3GPP TDocs (written contributions) at meeting
Meeting: GP-51 - 2011-08-29 to 2011-09-02, Goteborg
meeting id: GP-51 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
GP‑111000 | Draft Agenda for TSG GERAN no. 51 in Göteborg | GERAN Chairman | - |
GP‑111001 | Draft Agenda for TSG GERAN WG1 during TSG GERAN no. 51 in Göteborg | GERAN WG1 Chairman | - |
GP‑111002 | Draft Agenda for TSG GERAN WG2 during TSG GERAN no. 51 in Göteborg | GERAN WG2 Chairman | - |
GP‑111003 | Draft Agenda for TSG GERAN WG3new during TSG GERAN no. 51 in Göteborg | GERAN WG3 Chairman | - |
GP‑111004 | Revised Draft Agenda for TSG GERAN WG3new during TSG GERAN no. 51 in Göteborg | GERAN WG3 Chairman | - |
GP‑111005 | New WID: Introduction of ER-GSM band | BMWi, Huawei Technologies (UK), Kapsch CarrierCom France S.A.S, Nokia Siemens Networks, Sagemcom SAS | - |
GP‑111006 | Draft CR 24.008 Signalling of ER-GSM band capabilities (Rel-11) | Kapsch CarrierCom France S.A.S | - |
GP‑111007 | CR 45.001-0072 TCRT: Introduction of ER-GSM band (Rel-11) | Kapsch CarrierCom France S.A.S | POSTPONED |
GP‑111008 | CR 45.005-0464 TCRT: Introduction of ER-GSM band (Rel-11) | Kapsch CarrierCom France S.A.S | POSTPONED |
GP‑111009 | RF Pattern Matching positioning method | Polaris Wireless | WITHDRAWN |
GP‑111010 | Revised Draft Agenda for TSG GERAN WG2 during TSG GERAN no. 51 in Göteborg | GERAN WG2 Chairman | - |
GP‑111011 | CR 51.010-1-4608 Addition of new Test case 14.2.28 - Reference sensitivity TCH HS (Rel-9) | Agilent, Bureau Veritas ADT | - |
GP‑111012 | CR 51.010-1-4609 Addition of new Test case 14.2.29 - Reference sensitivity TCH EFS (Rel-9) | Agilent, Bureau Veritas ADT | - |
GP‑111013 | CR 51.010-1-4610 Addition of new Test case 14.2.30 - Reference sensitivity TCH AFS (Rel-9) | Agilent, Bureau Veritas ADT | - |
GP‑111014 | CR 51.010-1-4611 Addition of new Test case 14.2.31 - Reference sensitivity TCH AHS (Rel-9) | Agilent, Bureau Veritas ADT | - |
GP‑111015 | CR 51.010-2-0710 Addition of new RF VAMOS test cases-14.2.28, 14.2.29, 14.2.30 and 14.2.31 (Rel-9) | Agilent, Bureau Veritas ADT | - |
GP‑111016 | Test Case Applicability for GPRS-only Devices | Samsung Electronics Co., Ltd | - |
GP‑111017 | CR 51.010-1-4612 Clearly the identification on EFAD field in test SIM (Rel-9) | Bureau Veritas ADT | WITHDRAWN |
GP‑111018 | CR 51.010-1-4613 113.17.2aCorrection of test procedure (Rel-9) | Rohde & Schwarz | - |
GP‑111019 | CR 51.010-1-4614 New test case 14.2.36 Reference sensitivity Repeated SACCH performance (Rel-9) | Rohde & Schwarz | - |
GP‑111020 | CR 51.010-1-4615 New test case 14.2.37 Reference sensitivity Repeated FACCH/F performance (Rel-9) | Rohde & Schwarz | - |
GP‑111021 | CR 51.010-1-4616 New test case 14.20.10 Repeated SACCH – VDTS-1 (Rel-9) | Rohde & Schwarz | - |
GP‑111022 | CR 51.010-1-4617 New test case 14.20.6 FACCH/F – VDTS-1 (Rel-9) | Rohde & Schwarz | - |
GP‑111023 | CR 51.010-1-4618 New test case 14.20.7 FACCH/H – VDTS-1 (Rel-9) | Rohde & Schwarz | - |
GP‑111024 | CR 51.010-1-4619 New test case 14.20.8 SACCH – VDTS-1 (Rel-9) | Rohde & Schwarz | - |
GP‑111025 | CR 51.010-1-4620 New test case 14.20.9 Repeated FACCH/F – VDTS-1 (Rel-9) | Rohde & Schwarz | - |
GP‑111026 | CR 51.010-2-0711 Addition of new VAMOS RF tests (Rel-9) | Rohde & Schwarz | - |
GP‑111027 | CR 51.010-1-4621 26.21.0 Adjustments to VAMOS test cases table due new and modified test cases (Rel-9) | Rohde & Schwarz | - |
GP‑111028 | CR 51.010-1-4622 26.21.5 New VAMOS test case VAMOS Signalling / MO-MT VAMOS call / TSC assignment in DTM Assignment Command (Rel-9) | Rohde & Schwarz | WITHDRAWN |
GP‑111029 | CR 51.010-1-4623 26.21.8 New VAMOS test case VAMOS Signalling / MS terminated call / Early assignment / Handover to different AMR codec rates (Rel-9) | Rohde & Schwarz | - |
GP‑111030 | CR 51.010-2-0712 VAMOS Signalling test cases applicability table (Rel-9) | Rohde & Schwarz | - |
GP‑111031 | CR 51.010-1-4624 26.21.2 Corrections to channel mode modify procedure (Rel-9) | Rohde & Schwarz | - |
GP‑111032 | CR 51.010-1-4625 26.21.6 Corrections to the expected sequence (Rel-9) | Rohde & Schwarz | - |
GP‑111033 | CR 51.010-1-4626 26.6.8.7-8 Corrections to test procedure and expected sequence (Rel-9) | Rohde & Schwarz | - |
GP‑111034 | CR 51.010-1-4627 45.5.1 Specific messages content incorrect (Rel-9) | Rohde & Schwarz | - |
GP‑111035 | CR 51.010-1-4628 10.1a and 10.2a Clarification of channel type to be used (Rel-9) | Rohde & Schwarz | - |
GP‑111036 | CR 51.010-1-4629 Section 70 changes for devices not supporting speech (Rel-9) | Spirent Communications | - |
GP‑111037 | CR 51.010-2-0713 Corrections for Privacy and Notification test cases (Rel-9) | Spirent Communications | - |
GP‑111038 | VAMOS Workplan | Research in Motion UK Limited | - |
GP‑111039 | CR 51010-1-4630 Addition of new testcase 26.21.5 (Rel-9) | Research in Motion UK Limited | - |
GP‑111040 | CR 51010-2-0714 Addition of new test case tc 26.21.5 to the table B.1 and table B.1a (Rel-9) | Research in Motion UK Limited | WITHDRAWN |
GP‑111041 | CR 51010-1-4631 Clarification of C1 Test signal in 51010-1 (Rel-9) | Research in Motion UK Limited | - |
GP‑111042 | CR 51.010-1-4632 Correction to A-GPS Protocol Error Test Cases (Rel-9) | Qualcomm Incorporated | - |
GP‑111043 | CR 51.010-5-0108 Update for the latest version of TTCN (Rel-9) | TF 160 | - |
GP‑111044 | CR 51.010-5-0109 Correction to the test cases 26.6.11.3 and 26.6.11.4 (Rel-9) | TF 160 | - |
GP‑111045 | CR 36.523-1-1386 Corrections to GERAN – LTE Tests (Rel-9) | TF 160 | - |
