3GPP TDocs (written contributions) at meeting
Meeting: R1-53 - 2008-05-05 to 2008-05-09, Kansas City
meeting id: R1-53 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑081710 | Draft Agenda for RAN1#53 meeting | RAN1 Chairman | Approved |
R1‑081711 | Final report of RAN1#52bis meeting | MCC Support | Approved |
R1‑081712 | Efficient Downlink Control Signaling for MU-MIMO | InterDigital Communications, LLC | Not treated |
R1‑081713 | PDCCH MIMO Format Options for E-UTRA | InterDigital Communications, LLC | Not treated |
R1‑081714 | IMT Advanced RAN1 Requirements - An India Perspective | CEWiT | Noted |
R1‑081715 | LS on Release 8 non-essential SAE features | TSG SA, Ericsson | Noted |
R1‑081716 | LS on Decision of MBMS and LCS in SAE Rel8 Scope Discussions | TSG SA, NTT DoCoMo | Noted |
R1‑081717 | LS on Transmission of physical layer parameters | RAN2, Ericsson | Noted |
R1‑081718 | LS on PDCCH for DL data arrival and random access response format | RAN2, Qualcomm | Noted |
R1‑081719 | LS on Earthquake and Tsunami Warning System | SA2, NTT DoCoMo | Noted |
R1‑081720 | LS Request for Evaluation Framework Link Level Data | SA4, Qualcomm | Noted |
R1‑081721 | Requirement for LTE-Advanced | Samsung | Noted |
R1‑081722 | Future 3GPP Radio Technologies for LTE-Advanced | Samsung | Noted |
R1‑081723 | Draft CR on Downlink RS | Samsung | Revised |
R1‑081724 | Draft CR on Uplink RS | Samsung | Revised |
R1‑081725 | Sequence generation for DL cell-specific reference signals | Samsung | Revised |
R1‑081726 | DL PHICH Remapping with UL RB Size | Samsung | Not treated |
R1‑081727 | Results for the linkage between PUSCH MCS and ACK/NACK resource amount on PUSCH | Samsung | Noted |
R1‑081728 | ACK/NAK DTX Detection in the PUSCH | Samsung | Not treated |
R1‑081729 | ACK/NAK Repetitions in E-UTRA UL | Samsung | Not treated |
R1‑081730 | Increasing PUCCH Multiplexing Capacity | Samsung | Not treated |
R1‑081731 | Simplex coding for ACK/NACK bits in PUSCH | Samsung, TI, LGE, Panasonic | Revised |
R1‑081732 | Multiplexing of Rank and CQI/PMI in PUSCH channel | Samsung, TI, LGE, Panasonic | Revised |
R1‑081733 | Summary of Reflector Discussions on EUTRA DL RS | Samsung | Noted |
R1‑081734 | Summary of Reflector Discussions on EUTRA UL RS | Samsung | Noted |
R1‑081735 | PDSCH-to-RE mapping robust against CCFI reception errors | Samsung | Noted |
R1‑081736 | SRS transmission in UpPTS | Samsung | Not treated |
R1‑081737 | SRS indication for TDD | Samsung | Not treated |
R1‑081738 | Views on SRS subframe indication in DBCH | Samsung | Not treated |
R1‑081739 | DVRB to PRB mapping in DwPTS | Samsung | Noted |
R1‑081740 | On DM RS position | Samsung | Noted |
R1‑081741 | RE puncturing pattern for RS boosting | Samsung | Not treated |
R1‑081742 | Draft CR on Sounding RS | Samsung | Revised |
R1‑081743 | Summary of email discussion on CQI reporting | Samsung | Noted |
R1‑081744 | SU-MIMO PMI feedback and Compression | Samsung | Not treated |
R1‑081745 | CQI Reporting for MU-MIMO | Samsung | Not treated |
R1‑081746 | Relation of Rank report and PUCCH CQI/PMI reports | Samsung | Noted |
R1‑081747 | Inter-cell inteference measurement using unused DL PRBs | Samsung | Noted |
R1‑081748 | CCE to uplink ACK/NACK mapping in TDD | Samsung | Not treated |
R1‑081749 | Timing for Enhanced Uplink in Cell_FACH | Samsung | Noted |
R1‑081750 | Reliable transmission of serving cell change acknowledgment | Samsung | Noted |
R1‑081751 | Control channel structure for dual-cell HSDPA | Samsung | Noted |
R1‑081752 | Proposals on PHY related aspects in LTE Advanced | NEC Group | Noted |
R1‑081753 | UL Frequency Hopping Pattern Generation with System Frame Number | NEC Group | Withdrawn |
R1‑081754 | 36211 CR0014 (Rel-8, F) Further Correction of the predefined hopping pattern for PUSCH | NEC Group | Withdrawn |
R1‑081755 | Resource Allocation for the UL Hopping Users | NEC, Motorola, LGE, Samsung, Ericsson | Not treated |
R1‑081756 | 36.213 CR0015 (Rel-8, F) Correction of UE PUSCH frequency hopping procedure | NEC, Samsung, Motorola, LGE, Ericsson | Revised |
R1‑081757 | Bandwidth part sizes for UE selected CQI reports on the PUCCH | NEC Group | Not treated |
R1‑081758 | Further clarification on precoding confirmation | NEC Group | Noted |
R1‑081759 | Evaluation of Mode 1-2 PUSCH based Reporting | NEC Group | Withdrawn |
R1‑081760 | Further clarification on P_A | NEC Group | Noted |
R1‑081761 | Technologies for LTE - Advanced | SHARP | Noted |
R1‑081762 | On overload indicator triggering and reporting format | SHARP | Not treated |
R1‑081763 | Considerations on Set S | SHARP | Not treated |
R1‑081764 | PDCCH format 1/2 resource allocation type modification to reduce overhead | ASUSTeK | Not treated |
R1‑081765 | Discussions on the report format of overload indicator | ZTE | Not treated |
R1‑081766 | Time & Frequency Location Mapping for TDD PRACH | ZTE | Noted |
R1‑081767 | Two-threshold RSRP trigger mechanism | ZTE | Not treated |
R1‑081768 | ACKNAK transmission in PUSCH considering DTX in TDD | ZTE | Not treated |
R1‑081769 | ACKNAK bundling transmission in PUCCH considering DTX in TDD | ZTE | Not treated |
R1‑081770 | Control signalling for supporting of DL MU-MIMO | ZTE | Not treated |
R1‑081771 | On the Remaining Issues of PUCCH slot-based CS/OC remapping | ZTE | Not treated |
R1‑081772 | Modification of Cyclic Shift Hopping for CQI | ZTE | Missing |
R1‑081773 | Technical points for LTE-Advanced | ZTE | Noted |
R1‑081774 | 25.223 CR0053 (Rel-7, F) Correction of uplink multicode capability for 1.28Mcps TDD EUL | CATT | Agreed |
R1‑081775 | Technique proposals for LTE-Advanced | CATT | Noted |
R1‑081776 | Multiple A/Ns transmission for TDD | CATT | Not treated |
R1‑081777 | SRS configurations for TDD | CATT, RITT | Not treated |
R1‑081778 | Considerations for PRACH and SRS in UpPTS | CATT | Noted |
R1‑081779 | DRS power boosting | CATT | Not treated |
R1‑081780 | Soft buffer size for TDD | CATT, RITT, Spreadtrum Communications | Noted |
R1‑081781 | Draft CR on Correction of the description of PUSCH power control for TDD (36.213, F) | CATT, Motorola | Revised |
R1‑081782 | Consideration on the scrambling of PDSCH for MU-MIMO | Huawei | Revised |
R1‑081783 | Consideration on SRI transmission onPUCCH | Huawei | Not treated |
R1‑081784 | Consideration on MCS offset between data and CQI on PUSCH | Huawei | Noted |
R1‑081785 | Proposal on utilizing of reserved CFI state | Huawei | Not treated |
R1‑081786 | SRS transmission subframe configuration | Huawei | Not treated |
R1‑081787 | Proposal of CG sequence hopping in group planning | Huawei | Not treated |
R1‑081788 | Uplink ACK/NAK implicit mapping in TDD | Huawei | Withdrawn |
R1‑081789 | Uplink ACK/NACK bundling configuration in TDD | Huawei | Not treated |
R1‑081790 | Considerations on ACK/NACK bundling and Multi-ACK/NACK multiplexing in TDD | Huawei | Not treated |
