsson | Noted - Revised |
R1‑082917 | Draft CR for 36.211 regarding DCI format1C | LGE, Motorola, Panasonic | Noted - Revised |
R1‑082918 | Introduction of draft CRs for DCI format 1C | LGE, Motorola, Panasonic | Noted |
R1‑082919 | Draft CR for 36.212 regarding DCI format1C | LGE, Motorola, Panasonic | Noted |
R1‑082920 | Clarification of the bit values in DCI formats | LGE | Not treated |
R1‑082921 | Subframe bundling issue for CQI transmission in PUSCH | LGE | Noted |
R1‑082922 | PUSCH control information offsets | LGE | Noted |
R1‑082923 | Definition of Code Rate in PUSCH control information MCS calculation | LGE, Ericsson | Noted |
R1‑082924 | Draft CR for offset signaling of uplink control information MCS in TS36.212 | LGE | Noted |
R1‑082925 | 36.212 CR0028 (Rel-8, F) Corrections of mapping of ACK/NAK to binary bit values | LGE, Ericsson, TI | Agreed |
R1‑082926 | Draft CR for 36.213 regarding DCI format1C | LGE, Motorola, Panasonic | Noted - Revised |
R1‑082927 | Draft CR for offset signaling of uplink control information MCS in TS36.213 | LGE | Noted - Revised |
R1‑082928 | Correction to the downlink resource allocation | LGE, NEC, ALU, Motorola, Samsung | Noted - Revised |
R1‑082929 | Correction to UL DM RS cyclic shift to PHICH index mapping | LGE | Not treated |
R1‑082930 | Correction to the precoder index assignment for open loop spatial multiplexing | LGE | Not treated |
R1‑082931 | Clarification of uplink index in TDD mode | LGE | Not treated |
R1‑082932 | Clarification of uplink power control command index | LGE | Revised |
R1‑082933 | Correction to the uplink power control | LGE, Samsung, Philips | Revised |
R1‑082934 | Correction to the downlink/uplink timing in TS36.213 | LGE, Panasonic, Ericsson | Noted - Revised |
R1‑082935 | Correction to the time alignment command | LGE, Panasonic, Ericsson | Noted - Revised |
R1‑082936 | Introduction of timing definitions | LGE, Panasonic, Ericsson | Noted |
R1‑082937 | Efficient Utilization of Unused PUCCH RB | LGE | Not treated |
R1‑082938 | Necessity of Shortened SR | LGE | Not treated |
R1‑082939 | 36.213 CR0048R1 (Rel-8, F) for correction of mapping of cyclic shift value to PHICH modifier | LGE, Samsung | Agreed |
R1‑082940 | Remaining Details on MU-MIMO transmission Mode | LGE | Not treated |
R1‑082941 | Consideration on DL-MIMO in LTE-Advanced | LGE | Not treated |
R1‑082942 | Network MIMO in LTE-Advanced | LGE | Not treated |
R1‑082943 | Uplink MIMO Transmission for LTE-Advanced | LGE | Not treated |
R1‑082944 | Consideration on Relaying Frame Structure Design in LTE-A FDD Mode | LGE | Not treated |
R1‑082945 | Uplink multiple access schemes for LTE-A | LGE | Not treated |
R1‑082946 | Carrier aggregation and control signaling for LTE-A | LGE | Not treated |
R1‑082947 | 25.221 CR0162 (Rel-7, F) Correction on the time slot format for LCR TDD MBSFN | CATT | Agreed |
R1‑082948 | 25.221 CR0163 (Rel-8, A) Correction on the time slot format for LCR TDD MBSFN | CATT | Agreed |
R1‑082949 | 25.222 CR0154 (Rel-8, A) Clarification of TRRI on E-AGCH for 1.28Mcps TDD EUL | CATT,TD-TECH,ZTE | Agreed |
R1‑082950 | 25.222 CR0155 (Rel-8, A) Correction of E-HICH coding for 1.28 Mcps TDD EUL | CATT,TD-TECH | Agreed |
R1‑082951 | 25224 CR0188 (Rel-8, A) Correction of E-PUCH power control for 1.28 Mcps TDD EUL | CATT | Agreed |
R1‑082952 | 25.224 CR0189 (Rel-7, F) Further clarification of the E-AGCH monitoring for 1.28Mcps TDD EUL | CATT | Withdrawn |
R1‑082953 | 25.224 CR0190 (Rel-8, F) Clarification of the E-AGCH monitoring for 1.28Mcps TDD EUL | CATT | Withdrawn |
R1‑082954 | 25.224 CR0191 (Rel-7, F) Correction of UpPCHPOS bit number in subclause 5.2.7 | CATT | Agreed |
R1‑082955 | 25.224 CR0192 (Rel-8, A) Correction of UpPCHPOS bit number in subclause 5.2.7 | CATT | Agreed |
R1‑082956 | Consideration about VoIP downlink transmission for 1.28Mcps TDD | CATT | Noted |
R1‑082957 | HS-SCCH structure suppoting MIMO for 1.28Mcps TDD | CATT | Noted |
R1‑082958 | UL SRI Parameters Configuration | CATT, RITT | Noted |
R1‑082959 | To reuse TBS table for punctured PRB | CATT | Noted |
R1‑082960 | DVRB mapping in DwPTS and Draft CR for 36.211 | CATT, Samsung, Huawei | Not treated |
R1‑082961 | Way Forward on the Maximum SRS Bandwidth for UpPTS | CATT, CMCC, Huawei, Motorola, RITT, ZTE | Revised |
R1‑082962 | Draft CR for 36.211 (Rel-8, F) Maximum SRS Bandwidth for UpPTS | CATT, CMCC, Huawei, Motorola, RITT, ZTE | Noted |
R1‑082963 | On collision between SRS and PRACH in UpPTS | CATT, Huawei | Noted |
R1‑082964 | DRAFT CR for 36.213 (Rel-8, F) On collision between SRS and PRACH in UpPTS | CATT, Huawei | Not treated |
R1‑082965 | Physical Layer Parameters for CQI reporting in TDD | CATT,TI | Not treated |
R1‑082966 | CQI reporting period for TDD | CATT,TI | Not treated |
R1‑082967 | DRAFT CR for 36.213 (Rel-8, F) PDCCH search space | CATT | Not treated |
R1‑082968 | 36.213 CR0059 (Rel-8, D) PUSCH Power Control | CATT | Noted - Revised |
R1‑082969 | 36.211 CR0060 (Rel-8, F) Definition on the slot number for frame structure type 2 | CATT, LGE | Agreed |
R1‑082970 | 25.225 CR0089 (Rel-8, B) E-UTRA measurements for UTRA TDD – E-UTRA interworking | CATT | Agreed |
R1‑082971 | A Technique to Enhance the Cell Edge performance | CATT, RITT | Not treated |
R1‑082972 | Enhanced Beamforming Technique for LTE-A | CATT | Not treated |
R1‑082973 | Uplink Non-codebook-based Precoding | CATT | Not treated |
R1‑082974 | Proposal of multiple sites coordination for LTE-A TDD | CATT | Not treated |
R1‑082975 | Application Scenarios for LTE-Advanced Relay | CMCC, Vodafone, Huawei | Noted |
R1‑082976 | Combined fixed and adaptive soft-frequency reuse for inter-cell interference coordination | Mitsubishi Electric | Not treated |
R1‑082977 | 36.211 CR0051 (Rel-8, F) on PRACH configuration for frame structure type 1 | Panasonic | Agreed |
R1‑082978 | Way Forward on the PRACH frequency offset | Panasonic, LG Electronics, Motorola, NTT DoCoMo, Samsung, Texas Instruments | Noted |
R1‑082979 | 36.211 DraftCR on PRACH frequency offset | Panasonic, LG Electronics, Motorola, NTT DoCoMo, Samsung, Texas Instruments | Noted |
R1‑082980 | Further considerations on the scrambling for ACK/NACK | Panasonic, NTT DoCoMo | Not treated |
R1‑082981 | Restriction of RI offset for CQI on PUCCH in TS 36.213 | Panasonic | Not treated |
R1‑082982 | Periodic CQI reports and SFN wrap-around | Panasonic | Noted |
R1‑082983 | Correction of subscripts in TS 36.213 section 7.2.2 | Panasonic, NEC, Philips | Noted |
R1‑082984 | CQI reporting with TTI bundling or A/N repetition | Panasonic | Missing |
R1‑082985 | 36.213 CR0060 (Rel-8, F) RB restriction and modulation order for CQI-only transmission on PUSCH | Panasonic | Agreed |
R1‑082986 | 36.213 CR0061 (Rel-8, F) Modulation order determination for uplink retransmissions | Panasonic | Agreed |
R1‑082987 | RAN1/2 specification alignment on HARQ operation | Panasonic | Not treated |
R1‑082988 | Treatment of CQI-only in HARQ procedure | Panasonic | Not treated |
R1‑082989 | RNTI assignment | Panasonic | Not treated |