GP‑111046 | CR 51.010-1-4633 New test case tc 14.20.1 (Rel-9) | ST-Ericsson SA | - |
GP‑111047 | CR 51.010-1-4634 New test case tc 14.20.2 (Rel-9) | ST-Ericsson SA | - |
GP‑111048 | CR 51.010-1-4635 New test case tc 58d.1.1 (Rel-9) | ST-Ericsson SA | - |
GP‑111049 | CR 51.010-2-0715 New test case tc 58d.1.1 added part 2 (Rel-9) | ST-Ericsson SA | - |
GP‑111050 | EFTA Workplan | ST-Ericsson SA | - |
GP‑111051 | GERAN3#52 ELECTRONIC meeting schedule | WG3 Chairman (Samsung) | - |
GP‑111052 | CR 51.010-1-4636 New test case tc 13.1a (Rel-9) | ST-Ericsson SA | - |
GP‑111053 | CR 51.010-1-4637 New test case tc 13.2a (Rel-9) | ST-Ericsson SA | - |
GP‑111054 | GELTE Workplan | Renesas Mobile Europe Ltd | - |
GP‑111055 | CR 36.523-1-1387 Addition of new Test case 13.4.2.5 Inter-system mobility / Service based redirection from GSM/GPRS to E-UTRA (Rel-9) | Renesas Mobile Europe Ltd | WITHDRAWN |
GP‑111056 | CR 36.523-2-0221 Addition of new Test case 13.4.2.5 (Rel-9) | Renesas Mobile Europe Ltd | WITHDRAWN |
GP‑111057 | CR 36.523-1-1388 Correction to the test procedure 6.2.3.22 (Rel-9) | Renesas Mobile Europe Ltd | - |
GP‑111058 | CR 51.010-1-4638 Addition of new Test case 14.2.34 Reference sensitivity FACCH/H performance (Rel-9) | Renesas Mobile Europe Ltd | - |
GP‑111059 | CR 51.010-2-0716 Addition of new Test case 14.2.34 (Rel-9) | Renesas Mobile Europe Ltd | - |
GP‑111060 | CR 51.010-2-0717 New test’s added for Vamos part2 (Rel-9) | ST-Ericsson SA | - |
GP‑111061 | CR 45.002-0156 Clarification of EFTA operation in a DCDL configuration (Rel-9) | Telefon AB LM Ericsson, ST-Ericsson SA | POSTPONED |
GP‑111062 | CR 45.002-0157 Clarification of EFTA operation in a DCDL configuration (Rel-10) | Telefon AB LM Ericsson, ST-Ericsson SA | POSTPONED |
GP‑111063 | CR 44.060-1502 Uplink Control Timeslot usage for EFTA (Rel-9) | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑111064 | CR 44.060-1503 Uplink Control Timeslot usage for EFTA (Rel-10) | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑111065 | Usage of Higher MCSs on CCCH Downlink | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑111066 | Further Evaluation of RACH Procedures for Low Priority MTC Devices | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑111067 | pCR 43.868 - New RACH procedure for devices configured for low priority access | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑111068 | Reply LS on PLMN and CSG whitelist handling in H(e)NB | TSG CT WG1 | - |
GP‑111069 | LS on extreme temperatures requirements for testing of different device (GP-110574) | GERAN WG3 | - |
GP‑111070 | Reply LS on Update for ITU-R Recommendation M.1073-2 | ETSI TC MSG | - |
GP‑111071 | Reply LS on referencing ER-GSM band into 3GPP GERAN and ETSI MSG Standards | ETSI TC MSG | - |
GP‑111072 | LS on introduction of VAMOS into EN 301 502 | ETSI TC MSG | - |
GP‑111073 | LS on Status of the MSR-NC work item | TSG RAN WG4 | - |
GP‑111074 | Reply LS on Update for ITU-R Recommendation M.1073-2 | TSG RAN | - |
GP‑111075 | Reply LS on PLMN and CSG whitelist handling in H(e)NB | TSG SA WG2 | - |
GP‑111076 | Reply LS on PLMN and CSG whitelist handling in H(e)NB | TSG SA WG2 | - |
GP‑111077 | Reply LS to Reply LS on Network Sharing | TSG SA WG2 | - |
GP‑111078 | LS on the introduction of FULL-MOCN-GERAN feature | TSG SA WG2 | - |
GP‑111079 | Reply LS on UE capabilities for Inter-RAT energy saving | TSG SA WG2 | - |
GP‑111080 | Inter-MSC handover failures and lists of permitted algorithms in the context of A5/4 | TSG SA WG3 | - |
GP‑111081 | LS on the length of security information in Public Warning System (PWS) | TSG SA WG3 | - |
GP‑111082 | LS on Navigation and Location Standardization | ETSI TC SES WG SCN | - |
GP‑111083 | LS on Equivalent PLMN identities and MDT | TSG SA | - |
GP‑111084 | Reply LS on sending SMS on FACCH | TSG SA WG4 | - |
GP‑111085 | Analysis on Traffic Characteristic of IM Service in China | CMCC | - |
GP‑111086 | Suggestion on the Performance Metrics for GERANEMDA | CMCC | - |
GP‑111087 | Discussion on the Improvement of PDCH Utilization Efficiency of Mobile Data Applications | CMCC | - |
GP‑111088 | WID: Work Item Description on Service Identification | CMCC | - |
GP‑111089 | Meeting Minutes of BTS Energy Savings telco#5 | SI Rapporteur | - |
GP‑111090 | Draft 3GPP TR 45.926V0.0.10 on "Solutions for GSM/EDGE BTS Energy Saving" | SI Rapporteur | - |
GP‑111091 | Comments on support of "Pattern Matching" in GERAN | Qualcomm Incorporated, Telefon AB LM Ericsson | - |
GP‑111092 | TIGHTER – Workplan | WI rapporteur | - |
GP‑111093 | TIGHTER – Meeting minutes from 3GPP Teleconference #5 | WI rapporteur | - |
GP‑111094 | TIGHTER Sheet and Current Values | WI rapporteur | - |
GP‑111095 | Implications of MSR medium range/local area BS class requirements | Telecom Italia S.p.A., Vodafone Group Plc, China Mobile Comm. Corp., Huawei Technologies Co., Ltd. | - |
GP‑111096 | Enhancement on RACH with mixed traffic | ZTE Corporation | - |
GP‑111097 | Working Assumptions for VAMOS Enhancements | ZTE Corporation | - |
GP‑111098 | CR 45.005-0465 Reference interference performance for VAMOS I MS (Rel-9) | Research in Motion UK Limited | - |
GP‑111099 | CR 45.005-0466 Reference interference performance for VAMOS I MS (Rel-10) | Research in Motion UK Limited | - |
GP‑111100 | CR 44.018-0906 Separate Cipher Keys for TCH and SACCH (Rel-10) | Intel Corporation (UK) Ltd | - |
GP‑111101 | Discussion on proposal of new test cases to test random filler bits | Anite Telecoms Ltd. | - |