R1‑081791 | Technical proposals and considerations for LTE advanced | Panasonic | Noted |
R1‑081792 | PDCCH contents and formats | Panasonic | Revised |
R1‑081793 | Control signalling for downlink MU-MIMO | Panasonic | Not treated |
R1‑081794 | Necessity of the scrambling for ACK/NACK on PUCCH | Panasonic | Not treated |
R1‑081795 | Necessity of the scrambling for the reference signal of CQI in PUCCH | Panasonic | Not treated |
R1‑081796 | ACK/NACK repetition and Implicit Resource Allocation for PUCCH | Panasonic | Not treated |
R1‑081797 | Initialization of the pseudo-random sequence generator for CS hopping | Panasonic | Not treated |
R1‑081798 | Sounding RS bandwidth configuration | Panasonic | Not treated |
R1‑081799 | Configuration and relation of PUCCH CQI elements | Panasonic | Not treated |
R1‑081800 | Testing and CQI | Panasonic | Not treated |
R1‑081801 | Offset between CQI and data MCS on PUSCH | Panasonic | Noted |
R1‑081802 | Reply of RAN2 LS of RACH | Panasonic | Noted |
R1‑081803 | Timing alignment command responding time | Panasonic | Noted |
R1‑081804 | HARQ soft buffer between codewords | Panasonic | Noted |
R1‑081805 | draft CR for 36.212 on resource assignment field for distributed VRB | Panasonic | Revised |
R1‑081806 | draft CR for 36.213 on resource alloaction for distributed VRB | Panasonic | Revised |
R1‑081807 | Clarification on simultaneous transmission of aperiodic CQI and UL ACK/NACK | Panasonic | Noted |
R1‑081808 | On the requirements for LTE-advanced | LG Electronics | Noted |
R1‑081809 | On the Consideration of Technical Candidates for LTE-advanced | LG Electronics | Noted |
R1‑081810 | RB assignment with PDCCH DCI format 1C | LG Electronics | Not treated |
R1‑081811 | Remaining Control Signaling Issues for Downlink MIMO | LG Electronics | Not treated |
R1‑081812 | TP on Punctured PUCCH format | LG Electronics | Not treated |
R1‑081813 | Efficient Utilization of Unused PUCCH RB | LG Electronics | Not treated |
R1‑081814 | Correction on PUCCH Channelization Index | LG Electronics | Revised |
R1‑081815 | Bundled ACK/NACK in TDD | LG Electronics | Not treated |
R1‑081816 | CCE to bundled ACK/NACK index mapping in TDD | LG Electronics | Not treated |
R1‑081817 | Scrambling sequence generation in E-UTRA | LG Electronics | Revised |
R1‑081818 | Introduction of CR for downlink DVRB mapping to PRB | LG Electronics, Panasonic, NEC, Nortel, Motorola, Ericsson | Noted |
R1‑081819 | Draft CR for 36.211 on downlink VRB mapping to PRB for distributed transmission | LG Electronics, Panasonic, NEC, Nortel, Motorola, Ericsson | Revised |
R1‑081820 | Draft CR for clarification of modulation symbols to REs mapping for DVRB | LG Electronics, Panasonic, NEC, Nortel, Motorola, Ericsson | Revised |
R1‑081821 | Remaining Issues on UE feedback | LG Electronics | Not treated |
R1‑081822 | Performance Evaluation of CQI/PMI Feedback Schemes on PUSCH | LG Electronics | Not treated |
R1‑081823 | On the scenario and channel model for LTE-Advanced | CMCC | Noted |
R1‑081824 | Proposal for Improving Interference Estimation | Marvell | Revised |
R1‑081825 | Edge treatment for frequency selective CQI on PUSCH | Marvell | Not treated |
R1‑081826 | Edge treatment for spatial differential CQI format on PUCCH | Marvell | Not treated |
R1‑081827 | Hitachi’s proposals on Physical Layer Aspects for LTE-Advanced | Hitachi, Ltd. | Noted |
R1‑081828 | Enhancement on Technologies for LTE advanced Requirements | Nortel | Noted |
R1‑081829 | PDCCH format for OL MIMO | Nortel | Not treated |
R1‑081830 | View on PHICH Mapping with extended CP for antenna port 1 and 2 | Nortel | Not treated |
R1‑081831 | Performance evaluation of codebook size reduction for 2 Tx | Nortel | Noted |
R1‑081832 | CQI estimation methodology | Nortel | Not treated |
R1‑081833 | Definition of configured set S of CQI reporting subbands | Nortel | Revised |
R1‑081834 | On CSI prediction in LTE | Nortel | Not treated |
R1‑081835 | Differential PMI feedback | Nortel | Not treated |
R1‑081836 | Need of procedure for supporting MU-MIMO | Nortel | Not treated |
R1‑081837 | PDCCH format for support of MU-MIMO operation | Huawei | Not treated |
R1‑081838 | Physical layer technologies for LTE-Advanced | Huawei | Noted |
R1‑081839 | PDCCH format for allocation of dedicated preambles | Nokia, Nokia Siemens Networks | Noted |
R1‑081840 | UL grant for random access message 3 | Nokia, Nokia Siemens Networks | Revised |
R1‑081841 | LTE-A Requirements | Nokia, Nokia Siemens Networks | Noted |
R1‑081842 | LTE-A Proposals for evolution | Nokia Siemens Networks, Nokia | Noted |
R1‑081843 | 36211 CR0012R1 (Rel-8, F) Correction to Limitation of Constellation Size of ACK Transmission in PUSCH | Nokia Siemens Networks, Nokia, Qualcomm | Agreed |
R1‑081844 | Draft CR to 36.211 - Corrections to Secondary Synchronization Signal Mapping | Nokia Siemens Networks, Nokia | Revised |
R1‑081845 | PDCCH DL grant size of LTE TDD | Nokia, Nokia Siemens Networks | Not treated |
R1‑081846 | Proposed way forward on DL signalling of UL CL antenna selection | Nokia Siemens Networks, Nokia | Noted |
R1‑081847 | On the PDCCH Format 1C signaling | Nokia, Nokia Siemens Networks | Not treated |
R1‑081848 | Signaling of precoding information | Nokia, Nokia Siemens Networks | Not treated |
R1‑081849 | Signaling of persistent scheduling | Nokia, Nokia Siemens Networks | Not treated |
R1‑081850 | Simulation results: PDCCH hashing function performance of consecutive vs. distributive CCE assignment | Nokia, Nokia Siemens Networks | Withdrawn |
R1‑081851 | On the PUCCH overhead associated with CCE index mapping | Nokia, Nokia Siemens Networks | Not treated |
R1‑081852 | Linkage between PUSCH MCS and amount of control resources on PUSCH | Nokia Siemens Networks, Nokia | Noted |
R1‑081853 | Simulation results: Linkage between PUSCH MCS and amount of control resources on PUSCH | Nokia Siemens Networks, Nokia | Noted |
R1‑081854 | Multiplexing between Rank and SR | Nokia Siemens Networks, Nokia | Not treated |
R1‑081855 | Avoiding PUSCH error situations caused by DL allocation grant signalling failure | Nokia Siemens Networks, Nokia | Not treated |
R1‑081856 | Coverage Comparison between PUSCH, PUCCH and RACH | Nokia Siemens Networks, Nokia | Not treated |
R1‑081857 | Proposed way forward on ACK/NACK repetition on PUCCH | Nokia Siemens Networks, CATT, CMCC, Motorola, Nokia | Not treated |
R1‑081858 | ACKNACK Bundling Details for LTE TDD | Nokia, Nokia Siemens Networks | Not treated |
R1‑081859 | Usage of 4th pattern of UL TTI index in LTE TDD | Nokia, Nokia Siemens Networks | Not treated |
R1‑081860 | Further Issues with DL RS Initialization | Nokia Siemens Networks, Nokia | Not treated |
R1‑081861 | Clarification to transmission of PMCH subframes in frame structure type 2 | Nokia, Nokia Siemens Networks | Noted |