R1‑082990 | UL Power related topics | Panasonic | Noted |
R1‑082991 | Persistent scheduling and MIMO mode | Panasonic | Not treated |
R1‑082992 | PUSCH control information offset for CQI only | Panasonic | Not treated |
R1‑082993 | Measurement gap and TA value | Panasonic | Noted - Revised |
R1‑082994 | Text proposal for the ACK/NACK repetition and Implicit mapping | Panasonic | Not treated |
R1‑082995 | Transport block mapping and PDCCH signaling for carrier aggregation | Panasonic | Not treated |
R1‑082996 | Preliminary evaluation on non-contiguous resource allocation and transmission for LTE-Advanced uplink | Panasonic | Not treated |
R1‑082997 | Transmit diversity scheme for LTE-Adv uplink | Panasonic | Not treated |
R1‑082998 | Precoding consideration on LTE-Adv uplink | Panasonic | Not treated |
R1‑082999 | Support of the UL/DL asymmetric carrier aggregation | Panasonic | Noted |
R1‑083000 | Discussion of the LTE-Advanced only band | Panasonic | Not treated |
R1‑083001 | Text proposal of Relaying functionality for TR on LTE-Advanced | Panasonic | Not treated |
R1‑083002 | Discussion on the TD Relay and FD relay for FDD system | Panasonic | Not treated |
R1‑083003 | Bandwidth part sizes for UE selected CQI reports on the PUCCH | NEC Group | Noted |
R1‑083004 | Number of antenna ports for PDSCH | NEC Group | Noted - Revised |
R1‑083005 | Clarification on PUSCH TPC commands | NEC Group, LGE | Noted - Revised |
R1‑083006 | Views on remaining details on MU-MIMO for LTE Rel. 8 | NEC Group | Not treated |
R1‑083007 | 36.211 CR0061 (Rel-8, F) Correction of the Npucch sequence upper limit for the formats 1/1a/1b | NEC Group | Agreed |
R1‑083008 | 36.211 CR0062 (rel-8, F) Clarifications for DMRS parameters | NEC Group | Revised |
R1‑083009 | Simultaneous Reception of Persistent and Dynamic scheduling | NEC Group | Withdrawn |
R1‑083010 | Clarification of the DCI formats that can be simultaneously received in each transmission mode | NEC Group | Withdrawn |
R1‑083011 | Uplink Access Scheme for LTE-Advanced in BW=<20MHz | NEC Group | Not treated |
R1‑083012 | Uplink Access Scheme for LTE-Advanced in BW>20MHz | NEC Group | Not treated |
R1‑083013 | Correction to the definition of nbar_oc for extended CP | NEC Group, Samsung | Not treated |
R1‑083014 | Evaluation Model for LTE-Advanced | NTT DoCoMo | Noted |
R1‑083015 | Updated Views on Support of Wider Bandwidth in LTE-Advanced | NTT DoCoMo | Not treated |
R1‑083016 | Views on UL Hybrid Radio Access Scheme in LTE-Advanced | NTT DoCoMo | Not treated |
R1‑083017 | Views on UL MIMO Schemes in LTE-Advanced | NTT DoCoMo | Not treated |
R1‑083018 | Views on Coordinated Multipoint Transmission/Reception in LTE-Advanced | NTT DoCoMo | Not treated |
R1‑083019 | Inter-cell Radio Resource Management for Heterogeneous Network | NTT DoCoMo | Not treated |
R1‑083020 | Downlink spectrum utilization in LTE-Advanced | Huawei | Not treated |
R1‑083021 | UL 4 TX antennas transmit diversity for LTE-Advanced | Huawei | Not treated |
R1‑083022 | 25.213 CR0097 (Rel-7, F) Restricted Beta Factor Combinations for EUL | Ericsson | Noted - Revised |
R1‑083023 | Improved EUL power control at UE power limitation | Ericsson | Noted |
R1‑083024 | 25.212 CR0270 (Rel-8, B) Introduction of HS-PDSCH Serving Cell Change Enhancements | Ericsson | Revised |
R1‑083025 | 25.214 CR0498R1 (Rel-8, B) Introduction of HS-PDSCH Serving Cell Change Enhancements | Ericsson | Revised |
R1‑083026 | 25.211 CR0257 (Rel-8,B) “Introduction of Dual-Cell HSDPA Operation on Adjacent Carriers” | Ericsson | Noted - Revised |
R1‑083027 | 25.212 CR0267 (Rel-8, B) “Introduction of Dual-Cell HSDPA Operation on Adjacent Carriers” | Ericsson | Noted - Revised |
R1‑083028 | 25.213 CR0095 (Rel-8, B) “Introduction of Dual-Cell HSDPA Operation on Adjacent Carriers” | Ericsson | Noted - Revised |
R1‑083029 | 25.214 CR0497 (Rel-8, B) “Introduction of Dual-Cell HSDPA Operation on Adjacent Carriers” | Ericsson | Noted - Revised |
R1‑083030 | Introduction of Dual-Cell HSDPA Operation on Adjacent Carriers | Ericsson | Noted |
R1‑083031 | Proposed response to LS on ICIC signaling (R2-083875) | Huawei | Noted |
R1‑083032 | Remaining issues on PDCCH for semi-persistent scheduling | Huawei | Noted |
R1‑083033 | Remaining issues on SIB transmission | Huawei | Noted |
R1‑083034 | Correction on orthogonal cover index of DMRS for PUCCH with extended CP | Huawei | Not treated |
R1‑083035 | Clarification on number of OFDM symbols used for PDCCH | Huawei | Revised |
R1‑083036 | correction for the table of large delay CDD | Huawei | Not treated |
R1‑083037 | Corrections to 36.211 | Huawei | Not treated |
R1‑083038 | Multi-Ack/NACK on PUSCH for TDD | Huawei | Revised |
R1‑083039 | Resolve the ambiguity between PHICH sequence index and symbol-quadruplet index | Huawei | Revised |
R1‑083040 | Correction of some definitions in section 5.2.2.6 | Huawei | Noted |
R1‑083041 | Clarification on resource allocation in DCI format 1/2/2A | Huawei, LGE | Noted - Revised |
R1‑083042 | Remaining issues on format 1C | Huawei | Revised |
R1‑083043 | TPC for PUSCH and PUCCH on format3/3A | Huawei | Noted |
R1‑083044 | Power offset signaling for MU-MIMO | Huawei | Revised |
R1‑083045 | Corrections to 36.213 | Huawei | Not treated |
R1‑083046 | Delta value for PUCCH power control | Huawei | Noted |
R1‑083047 | Consideration on DCI format for downlink MU-MIMO | Huawei, CATT | Not treated |
R1‑083048 | Draft CR on UL AN mapping for TDD | Huawei, Samsung, CATT | Revised |
R1‑083049 | Consideration on CoMP for LTE-Advanced | Huawei | Not treated |
R1‑083050 | Inter-eNB and Intra-eNB Schemes of CoMP for LTE-Advanced | Huawei | Noted |
R1‑083051 | Draft LS on additional RSRP trigger for ICIC | Ericsson | Revised |
R1‑083052 | Defining the PRACH resource location in frequency | Ericsson | Withdrawn |
R1‑083053 | 36.211 CR0063 (Rel-8, F) Correction of n_prs | Ericsson | Agreed |
R1‑083054 | 36.211 CR0064 (Rel-8, F) Introducing missing parameters into 36.211 | Ericsson | Noted - Revised |
R1‑083055 | 36.211 CR0065 (Rel-8, F) Clarification on reception of synchronization signals | Ericsson | Revised |
R1‑083056 | On the uplink-downlink radio frame timing in LTE FDD | Ericsson | Noted |
R1‑083057 | 36.212 CR0040 (Rel-8, F) Introducing missing parameters into 36.212 | Ericsson | Missing |
R1‑083058 | 36.213 CR0047R1 (Rel-8, F) Removal of CR0009 | Ericsson | Agreed |
R1‑083059 | 36.213 CR0062 (Rel-8, F) Introducing missing parameters into 36.213 | Ericsson | Revised |
R1‑083060 | 36.213 CR0063 (Rel-8, F) Correcting the range and representation of delta_TF_PUCCH | Ericsson | Noted - Revised |
R1‑083061 | Defining random access timing requirements | Ericsson | Withdrawn |
R1‑083062 | 36.213 CR0064 (Rel-8, F) Adjusting TBS sizes to for VoIP | Ericsson | Noted - Revised |
R1‑083063 | 36.213 CR0065 (Rel-8, F) Clarification on PUSCH hopping type 1 | Ericsson | Not treated |
R1‑083064 | Remaining Details on Control Signaling for the MU-MIMO Transmission Mode | Ericsson | Not treated |