GP‑111102 | CR 51.010-1-4639 Correction of test case 20.25.3a for 1.28Mcps TDD: P-CCPCH RSCP (Rel-9) | Anritsu Ltd. | - |
GP‑111103 | Work Items for the TSG WG meeting GERAN3#51 | ETSI MCC | - |
GP‑111104 | CR 36.523-1-1386 rev 1 Corrections to GERAN – LTE Tests (Rel-9) | TF 160 | - |
GP‑111105 | CR 51.010-1-4632 rev 1 Correction to A-GPS Protocol Error Test Cases (Rel-9) | Qualcomm Incorporated | - |
GP‑111106 | Discussion on proposal of new test cases to test random filler bits | Anite Telecoms Ltd., Rohde & Schwarz | - |
GP‑111107 | CR 51010-1-4630 rev 1 Addition of new testcase 26.21.5 (Rel-9) | Research in Motion UK Limited | - |
GP‑111108 | CR 51.010-1-4608 rev 1 Addition of new Test case 14.2.28 - Reference sensitivity TCH HS (Rel-9) | Agilent, Bureau Veritas ADT | - |
GP‑111109 | CR 51.010-1-4609 rev 1 Addition of new Test case 14.2.29 - Reference sensitivity TCH EFS (Rel-9) | Agilent, Bureau Veritas ADT | - |
GP‑111110 | CR 51.010-1-4610 rev 1 Addition of new Test case 14.2.30 - Reference sensitivity TCH AFS (Rel-9) | Agilent, Bureau Veritas ADT | - |
GP‑111111 | CR 51.010-1-4611 rev 1 Addition of new Test case 14.2.31 - Reference sensitivity TCH AHS (Rel-9) | Agilent, Bureau Veritas ADT | - |
GP‑111112 | Action points after GERAN3#51 | TSG WG GERAN3 Chair | - |
GP‑111113 | Work Items after the TSG WG meeting GERAN3#51 | ETSI MCC | - |
GP‑111114 | CR 51.010-1-4617 rev 1 New test case 14.20.6 FACCH/F – VDTS-1 (Rel-9) | Rohde & Schwarz | - |
GP‑111115 | CR 51.010-1-4614 rev 1 New test case 14.2.36 Reference sensitivity Repeated SACCH performance (Rel-9) | Rohde & Schwarz | - |
GP‑111116 | CR 51.010-1-4615 rev 1 New test case 14.2.37 Reference sensitivity Repeated FACCH/F performance (Rel-9) | Rohde & Schwarz | - |
GP‑111117 | CR 51.010-1-4616 rev 1 New test case 14.20.10 Repeated SACCH – VDTS-1 (Rel-9) | Rohde & Schwarz | - |
GP‑111118 | CR 51.010-1-4618 rev 1 New test case 14.20.7 FACCH/H – VDTS-1 (Rel-9) | Rohde & Schwarz | - |
GP‑111119 | CR 51.010-1-4619 rev 1 New test case 14.20.8 SACCH – VDTS-1 (Rel-9) | Rohde & Schwarz | - |
GP‑111120 | CR 51.010-1-4620 rev 1 New test case 14.20.9 Repeated FACCH/F – VDTS-1 (Rel-9) | Rohde & Schwarz | - |
GP‑111121 | CR 45.005-0467 EVM for AQPK for Repeater (Rel-9) | Andrew Wireless Systems GmbH | - |
GP‑111122 | CR 45.005-0468 EVM for AQPK for Repeater (Rel-10) | Andrew Wireless Systems GmbH | - |
GP‑111123 | CR 51.026-0017 EVM for AQPK for Repeater (Rel-9) | Andrew Wireless Systems GmbH | - |
GP‑111124 | CR 51.026-0018 EVM for AQPK for Repeater (Rel-10) | Andrew Wireless Systems GmbH | - |
GP‑111125 | CR 44.060-1504 Support indication of Immediate Packet Assignment in EGPRS Packet Channel Request (Rel-11) | Huawei Technologies Co., Ltd., Qualcomm Incorporated | - |
GP‑111126 | Analysis of EGPRS Channel Request | Huawei Technologies Co., Ltd., Qualcomm Incorporated | - |
GP‑111127 | Performance Difference between VAMOS I and VAMOS II | Huawei Technologies Co., Ltd., Telecom Italia S.p.A, China Mobile Com. Corporation, Vodafone (all 3GPP IM) | - |
GP‑111128 | DRAFT ENHVAMOS TR skeleton v0.0.1 | WI Rapporteur | - |
GP‑111129 | Work Plan of SI ENHVAMOS | WI Rapporteur | - |
GP‑111130 | Proposed Working Assumptions for ENHVAMOS | Huawei Technologies Co., Ltd. | - |
GP‑111131 | MCS re-design for DAS-12 and DBS-12 | Huawei Technologies Co., Ltd. | - |
GP‑111132 | Performance comparison: Padded HOM and SBPCE2 | Huawei Technologies Co., Ltd. | - |
GP‑111133 | Discussion on metrics for MTC study | Huawei Technologies Co., Ltd., Telecom Italia S.p.A, China Mobile Com. Corporation, Vodafone (all 3GPP IM) | - |
GP‑111134 | Discussion on KPIs for legacy mobiles | Huawei Technologies Co., Ltd., Telecom Italia S.p.A, China Mobile Com. Corporation, Vodafone (all 3GPP IM) | - |
GP‑111135 | Discussion on MTC device power consumption on RACH solutions | Huawei Technologies Co., Ltd. | - |
GP‑111136 | CR 45.008-0542 Correction on CSG membership check in idle mode (Rel-8) | Huawei Technologies Co., Ltd. | - |
GP‑111137 | CR 45.008-0543 Correction on CSG membership check in idle mode (Rel-9) | Huawei Technologies Co., Ltd. | - |
GP‑111138 | CR 45.008-0544 Correction on CSG membership check in idle mode (Rel-10) | Huawei Technologies Co., Ltd. | - |
GP‑111139 | Discussion on inter-RAT energy saving | Huawei Technologies Co., Ltd., Vodafone (all 3GPP IM) | - |
GP‑111140 | DRAFT GERANEMDA TR skeleton v0.0.1 | WI Rapporteur | - |
GP‑111141 | GERANEMDA workplan | WI Rapporteur | - |
GP‑111142 | Proposal on use case for GERANEMDA study | Huawei Technologies Co., Ltd., China Mobile Comm Corp | - |
GP‑111143 | CR 45.008-0545 Clarification for measurement control parameter on SACCH (Rel-8) | Huawei Technologies Co., Ltd. | - |
GP‑111144 | CR 45.008-0546 Clarification for measurement control parameter on SACCH (Rel-9) | Huawei Technologies Co., Ltd. | - |
GP‑111145 | CR 45.008-0547 Clarification for measurement control parameter on SACCH (Rel-10) | Huawei Technologies Co., Ltd. | - |
GP‑111146 | Ciphering on SACCH | Intel Corporation (UK) Ltd | - |
GP‑111147 | CR 45.008-0548 Clarification for RX_QUAL requirements for VAMOS mode (Rel-9) | Research in Motion UK Limited, Renesas Mobile Europe Ltd | - |
GP‑111148 | CR 45.008-0549 Clarification for RX_QUAL requirements for VAMOS mode (Rel-10) | Research in Motion UK Limited, Renesas Mobile Europe Ltd | - |
GP‑111149 | G2-50 Meeting Report | MCC | - |
GP‑111150 | Network Improvement for Pairing Legacy DARP Phase I Mobiles in VAMOS Operation | Motorola Mobility UK Ltd. | - |