R1‑081862 | SRS Configurations for LTE TDD | Nokia, Nokia Siemens Networks | Not treated |
R1‑081863 | Handling of dynamically varying SRS BW | Nokia Siemens Networks, Nokia | Not treated |
R1‑081864 | Frequency hopping arrangement for SRS | Nokia Siemens Networks, Nokia | Noted |
R1‑081865 | 36.212 CR0004 (Rel-8, F) on ACK insertion into PUSCH | Nokia Siemens Networks, Nokia | Noted - Revised |
R1‑081866 | Overload Indicator (OI) Configuration and Reporting Criteria | Nokia Siemens Networks, Nokia | Not treated |
R1‑081867 | Further Discussion on Relative Narrowband TX Power Indicator for DL ICIC | Nokia Siemens Networks, Nokia | Not treated |
R1‑081868 | Number of spatially multiplexed users for LTE DL MU-MIMO | Nokia, Nokia Siemens Networks | Not treated |
R1‑081869 | Channel Quality Indicator for LTE MU-MIMO | Nokia, Nokia Siemens Networks | Not treated |
R1‑081870 | Effect of Precoding Granularity on LTE Multiuser MIMO | Nokia, Nokia Siemens Networks | Not treated |
R1‑081871 | Draft CR to 36.214 - Introduction of eNode B Measurement of Received Interference Power | Nokia Siemens Networks, Nokia | Revised |
R1‑081872 | Further open issues for Soft Buffer Allocation | Nokia, Nokia Siemens Networks | Noted |
R1‑081873 | Semi-Static Interference Coordination Method | Alcatel-Lucent | Noted |
R1‑081874 | Support for Semi-Static Inter cell Interference Coordination | Alcatel-Lucent, Nortel Networks | Not treated |
R1‑081875 | eNodeB Indicator definition for ^^ “Maximum Tx Power per PRB normalized” | Alcatel-Lucent | Revised |
R1‑081876 | X2-signalling of eNodeB Max Tx Power per PRB report | Alcatel-Lucent | Not treated |
R1‑081877 | LTE - IMT advanced - Candidate Technologies | Alcatel-Lucent | Revised |
R1‑081878 | 25.212 CR0262r1 (Rel-8, B) HS-SCCH orders for HS-SCCH-less operation | Ericsson | Agreed |
R1‑081879 | 25.214 CR0483r2 (Rel-8, B) HS-SCCH orders for HS-SCCH-less operation | Ericsson | Revised |
R1‑081880 | EUL coverage enhancements | Ericsson | Noted |
R1‑081881 | Timing for EUL in CELL_FACH | Ericsson | Noted |
R1‑081882 | AICH/E-AICH error targets | Ericsson | Noted |
R1‑081883 | HS-PDSCH Serving Cell change enhancements | Ericsson | Noted |
R1‑081884 | Framework for DC-HSDPA operation | Ericsson | Noted |
R1‑081885 | System simulation results for DC-HSDPA operation | Ericsson | Revised |
R1‑081886 | 25.211 Draft CR (Rel-6, F) Correction to E-DCH control channel timing | Qualcomm Europe | Revised |
R1‑081887 | Dynamic uplink load balancing using E-AICH | Qualcomm Europe | Noted |
R1‑081888 | 25.211 CR0254 (Rel-8, B) Introduction of E-AICH for the purpose of E-DCH Resource Configuration Allocation | Qualcomm Europe | Revised |
R1‑081889 | Minimum Error Performance Targets for AICH/E-AICH based E-DCH Resource Allocation Scheme | Qualcomm Europe | Noted |
R1‑081890 | Text proposal for TR on simulation results | Qualcomm Europe | Revised |
R1‑081891 | UE Implementation Impact due to DC-HSDPA | Qualcomm Europe | Noted |
R1‑081892 | Updates to HS-DPCCH Cubic Metric Analysis for DC-HSDPA | Qualcomm Europe | Noted |
R1‑081893 | Responses to the questions on Multi-layer Optimization | KDDI | Noted |
R1‑081894 | 25.214 CR0484 & CR0485 (Rel-7, F; Rel-8, A), Correction to E-DPCCH gain factor calculation | Nokia, Nokia Siemens Networks | Agreed |
R1‑081895 | 25.215 CR0188 (Rel-8, B), E-UTRA measurements for UTRA – E-UTRA interworking | Nokia, Nokia Siemens Networks | Agreed |
R1‑081896 | 25211CRdraft, Introduction of the Enhanced Uplink for CELL_FACH state | Nokia Siemens Networks, Ericsson, Motorola, NEC, Nokia, NXP, Philips Qualcomm, Samsung | Revised |
R1‑081897 | 25214CRdraft, Introduction of the Enhanced Uplink for CELL_FACH state | Nokia Siemens Networks, Nokia, Ericsson, InterDigital, Samsung | Revised |
R1‑081898 | AICH/E-AICH perf requirements | Nokia, Nokia Siemens Networks | Noted |
R1‑081899 | On E-DCH random access interference | Nokia, Nokia Siemens Networks | Withdrawn |
R1‑081900 | On E-DCH random access synchronisation and L1-L3 interaction | Nokia, Nokia Siemens Networks | Noted |
R1‑081901 | Performance of HS-PDSCH serving cell change procedure proposal | Nokia, Nokia Siemens Networks | Noted |
R1‑081902 | Compromise proposal for HS-PDSCH serving cell change enhancement | Nokia, Nokia Siemens Networks | Noted |
R1‑081903 | Initial simulation results for dual cell HSDPA operation | Nokia, Nokia Siemens Networks | Noted |
R1‑081904 | HS-DPCCH impact to coverage | Nokia, Nokia Siemens Networks | Noted |
R1‑081905 | Issues with 1/2 subcarrier shift in LTE uplink | NextWave Wireless | Noted |
R1‑081906 | 25.221 CR0156 (Rel-7,cat-F) "Applicability of sync case 2" | NextWave Wireless | Agreed |
R1‑081907 | 25.221 CR0157 (Rel-8,cat-A) "Applicability of sync case 2" | NextWave Wireless | Agreed |
R1‑081908 | 36.211_CR0013 (Rel-8,cat-F) "Uplink baseband signal definition" | NextWave Wireless | Noted |
R1‑081909 | Physical layer parameters to specify for transmit antenna selection: Summary of remaining UL SRS related issues and way forward | Mitsubishi Electric | Noted |
R1‑081910 | Use case of OI/HII indicators for uplink ICIC | Mitsubishi Electric | Not treated |
R1‑081911 | Power Offsets to Support PUSCH Data and Control Multiplexing | Alcatel-Lucent | Not treated |
R1‑081912 | LTE Advanced Requirements | Alcatel-Lucent | Noted |
R1‑081913 | Requirements for LTE Advanced | Motorola | Noted |
R1‑081914 | LTE Advanced Technical Proposal Identification and Grouping | Motorola | Noted |
R1‑081915 | RV for UL Subframe Bundling | Motorola | Noted |
R1‑081916 | Adjustments to UE Downlink Soft Buffer Sizes based on LTE transport block sizes | Motorola | Revised |
R1‑081917 | Definitions for DCI Format 1C | Motorola | Revised |
R1‑081918 | Remaining details of MCS/TBS signalling | Motorola, LGE | Revised |
R1‑081919 | ACK/NACK Bundling for TDD | Motorola, LGE, Qualcomm, Texas Instrument, Huawei | Revised |
R1‑081920 | Multiple ACK/NACK Transmission for TDD | Motorola | Revised |
R1‑081921 | Need for ACK/NACK Repetition | Motorola | Not treated |
R1‑081922 | Resource Provisioning for UL control in PUSCH | Motorola | Noted |
R1‑081923 | Remaining details on ACK/NACK transmission for TDD | Motorola | Not treated |
R1‑081924 | UL DM RS Remaining Issues | Motorola | Revised |
R1‑081925 | UL Sounding RS Remaining Issues | Motorola | Not treated |
R1‑081926 | Set S for CQI Feedback | Motorola | Not treated |
R1‑081927 | Required PUCCH and PUSCH CQI/PMI/RI Reporting Modes | Motorola | Not treated |
R1‑081928 | Way Forward on Indication of UE Antenna Selection for PUSCH | Motorola, Mitsubishi Electric, Nortel | Noted |
R1‑081929 | Impact of Uplink Bundling on TDD | Motorola | Not treated |
R1‑081930 | Calculation of ΔTF(TF(i)) for UL-PC | Motorola | Noted |
R1‑081931 | 36.211 CR0015 (Rel-8, F) on PHICH mapping for one and two antenna ports in extended CP | Samsung | Revised |