R1‑083065 | On multiple ACK/NAK multiplexing on PUCCH for TDD | Ericsson | Revised |
R1‑083066 | Transmission ACK/NAK on PUSCH for LTE TDD | Ericsson | Noted - Revised |
R1‑083067 | Draft LS TBS table and UL TTI bundling adjustments | Ericsson | Noted |
R1‑083068 | Draft CR Correcting the maximum number of bits received during one TTI | Ericsson | Noted |
R1‑083069 | LTE-Advanced – Coordinated Multipoint transmission/reception | Ericsson | Not treated |
R1‑083070 | Refined Antenna Model for LTE Advanced Evaluations | Ericsson | Noted |
R1‑083071 | 25.212 CR0271 (Rel-7,F) Correction to the table name and the quoted name | HUAWEI | Agreed |
R1‑083072 | 25.212 CR0272 (Rel-8,A) Correction to the table name and the quoted name | HUAWEI | Agreed |
R1‑083073 | Enhanced Pilot Reference for E-DPCCH Power Boosting | HUAWEI | Noted |
R1‑083074 | Discussion on CPC feature for DC-HSDPA | HUAWEI | Not treated |
R1‑083075 | Analysis of HS-DPCCH Design for DC-HSDPA | HUAWEI | Noted |
R1‑083076 | Discussion on supplementary carrier control | HUAWEI | Noted |
R1‑083077 | Analysis of HS-SCCH design for DC-HSDPA | HUAWEI | Noted |
R1‑083078 | Discussion on single stream with multi RV versions mode in DC-HSDPA operation | HUAWEI | Noted |
R1‑083079 | On required number of evaluation for LTE-Advanced | CMCC | Noted |
R1‑083080 | Some consideration for indoor scenario | CMCC | Noted |
R1‑083081 | Physical layer support for CSG | Nokia, Nokia Siemens Networks | Noted |
R1‑083082 | SRS BW configuration in UpPTS | Nokia, Nokia Siemens Networks | Not treated |
R1‑083083 | Multiple ACKNAK Transmission on PUCCH for LTE TDD | Nokia, Nokia Siemens Networks | Not treated |
R1‑083084 | Multiple ACKNAK Transmission on PUSCH for LTE TDD | Nokia, Nokia Siemens Networks | Noted |
R1‑083085 | PRACH resource placement | Nokia Siemens Networks, Nokia, Ericsson | Revised |
R1‑083086 | 36.211 CR0056R1 (Rel-8, F) Remaining issues on SRS hopping | Nokia Siemens Networks, Nokia, Huawei, NTT DoCoMo, Panasonic, ZTE | Revised |
R1‑083087 | 36.211 CR0048R1 (Rel-8, F) Frequency Shifting of UE-specific RS | Nokia Siemens Networks, Nokia, Sharp | Agreed |
R1‑083088 | Correction to Precoding for Transmit Diversity | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑083089 | Definition of Bit Mapping for DCI Signalling | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑083090 | Details of Using DCI Format 1A for Scheduling of Common Control Channels | Nokia Siemens Networks, Nokia | Noted |
R1‑083091 | PUSCH Error Case Handling for ACK/NACK Bundling in LTE TDD | Nokia, Nokia Siemens Networks | Noted |
R1‑083092 | 36.213 CR0046R1 (Rel-8, F) Correction of the description of PUCCH power control for TDD | Nokia, Nokia Siemens Networks | Revised |
R1‑083093 | Finalizing Multi-User MIMO for LTE Rel. 8 | Nokia, Nokia Siemens Networks | Not treated |
R1‑083094 | PUCCH resource allocation for repeated ACK/NACK | Nokia Siemens Networks, Nokia | Not treated |
R1‑083095 | On the removal of code rate limitations for PDCCH blind decoding | Nokia, Nokia Siemens Networks | Not treated |
R1‑083096 | PC of RACH message 3 | Nokia Siemens Networks, Nokia | Noted |
R1‑083097 | Overload Indicator (OI) Configuration and Reporting Criteria | Nokia Siemens Networks, Nokia | Not treated |
R1‑083098 | Definition of Bit Mapping for DCI Signalling | Nokia Siemens Networks, Nokia | Noted |
R1‑083099 | Correction to Precoder Cycling for Open-loop Spatial Multiplexing | Nokia Siemens Networks, Nokia | Not treated |
R1‑083100 | Way forward on DRS EPRE | Nokia Siemens Networks, Nokia | Noted |
R1‑083101 | NDI handling | Nokia, Nokia Siemens Networks | Not treated |
R1‑083102 | LTE-A Simulation Methodology and Assumptions | Nokia, Nokia Siemens Networks | Noted |
R1‑083103 | Autonomous component carrier selection for LTE-Advanced | Nokia Siemens Networks, Nokia | Not treated |
R1‑083104 | Further Simulation Results of User Grouping Methods for Downlink Inter-cell interference coordination | CHTTL | Not treated |
R1‑083105 | Considerations on Spectrum Aggregation in LTE-Advanced | CHTTL, KDDI | Revised |
R1‑083106 | Simulation Requirements to Support Spectrum Aggregation for LTE-Advanced | CHTTL | Not treated |
R1‑083107 | Necessary RSRP Information for UL and DL ICIC to be provided by Layer 2 | Alcatel-Lucent | Noted |
R1‑083108 | Proposed Response LS on RSRP Signalling for ICIC | Alcatel-Lucent | Noted |
R1‑083109 | Proposal for detailing the Skeleton of LTE Advanced TR | Alcatel-Lucent | Not treated |
R1‑083110 | MIMO and CQI-Techniques for LTE-Advanced | Alcatel-Lucent | Not treated |
R1‑083111 | System Simulation Evaluation for Link from eNode-B to RN | Fujitsu | Not treated |
R1‑083112 | System Simulation Methodology – IR-HARQ Combining | Fujitsu | Not treated |
R1‑083113 | DL System Level Performance Comparison between 2GHz and 3.5GHz for Advanced E-UTRA | Fujitsu | Not treated |
R1‑083114 | On sub-carrier spacing | Fujitsu | Not treated |
R1‑083115 | Discussion on DL coordinated multipoint transmission | Fujitsu | Not treated |
R1‑083116 | PAPR of UL access schemes | Fujitsu | Not treated |
R1‑083117 | HARQ Processes in DC-HSDPA | InterDigital Communications LLC | Noted |
R1‑083118 | 36.211 CR0057R1 (Rel-8, F) on correction of n_cs(n_s) and OC/CS remapping for PUCCH formats 1/1a/1b and 2/2a/2b | Texas Instruments, Samsung, Panasonic, ZTE, LGE, Ericsson | Agreed |
R1‑083119 | Draft CR on correction of definition of xu,v(n) in PRACH | Texas Instruments | Withdrawn |
R1‑083120 | Draft CR on Refinement for REG Definition for n = 4 | Texas Instruments, Ericsson, LG Electronics, Samsung, ZTE | Noted - Revised |
R1‑083121 | Way forward on UE specific SRS configuration | Texas Instruments, Samsung, CATT, RITT, ZTE, Qualcomm, CMCC, Huawei | Noted |
R1‑083122 | Draft CR on UE Specific SRS Configuration | Texas Instruments, Huawei, Samsung, CATT, ZTE, RITT | Not treated |
R1‑083123 | Way forward on support of ACK/NAK repetition | Texas Instruments, LGE, Samsung, ZTE | Not treated |
R1‑083124 | Multiple ACK/NAK Transmission in TDD | Texas Instruments | Not treated |
R1‑083125 | Performance of Multi-bit ACK/NAK Transmission in TDD | Texas Instruments | Not treated |
R1‑083126 | Concurrent Transmission of Multi-bit ACK/NAK and CQI in TDD UL | Texas Instruments | Not treated |
R1‑083127 | Concurrent Transmission of Multiple ACK/NAK and SRI in TDD UL | Texas Instruments | Not treated |
R1‑083128 | TDD System Evaluation of Multi-Bit ACK/NAK and ACK/NAK Bundling | Texas Instruments | Not treated |
R1‑083129 | Draft CR on Reference for CQI/PMI Reporting Offset | Texas Instruments | Noted - Revised |
R1‑083130 | Draft CR on miscellaneous update in 36.213 | Texas Instruments, Motorola, CATT | Noted - Revised |
R1‑083131 | Update on Physical Layer Parameters for CQI Reporting | Texas Instruments | Noted - Revised |
R1‑083132 | On remaining issues of PUCCH CQI reports | Texas Instruments | Not treated |
R1‑083133 | Impact of Higher Carrier Frequencies onto the Uplink of LTE – A | Texas Instruments | Not treated |