GP‑111151 | CR 45.005-0451 rev 2 Clarification of the notation used for frequency offsets (Rel-9) | Alcatel-Lucent | - |
GP‑111152 | CR 45.005-0452 rev 2 Clarification of the notation used for frequency offsets (Rel-10) | Alcatel-Lucent | - |
GP‑111153 | CR 51.021-0202 rev 2 Clarification of the notation used for the minimum spacing between carriers (Rel-9) | Alcatel-Lucent | - |
GP‑111154 | CR 51.021-0203 rev 2 Clarification of the notation used for the minimum spacing between carriers (Rel-10) | Alcatel-Lucent | - |
GP‑111155 | CR 45.005-0469 Correction of some VAMOS-II AHS7.4 RBERII values and a TCH/HS Rber1b typing error for GSM900 VDTS-3 SCPIR = +4dB (Rel-9) | Renesas Mobile Europe Ltd | - |
GP‑111156 | CR 45.005-0470 Correction of some VAMOS-II AHS7.4 RBERII values and a TCH/HS Rber1b typing error for GSM900 VDTS-3 SCPIR = +4dB (Rel-10) | Renesas Mobile Europe Ltd | - |
GP‑111157 | CR 45.005-0471 Interferer signal levels for TIGHTER (Rel-10) | Renesas Mobile Europe Ltd, Com-Research GmbH, Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑111158 | CR 45.005-0472 Clarification of references to TS 24.008 (Rel-10) | Renesas Mobile Europe Ltd | - |
GP‑111159 | CR 45.005-0473 TIGHTER Performance requirements (Rel-10) | Renesas Mobile Europe Ltd, ST-Ericsson SA | - |
GP‑111160 | CR 45.008-0550 Clarification of requirements for reporting handover measurements for CSG cells (Rel-9) | Research in Motion UK Limited | - |
GP‑111161 | CR 45.008-0551 Clarification of requirements for reporting handover measurements for CSG cells (Rel-10) | Research in Motion UK Limited | - |
GP‑111162 | UTRAN FDD RSCP suitability parameter storage and applicability | Research in Motion UK Limited | - |
GP‑111163 | Priority-based reselection in 44.018 and 45.008 | Research in Motion UK Limited | - |
GP‑111164 | CR 45.008-0552 Priority-based reselection: corrections and clarifications (Rel-8) | Research in Motion UK Limited | - |
GP‑111165 | CR 45.008-0553 Priority-based reselection: corrections and clarifications (Rel-9) | Research in Motion UK Limited | - |
GP‑111166 | CR 45.008-0554 Priority-based reselection: corrections and clarifications (Rel-10) | Research in Motion UK Limited | - |
GP‑111167 | CR 45.008-0555 Measurement reporting limits for CSG cells – removal of brackets (Rel-9) | Research in Motion UK Limited | - |
GP‑111168 | CR 45.008-0556 Measurement reporting limits for CSG cells – removal of brackets (Rel-10) | Research in Motion UK Limited | - |
GP‑111169 | On the removal of VDTS-4 | Telefon AB LM Ericsson, ST-Ericsson SA, Vodafone Group Plc | - |
GP‑111170 | CR 51.021-0204 Correction of blocking frequency range for multicarrier BTS equipped with multicarrier receiver (Rel-9) | Telefon AB LM Ericsson | - |
GP‑111171 | CR 51.021-0205 Correction of blocking frequency range for multicarrier BTS equipped with multicarrier receiver (Rel-10) | Telefon AB LM Ericsson | - |
GP‑111172 | CR 51.021-0206 Specification of the applicability of equivalent receiver paths (Rel-9) | Telefon AB LM Ericsson | - |
GP‑111173 | CR 51.021-0207 Specification of the applicability of equivalent receiver paths (Rel-10) | Telefon AB LM Ericsson | - |
GP‑111174 | CR 51.021-0208 Correction to conducted spurious emissions test case (Rel-9) | Telefon AB LM Ericsson | - |
GP‑111175 | CR 51.021-0209 Correction to conducted spurious emissions test case (Rel-10) | Telefon AB LM Ericsson | - |
GP‑111176 | Work plan of SI “Signal Precoding enhancements for EGPRS2 DL“ | WI rapporteur | - |
GP‑111177 | Meeting minutes of SPEED telco#5 | WI rapporteur | - |
GP‑111178 | TR 45.860 Signal Precoding Enhancements for EGPRS2 DL v0.7.0 | WI rapporteur | - |
GP‑111179 | Revised SPEED WID | Telefon AB LM Ericsson, ST-Ericsson SA, Telecom Italia S.p.A, Vodafone Group Plc, China Mobile Com. Corp. ZTE Corporation, Research In Motion UK Limited | - |
GP‑111180 | PAR reduction complexity of SBPCE2 | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑111181 | pCR 45.860 PAR reduction complexity of SBPCE2 | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑111182 | pCR45.860 Impacts on Base Station and Mobile Station for SBPCE2 | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑111183 | Complexity reduction of SBPCE2B | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑111184 | pCR45.860 Complexity reduction of SBPCE2B | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑111185 | SBPCE2 USF/PAN multiplexing | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑111186 | pCR45.860 SBPCE2 USF/PAN multiplexing | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑111187 | pCR45.860 Reference performance for SBPCE2 | Telefon AB LM Ericsson | - |
GP‑111188 | CR 45.005-0474 Introduction of VDTS-4 (Rel-9) | Com-Research GmbH | - |
GP‑111189 | CR 45.005-0475 Introduction of VDTS-4 (Rel-10) | Com-Research GmbH | - |
GP‑111190 | CR 45.002-0158 Applicability of reduced switching times for fast downlink frequency switching (Rel-10) | Research in Motion UK Limited | - |
GP‑111191 | CR 45.005-0476 Introduction of EVM requirements for AQPSK (Rel-9) | Nokia Siemens Networks, Huawei Technologies Co., Ltd, Telefon AB LM Ericsson | - |
GP‑111192 | CR 45.005-0477 Introduction of EVM requirements for AQPSK (Rel-10) | Nokia Siemens Networks, Huawei Technologies Co., Ltd, Telefon AB LM Ericsson | - |
GP‑111193 | CR 51.021-0210 Introduction of EVM requirements for AQPSK (Rel-9) | Nokia Siemens Networks, Huawei Technologies Co., Ltd, Telefon AB LM Ericsson | - |