R1‑081932 | Remaning Issue of Soft Buffer Configuration for Dual Codeword MIMO | Freescale | Noted |
R1‑081933 | Remaning Issue for Rank Feedback Configuration | Freescale | Noted |
R1‑081934 | UE Behavior for the case of Unreliable E-AICH Reception | InterDigital | Noted |
R1‑081935 | 36211 CR007R3 (Rel-8, F) Correction of the predefined hopping pattern for PUSCH | Samsung | Agreed |
R1‑081936 | Introduction of 25.321CR(Rel-7) on 1.28Mcps TDD EUL TBS table change | RITT, TD Tech, CATT, ZTE, Spreadtrum | Endorsed |
R1‑081937 | Draft TR25.824 v0.1.1 | TD Tech | Revised |
R1‑081938 | Text proposal to TR 25.824 on MIMO conclusions | TD Tech | Revised |
R1‑081939 | Draft 1.28Mcps TDD CPC skeleton TR 25.929 v0.0.1 | TD Tech | Agreed |
R1‑081940 | Some considerations on bundling and multiplexing ACK transmission in TDD | TD Tech | Not treated |
R1‑081941 | 2ms/10ms TTI Selection for EUL.doc | Huawei | Noted |
R1‑081942 | Disscussion on dual cell deployment secnarions | Huawei | Noted |
R1‑081943 | A proposal and simulation result of HS-DPCCH Design for DC-HSPA | Huawei | Noted |
R1‑081944 | Preamble sequence selection | LG Electronics | Noted |
R1‑081945 | 36.213 CR0016 (Rel-8, F) on Random accesss preamble selection | LG Electronics | Withdrawn |
R1‑081946 | Skeleton of TR36.913"Requirements for LTE-Advanced" | LTE-Advanced rapporteur (NTT DoCoMo) | Revised |
R1‑081947 | Views on Requirements for LTE-Advanced | NTT DoCoMo | Noted |
R1‑081948 | Proposals for LTE-Advanced Technologies | NTT DoCoMo | Noted |
R1‑081949 | Views on PDCCH Format 1C | NTT DoCoMo | Not treated |
R1‑081950 | Necessity of ACK/NAK Repetition in PUCCH | NTT DoCoMo, Fujitsu, Mitsubishi Electric, NEC, Panasonic, Sharp, Toshiba Corporation | Noted |
R1‑081951 | Views on SRS Bandwidth Details | NTT DoCoMo | Not treated |
R1‑081952 | Views on Frequency Hopping Method for SRS | NTT DoCoMo | Not treated |
R1‑081953 | Views on CQI Reporting Options in E-UTRA | NTT DoCoMo | Not treated |
R1‑081954 | Draft LS response to Request for Evaluation Framework Link Level Data | Qualcomm Europe | Noted - Revised |
R1‑081955 | LTE Link Level Throughput Data for SA4 Evaluation Framework | Qualcomm Europe | Noted |
R1‑081956 | Evaluation methodology for LTE-A proposals | Qualcomm Europe | Noted |
R1‑081957 | Categorization of technical proposals for the PHY layer of LTE-A | Qualcomm Europe | Noted |
R1‑081958 | PDCCH format in support of DL MIMO and BF operation | Qualcomm Europe | Not treated |
R1‑081959 | Specification details for PHICH transmission for extended CP | Qualcomm Europe | Noted |
R1‑081960 | Control in support of DL MU-MIMO operation | Qualcomm Europe | Not treated |
R1‑081961 | Mapping of PHICH resources from PUSCH and DM-RS transmission | Qualcomm Europe | Not treated |
R1‑081962 | Support of DTX signalling for CQI transmission with normal CP | Qualcomm Europe | Not treated |
R1‑081963 | Improved staggering pattern for PUCCH format 1 | Qualcomm Europe | Not treated |
R1‑081964 | Confirmation of various UL transmission configurations | Qualcomm Europe | Revised |
R1‑081965 | Support of ACK repetition in the UL of E-UTRA | Qualcomm Europe | Not treated |
R1‑081966 | Further details on UL ACK/NAK resource allocation | Qualcomm Europe | Not treated |
R1‑081967 | Interleaver for PUCCH | Qualcomm Europe | Not treated |
R1‑081968 | Antenna configuration for mixed unicast/MBSFN subframes | Qualcomm Europe | Noted |
R1‑081969 | RS power boosting and interference estimation | Qualcomm Europe | Not treated |
R1‑081970 | Frequency shift for UE specific and MBSFN RS | Qualcomm Europe | Noted |
R1‑081971 | 36.212 CR0006 (Rel-8, F) Miscellaneous fixes to 36.212 | Qualcomm Europe | Noted - Revised |
R1‑081972 | Synchronization procedure at the UE | Qualcomm Europe | Noted |
R1‑081973 | Details on specifications aspects for UL ICIC | Qualcomm Europe | Noted |
R1‑081974 | Finalizing DL ICIC for Rel.8 | Qualcomm Europe | Noted |
R1‑081975 | Definition of measurement gaps in 36.213 | Qualcomm Europe | Not treated |
R1‑081976 | Finalizing hopping patterns for UL | Qualcomm Europe | Withdrawn |
R1‑081977 | Details on UL grant portion of RACH MSG2 | Qualcomm Europe | Noted |
R1‑081978 | Details on PDCCH for DL data arrival | Qualcomm Europe | Noted |
R1‑081979 | Enhancements for LTE-Advanced | Texas Instruments | Noted |
R1‑081980 | Remaining Issues on PDCCH Content and Formats | Texas Instruments | Not treated |
R1‑081981 | ACK/NAK Repetition in EUTRA Uplink | Texas Instruments | Not treated |
R1‑081982 | Simultaneous Transmission of the Current and the Repeated ACKNAK | Texas Instruments | Not treated |
R1‑081983 | On Remaining Issues of PUCCH Slot Based CS/OC Remapping | Texas Instruments, Samsung, Panasonic | Not treated |
R1‑081984 | SRI Resource Configuration on PUCCH | Texas Instruments | Not treated |
R1‑081985 | ACK/NAK DTX Detection with ACK/NAK Bundling in TDD | Texas Instruments | Not treated |
R1‑081986 | ACK/NAK DTX Detection for Concurrent Transmission of ACK/NAK and SRI | Texas Instruments | Not treated |
R1‑081987 | Concurrent Transmission of ACK/NAK and CQI in TDD | Texas Instruments | Not treated |
R1‑081988 | Support of Multiple ACK/NAK Transmission in TDD | Texas Instruments | Not treated |
R1‑081989 | Coding of Control Information on PUSCH | Texas Instruments | Not treated |
R1‑081990 | CQI Coding on PUCCH and PUSCH | Texas Instruments | Not treated |
R1‑081991 | Cell Specific SRS Subframe Configuration | Texas Instruments | Not treated |
R1‑081992 | UE Specific SRS Configuration | Texas Instruments | Not treated |
R1‑081993 | Modification on PRBS Initialization for DL RS | Texas Instruments | Revised |
R1‑081994 | Specification on CQI Measurement | Texas Instruments | Revised |
R1‑081995 | CQI Reporting on PUSCH | Texas Instruments | Not treated |
R1‑081996 | Configuration on CQI/PMI/RI Reporting | Texas Instruments | Noted |
R1‑081997 | Performance of CQI Reporting Modes | Texas Instruments | Not treated |
R1‑081998 | Review of LTE advanced requirements | Vodafone Group | Noted |
R1‑081999 | Performance of Frequency-Selective PMI Compression for E-UTRA: Results for Rank-1 Precoding | Icera Semiconductor | Not treated |
R1‑082000 | Performance of Frequency-Selective PMI Compression for E-UTRA: Results for Rank-2 Precoding | Icera Semiconductor | Not treated |
R1‑082001 | On Multiple ACK/NAK for LTE TDD | Ericsson | Not treated |
R1‑082002 | Details of ACK/NAK bundling for LTE TDD | Ericsson | Not treated |
R1‑082003 | 36.211 CR0016 (Rel-8, F) Correction of PUCCH in absence of mixed formats | Ericsson | Revised |
R1‑082004 | MCS and TBS Tables for PUSCH | Ericsson | Not treated |
R1‑082005 | SRS remaining details | Ericsson | Not treated |
R1‑082006 | Draft CR on LTE TDD PRACH time/frequency mapping | Ericsson | Revised |
R1‑082007 | On timing advance offsets for LTE TDD and FDD HD | Ericsson | Noted |
R1‑082008 | Start of RA preamble format 4 | Ericsson | Noted |