R1‑083134 | On Uplink Macro-diversity for LTE – Advanced | Texas Instruments | Not treated |
R1‑083135 | On Uplink Evaluation Methodology for LTE – Advanced | Texas Instruments | Noted |
R1‑083136 | Further analysis on UL SU-MIMO for E-UTRA | Texas Instruments | Not treated |
R1‑083137 | Aspects of Cooperative MIMO for Advanced E-UTRA | Texas Instruments | Not treated |
R1‑083138 | 36.213 CR0066 (Rel-8, F) Alignment of RAN1/RAN2 RACH specification | Ericsson | Agreed in principle |
R1‑083139 | Extension of the cell-ID space | Nortel | Noted |
R1‑083140 | Handover based on RSRQ measurements | Nortel | Noted |
R1‑083141 | The need of supporting open-loop SM in initial deployment of release-8 | Nortel | Revised |
R1‑083142 | On PDCCH mapping to physical resource elements | Nortel | Not treated |
R1‑083143 | Signaling of offset parameter for computing control resources on PUSCH | Nortel | Noted |
R1‑083144 | P_A Setting for DL RS power boosting for 4-tx system | Nortel | Noted |
R1‑083145 | CQI/PMI reporting on PUSCH | Nortel | Noted |
R1‑083146 | Discussion on sub-band CQI measurement | Nortel | Not treated |
R1‑083147 | On Power Level for MU-MIMO | Nortel | Not treated |
R1‑083148 | Proposed changes to PDSCH transmission modes | Nortel | Not treated |
R1‑083149 | RSRP measurement of neighbor cell | Nortel | Not treated |
R1‑083150 | Consideration on Transmit diversity for PUSCH in LTE-A | Nortel | Not treated |
R1‑083151 | Differential codebook feedback scheme for LTE-A | Nortel | Not treated |
R1‑083152 | DL CL-MIMO optimization for nomadic UE | Nortel | Not treated |
R1‑083153 | LTE-A downlink 8x8 MIMO performance evaluaiton | Nortel | Not treated |
R1‑083154 | LTE-Advanced evaluation scenarios | Nortel | Noted |
R1‑083155 | On different relay schemes for LTE-A | Nortel | Not treated |
R1‑083156 | Opportunistic space time multiple access for LTE-Advanced | Nortel | Not treated |
R1‑083157 | RS design consideration for high-order MIMO in LTE-A | Nortel | Not treated |
R1‑083158 | Some further consideration for DL transparent relay in LTE-A | Nortel | Noted |
R1‑083159 | Transmit diversity for PUCCH in LTE-A | Nortel | Not treated |
R1‑083160 | Analysis of PCI extension schemes | Qualcomm Europe | Noted |
R1‑083161 | Initialization of Scrambling for PDSCH | Qualcomm Europe | Not treated |
R1‑083162 | Clarification of PRACH Preamble format 4 | Qualcomm Europe | Not treated |
R1‑083163 | Clarification on RACH baseband signal generation | Qualcomm Europe | Not treated |
R1‑083164 | Clarification on UL VRB Allocation | Qualcomm Europe | Revised |
R1‑083165 | Clarification on PUSCH DM-RS scrambling | Qualcomm Europe | Noted |
R1‑083166 | Resource remapping for PUCCH formats 2/2a/2b | Qualcomm Europe | Not treated |
R1‑083167 | Clarification on PUCCH Resource Hopping | Qualcomm Europe | Not treated |
R1‑083168 | Linkage Among UL Power Control Parameters | Qualcomm Europe | Not treated |
R1‑083169 | PDCCH Ambiguous Payload Size | Qualcomm Europe | Noted |
R1‑083170 | Miscellaneous corrections | Qualcomm Europe | Noted - Revised |
R1‑083171 | Correcting the parameter Q_ACK | Qualcomm Europe | Withdrawn |
R1‑083172 | Padding one bit to DCI format 1B when format 1A and format 1B have the same size | Qualcomm Europe | Noted |
R1‑083173 | Way Forward on UL ACK Repetition | Qualcomm Europe, Ericsson | Not treated |
R1‑083174 | Confirmation of various UL transmission configurations | Qualcomm Europe | Not treated |
R1‑083175 | Power setting of MSG3 of RACH procedure | Qualcomm Europe | Noted |
R1‑083176 | UL ACK/NAK assignment procedure | Qualcomm Europe | Not treated |
R1‑083177 | Power offsets in UE-specific RS operation | Qualcomm Europe | Noted |
R1‑083178 | SRS resource allocation when UpPTS consists of 2 symbols | Qualcomm Europe | Not treated |
R1‑083179 | PMI reporting for DL transmissions configured for antenna port 5 | Qualcomm Europe | Not treated |
R1‑083180 | Clarifying UE-selected subband CQI report on PUCCH | Qualcomm Europe | Noted - Revised |
R1‑083181 | Clarifying PUSCH resource allocation | Qualcomm Europe | Noted |
R1‑083182 | Clarifying PUSCH hopping procedure | Qualcomm Europe | Not treated |
R1‑083183 | DL resource allocation for small system bandwidths | Qualcomm Europe | Noted |
R1‑083184 | Issues in DL Peak Rate Related TBS Design | Qualcomm Europe | Noted |
R1‑083185 | DRS in the DVRB case | Qualcomm Europe | Not treated |
R1‑083186 | Handling of Uplink Grant in Random Access Response | Qualcomm Europe | Noted |
R1‑083187 | Text proposal for evaluation methodology for mobility studies | Qualcomm Europe | Noted |
R1‑083188 | Text proposal for evaluation methodology for heterogeneous deployments | Qualcomm Europe | Not treated |
R1‑083189 | Advantages of synchronous network operation | Qualcomm Europe | Not treated |
R1‑083190 | New interference scenarios in LTE-A | Qualcomm Europe | Not treated |
R1‑083191 | Operation of relays in LTE-A | Qualcomm Europe | Not treated |
R1‑083192 | Network MIMO for Downlink Transmission in LTE-Advanced | Qualcomm Europe | Noted |
R1‑083193 | Carrier aggregation operation in LTE-A | Qualcomm Europe | Not treated |
R1‑083194 | Studies of different waveforms for the UL of LTE-A | Qualcomm Europe | Not treated |
R1‑083195 | Range expansion for efficient support of heterogeneous networks | Qualcomm Europe | Not treated |
R1‑083196 | Serving cell association in heterogeneous networks | Qualcomm Europe | Not treated |
R1‑083197 | Important Aspects of Mobility Procedures | Qualcomm Europe | Noted |
R1‑083198 | Uplink transmit diversity schemes with low cubic metric for LTE-Advanced | Mitsubishi Electric | Not treated |
R1‑083199 | 25.215 CR0192 (Rel-8, F) Modification of RSRP definition | Nokia Siemens Networks, Nokia | Agreed |
R1‑083200 | Discussion on the dual cell HSDPA operation on adjacent carriers | Nokia, Nokia Siemens Networks | Noted |
R1‑083201 | Dropping of RI/PMI Report on PUCCH | Icera Semiconductor | Not treated |
R1‑083202 | Definition of PRACH frequency position | LG Electronics | Revised |
R1‑083203 | Alignment of L1/L2 PRACH power control specification | LG Electronics, Ericsson, Qualcomm | Noted |
R1‑083204 | [DRAFT] LS on PRACH preamble power offset | LG Electronics, Ericsson, Qualcomm | Noted - Revised |
R1‑083205 | Application of L2 Relay in an Interference Limited Environment for LTE-A | InterDigital Communications LLC | Not treated |
R1‑083206 | DCI Format 1A definition for Broadcast Control | Motorola | Revised |
R1‑083207 | DCI Format 1C with implicit RV and TBS | Motorola | Noted |
R1‑083208 | DCI Format 1C Overall Definition | Motorola | Not treated |
R1‑083209 | Draft CR 36.212 on DCI Format 1A | Motorola | Noted - Revised |
R1‑083210 | Draft CR 36.213 Maximum PDCCH Coding Rate Threshold (0.75 --> 0.84) | Motorola | Not treated |
R1‑083211 | Draft CR 36.213 PUCCH reporting | Motorola, TI | Noted - Revised |
R1‑083212 | SIB1 and SI-x TBS vs Number of Transmissions | Motorola | Revised |
R1‑083213 | DCI Format 1C and 1.4, 3, 5, and 10 MHz link performance | Motorola | Noted |