GP‑111194 | CR 51.021-0211 Introduction of EVM requirements for AQPSK (Rel-10) | Nokia Siemens Networks, Huawei Technologies Co., Ltd, Telefon AB LM Ericsson | - |
GP‑111195 | CR 45.005-0478 Uplink receiver performance requirements for VAMOS (Rel-9) | Nokia Siemens Networks, Telefon AB LM Ericsson | - |
GP‑111196 | CR 45.005-0479 Uplink receiver performance requirements for VAMOS (Rel-10) | Nokia Siemens Networks, Telefon AB LM Ericsson | - |
GP‑111197 | CR 51.021-0212 Uplink receiver performance requirements for VAMOS (Rel-9) | Nokia Siemens Networks, Telefon AB LM Ericsson | - |
GP‑111198 | CR 51.021-0213 Uplink receiver performance requirements for VAMOS (Rel-10) | Nokia Siemens Networks, Telefon AB LM Ericsson | - |
GP‑111199 | Meeting Minutes of VAMOS telco #14 | WI Rapporteur | - |
GP‑111200 | Work Plan for VAMOS | WI Rapporteur | - |
GP‑111201 | Updated performance evaluation on IPA | Huawei Technologies Co., Ltd., Qualcomm Incorporated | - |
GP‑111202 | Continued discussion for IPA parameters | Huawei Technologies Co., Ltd., Qualcomm Incorporated | - |
GP‑111203 | CR 44.018-0907 Introduction of Immediate Packet Assignment (Rel-11) | Huawei Technologies Co., Ltd., Qualcomm Incorporated | - |
GP‑111204 | Draft CR 24.008 Capability indication for Immediate Packet Assignment | Huawei Technologies Co., Ltd., Qualcomm Incorporated | - |
GP‑111205 | CR 44.018-0908 Correction on measurement control parameter in Measurement Information (Rel-8) | Huawei Technologies Co., Ltd. | - |
GP‑111206 | CR 44.018-0909 Correction on measurement control parameter in Measurement Information (Rel-9) | Huawei Technologies Co., Ltd. | - |
GP‑111207 | CR 44.018-0910 Correction on measurement control parameter in Measurement Information (Rel-10) | Huawei Technologies Co., Ltd. | - |
GP‑111208 | Discussion on AMR Codec Mode adaptation during Handover procedure | Huawei Technologies Co., Ltd. | - |
GP‑111209 | Discussion on CN overload control in GERAN | LG Electronics Inc. | - |
GP‑111210 | BCCH Carrier Power Reduction Methodology | ZTE Corporation | - |
GP‑111211 | On the rotation-based techniques to reduce the PAPR of SPEED | Nokia Siemens Networks | - |
GP‑111212 | Aligning MCBTS testing according to MSR-NC principles | Telefon AB LM Ericsson | - |
GP‑111213 | CR 51.021-0214 Aligning MCBTS testing according to MSR-NC principles (Rel-10) | Telefon AB LM Ericsson | - |
GP‑111214 | Multiplexing multiple MTC devices in a single block period | Samsung Electronics Co, Huawei Technologies Co., Ltd. | - |
GP‑111215 | 3GPP TSG GERAN Work Plan | Vodafone (all 3GPP IM) | - |
GP‑111216 | Work plan of SI “Solutions for GSM/EDGE BTS Energy Saving” (BTSEnergy) | Vodafone (all 3GPP IM), Nokia Siemens Networks | - |
GP‑111217 | CR 48.018-0310 Incorrect message encoding for Network Sharing (Rel-10) | Vodafone (all 3GPP IM) | - |
GP‑111218 | GERAN Rel-11 MTC Enhancements | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑111219 | New WID for Rel-11 NIMTC | Telefon AB LM Ericsson, ST-Ericsson SA, Vodafone Group Plc, China Mobile Comm Corp | - |
GP‑111220 | CR 44.018-0911 Alignment of Extended Access Barring with TS 22.011 (Rel-10) | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑111221 | CR 44.018-0882 rev 6 Implicit Immediate Assignment Reject (Rel-10) | Telefon AB LM Ericsson, ST-Ericsson SA, Vodafone Group Plc, Renesas Mobile Europe Ltd | - |
GP‑111222 | CR 44.018-0912 Low Priority NAS Indication for CS Domain (Rel-10) | Telefon AB LM Ericsson, ST-Ericsson SA, Vodafone Group Plc | - |
GP‑111223 | CR 44.006-0032 Low Priority NAS Indication for CS Domain (Rel-10) | Telefon AB LM Ericsson, ST-Ericsson SA, Vodafone Group Plc | - |
GP‑111224 | CR 48.008-0342 Low Priority NAS Indication for CS Domain (Rel-10) | Telefon AB LM Ericsson, ST-Ericsson SA, Vodafone Group Plc | - |
GP‑111225 | CR 44.060-1485 rev 3 Low Priority NAS Indication for PS Domain (Rel-10) | Telefon AB LM Ericsson, ST-Ericsson SA, Vodafone Group Plc | - |
GP‑111226 | CR 48.018-0311 Low Priority NAS Indication for PS Domain (Rel-10) | Telefon AB LM Ericsson, ST-Ericsson SA, Vodafone Group Plc | - |
GP‑111227 | Distribution time for ETWS Primary Notification message considering different digital signature lengths | Telefon AB LM Ericsson | - |
GP‑111228 | CR 48.008-0343 Correction to Local Call Local Switch procedure (Rel-10) | Telefon AB LM Ericsson | - |
GP‑111229 | Discussion on Fast Acquisition of UTRAN System Information | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑111230 | CR 44.018-0913 Clarifications to the Fast Acquisition of System Information procedure (Rel-11) | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑111231 | Enhanced Fast Acquisition of System Information procedure | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑111232 | On Removing SACCH Ciphering | Renesas Mobile Europe Ltd, Qualcomm Incorporated | - |
GP‑111233 | CR 44.018-0889 rev 3 Introduction of Selective Ciphering on SACCH (Rel-10) | Renesas Mobile Europe Ltd, Qualcomm Incorporated | - |
GP‑111234 | Draft CR 24.008 Introduction of Selective Ciphering on SACCH (Rel-10) | Renesas Mobile Europe Ltd, Qualcomm Incorporated | - |
GP‑111235 | CR 51.021-0215 Reduction of testing effort related to blocking receiver performance and AM suppression for multicarrier BTS equipped with multicarrier receiver (Rel-9) | Nokia Siemens Networks | - |
GP‑111236 | CR 51.021-0216 Reduction of testing effort related to blocking receiver performance and AM suppression for multicarrier BTS equipped with multicarrier receiver (Rel-10) | Nokia Siemens Networks | - |