R1‑082009 | 36.212 CR0005 (Rel-8, F) Introduction of format 1C | Ericsson | Noted - Revised |
R1‑082010 | Multiplexing of information within CQI, PMI and RI report | Ericsson | Revised |
R1‑082011 | Multiplexing of information fields in DCI formats to PDCCH payload bits | Ericsson | Agreed |
R1‑082012 | 36.213 CR0017 (Rel-8, F) Blind PDCCH decoding | Ericsson | Revised |
R1‑082013 | On radio link problem detection | Ericsson | Withdrawn |
R1‑082014 | Further results on CQI measurement methodology | Ericsson | Noted |
R1‑082015 | Frequency Selective CQI Reporting on PUCCH | Ericsson | Not treated |
R1‑082016 | 36.213 CR0018 (Rel-8, F) Clarification on transmission modes | Ericsson | Revised |
R1‑082017 | Association between DL control channel and UL ACK/NAK resource for LTE TDD | Ericsson | Not treated |
R1‑082018 | On soft buffer usage for LTE TDD | Ericsson | Noted |
R1‑082019 | Summary of e-mail discussions on DL control signaling | Ericsson | Noted |
R1‑082020 | Summary of e-mail discussions on UL control signaling | Ericsson | Noted |
R1‑082021 | Draft LS on power headroom reporting | Ericsson | Noted - Revised |
R1‑082022 | Response on RAN2 LS on transmission of Physical Layer parameters | Ericsson | Revised |
R1‑082023 | LTE-Advanced performance targets | Ericsson | Noted |
R1‑082024 | Discussion on some technology components proposed for LTE-Advanced | Ericsson | Noted |
R1‑082025 | 36.211 CR0017 (Rel-8, F) Specification of CCE size and PHICH resource indication | Ericsson | Agreed |
R1‑082026 | 36.211 CR0018 (Rel-8) Correction of the description of frame structure type 2 | CATT, Ericsson, Nokia, Nokia Siemens Networks | Revised |
R1‑082027 | Refinements on signaling of CQI/precoding information on PDCCH | Ericsson | Revised |
R1‑082028 | Remaining details on control signaling for the MU-MIMO transmission mode | Ericsson | Not treated |
R1‑082029 | LS on RAN2 assumptions on L1 | RAN2, Ericsson | Noted |
R1‑082030 | Way to reduce search space on PDCCH blind decoding | Spreadtrum Communications | Not treated |
R1‑082031 | SRS frequency hopping on UpPTS in LTE-TDD | Spreadtrum Communications | Withdrawn |
R1‑082032 | On the technologies of IMT-advanced | Spreadtrum Communications | Not treated |
R1‑082033 | On the requirements of IMT-advanced | Spreadtrum Communications | Not treated |
R1‑082034 | Candidate Technologies for LTE-Advanced | T-Mobile International | Noted |
R1‑082035 | 36.211 CR0019 (Rel-8, F) On Delta^pucch_shift correction | Ericsson | Agreed |
R1‑082036 | Comments on LTE-Advanced Requirements | Philips, NXP | Noted |
R1‑082037 | Key Physical Layer Technologies to address the LTE-Advanced Requirements | Philips, NXP | Noted |
R1‑082038 | Search space design for PDCCH blind decoding | Philips, NXP | Missing |
R1‑082039 | PDCCH message information content for persistent scheduling | Philips, NXP | Not treated |
R1‑082040 | Distributed Resource Allocation Signalling on PDCCH | Philips, NXP | Missing |
R1‑082041 | Index for PDCCH signalling of UL resource allocation in conjunction with DRX | Philips, NXP | Not treated |
R1‑082042 | 36.211 CR0020 (Rel-8, F) Correction of DL/UL Allocation for TDD | Philips, NXP | Noted |
R1‑082043 | Remaining issues on UE-specific RS | Philips, NXP | Revised |
R1‑082044 | Codebook for MU-MIMO | Philips, NXP | Not treated |
R1‑082045 | CQI definition for MU-MIMO | Philips, NXP | Not treated |
R1‑082046 | RACH procedure for E-DCH in Cell_FACH | Philips, NXP | Noted |
R1‑082047 | On LTE Advanced | Fujitsu | Withdrawn |
R1‑082048 | DC-HSDPA framework assumptions | Qualcomm Europe | Noted |
R1‑082049 | 25.214 CR0486 (Rel-7, F) Clarification of burst transmission during DTX transitions | Qualcomm Europe | Withdrawn |
R1‑082050 | 25.214 CR0487 (Rel-8, A) Clarification of burst transmission during DTX transitions | Qualcomm Europe | Withdrawn |
R1‑082051 | 25.214 CR0488 (Rel-7, F) Correction to attachment method for HS-DSCH in the URA_PCH or CELL_PCH state | Qualcomm Europe | Noted |
R1‑082052 | 25.214 CR0489 (Rel-8, A) Correction to attachment method for HS-DSCH in the URA_PCH or CELL_PCH state | Qualcomm Europe | Noted |
R1‑082053 | Power Scaling and EUL Coverage | Qualcomm Europe | Noted |
R1‑082054 | Physical-layer parameters to be configured by RRC | Ericsson | Revised |
R1‑082055 | Physical-layer parameters to be configured by RRC, explanations | Ericsson | Noted |
R1‑082056 | On 2-Tx Codebook Subset Selection | Nortel | Revised |
R1‑082057 | UL DM RS Remaining Issues | Motorola | Not treated |
R1‑082058 | PDCCH UL Grant Size of LTE TDD | Nokia, Nokia Siemens Networks | Not treated |
R1‑082059 | Definitions for DCI Format 1C | Motorola | Not treated |
R1‑082060 | 36.211 CR0015R1 (Rel-8, F) on PHICH mapping for one and two antenna ports in extended CP | Samsung, NEC | Agreed |
R1‑082061 | Summary of e-mail discussion on soft buffer usage on TDD | NTT DoCoMo | Noted |
R1‑082062 | Effect of voice interruption during serving cell change to VoIP capacity | Nokia, Nokia Siemens Networks | Noted |
R1‑082063 | 36.211 CR0016R1 (Rel-8, F) Correction of PUCCH in absence of mixed formats | Ericsson | Agreed |
R1‑082064 | Multiple ACK/NACK Transmission for TDD | Motorola | Not treated |
R1‑082065 | Modification on PRBS Initialization for DL RS | Texas Instruments | Not treated |
R1‑082066 | Specification on CQI Measurement | Texas Instruments | Not treated |
R1‑082067 | Aspects of Multiple ACK/NAK Transmission in TDD | Texas Instruments | Not treated |
R1‑082068 | Downlink RS Initialization in E-UTRA | Motorola | Not treated |
R1‑082069 | Remaining details of MCS/TBS signalling | Motorola, LGE, Qualcomm | Revised |
R1‑082070 | Operator Views on requirements for LTE-Advanced | NTT DoCoMo, AT&T, CMCC, Orange, Telecom Italia, Telefonica, T-Mobile, Vodafone | Noted |
R1‑082071 | Resource allocation for PDCCH format 1C | ASUSTeK | Not treated |
R1‑082072 | Skeleton of TR36.913"Requirements for LTE-Advanced" | LTE-Advanced rapporteur (NTT DoCoMo) | Endorsed |
R1‑082073 | Draft CR on LTE TDD PRACH time-frequency mapping | ZTE | Noted |
R1‑082074 | Scrambling sequence generation in E-UTRA | LG Electronics | Not treated |
R1‑082075 | Clarification of PUCCH ACK/NACK Index generation | LG Electronics | Not treated |
R1‑082076 | LTE - IMT advanced - Candidate Technologies | Alcatel-Lucent | Noted |
R1‑082077 | Physical layer requirements for LTE-Advanced | LTE-Advanced rapporteur (NTT DoCoMo) | Revised |
R1‑082078 | UL grant for random access message 3 | Nokia, Nokia Siemens Networks | Noted |
R1‑082079 | PDCCH contents and formats | Panasonic | Noted |
R1‑082080 | Refinements on signaling of CQI/precoding information on PDCCH | Ericsson, TI, NTT DoCoMo, NEC | Noted |
R1‑082081 | Outcome of Physical Layer requirements for LTE-Advanced session | LTE-Advanced rapporteur (NTT DoCoMo) | Not treated |