R1‑083214 | Draft LS Response to LS on information about new PDCCH Format 1C and LS on SI Scheduling | Motorola | Revised |
R1‑083215 | Signaling Considerations for MU-MIMO Transmission Mode | Motorola | Not treated |
R1‑083216 | Subband Size and #Subband CQI in S vs. System Bandwidth in 36.213 | Motorola | Not treated |
R1‑083217 | CR for correction of the number of coded bits for control information on PUSCH | Motorola, NEC | Noted |
R1‑083218 | CR for limiting the number of coded symbols for A/N and RI on PUSCH in case of a retransmission | Motorola | Noted |
R1‑083219 | CR for avoiding error conditions in CQI/PMI/RI and Uplink data multplexing | Motorola | Noted |
R1‑083220 | CR for RE provisioning for the control information in case of CQI-only tranmission on PUSCH | Motorola | Noted - Revised |
R1‑083221 | CR for A/N transmission in TDD | Motorola | Noted - Revised |
R1‑083222 | Link Error Prediction for LTE-A | Motorola | Missing |
R1‑083223 | Classification of Relays | Motorola | Noted |
R1‑083224 | Common Reference Symbol Mapping/Signaling for 8 Transmit Antennas | Motorola | Not treated |
R1‑083225 | Spectrum Aggregation Scenarios for LTE-Advanced | Motorola | Not treated |
R1‑083226 | Approaches to Assess Uplink Transmission Enhancement for LTE-Advanced | Motorola | Not treated |
R1‑083227 | Uplink Multiple Antenna Schemes for LTE-Advanced | Motorola | Not treated |
R1‑083228 | Downlink Multiple Antenna Schemes for LTE-Advanced | Motorola | Not treated |
R1‑083229 | Multiple Point Coordination and Its Classification | Motorola | Noted |
R1‑083230 | Multiple ACK/NACK transmission for TDD | Motorola | Not treated |
R1‑083231 | Uplink ACK/NACK resource reduction scheme for TDD | Motorola | Noted |
R1‑083232 | Carrier Aggregation for LTE-A e-NodeB issues | Motorola | Not treated |
R1‑083233 | Video Services over LTE-A | Motorola | Not treated |
R1‑083234 | False Positive Issue in SPS Activation with Single PDCCH | Freescale | Noted |
R1‑083235 | Correction on scrambling of ACK/NAK bits for PUCCH format 2a/2b | Freescale | Withdrawn |
R1‑083236 | DL Coordinated Beam Switching for Interference management in LTE-A | Huawei | Not treated |
R1‑083237 | Extended PCI set for CSG | Infineon | Withdrawn |
R1‑083238 | HS-SCCH structure for 1.28Mcps TDD MIMO | TD Tech | Noted |
R1‑083239 | ICIC with Multi-site MIMO | Mitsubishi Electric | Not treated |
R1‑083240 | Removal of interpretation of NDI information in 36.213 | Qualcomm Europe | Not treated |
R1‑083241 | Joint SM with TAS for LTE-A uplink | Alcatel Shanghai Bell, Alcatel-Lucent | Not treated |
R1‑083242 | Clarification of spatial differential CQI index | LG Electronics | Not treated |
R1‑083243 | Discussion on HS-DPCCH Code Design for DC-HSDPA | HUAWEI | Noted |
R1‑083244 | Feedback and Precoding Techniques for MU-MIMO | NXP, Philips | Not treated |
R1‑083245 | On the terminal capabilities of IMT-Advanced | Spreadtrum Communications | Not treated |
R1‑083246 | Exploiting the potentials of TDD schemes for IMT-Advanced | Spreadtrum Communications | Not treated |
R1‑083247 | Draft CR 36.213 on DRS EPRE | Motorola | Revised |
R1‑083248 | Discussion on the SI transmission | LGE | Noted |
R1‑083249 | Summary of the e-mail discussion on Consequence analysis of Low/ Medium features in LTE Rel-8 | NTT DOCOMO | Noted |
R1‑083250 | Draft LS on Consequence analysis of Low/ Medium features in LTE Rel-8 | NTT DOCOMO | Noted - Revised |
R1‑083251 | Group signalling for Low/ Medium features in LTE Rel-8 | NTT DOCOMO | Noted |
R1‑083252 | Draft LS on additional RSRP trigger for ICIC | Ericsson | Noted |
R1‑083253 | PRACH resource placement | Nokia Siemens Networks, Ericsson, Nokia, ZTE | Noted |
R1‑083254 | Considerations on Spectrum Aggregation in LTE-Advanced | CHTTL, ITRI | Missing |
R1‑083255 | Draft CR on PRACH resource placement | Ericsson, Nokia, Nokia Siemens Networks, ZTE | Noted - Revised |
R1‑083256 | On multiple ACK/NAK multiplexing on PUCCH for LTE TDD | Ericsson | Not treated |
R1‑083257 | Draft LS Response to LS on information about new PDCCH Format 1C and LS on SI Scheduling | Motorola | Noted - Revised |
R1‑083258 | SIB1 and SI-x TBS vs Number of Transmissions | Motorola | Noted - Revised |
R1‑083259 | DCI Format 1A definition for Broadcast Control | Motorola | Noted |
R1‑083260 | 25.224 CR0185R3 (Rel-7, F) HS-SCCH and HS-SICH power control clarification for 1.28Mcps TDD | TD Tech, ZTE | Noted - Revised |
R1‑083261 | 25.224 CR0186R3 (Rel-8, A) HS-SCCH and HS-SICH power control clarification for 1.28Mcps TDD | TD Tech, ZTE | Noted - Revised |
R1‑083262 | Draft CR 36.213 on DRS EPRE | Motorola, Texas Instruments | Noted - Revised |
R1‑083263 | The need of supporting open-loop SM in initial deployment of release-8 | Nortel | Noted |
R1‑083264 | Separate frequency layer for CSG cells | Nokia, Nokia Siemens Networks | Noted |
R1‑083265 | Draft LS on additional RSRP trigger for ICIC | Ericsson | Noted - Revised |
R1‑083266 | Handling of Uplink Grant in Random Access Response | Qualcomm | Noted - Revised |
R1‑083267 | DRAFT LS Reply to Uplink grant format in Random Access Response | Qualcomm | Noted - Revised |
R1‑083268 | 25.214 CR0500R1 (Rel-8, F) Clarification of HS-SCCH order in HS-PDSCH Serving Cell Change Enhancements | Philips, NXP, Qualcomm | Withdrawn |
R1‑083269 | [DRAFT] LS on PRACH preamble power offset | LG Electronics, Ericsson, Qualcomm | Noted - Revised |
R1‑083270 | Update on Physical Layer Parameters for CQI Reporting | Texas Instruments | Noted |
R1‑083271 | 36.213 CR0053R1 (Rel-8, F) Correction of the equation for PUCCH power control | Samsung | Agreed in principle |
R1‑083272 | LS on additional RSRP trigger for ICIC | RAN1, Ericsson | Agreed |
R1‑083273 | LS on TBS table and UL TTI bundling adjustments | RAN1, Ericsson | Agreed |
R1‑083274 | 36.213 Draft CR Clarifying Requirement for Max PDSCH Coding Rate | Qualcomm | Noted - Revised |
R1‑083275 | 25.214 CR0498R2 (Rel-8, B) Introduction of HS-PDSCH Serving Cell Change Enhancements | Ericsson, NXP, Philips, Qualcomm Europe, Samsung | Noted - Revised |
R1‑083276 | Multi-Ack/NACK on PUSCH for TDD | Huawei | Noted |
R1‑083277 | Draft LS on timing adjustments | LGE, Panasonic | Noted |
R1‑083278 | Draft CR on UL AN mapping for TDD | Huawei, Samsung, CATT, LGE | Noted |
R1‑083279 | 36.213 CR0067 (Rel-8, F) Correction to the downlink resource allocation | LGE, NEC, Alcatel Lucent, Motorola, Samsung | Agreed |
R1‑083280 | 25.212 CR0270R1 (Rel-8, B) Introduction of HS-PDSCH Serving Cell Change Enhancements | Ericsson, Qualcomm | Noted - Revised |
R1‑083281 | 36.213 CR0068 (Rel-8, F) Removal of special handling for PUSCH mapping in PUCCH region | Ericsson, Qualcomm, Nokia, Nokia Siemens Networks, Motorola, Samsung, NEC , Panasonic, Huawei, LGE | Agreed |
R1‑083282 | 25.224 CR0190R1 (Rel-8, A) Clarification of the E-AGCH monitoring for 1.28Mcps TDD EUL | CATT | Agreed |
R1‑083283 | 36.213 CR0069 (Rel-8, F) Correction to the uplink power control | LGE, Samsung, Philips | Agreed |