GP‑111237 | Performance Evaluation for Hybrid Packet Channel | Nokia Siemens Networks | - |
GP‑111238 | Output power decrease on BCCH carrier for GMSK | Nokia Siemens Networks | - |
GP‑111239 | Meeting Minutes of BTS Energy Savings telco#4 | SI Rapporteur | - |
GP‑111240 | CR 44.018-0914 Priority based reselection: clarifications and corrections (Rel-8) | Research in Motion UK Limited | - |
GP‑111241 | CR 44.018-0915 Priority based reselection: clarifications and corrections (Rel-9) | Research in Motion UK Limited | - |
GP‑111242 | CR 44.018-0916 Priority based reselection: clarifications and corrections (Rel-10) | Research in Motion UK Limited | - |
GP‑111243 | CR 44.060-1475 rev 8 Mobility to CSG cells in NC2 mode (Rel-10) | Research in Motion UK Limited | - |
GP‑111244 | CR 44.018-0905 rev 2 Mobility to CSG cells in NC2 mode (Rel-10) | Research in Motion UK Limited | - |
GP‑111248 | Mobility Aspects for Full MOCN | Renesas Mobile Europe Ltd | - |
GP‑111249 | Broadcast Aspects for Full MOCN | Renesas Mobile Europe Ltd | - |
GP‑111250 | Signaling of the Selected PLMN ID from MS to the BSS for Full MOCN | Renesas Mobile Europe Ltd | - |
GP‑111251 | Equivalent PLMN List and CSG Reporting in Dedicated Mode | Renesas Mobile Europe Ltd | - |
GP‑111252 | CSG cell Access Check during inter-PLMN handover in DTM | Renesas Mobile Europe Ltd | - |
GP‑111253 | CR 48.018-0312 Correction of requirements related to the SON Transfer RIM application (Rel-10) | Alcatel-Lucent | - |
GP‑111254 | CR 48.008-0341 rev 1 Support for detection of unnecessary IRAT HO (Rel-10) | Alcatel-Lucent | - |
GP‑111255 | CR 48.018-0307 rev 1 Support for detection of unnecessary IRAT HO (Rel-10) | Alcatel-Lucent | - |
GP‑111256 | FULL-MOCN-GERAN: GERAN#50 issues + EAB handling | Alcatel-Lucent | - |
GP‑111257 | FULL-MOCN-GERAN: detailed technical discussion | Alcatel-Lucent | - |
GP‑111258 | LS on using test loop mode in GERAN to LTE interworking TCs | TSG RAN WG5 | - |
GP‑111259 | Reply LS on the Progress on LTE Interworking TCs | TSG RAN WG5 | - |
GP‑111260 | A low latency approach for signalling presence of access control mechanisms in relation to NIMTC and potentially GEMDA | Nokia Siemens Networks | - |
GP‑111261 | Draft CR to 44.018 Introduction of a low latency mechanism to signal changes in the state of System Information message Type 21 on the BCCH | Nokia Siemens Networks | - |
GP‑111262 | Does the short access TBF merit revisiting for GEMDA? | Nokia Siemens Networks | - |
GP‑111263 | WID:GERAN aspects of single radio voice call continuity from UTRAN/GERAN to E-UTRAN/HSPA | ZTE Corporation | - |
GP‑111264 | CR 44.018-0918 Correction to CSG reporting to include equivalent PLMNs (Rel-9) | Renesas Mobile Europe Ltd | - |
GP‑111265 | CR 44.060-1506 Correction to CSG reporting to include equivalent PLMNs (Rel-9) | Renesas Mobile Europe Ltd | - |
GP‑111266 | Draft TR 43.868 GERANIMTC v.0.4.0 | WI Rapporteur | - |
GP‑111267 | Reply LS on the introduction of FULL-MOCN-GERAN feature | TSG CT WG1 | - |
GP‑111268 | Reply LS on PLMN and CSG whitelist handling in H(e)NB | TSG RAN WG2 | - |
GP‑111269 | Response LS on the length of security information in Public Warning System (PWS) | TSG RAN WG2 | - |
GP‑111270 | CR 45.005-0480 Clarification of applicability of requirements for spurious response frequencies for multicarrier receiver (Rel-9) | Nokia Siemens Networks | - |
GP‑111271 | CR 45.005-0481 Clarification of applicability of requirements for spurious response frequencies for multicarrier receiver (Rel-10) | Nokia Siemens Networks | - |
GP‑111272 | CR 51.021-0217 Clarification of applicability of requirements for spurious response frequencies and of the inband blocking requirement for multicarrier receiver (Rel-9) | Nokia Siemens Networks | - |
GP‑111273 | CR 51.021-0218 Clarification of applicability of requirements for spurious response frequencies and of the inband blocking requirement for multicarrier receiver (Rel-10) | Nokia Siemens Networks | - |
GP‑111274 | On multislot capability parameters applicable to EFTA | Research in Motion UK Limited | - |
GP‑111275 | Reply LS to LS on Equivalent PLMN identities and MDT | TSG SA WG5 | - |
GP‑111276 | EGPRS2 link quality measurements reporting in DLDC | Research In Motion UK Ltd. | - |
GP‑111277 | Draft CR 44.060 EGPRS Ack/Nack Description truncation in EGPRS PACKET DOWNLINK ACK/NACK TYPE 2 message (Rel-7) | Research In Motion UK Ltd. | - |
GP‑111278 | LS on new E-UTRA/UTRA operating bands | TSG RAN WG4 | - |
GP‑111279 | LS on CRs for MSR specifications | TSG RAN WG4 | - |
GP‑111280 | LS on Status of the MSR-NC work item | TSG RAN WG4 | - |
GP‑111281 | Revised SPEED WID | Telefon AB LM Ericsson, ST-Ericsson SA, Telecom Italia S.p.A, Vodafone Group Plc, China Mobile Com. Corp. ZTE Corporation, Research In Motion UK Limited, Huawei Technologies Co., Ltd. | - |
GP‑111282 | Revised Work plan of SI “Solutions for GSM/EDGE BTS Energy Saving” (BTSEnergy) | Vodafone (all 3GPP IM), Nokia Siemens Networks | - |
GP‑111283 | Revised Meeting Minutes of BTS Energy Savings telco#5 | SI Rapporteur | - |
GP‑111284 | Draft 3GPP TR 45.926 V0.0.11 on Solutions for GSM/EDGE BTS Energy Saving | SI Rapporteur | - |
GP‑111285 | Revised GERANEMDA workplan | WI Rapporteur | - |
GP‑111286 | Discussion on IM3 products in MCBTS NC configuration | Huawei Technologies Co., Ltd. | - |
GP‑111287 | Revised Work Plan of SI ENHVAMOS | WI Rapporteur | - |