R1‑082082 | Draft response to LS on change rate of Physical Layer parameters | Ericsson | Revised |
R1‑082083 | TBS=0 signalling | Motorola | Noted |
R1‑082084 | LS response to Request for Evaluation Framework Link Level Data | RAN1, Qualcomm | Agreed |
R1‑082085 | 25.214 CR0483r3 (Rel-8, B) HS-SCCH orders for HS-SCCH-less operation | Ericsson | Agreed |
R1‑082086 | Simplex coding for ACK/NACK bits in PUSCH | Samsung, TI, LGE, Panasonic, Qualcomm, Motorola | Agreed |
R1‑082087 | Multiplexing of Rank and CQI/PMI in PUSCH channel | Samsung, TI, LGE, Panasonic, Qualcomm | Agreed |
R1‑082088 | Text proposal to TR 25.824 on MIMO conclusions | TD Tech, CATT | Revised |
R1‑082089 | 25.211 CR0253 & CR0255 (Rel-7, F; Rel-8, A) Correction to E-DCH control channel timing | Qualcomm Europe | Agreed - Revised |
R1‑082090 | 36.213 CR0017R1 (Rel-8, F) Blind PDCCH decoding | Ericsson | Revised |
R1‑082091 | MCS and TBS Tables for PUSCH | Ericsson, Panasonic, Motorola | Agreed |
R1‑082092 | Draft CR on LTE TDD PRACH time/frequency mapping | Ericsson | Revised |
R1‑082093 | 25.223 CR0054 (Rel-8, A) Correction of uplink multicode capability for 1.28Mcps TDD EUL | CATT | Agreed |
R1‑082094 | Text proposal for TR on simulation results | Qualcomm Europe | Noted |
R1‑082095 | Implicit mapping between CCE and PUCCH for ACK/NACK TDD | Huawei | Not treated |
R1‑082096 | LS on power headroom reporting | RAN1, Ericsson | Agreed |
R1‑082097 | Way forward on ACK/NACK DTX detection in PUSCH | Nokia, Nokia Siemens Networks, Samsung | Noted |
R1‑082098 | Draft LS response on RAN2 assumptions on L1 | Ericsson | Noted - Revised |
R1‑082099 | Draft Response to LS on Transmission of physical layer parameters | Ericsson | Noted - Revised |
R1‑082100 | Way forward on ACK/NACK Bundling for TDD | Motorola, LGE, Qualcomm, Texas Instrument, Huawei, CATT, CMCC, Ericsson, Samsung | Noted |
R1‑082101 | void | - | - |
R1‑082102 | [Draft] LS on L1-related parameters to be configured by RRC | Ericsson | Revised |
R1‑082103 | Multiplexing of information within CQI, PMI and RI report | Ericsson, Texas Intruments | Agreed |
R1‑082104 | Narrow bandwidth PDCCH coverage problem | Ericson, Motorola, Nokia, Nokia Siemens Networks | Noted |
R1‑082105 | On 2-Tx Codebook Subset Selection | Nortel | Noted |
R1‑082106 | Definition of configured set S of CQI reporting subbands | Nortel | Noted |
R1‑082107 | Summary of Tuesday morning ad hoc session | Ad-hoc chairman | Endorsed |
R1‑082108 | Impact of IQ leakage on PHICH performance | Motorola | Noted |
R1‑082109 | UE Transmit Antenna Selection | Motorola | Noted |
R1‑082110 | Format 1C Blind Decoding restrictions | Motorola, Samsung, Ericsson, Nokia, Nokia-Siemens-Networks | Noted |
R1‑082111 | 36.211 CR0034 (Rel-8, F) Clarification of the PDCCH-to-RE mapping | Ericsson | Agreed |
R1‑082112 | [Draft] LS on MCS and TBS Tables | Ericsson | Revised |
R1‑082113 | Coding of ACK on PUSCH | Qualcomm Europe, Samsung | Revised |
R1‑082114 | CRC for control information on PUSCH | Qualcomm Europe | Revised |
R1‑082115 | Coding of RI on PUSCH and mapping | Qualcomm Europe, Samsung | Revised |
R1‑082116 | Text proposal to TR 25.824 on MIMO conclusions | TD Tech, CATT | Agreed |
R1‑082117 | TR25.824 v0.1.2 | TD Tech | Agreed |
R1‑082118 | LS to RAN4 on AICH/E-AICH | Ericsson | Revised |
R1‑082119 | Performance of the Mode 2-0 average Best-M CQI scheme | Nokia Siemens Networks, Nokia | Not treated |
R1‑082120 | 25.211 CR0256 (Rel-8, B) Introduction of the Enhanced Uplink for CELL_FACH state | Nokia Siemens Networks, Ericsson, Motorola, NEC, Nokia, NXP, Philips, Qualcomm, Samsung | Revised |
R1‑082121 | 25.214 CR0490 (Rel-8, B) Introduction of the Enhanced Uplink for CELL_FACH state | Nokia Siemens Networks, Ericsson, Motorola, NEC, Nokia, NXP, Philips, Qualcomm, Samsung | Agreed |
R1‑082122 | Remaining details of MCS/TBS signalling | Motorola, LGE, Qualcomm, Ericsson, Panasonic | Revised |
R1‑082123 | Adjustments to UE Downlink Soft Buffer Sizes based on LTE transport block sizes | Motorola, Nokia, Nokia Siemens Networks | Agreed |
R1‑082124 | Proposal for Improving Interference Estimation | Marvell | Not treated |
R1‑082125 | 36.212 CR0009 (Rel-8, F) on Soft buffer split for MIMO and TDD | Nokia, Nokia Siemens Networks | Revised |
R1‑082126 | Draft LS on CR to 36.306 | Motorola | Revised |
R1‑082127 | 36.212 CR0006R1 (Rel-8, F) Miscellaneous fixes to 36.212 | Qualcomm Europe | Agreed |
R1‑082128 | 36.212 CR0005R1 (Rel-8, F) Introduction of format 1C | Ericsson | Agreed |
R1‑082129 | 36.212 CR0007 (Rel-8, F) SIMO/MIMO operation in other frame format | Qualcomm Europe | Withdrawn |
R1‑082130 | 36.213 CR0019 (Rel-8, F) Clarification of Tx Mode vs DCI format | Motorola | Revised |
R1‑082131 | 36.212 CR0004R1 (Rel-8, F) on ACK insertion into PUSCH | Nokia Siemens Networks, Nokia | Agreed |
R1‑082132 | DTX Detection Performance of ACK/NACK on PUSCH | Ericsson | Missing |
R1‑082133 | 36.212 CR0008 (Rel-8, F) on multiplexing scheme for indicators | Ericsson, Texas Instruments | Revised |
R1‑082134 | void | - | - |
R1‑082135 | System simulation results for DC-HSDPA operation | Ericsson | Noted |
R1‑082136 | Sequence generation for DL cell-specific reference signals | Samsung | Noted |
R1‑082137 | PRBS initialization for DL RS | LG Electronics, TI, Nokia, Nokia Siemens Networks | Noted |
R1‑082138 | Text Proposal for DC-HSDPA assumptions and standards impact | Ericsson, QUALCOMM Europe | Revised |
R1‑082139 | Text Proposal for TR on HS-DPCCH Cubic Metric Analysis | Qualcomm Europe | Revised |
R1‑082140 | Text Proposal for TR on UE Implementation Impact due to DC-HSDPA | Qualcomm Europe | Agreed |
R1‑082141 | Text proposal for TR on system simulation results | Qualcomm Europe | Agreed |
R1‑082142 | Way forward on SRS Bandwidth configuration | Panasonic, Ericsson, NTT DoCoMo, Motorola, Nokia, Nokia Siemens Networks, TI, LGE, Qualcomm, Fujitsu, Toshiba | Agreed |
R1‑082143 | Way forward on cell specific SRS subframe configuration | TI, Samsung, CATT, Ericsson, Panasonic, CMCC, Qualcomm | Noted |
R1‑082144 | DL RS Initialization | Motorola | Noted |
R1‑082145 | 36.211 CR0021 (Rel-8, F) Corrections to Secondary Synchronization Signal Mapping | Nokia Siemens Networks, Nokia | Agreed |
R1‑082146 | 36.211 CR0018R1 (Rel-8) Correction of the description of frame structure type 2 | CATT, Ericsson, Nokia, Nokia Siemens Networks | Revised |
R1‑082147 | Draft response to LS on change rate of Physical Layer parameters | Ericsson | Revised |
R1‑082148 | Physical-layer parameters to be configured by RRC | Ericsson | Noted - Revised |
R1‑082149 | eNodeB Indicator definition for ^^ “Maximum Tx Power per PRB normalized” | Alcatel-Lucent | Not treated |
R1‑082150 | Common RS configurations in conjunction with UE-specific RS | Philips, NXP, Ericsson | Noted |
R1‑082151 | 36.211 CR0028 (Rel-8, F) Timing advance offset | Ericsson | Revised |