R1‑083284 | 36.213 CR0039R2 (Rel-8, F) Clarification on uplink power control | Samsung | Agreed |
R1‑083285 | 36.213 CR0070 (Rel-8, F) Definition of Bit Mapping for DCI signalling | Nokia Siemens Networks, Nokia, LGE, NEC | Noted - Revised |
R1‑083286 | 36.213 CR0059R1 (Rel-8, D) PUSCH Power Control | CATT | Agreed |
R1‑083287 | 36.213 CR0071 (Rel-8, F) Clarification on PUSCH TPC commands | NEC Group, LG Electronics, Samsung | Agreed |
R1‑083288 | 36.213 CR0072 (Rel-8, F) Reference for CQI/PMI Reporting Offset | Texas Instruments, NEC, Ericsson, Huawei, NTT DoCoMo, LGE | Noted - Revised |
R1‑083289 | 25.224 CR0195 (Rel-7, F) Correction of the E-AGCH monitoring for 1.28Mcps TDD EUL | TD Tech | Not treated |
R1‑083290 | 25.224 CR0196 (Rel-8, A) Correction of the E-AGCH monitoring for 1.28Mcps TDD EUL | TD Tech | Not treated |
R1‑083291 | Way forward on TDD PUCCH multi-bit Ack/NACK transmission | TI, Huawei, CATT, Ericsson, Nokia, NSN, ZTE | Agreed |
R1‑083292 | CQI transmission supporting dual-cell HSDPA | Samsung | Noted |
R1‑083293 | Discussion on activation/deactivation of dual-cell HSDPA | Samsung | Noted |
R1‑083294 | 36.213 CR0073 (Rel-8, F) A/N transmission in TDD | Motorola | Noted |
R1‑083295 | 36.213 Draft CR (Rel-8, F) Support of multi-bit ACK/NAK transmission in TDD | TI, CMCC | Noted - Revised |
R1‑083296 | 36.213 Draft CR (Rel-8, F) Uplink ACK/NACK mapping for TDD | Huawei,CATT, CMCC, Nokia,Nokia Siemens Network, Texas Instruments | Noted - Revised |
R1‑083297 | 36.213 CR0046R2 (Rel-8, F) Correction of the description of PUCCH power control for TDD | Nokia, Nokia Siemens Networks | Agreed |
R1‑083298 | Definition of PRACH frequency offset | LG Electronics | Noted |
R1‑083299 | Draft LS on UL SRI Parameters Configuration | CATT | Noted - Revised |
R1‑083300 | 36.213 Draft CR (Rel-8, F) UL SRI Parameters Configuration | CATT, RITT, Texas Instruments, Nokia, Nokia Siemens Networks | Noted - Revised |
R1‑083301 | Remaining issues on format 1C | Huawei, CHTTL | Noted |
R1‑083302 | Power offset signaling for MU-MIMO | Huawei, CHTTL | Noted |
R1‑083303 | Clarification on number of OFDM symbols used for PDCCH | Huawei, Ericsson, TI | Noted |
R1‑083304 | 36.211 CR0066 (Rel-8, F) Correction to the downlink/uplink timing | LGE, Panasonic, Ericsson | Agreed |
R1‑083305 | Clarification on narrow BW referred in section 5.3.4 | Huawei, Ericsson, TI | Noted |
R1‑083306 | 36.213 CR0074 (Rel-8, F) Correction to the downlink/uplink timing | LGE, Panasonic, Ericsson | Agreed |
R1‑083307 | 36.213 CR0075 (Rel-8, F) Correction to the time alignment command | LGE, Panasonic, Ericsson | Agreed |
R1‑083308 | [Draft] LS on timing adjustment | LGE | Noted - Revised |
R1‑083309 | [Draft] LS on measurement gap | Panasonic | Noted - Revised |
R1‑083310 | 36.213 CR0072R1 (Rel-8, F) Reference for CQI/PMI Reporting Offset | Texas Instruments, NEC, Ericsson, Huawei, NTT DoCoMo, LG Electronics | Agreed |
R1‑083311 | 36.213 CR0055R1 (Rel-8, F) Clarification on mapping of Differential CQI fields | Samsung | Agreed |
R1‑083312 | Resolve the ambiguity between PHICH sequence index and symbol-quadruplet index | Huawei | Noted |
R1‑083313 | Introducing Dynamic Carrier Switching in DC-HSDPA | Qualcomm Europe | Noted |
R1‑083314 | 25.222 CR0151R1 (Rel-8, A) Clarification on E-HICH coding for 1.28Mcps TDD | TD Tech | Agreed |
R1‑083315 | 25.222 CR0156 (Rel-7, F) Clarification on E-HICH coding for 1.28Mcps TDD | TD Tech | Agreed |
R1‑083316 | 25.222 CR0152R1 (Rel-7, F) Clarification of E-UCCH Number indicator on E-AGCH for 1.28Mcps TDD | TD Tech | Agreed |
R1‑083317 | 25.222 CR0153R1 (Rel-8, A) Clarification of E-UCCH Number indicator on E-AGCH for 1.28Mcps TDD | TD Tech | Agreed |
R1‑083318 | 25.224 CR0185R4 (Rel-7, F) HS-SCCH and HS-SICH power control clarification for 1.28Mcps TDD | TD Tech, ZTE | Agreed |
R1‑083319 | 25.224 CR0186R4 (Rel-8, A) HS-SCCH and HS-SICH power control clarification for 1.28Mcps TDD | TD Tech, ZTE | Agreed |
R1‑083320 | 25.224 CR0194R1 (Rel-8, A) EUL power control improvement for 1.28Mcps TDD | TD Tech | Agreed |
R1‑083321 | CR for 36.212 regarding DCI format1C | LGE | Noted - Revised |
R1‑083322 | CR for 36.212 regarding DCI format1C (Implicit RV) | LGE | Noted |
R1‑083323 | Draft CR for 36.213 regarding DCI format1C | LGE | Missing |
R1‑083324 | Consideration on Uplink Multiple Access for LTE-Advanced | ZTE | Not treated |
R1‑083325 | 36.211 CR0259 (Rel-8, F) Correcting Ncs value for PRACH preamble format 0-3 | ZTE, Ericsson | Noted - Revised |
R1‑083326 | [Draft] LS on PDCCH DCI format 1C | LGE | Noted - Revised |
R1‑083327 | 36.212 CR0041 (Rel-8, F) Definition of Bit Mapping for DCI Signalling | Nokia Siemens Networks, Nokia, LGE, NEC | Agreed |
R1‑083328 | 36.212 CR0042 (Rel-8, F) Clarification on resource allocation in DCI format 1/2/2A | Huawei, LGE | Noted - Revised |
R1‑083329 | 25.212 CR0270R2 (Rel-8, B) Introduction of HS-PDSCH Serving Cell Change Enhancements | Ericsson, Motorola, NXP, Philips, Qualcomm Europe, Samsung | Agreed |
R1‑083330 | 25.214 CR0498R3 (Rel-8, B) Introduction of HS-PDSCH Serving Cell Change Enhancements | Ericsson, Motorola, NXP, Philips, Qualcomm Europe, Samsung | Agreed |
R1‑083331 | 36.212 CR0033R2 (Rel-8, F) Corrections to DCI formats | Philips, NXP | Agreed |
R1‑083332 | Draft CRs on DCI Format 1A changes needed for scheduling Broadcast Control | Motorola | Noted - Revised |
R1‑083333 | 36.212 CR0037R1 (Rel-8, F) Clarification of TPC commands signaled in DCI formats 3/3A | Samsung | Noted - Revised |
R1‑083334 | 36.211 CR0056R2 (Rel-8, F) Remaining issues on SRS hopping | Huawei, NTT DoCoMo, Nokia Siemens Networks, Nokia, Panasonic, ZTE, Ericsson, NEC | Agreed |
R1‑083335 | 36.211 CR0067 (Rel-8, F) ACK/NACK Scrambling scheme on PUCCH | Panasonic, Samsung, TI, NTT DoCoMo, LGE, Sharp, Mitsubishi, KDDI, Fujitsu | Agreed |
R1‑083336 | Way forward on MU-MIMO | Huawei, Motorola | Noted |
R1‑083337 | 36.213 CR0077 (Rel-8, F) Correction of Offset signalling of UL Control information MCS | LGE | Revised |
R1‑083338 | HS-DPCCH handling for DC-HSDPA at UE power limitation | Ericsson | Noted |
R1‑083339 | [Draft] LS on PDCCH DCI format 1C | LGE | Noted - Revised |
R1‑083340 | CR for RE provisioning for the control information in case of CQI-only tranmission on PUSCH | Motorola | Noted - Revised |
R1‑083341 | 36.211 CR0068 (Rel-8, F) DCI format1C | LGE, Motorola, Panasonic | Agreed |
R1‑083342 | 36.212 CR0044 (Rel-8, F) DCI format1C | LGE | Agreed |
R1‑083343 | 36.212 CR0039R1 (Rel-8, F) Linking of control resources in PUSCH to data MCS | Samsung, Panasonic, LGE, Motorola, Huawei | Agreed |
R1‑083344 | 36.213 CR0078 (Rel-8, F) DCI format1C | LGE, Motorola, Panasonic | Revised |
R1‑083345 | 36211 CR0053 (Rel-8, F) on Orthogonal cover sequence for shortened PUCCH format 1a and 1b | Panasonic, LGE, NextWave Wireless | Agreed |
R1‑083346 | LS on considerations on transport block sizes for VoIP | RAN2, Ericsson | Noted |
R1‑083347 | 36.213 CR0062R1 (Rel-8, F) Introducing missing parameters into 36.213 | Ericsson | Revised |