GP‑111288 | Collected performance | WI Rapporteur | - |
GP‑111289 | CR 44.060-1507 Clarification on the applicability of the DEFAULT_UTRAN_XXX parameters received in the Packet Measurement Order message (Rel-8) | Renesas Mobile Europe Ltd | - |
GP‑111290 | WID:GERAN aspects of single radio voice call continuity from UTRAN/GERAN to E-UTRAN/HSPA (revision of GP-111263) | ZTE Corporation, ORANGE SA, Telefon AB LM Ericsson, ST-Ericsson SA, China Mobile Communications Corporation Alcatel-Lucent, Huawei Technologies Co., Ltd. | - |
GP‑111291 | Draft New WID: Work Item Description on Service Identification (revision of GP-111088) | CMCC et al. | - |
GP‑111292 | (Third) LS on enabling detection of unnecessary IRAT HO for A/Gb-mode BSS | TSG RAN WG3 | - |
GP‑111293 | Reply LS on Inter-MSC handover failures and lists of permitted algorithms in the context of A5/4 | TSG CT WG4 | - |
GP‑111294 | TIGHTER Sheet and Current Values (revision of GP-111094) | WI rapporteur | - |
GP‑111295 | CR 45.005-0473 rev 1 TIGHTER Performance requirements (Rel-10) | Renesas Mobile Europe Ltd, ST-Ericsson SA, Com-Research GmbH | - |
GP‑111296 | [DRAFT] Reply LS on extreme temperatures requirements for testing of different devices (To: TSG GERAN WG3, Cc: TSG RAN WG4, TSG RAN WG5) | TSG GERAN WG1 | - |
GP‑111297 | Draft Reply LS on introduction of VAMOS into EN 301 502 (To: ETSI TC MSG) | TSG GERAN WG1 | - |
GP‑111298 | CR 45.005-0451 rev 3 Clarification of the notation used for frequency offsets (Rel-9) | Alcatel-Lucent | - |
GP‑111299 | CR 45.005-0452 rev 3 Clarification of the notation used for frequency offsets (Rel-10) | Alcatel-Lucent | - |
GP‑111300 | CR 45.005-0470 rev 1 Correction of some VAMOS-II AHS7.4 RBERII values and a TCH/HS Rber1b typing error for GSM900 VDTS-3 SCPIR = +4dB (Rel-10) | Renesas Mobile Europe Ltd | - |
GP‑111301 | LS on PLMN and CSG whitelist handling in H(e)NB | TSG GERAN WG2 | - |
GP‑111302 | LS on the introduction of FULL-MOCN-GERAN | TSG GERAN WG2 | - |
GP‑111303 | Reply LS on Inter-MSC handover failures and lists of permitted algorithms in the context of A5/4 (To: TSG SA3, TSG CT4) | TSG GERAN WG2 | - |
GP‑111304 | Reply LS on the length of security information in Public Warning System (PWS) (To: TSG SA WG3, Cc: TSG RAN WG2, TSG CT WG1) | TSG GERAN WG2 | - |
GP‑111305 | Reply LS on enabling detection of unnecessary IRAT HO for A/Gb-mode BSS (To: TSG RAN WG3) | TSG GERAN WG2 | - |
GP‑111306 | CR 44.060-1502 rev 1 Uplink Control Timeslot usage for EFTA (Rel-9) | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑111307 | CR 44.060-1503 rev 1 Uplink Control Timeslot usage for EFTA (Rel-10) | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑111308 | CR 44.060-1508 EGPRS Ack/Nack Description truncation in EGPRS PACKET DOWNLINK ACK/NACK TYPE 2 message (Rel-7) | Research in Motion UK Limited | - |
GP‑111309 | CR 44.060-1509 EGPRS Ack/Nack Description truncation in EGPRS PACKET DOWNLINK ACK/NACK TYPE 2 message (Rel-8) | Research in Motion UK Limited | - |
GP‑111310 | CR 44.060-1510 EGPRS Ack/Nack Description truncation in EGPRS PACKET DOWNLINK ACK/NACK TYPE 2 message (Rel-9) | Research in Motion UK Limited | - |
GP‑111311 | CR 44.060-1511 EGPRS Ack/Nack Description truncation in EGPRS PACKET DOWNLINK ACK/NACK TYPE 2 message (Rel-10) | Research in Motion UK Limited | - |
GP‑111312 | Distribution time for ETWS Primary Notification message considering different digital signature lengths | Telefon AB LM Ericsson | - |
GP‑111313 | CR 44.018-0908 rev 1 Correction on measurement control parameter in Measurement Information (Rel-8) | Huawei Technologies Co., Ltd. | - |
GP‑111314 | CR 44.018-0909 rev 1 Correction on measurement control parameter in Measurement Information (Rel-9) | Huawei Technologies Co., Ltd. | - |
GP‑111315 | CR 44.018-0910 rev 1 Correction on measurement control parameter in Measurement Information (Rel-10) | Huawei Technologies Co., Ltd. | - |
GP‑111316 | CR 44.018-0914 rev 1 Priority based reselection: clarifications and corrections (Rel-8) | Research in Motion UK Limited | - |
GP‑111317 | CR 44.018-0915 rev 1 Priority based reselection: clarifications and corrections (Rel-9) | Research in Motion UK Ltd | - |
GP‑111318 | CR 44.018-0916 rev 1 Priority based reselection: clarifications and corrections (Rel-10) | Research in Motion UK Ltd | - |
GP‑111319 | CR 44.060-1512 Priority based reselection: clarifications and corrections (Rel-8) | Research in Motion UK Ltd | - |
GP‑111320 | CR 44.060-1513 Priority based reselection: clarifications and corrections (Rel-9) | Research in Motion UK Ltd | - |
GP‑111321 | CR 44.060-1514 Priority based reselection: clarifications and corrections (Rel-10) | Research in Motion UK Ltd | - |
GP‑111322 | CR 44.018-0919 Correction to inter-RAT handover restrictions (Rel-8) | Research in Motion UK Ltd | WITHDRAWN |
GP‑111323 | CR 44.018-0920: Correction to inter-RAT handover restrictions (Rel-9) | Research in Motion UK Ltd | WITHDRAWN |
GP‑111324 | CR 44.018-0921: Correction to inter-RAT handover restrictions (Rel-10) WITHDRAWN | Research in Motion UK Ltd | - |
GP‑111325 | CR 44.060-1515 Clarification on the applicability of the DEFAULT_UTRAN_XXX parameters received in the Packet Measurement Order message (Rel-9) | Renesas Mobile Europe Ltd | - |
GP‑111326 | CR 44.060-1516 Clarification on the applicability of the DEFAULT_UTRAN_XXX parameters received in the Packet Measurement Order message (Rel-10) | Renesas Mobile Europe Ltd | - |
GP‑111327 | FULL-MOCN-GERAN: GERAN #50 issues + EAB handling | Alcatel-Lucent | - |