R1‑082152 | 36.211 CR0022 (Rel-8, F) Downlink VRB mapping to PRB for distributed transmission | LGE, Panasonic, Motorola, Nortel, Ericsson, NEC | Agreed |
R1‑082153 | 36.212 CR0010 (Rel-8, F) Resource assignment field for distributed VRB | Panasonic, LGE, Motorola, NEC, Nortel, Ericsson | Agreed |
R1‑082154 | 36.213 CR0020 (Rel-8, F) Resource assignment field for distributed VRB | Panasonic, LGE, Motorola, NEC, Nortel, Ericsson | Agreed |
R1‑082155 | 36.211 CR0023 (Rel-8, F) Clarification of modulation symbols to REs mapping for DVRB | LG Electronics, Panasonic, NEC, Nortel Networks, Motorola, Ericsson | Agreed |
R1‑082156 | 36.213 CR0015R1 (Rel-8, F) Correction of UE PUSCH frequency hopping procedure | NEC, Samsung, Motorola, LGE, Ericsson | Agreed |
R1‑082157 | 36.211 CR0024 (Rel-8, F) Consideration on the scrambling of PDSCH | Huawei, Samsung, Philips | Revised |
R1‑082158 | 36.211 CR0025 (Rel-8, F) Corrections to initialization of DL RS Scrambling | Nokia Siemens Networks, Nokia | Agreed |
R1‑082159 | 36.211 CR0026 (Rel-8, F) on Downlink RS | Samsung | Agreed |
R1‑082160 | 36.211 CR0027 (Rel-8, F) on Uplink RS | Samsung | Agreed |
R1‑082161 | Joint way forward on simultaneous transmission of aperiodic CQI/PMI/RI and ACK/NACK in PUSCH | Panasonic, Qualcomm, Texas Instruments, Nokia Siemens Networks, Nokia, Samsung, NTT DoCoMo, LGE, Motorola, Huawei, Ericsson | Agreed |
R1‑082162 | 36.211 CR0029 (Rel-8, F) Timing of preamble format 4 | Ericson | Revised |
R1‑082163 | Summary of the session on TS 36.212 | ad hoc chair (NTT DoCoMo) | Endorsed |
R1‑082164 | Summary of the session on TS 36.306 | ad hoc chair (NTT DoCoMo) | Noted |
R1‑082165 | Summary of the session on Reference signal | ad hoc chair (NTT DoCoMo) | Endorsed |
R1‑082166 | Association between DL control channel and UL ACK/NAK resource for LTE TDD | Huawei, CATT, Motorola, Qualcomm, CMCC, Ericsson, Nokia, Nokia Siemens Networks | Not treated |
R1‑082167 | 36.213 CR0021 (Rel-8, B) Power headroom | Ericsson | Revised |
R1‑082168 | Way forward on ACK/NACK Bundling for TDD | Motorola, LGE, Qualcomm, Texas Instrument, Huawei, CATT, CMCC, Ericsson, Samsung | Noted |
R1‑082169 | 36.211 DraftCR (Rel-8, F) PDCCH length for carriers with mixed MBSFN and unicast traffic | Panasonic, Samsung, Qualcomm Europe, Nokia Siemens Networks, Nokia, Ericsson, NEC, LG Electronics, Motorola | Revised |
R1‑082170 | 36.212 DraftCR (Rel-8, F) Introduction of Downlink Assignment Index | Motorola | Revised |
R1‑082171 | 36.213 CR0018R1 (Rel-8, F) Clarification on transmission modes | Ericsson | Revised |
R1‑082172 | 36.213 CR0017R2 (Rel-8, F) Blind PDCCH decoding | Ericsson | Revised |
R1‑082173 | 36.213 CR0022 (Rel-8, F) Clarification for RI reporting in PUCCH and PUSCH reporting modes | Freescale | Agreed |
R1‑082174 | [Draft] LS on L1 impact of measurement gaps | Qualcomm | Revised |
R1‑082175 | Table contents for cell specific SRS subframe configuration | TI, Samsung, CATT, Ericsson, Panasonic, CMCC, Qualcomm, Motorola, Huawei | Agreed |
R1‑082176 | void | - | - |
R1‑082177 | Comparison of EPRE variation and RE puncturing | Nokia, Nokia Siemens Networks | Not treated |
R1‑082178 | 36.213 CR0021R1 (Rel-8, F) Power headroom | Ericsson | Revised |
R1‑082179 | Way forward on Relative narrowband TX power indicator for DL ICIC | Nokia Siemens Networks, Nokia, Alcatel-Lucent, Ericsson, Telecom Italia, T-Mobile, Orange | Noted |
R1‑082180 | Summary of DL Procedure | Ad-hoc chairman | Endorsed |
R1‑082181 | 36.211 CR0039 (Rel-8, F) on Timing advance command responding time | Panasonic | Agreed |
R1‑082182 | 36.213 CR0027 (Rel-8, F) on RL problem detection | Ericsson, Qualcomm Europe, Panasonic, Texas Instruments, LG Electronics | Agreed |
R1‑082183 | [Draft] LS to RAN3 about RAN1 decision regarding Relative Narrowband TX Power Indicator for DL ICIC | Alcatel-Lucent | Revised |
R1‑082184 | 36.213 CR0028 (Rel-8, F) Definition of Relative Narrowband TX Power Indicator | Nokia Siemens Networks | Agreed |
R1‑082185 | 36.211 CR0030 (Rel-8, F) Uplink sounding RS bandwidth configuration | Panasonic | Agreed |
R1‑082186 | Physical layer requirements for LTE-Advanced | LTE-Advanced rapporteur (NTT DoCoMo) | Noted |
R1‑082187 | 36.214 CR0005 (Rel-8, F) Introduction of eNode B Measurement of Thermal Noise Power | Qualcomm Europe | Agreed |
R1‑082188 | 36.214 CR0004 (Rel-8, F) Introduction of eNode B Measurement of Received Interference Power | Nokia Siemens Networks, Nokia | Agreed |
R1‑082189 | Draft CR on SRS hopping | Nokia Siemens Networks, Nokia | Revised |
R1‑082190 | Signalling of CQI only on PUSCH | Panasonic, Ericsson, Qualcomm Europe, Samsung | Noted |
R1‑082191 | Wayforward on DL signalling of Precoding Information for Closed-loop Spatial multiplexing | Ericsson, Texas Instruments, NTT DoCoMo, Sharp, NEC, Mitsubishi, Nokia, Motorola, Nokia Siemens Networks, LGE, Fujitsu, Panasonic | Revised |
R1‑082192 | 36.211 CR0031 (Rel-8, F) Use of common RS when UE specific RS are configured | Philips, NXP, Alcatel-Lucent, Ericsson, Nokia, Nokia Siemens Networks, Nortel, Qualcomm, Samsung, CMCC, CATT, Vodafone | Agreed |
R1‑082193 | 36.213 DraftCR (Rel-8, F) UL ACK/NACK procedure for TDD | Motorola | Revised |
R1‑082194 | [Draft] LS reply on PDCCH for DL data arrival and random access response format | Qualcomm Europe | Revised |
R1‑082195 | LS response on RAN2 assumptions on L1 | RAN1, Ericsson | Agreed |
R1‑082196 | Response to LS on Transmission of physical layer parameters | RAN1, Ericsson | Agreed |
R1‑082197 | Format 1C blind decoding restriction | Panasonic | Noted |
R1‑082198 | LS on DL synchronization and failure with E-DCH in Cell-FACH state | Nokia Siemens Networks, Nokia | Revised |
R1‑082199 | Physical-layer parameters to be configured by RRC | Ericsson | Agreed |
R1‑082200 | LS on L1-related parameters to be configured by RRC | RAN1, Ericsson | Agreed |
R1‑082201 | Response to LS on change rate of physical layer parameters | RAN1, Ericsson | Agreed |
R1‑082202 | LS on CR to TS36.306 | RAN1, Motorola | Agreed |
R1‑082203 | 36.212 CR0011 (Rel-8, F) Clarifying the use of the different DCI formats | Qualcomm Europe | Agreed |
R1‑082204 | 36.212 CR0012 (Rel-8, F) Clarifying the value of NL | Qualcomm Europe, InterDigital | Revised |
R1‑082205 | 36.212 CR0013 (Rel-8, F) Payload size for DCI formats 3 and 3A | Qualcomm Europe, Philips, NXP | Agreed |
R1‑082206 | 36.211 CR0032 (Rel-8, F) Uplink RS updates | Samsung | Revised |
R1‑082207 | 36.213 CR0017R3 (Rel-8, F) Blind PDCCH decoding | Ericsson | Revised |
R1‑082208 | 36.211 DraftCR (Rel-8, F) TDD PRACH time/frequency mapping | Ericsson, ZTE | Revised |
R1‑082209 | Confirmation of various UL transmission configurations | Qualcomm Europe, LGE, Panasonic | Revised |
R1‑082210 | 25.211 CR0256R1 (Rel-8, B) Introduction of the Enhanced Uplink for CELL_FACH state | Nokia Siemens Networks, Ericsson, Motorola, NEC, Nokia, NXP, Philips, Qualcomm, Samsung | Agreed |