R1‑083348 | Draft CR on dedicated reference signal mapping for PDCCH with 4 symbols | ZTE, Motorola, TI, Huawei | Noted |
R1‑083349 | Draft LS on Consequence analysis of Low/ Medium features in LTE Rel-8 | NTT DOCOMO | Noted - Revised |
R1‑083350 | Consequence analysis of Low/ Medium features in LTE Rel-8 | NTT DOCOMO | Noted |
R1‑083351 | 36.212 CR0037R2 (Rel-8, F) Clarification of TPC commands signaled in DCI formats 3/3A | Samsung | Agreed |
R1‑083352 | 36.212 CR0045 (Rel-8, F) Miscellaneous corrections | Qualcomm Europe | Agreed |
R1‑083353 | Summary of Ad-Hoc session on AI 6.2 | Ad-Hoc chairman | Noted |
R1‑083354 | Summary of Ad-Hoc session on AI 6.1 | Ad-Hoc chairman | Noted |
R1‑083355 | Update of TR 25.929 v0.0.1 | TD Tech | Missing |
R1‑083356 | 36.213 CR0077R1 (Rel-8, F) Correction of offset signalling of UL Control information MCS | LGE | Agreed |
R1‑083357 | 36.213 CR0079 (Rel-8, F) CQI reporting for antenna port 5 | Ericsson, Texas Instruments, NTT DoCoMo, Nokia, Nokia Siemens Networks, CATT | Noted |
R1‑083358 | 36.211 CR0069 (Rel-8, F) Refinement for REG Definition for n = 4 | Texas Instruments, Ericsson, LG Electronics, Samsung, ZTE | Agreed |
R1‑083359 | Draft CR on miscellaneous update in 36.213 | Texas Instruments, Motorola, CATT | Noted - Revised |
R1‑083360 | 36.213 CR0078R1 (Rel-8, F) DCI format1C | LGE, Motorola, Panasonic | Revised |
R1‑083361 | 36.213 draft CR for Correction to UL Hopping operation | Huawei | Noted - Revised |
R1‑083362 | Correction for missing RI/PMI report on PUCCH | Sharp, Icera | Noted |
R1‑083363 | Text proposal for RAN1 TR on LTE-Advanced | NTT DOCOMO | Noted - Revised |
R1‑083364 | LS on Consequence analysis of Low/ Medium features in LTE Rel-8 | RAN1, NTT DOCOMO | Agreed |
R1‑083365 | LS on PRACH preamble power offset | RAN1, LG Electronics, Ericsson, Qualcomm | Agreed |
R1‑083366 | Evaluation of PCI collision for CSG | Qualcomm Europe | Noted |
R1‑083367 | 36.213 CR0064R1 (Rel-8, F) Adjusting TBS sizes to for VoIP | Ericsson | Agreed |
R1‑083368 | 36.213 CR0063R1 (Rel-8, F) Correcting the range and representation of delta_TF_PUCCH | Ericsson | Noted - Revised |
R1‑083369 | Draft Reply LS on considerations on transport block sizes for VoIP | Ericsson | Noted - Revised |
R1‑083370 | Defining Delta_F_PUCCH for format 2a/2b | Ericsson | Noted |
R1‑083371 | Transmission of ACK/NAK on PUSCH for LTE TDD | Ericsson | Noted |
R1‑083372 | 36.211 CR0070 (Rel-8, F) Correction for the definition of UE specific RS | Sharp, Icera | Not treated |
R1‑083373 | 36.213 CR0080 (Rel-8, F) Correction to precoding cycling for open loop spatial multiplexing | Nokia Siemens Networks, Nokia, LGE, Samsung | Agreed |
R1‑083374 | 36.211 CR0062R1 (Rel-8, F) Clarifications for DMRS parameters | NEC Group | Agreed |
R1‑083375 | Way forward on UE specific SRS configuration | Texas Instruments, Samsung, CATT, RITT, ZTE, Qualcomm, CMCC, Huawei | Noted |
R1‑083376 | Draft CR on UE Specific SRS Configuration | Texas Instruments, Huawei, Samsung, CATT, ZTE, RITT | Noted - Revised |
R1‑083377 | Draft LS on support of TDD ACK/NACK multiplexing in Rel-8 | Texas Instruments | Noted - Revised |
R1‑083378 | Draft CR on PDCCH Ambiguous Payload Sizes | Qualcomm, LGE, NEC, Panasonic | Noted - Revised |
R1‑083379 | 36.213 CR0081 (Rel-8, F) Clarifying UE-selected subband CQI report on PUCCH | Qualcomm Europe | Revised |
R1‑083380 | 36.211 CR0073 (Rel-8, F0 Correction of the half duplex timing advance offset | Ericsson | Agreed |
R1‑083381 | Clarification on UL VRB Allocation | Qualcomm Europe | Noted |
R1‑083382 | Draft CR 36.213 on DRS EPRE | Motorola, Texas Instruments | Noted - Revised |
R1‑083383 | 36.211 CR0058R1 (Rel-8, F) Control region in a cell with 4 Tx antennas | Samsung, Panasonic | Noted |
R1‑083384 | Draft LS Response to LS on information about new PDCCH Format 1C and LS on SI Scheduling | Motorola | Revised |
R1‑083385 | SIB1 and SI-x TBS vs Number of Transmissions | Motorola | Missing |
R1‑083386 | Draft CR 36.213 PUCCH reporting | Motorola, TI | Noted - Revised |
R1‑083387 | 36.211 CR0065R1 (Rel-8, F) Clarification on reception of synchronization signals | Ericsson | Noted - Revised |
R1‑083388 | 36.211 CR0071 (Rel-8, F) Correcting Ncs value for PRACH preamble format 0-3 | ZTE, Ericsson, LGE, Panasonic | Agreed |
R1‑083389 | 36.213 CR0082 (Rel-8, F) CQI corrections | Philips | Not treated |
R1‑083390 | 36.213 CR0083 (Rel-8, F) Corrections to precoding for large delay CDD | Philips, NXP | Not treated |
R1‑083391 | 36.211 CR0065R2 (Rel-8, F) Clarification on reception of synchronization signals | Ericsson | Noted - Revised |
R1‑083392 | 36.211 CR0064R1 (Rel-8, F) Introducing missing parameters into 36.211 | Ericsson | Agreed |
R1‑083393 | 25.213 CR0097r1 (Rel-7, F) Restricted Beta Factor Combinations for EUL | Ericsson | Noted - Revised |
R1‑083394 | Draft LS on Improved EUL power control at UE power limitation | Ericsson | Noted - Revised |
R1‑083395 | 25.211 CR0257r1 (Rel-8,B) “Introduction of Dual-Cell HSDPA Operation on Adjacent Carriers” | Ericsson, Huawei, Nokia, Nokia Siemens Networks, Philips, Qualcomm Europe, Samsung | Agreed |
R1‑083396 | 25.212 CR0267r1 (Rel-8, B) “Introduction of Dual-Cell HSDPA Operation on Adjacent Carriers” | Ericsson, Huawei, Nokia, Nokia Siemens Networks, Philips, Qualcomm Europe, Samsung | Agreed |
R1‑083397 | 25.213 CR0095r1 (Rel-8, B) “Introduction of Dual-Cell HSDPA Operation on Adjacent Carriers” | Ericsson, Huawei, Nokia, Nokia Siemens Networks, Philips, Qualcomm Europe, Samsung | Agreed |
R1‑083398 | 25.214 CR0497r1 (Rel-8, B) “Introduction of Dual-Cell HSDPA Operation on Adjacent Carriers” | Ericsson, Huawei, Nokia, Nokia Siemens Networks, Philips, Qualcomm Europe, Samsung | Agreed |
R1‑083399 | 25.214 CR0497r2 (Rel-8, B) “Introduction of Dual-Cell HSDPA Operation on Adjacent Carriers” | Ericsson, Huawei, Nokia, Nokia Siemens Networks, Philips, Qualcomm Europe | Noted |
R1‑083400 | 36.211 CR0072 (Rel-8, F) Corrections to precoding for large delay CDD | Philips, NXP | Not treated |
R1‑083401 | Way Forward on the Maximum SRS Bandwidth for UpPTS | CATT, CMCC, Huawei, Motorola, RITT, ZTE | Noted |
R1‑083402 | 36.211 CR0074 (Rel-8, F) Correction to Precoding for Transmit Diversity | Nokia Siemens Networks, Nokia | Agreed |
R1‑083403 | Correction on scrambling of ACK/NAK bits for PUCCH format 2a/2b | Freescale | Noted |
R1‑083404 | 36.211 CR0075 (Rel-8, F) Clarification on number of OFDM symbols used for PDCCH | Huawei, Ericsson, TI | Agreed |
R1‑083405 | Draft LS on CSG cell identification | Qualcomm Europe, Nokia, Nokia Siemens Networks, Ericsson | Noted - Revised |
R1‑083406 | 36.211 CR0049R1 (Rel-8, F) Correction of PHICH to RE mapping in extended CP subframe | LGE, NEC, Nortel, Samsung | Agreed |
R1‑083407 | Draft CR on SRS starting position in UpPTS | Nokia, Nokia Siemens Networks | Noted |
R1‑083408 | 36.213 CR0084 (Rel-8, F) CQI reference measurement period | Philips, NXP, Ericsson, Qualcomm | Noted - Revised |
R1‑083409 | About shortened PUCCH format 1 and related UL transmission configurations | LGE, Panasonic, ZTE, Huawei, ETRI | Noted |
R1‑083410 | Text proposal for RAN1 TR on LTE-Advanced | NTT DOCOMO | Agreed |
R1‑083411 | MIMO session summary | Ad-Hoc chairman | Noted |
R1‑083412 | Way Forward on the remaining issues for ACK/NACK bundling | Nokia, CATT, CMCC, Ericsson, Huawei, LGE, Motorola, Nokia Siemens Networks, Qualcomm, Samsung, TI, ZTE | Noted |
R1‑083413 | Draft CR of reuse the MCS and TBS tables for DwPTS | CATT, CMCC, Nokia, Nokia Siemens Networks, RITT | Noted |
R1‑083414 | 36.213 CR0085 (Rel-8, F) CQI report for transmission mode 7 | Samsung, Qualcomm, LGE, Nortel | Noted |
R1‑083415 | 36.211 CR0076 (Rel-8, F) Clarification on tree structure for CCE aggregation | Ericsson | Missing |
R1‑083416 | LS on PDCCH DCI format 1C | RAN1, LG Electronics | Agreed |
R1‑083417 | Way Forward on TDD ACK/NACK on PUSCH | Ericsson, Huawei, CATT, CMCC, LGE, Motorola, Nokia, Nokia Siemens Networks, Qualcomm, Samsung,Texas Instruments, ZTE | Agreed |
R1‑083418 | 36.212 CR0042R1 (Rel-8, F) Clarification on resource allocation in DCI format 1/2/2A | Huawei, LGE | Agreed |
R1‑083419 | 36.212 CR0046 (Rel-8, F) Correction on downlink multi-user MIMO | Ericsson | Agreed |
R1‑083420 | 36.213 CR0086 (Rel-8, F) Correction on downlink multi-user MIMO | Ericsson | Agreed |
R1‑083421 | 36.212 CR0047 (Rel-8, F) Corrections to DL DCI Formats In case of Ambiguous Payload Sizes | Qualcomm Europe, LGE, NEC, Panasonic | Agreed |
R1‑083422 | Way Forward on PA range correction | Sharp, Fujitsu, Hitachi | Noted |
R1‑083423 | 36.212 CR0048 (Rel-8, F) CR for RE provisioning for the control information in case of CQI-only transmission on PUSCH | Motorola, LGE, Huawei | Agreed |
R1‑083424 | LS on CSG cell identification | RAN1, Qualcomm | Agreed |
R1‑083425 | 36.213 CR0087 (Rel-8, F) PUCCH Reporting | Motorola, Texas Instruments | Agreed |
R1‑083426 | 36.213 CR0081R1 (Rel-8, F) Clarifying UE-selected subband CQI report on PUCCH | Qualcomm Europe | Agreed |
R1‑083427 | 36.213 CR0062R2 (Rel-8, F) Introducing missing parameters into 36.213 | Ericsson | Agreed |
R1‑083428 | 36.211 CR0077 (Rel-8, F) Number of antenna ports for PDSCH | NEC Group, Motorola, Philips, Nortel, TI, Samsung | Agreed |
R1‑083429 | Reply LS on considerations on transport block sizes for VoIP | RAN1, Ericsson | Agreed |
R1‑083430 | 36.213 CR0063R2 (Rel-8, F) Correcting the range and representation of delta_TF_PUCCH | Ericsson | Agreed |
R1‑083431 | LS Reply to Uplink grant format in Random Access Response | RAN1, Qualcomm | Agreed |
R1‑083432 | LS Response to LS on information about new PDCCH Format 1C and LS on SI Scheduling | RAN1, Motorola | Agreed |
R1‑083433 | 36.213 CR0088 (Rel-8, F) Handling of Uplink Grant in Random Access Response | Qualcomm, Panasonic, Motorola | Noted - Revised |
R1‑083434 | 36.211 CR0078 (Rel-8, F) Correction to Type 2 PUSCH predetermined hopping for Nsb=1 operation | Motorola, LGE, Huawei | Agreed |
R1‑083435 | 36.213 CR0089 (Rel-8, F) Correction to UL Hopping operation | Huawei | Agreed |
R1‑083436 | 25.213 CR0097R2 (Rel-7, F) Restricted Beta Factor Combinations for EUL | Ericsson | Agreed |
R1‑083437 | 25.213 CR0098 (Rel-8, A) Restricted Beta Factor Combinations for EUL | Ericsson | Agreed |
R1‑083438 | 36.213 CR0084R1 (Rel-8, F) CQI reference measurement period | Philips, NXP, Ericsson, Motorola, Nokia, Nokia Siemens Networks, Qualcomm | Agreed |
R1‑083439 | 36.213 CR0088R1 (Rel-8, F) Handling of Uplink Grant in Random Access Response | Qualcomm, Panasonic, Motorola | Agreed |
R1‑083440 | LS on Improved EUL power control at UE power limitation | RAN1, Ericsson | Agreed |
R1‑083441 | 25211CR256R2 (Rel-8, B) Introduction of the Enhanced Uplink for CELL_FACH state | Nokia Siemens Networks, Ericsson, Motorola, NEC, Nokia, NXP, Philips, Qualcomm, Samsung | Agreed |
R1‑083442 | 25214CR490R1 (Rel-8, B) Introduction of the Enhanced Uplink for CELL_FACH state | Nokia Siemens Networks, Nokia, Ericsson, Samsung, Qualcomm, Philips, NXP, Huawei | Agreed |
R1‑083443 | 36.211 CR0079 (Rel-8, F) PRACH frequency location | Panasonic, Ericsson, ZTE, LGE | Agreed |
R1‑083444 | 36.212 CR0035R1 (Rel-8, F) Format 1B confirmation flag | Texas Instruments, LG Electronics, Motorola, Nortel, Philips, Qualcomm, Samsung | Agreed |
R1‑083445 | 36.213 CR0078R2 (Rel-8, F) DCI format1C | LGE, Motorola, Panasonic | Agreed |
R1‑083446 | 36.213 CR0090 (Rel-8, F) DRS EPRE | Motorola, Texas Instruments, Nokia Siemens Networks, Alcatel-Lucent | Agreed |
R1‑083447 | 36.212 CR0091 (Rel-8, F) Coding and multiplexing of multiple ACK/NACK in PUSCH | Nokia, Nokia Siemens Networks,Huawei | Revised |
R1‑083448 | 36.213 CR0070R1 (Rel-8, F) Definition of Bit Mapping for DCI signalling | Nokia Siemens Networks, Nokia, LGE, NEC | Agreed |
R1‑083449 | 36.213 CR0092 (Rel-8, F) Uplink ACK/NACK mapping for TDD | Huawei,CATT, CMCC, Nokia,Nokia Siemens Network, Texas Instruments | Agreed |
R1‑083450 | LS on UL SRI Parameters Configuration | RAN1, CATT | Agreed |
R1‑083451 | 36.213 CR0093 (Rel-8, F) UL SRI Parameters Configuration | CATT, RITT, Texas Instruments, Nokia, Nokia Siemens Networks | Agreed |
R1‑083452 | LS on timing adjustment | RAN1, LGE | Agreed |
R1‑083453 | 36.213 CR0094 (Rel-8, F) Miscellaneous update in 36.213 | Texas Instruments, Motorola, CATT, Ericsson, NTT DoCoMo, NEC, Huawei, Qualcomm | Agreed |
R1‑083454 | LS on measurement gap | RAN1, Panasonic | Agreed |
R1‑083455 | 36.213 CR0095 (Rel-8, F) Clarifying Requirement for Max PDSCH Coding Rate | Qualcomm | Agreed |
R1‑083456 | 36.213 CR0096 (Rel-8, F) on UE Specific SRS Configuration | Texas Instruments, Huawei, Samsung, CATT, ZTE, RITT | Agreed |
R1‑083457 | 36.212 CR0043 (Rel-8, F) DCI Format 1A changes needed for scheduling Broadcast Control | Motorola | Agreed |
R1‑083458 | 36.213 CR0097 (Rel-8, F) DCI Format 1A changes needed for scheduling Broadcast Control | Motorola | Agreed |
R1‑083459 | 36.212 CR0091R1 (Rel-8, F) Coding and multiplexing of multiple ACK/NACK in PUSCH | Ericsson, Nokia, Nokia Siemens Networks,Huawei | Revised |
R1‑083460 | 36.211 CR0065R3 (Rel-8, F) Clarification on reception of synchronization signals | Ericsson | Agreed |
R1‑083461 | 36.212 CR0091R2 (Rel-8, F) Coding and multiplexing of multiple ACK/NACK in PUSCH | Ericsson, Nokia, Nokia Siemens Networks,Huawei | Agreed |
R1‑083462 | 36.213 CR0098 (Rel-8, F) Processing of TPC bits in the random access response | Nokia Siemens Networks, Ericsson, LGE, Nokia, Samsung | Agreed |
R1‑083463 | 36.213 CR0099 (Rel-8, F) Reuse table for punctured PRB | CATT, CMCC, Nokia, Nokia Siemens Networks, RITT | Not treated |
R1‑083464 | 36.213 CR0100 (Rel-8, F) Support of multi-bit ACK/NAK transmission in TDD | Texas Instruments, CMCC, Ericsson | Revised |
R1‑083465 | LS on support of TDD ACK/NACK multiplexing in Rel-8 | RAN1, Texas Instruments | Agreed |
R1‑083466 | 36.213 CR0100R1 (Rel-8, F) Support of multi-bit ACK/NAK transmission in TDD | Texas Instruments, CMCC, Ericsson | Agreed |
page generated from database: 2024-07-20 12:15:34