R1‑082211 | Remaining details of MCS/TBS signalling | Motorola, LGE, Qualcomm, Ericsson, Panasonic | Agreed |
R1‑082212 | 36.212 CR0020 (Rel-8, F) Encoding of antenna indicator on DCI format 0 | Motorola | Agreed |
R1‑082213 | 36.212 CR0014 (Rel-8, F) Coding of ACK on PUSCH | Qualcomm Europe, Samsung | Agreed |
R1‑082214 | 36.212 CR0015 (Rel-8, F) Coding of RI on PUSCH and mapping | Qualcomm Europe, Samsung | Agreed |
R1‑082215 | 36.212 CR0016 (Rel-8, F) CRC for control information on PUSCH | Qualcomm Europe | Agreed |
R1‑082216 | 36.212 CR0017 (Rel-8, F) Introduction of Downlink Assignment Index | Motorola | Agreed |
R1‑082217 | void | - | - |
R1‑082218 | Wayforward on DL signalling of Precoding Information for Closed-loop Spatial multiplexing | Ericsson, Texas Instruments, NTT DoCoMo, Sharp, NEC, Mitsubishi, Nokia, Motorola, Nokia Siemens Networks, LGE, Fujitsu, Panasonic | Withdrawn |
R1‑082219 | 36.211 Draft CR (Rel-8, F) Correction to the scrambling sequence generation for PUCCH, PCFICH, PHICH, MBSFN RS and UE specific RS | LG Electronics, Nokia Siemens Networks, Nokia | Revised |
R1‑082220 | 36.211 Draft CR (Rel-8, F) Cell Specific Uplink Sounding RS Subframe Configuration | Texas Instruments | Revised |
R1‑082221 | 36.213 CR0030 (Rel-8, F) CQI reference and set S definition, CQI mode removal, and Miscellanious | Motorola | Agreed |
R1‑082222 | LS on L1 impact of measurement gaps | RAN1, Qualcomm | Agreed |
R1‑082223 | LS on Error Targets for AI/E-AI | RAN1, Ericsson | Agreed |
R1‑082224 | 36.211 CR0033 (Rel-8, F) on OC sequences for shortened PUCCH format 1/1a/1b | Panasonic | Agreed |
R1‑082225 | 25.214 CR0491 & CR0492 (Rel-7, F; Rel-8, A) Correction to E-DCH control channel timing | Qualcomm Europe | Revised |
R1‑082226 | LS to RAN2 on L1-L3 interaction | Nokia Siemens Networks, Nokia | Agreed |
R1‑082227 | Text Proposal for TR on HS-DPCCH Cubic Metric Analysis | Qualcomm Europe, Samsung, Huawei | Agreed |
R1‑082228 | 36.212 CR0018 (Rel-8, F) Coding of CQI/PMI on PUSCH coming from PUCCH | Qualcomm Europe | Agreed |
R1‑082229 | 36.213 CR0017R4 (Rel-8, F) Blind PDCCH decoding | Ericsson | Agreed |
R1‑082230 | 36.212 CR0019 (Rel-8, F) Simultaneous transmission of aperiodic CQI and UL control | Panasonic | Agreed |
R1‑082231 | 36.213 CR0024 (Rel-8, F) Simultaneous transmission of aperiodic CQI and UL control | Panasonic | Withdrawn |
R1‑082232 | 36.212 CR0009R1 (Rel-8, F) on Soft buffer split for MIMO and TDD | Nokia, Nokia Siemens Networks | Agreed |
R1‑082233 | 36.211 CR0035 (Rel-8, F) TDD PRACH time/frequency mapping | Ericsson, ZTE | Agreed |
R1‑082234 | 36.211 CR0018R2 (Rel-8) Correction of the description of frame structure type 2 | CATT, Ericsson, Nokia, Nokia Siemens Networks | Revised |
R1‑082235 | 36.213 CR0025 (Rel-8,F) on Correction of the description of PUSCH power control for TDD | CATT, Motorola, Nokia, NSN, Ericsson | Agreed |
R1‑082236 | 36.211 CR0036 (Rel-8, F) Cell Specific Uplink Sounding RS Subframe Configuration | Texas Instruments | Agreed |
R1‑082237 | 36.211 CR0037 (Rel-8, F) SRS hopping | Nokia Siemens Networks, Nokia | Withdrawn |
R1‑082238 | 36.212 CR0008R1 (Rel-8, F) on multiplexing scheme for indicators | Ericsson, Texas Instruments | Agreed |
R1‑082239 | 36.211 CR0018R3 (Rel-8) Correction of the description of frame structure type 2 | CATT, Ericsson, Nokia, Nokia Siemens Networks, CMCC, Philips, NXP, Samsung, RITT, ZTE | Agreed |
R1‑082240 | 36.211 CR0038 (Rel-8, F) PDCCH length for carriers with mixed MBSFN and unicast traffic | Panasonic, Samsung, Qualcomm Europe, Nokia Siemens Networks, Nokia, Ericsson, NEC, LG Electronics, Motorola | Agreed |
R1‑082241 | 36.211 CR0040 (Rel-8, F) Correction to the scrambling sequence generation for PUCCH, PCFICH, PHICH, MBSFN RS and UE specific RS | LG Electronics, Nokia Siemens Networks, Nokia | Agreed |
R1‑082242 | 36.211 CR0029R1 (Rel-8, F) Timing of preamble format 4 | Ericson | Agreed |
R1‑082243 | 36.213 CR0026 (Rel-8, F) UL ACK/NACK procedure for TDD | Motorola | Agreed |
R1‑082244 | 36.211 CR0024R1 (Rel-8, F) Consideration on the scrambling of PDSCH | Huawei, Samsung, Philips | Agreed |
R1‑082245 | 36.212 CR0012R1 (Rel-8, F) Clarifying the value of NL | Qualcomm Europe, InterDigital, Texas Instruments, Motorola, NEC | Agreed |
R1‑082246 | void | - | - |
R1‑082247 | 25.211 CR0253R1 & CR0255R1 (Rel-7, F; Rel-8, A) Correction to E-DCH control channel timing | Qualcomm Europe, Huawei | Agreed |
R1‑082248 | 25.214 CR0491R1 & CR0492R1 (Rel-7, F; Rel-8, A) Correction to E-DCH control channel timing | Qualcomm Europe | Agreed |
R1‑082249 | Text Proposal for DC-HSDPA assumptions and standards impact | Ericsson, QUALCOMM Europe | Agreed |
R1‑082250 | 36.211 CR0028R1 (Rel-8, F) Timing advance offset | Ericsson | Agreed |
R1‑082251 | LS reply on PDCCH for DL data arrival and random access response format | RAN1, Qualcomm Europe | Agreed |
R1‑082252 | LS on RL problem detection | RAN1, Ericsson | Agreed |
R1‑082253 | LS to RAN3 about RAN1 decision regarding Relative Narrowband TX Power Indicator for DL ICIC | Alcatel-Lucent | Agreed |
R1‑082254 | 36.213 CR0019R1 (Rel-8, F) Clarification of Tx Mode vs DCI format | Motorola | Agreed |
R1‑082255 | Confirmation of various UL transmission configurations - Revision 1 | Qualcomm Europe, LGE, Panasonic | Agreed - Revised |
R1‑082256 | Confirmation of various UL transmission configurations - Revision 2 | Qualcomm Europe, LGE, Panasonic | Noted |
R1‑082257 | 36.213 CR0021R2 (Rel-8, F) Power headroom | Ericsson | Agreed |
R1‑082258 | 36.213 CR0029 (Rel-8, F) Calculation of ΔTF(i) for UL-PC | Qualcomm, Philips, LGE | Agreed |
R1‑082259 | 36.211 CR0041 (Rel-8, F) PDCCH coverage in narrow bandwidths | Ericsson | Agreed |
R1‑082260 | 36.212 CR0021 (Rel-8, F) PDCCH coverage in narrow bandwidths | Ericsson | Agreed |
R1‑082261 | 36.213 CR0031 (Rel-8,F) Modulation order and TBS determination for PDSCH and PUSCH | Ericsson | Agreed |
R1‑082262 | LS on MCS and TBS Tables | RAN1, Ericsson | Agreed |
R1‑082263 | 36.212 CR0015R1 (Rel-8, F) Coding of RI on PUSCH and mapping | Qualcomm Europe, Samsung, Ericsson | Agreed |
R1‑082264 | 36.211 CR0030R1 (Rel-8, F) Uplink sounding RS bandwidth configuration | Panasonic, Nokia Siemens Networks, Nokia | Agreed |
R1‑082265 | 36.211 CR0032R1 (Rel-8, F) Uplink RS updates | Samsung | Agreed |
R1‑082266 | 36.213 CR0032 (Rel-8, F) on Sounding RS | Samsung | Agreed |
R1‑082267 | 36.211 CR0042 (Rel-8, F) Closed-Loop and Open-Loop Spatial Multiplexing | Ericsson | Agreed |
R1‑082268 | 36.212 CR0022 (Rel-8, F) Closed-Loop and Open-Loop Spatial Multiplexing | Ericsson | Agreed |
R1‑082269 | 36.211 CR0043 (Rel-8, F) Removal of small-delay CDD | Ericsson | Agreed |
R1‑082270 | 36.211 CR0026R1 (Rel-8, F) on Downlink RS | Samsung | Agreed |
page generated from database: 2024-04-13 13:51:47