GP‑111328 | FULL-MOCN-GERAN: detailed technical discussion | Alcatel-Lucent | - |
GP‑111329 | CR 44.018-0918 rev 1 Correction to CSG reporting to include equivalent PLMNs (Rel-9) | Renesas Mobile Europe Ltd | - |
GP‑111330 | CR 44.018-0922 Correction to CSG reporting to include equivalent PLMNs (Rel-10) | Renesas Mobile Europe Ltd | - |
GP‑111331 | CR 44.060-1506 rev 1 Correction to CSG reporting to include equivalent PLMNs (Rel-9) | Renesas Mobile Europe Ltd | - |
GP‑111332 | CR 44.060-1517 Correction to CSG reporting to include equivalent PLMNs (Rel-10) | Renesas Mobile Europe Ltd | - |
GP‑111333 | CR 44.018-0889 rev 4 Introduction of Selective Ciphering on SACCH (Rel-10) | Renesas Mobile Europe Ltd, Qualcomm Incorporated | - |
GP‑111334 | CR 44.060-1475 rev 9 Mobility to CSG cells in NC2 mode (Rel-10) | Research in Motion UK Ltd., Renesas Mobile Europe Ltd., Nokia Siemens Networks, Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑111335 | CR 44.060-1505 rev 1 DTR: Prioritization of V(S) and NACKED blocks (Rel-10) | Research in Motion UK Limited | - |
GP‑111336 | CR 48.008-0341 rev 2 Support for detection of unnecessary IRAT HO (Rel-10) | Alcatel-Lucent | - |
GP‑111337 | CR 44.060-1507 rev 1 Clarification on the applicability of the DEFAULT_UTRAN_XXX parameters received in the Packet Measurement Order message (Rel-8) | Renesas Mobile Europe Ltd | - |
GP‑111338 | CR 44.018-0882 rev 7 Implicit Immediate Assignment Reject (Rel-10) | Telefon AB LM Ericsson, ST-Ericsson, Vodafone Group Plc, Renesas Mobile Europe Ltd | - |
GP‑111339 | CR 48.008-0343 rev 1 Correction to Local Call Local Switch procedure (Rel-10) | Telefon AB LM Ericsson | - |
GP‑111340 | CR 48.018-0310 rev 1 Incorrect message encoding for Network Sharing (Rel-10) | Vodafone (all 3GPP IM) | - |
GP‑111341 | CR 44.060-1504 rev 1 Support indication of Immediate Packet Assignment in EGPRS Packet Channel Request (Rel-11) | Huawei Technologies Co., Ltd., Qualcomm Incorporated | - |
GP‑111342 | CR 44.018-0907 rev 1 Introduction of Immediate Packet Assignment (Rel-11) | Huawei Technologies Co., Ltd., Qualcomm Incorporated | - |
GP‑111343 | CR 44.060-1485 rev 4 Low Priority NAS Indication for PS Domain (Rel-10) | Telefon AB LM Ericsson, ST-Ericsson, Vodafone Group Plc | - |
GP‑111344 | CR 44.018-0923 Low Priority NAS Indication for PS Domain (Rel-10) | Telefon AB LM Ericsson, ST-Ericsson, Vodafone Group Plc | - |
GP‑111345 | WITHDRAWN | - | WITHDRAWN |
GP‑111346 | DRAFT GERANEMDA TR skeleton v0.0.1 | WI Rapporteur | - |
GP‑111347 | CR 44.018-0914 rev 2 Priority based reselection: clarifications and corrections (Rel-8) | Research in Motion UK Limited | - |
GP‑111348 | CR 48.018-0307 rev 2 Support for detection of unnecessary IRAT HO (Rel-10) | Alcatel-Lucent | - |
GP‑111349 | LS on Introduction of Selective Ciphering of Downlink SACCH (To: CT1) | TSG GERAN | - |
GP‑111350 | Working Assumptions for VAMOS Enhancements | ZTE Corporation | - |
GP‑111351 | CR 51.021-0202 rev 3 Clarification of the notation used for the minimum spacing between carriers (Rel-9) | Alcatel-Lucent | - |
GP‑111352 | CR 51.021-0203 rev 3 Clarification of the notation used for the minimum spacing between carriers (Rel-10) | Alcatel-Lucent | - |
GP‑111353 | CR 51.021-0204 rev 1 Correction of blocking frequency range for multicarrier BTS equipped with multicarrier receiver (Rel-9) | Telefon AB LM Ericsson | - |
GP‑111354 | CR 51.021-0205 rev 1 Correction of blocking frequency range for multicarrier BTS equipped with multicarrier receiver (Rel-10) | Telefon AB LM Ericsson | - |
GP‑111355 | CR 51.021-0206 rev 1 Specification of the applicability of equivalent receiver paths (Rel-9) | Telefon AB LM Ericsson | - |
GP‑111356 | CR 51.021-0207 rev 1 Specification of the applicability of equivalent receiver paths (Rel-10) | Telefon AB LM Ericsson | - |
GP‑111357 | CR 51.021-0215 rev 1 Reduction of testing effort related to blocking receiver performance and AM suppression for multicarrier BTS equipped with multicarrier receiver (Rel-9) | Nokia Siemens Networks | - |
GP‑111358 | CR 51.021-0216 rev 1 Reduction of testing effort related to blocking receiver performance and AM suppression for multicarrier BTS equipped with multicarrier receiver (Rel-10) | Nokia Siemens Networks | - |
GP‑111359 | CR 45.005-0480 rev 1 Clarification of applicability of requirements for spurious response frequencies for multicarrier receiver (Rel-9) | Nokia Siemens Networks | - |
GP‑111360 | CR 45.005-0481 rev 1 Clarification of applicability of requirements for spurious response frequencies for multicarrier receiver (Rel-10) | Nokia Siemens Networks | - |
GP‑111361 | CR 51.021-0217 rev 1 Clarification of applicability of requirements for spurious response frequencies and of the inband blocking requirement for multicarrier receiver (Rel-9) | Nokia Siemens Networks | - |
GP‑111362 | CR 51.021-0218 rev 1 Clarification of applicability of requirements for spurious response frequencies and of the inband blocking requirement for multicarrier receiver (Rel-10) | Nokia Siemens Networks | - |
GP‑111363 | CR 45.008-0548 rev 1 Clarification for RXQUAL requirements for VAMOS mode (Rel-9) | Research in Motion UK Limited, Renesas Mobile Europe Ltd | - |
GP‑111364 | CR 45.008-0549 rev 1 Clarification for RXQUAL requirements for VAMOS mode (Rel-10) | Research in Motion UK Limited, Renesas Mobile Europe Ltd | - |
GP‑111365 | Comments on the Qualcomm and Ericsson reply to support of "Pattern Matching" in GERAN | Polaris Wireless | WITHDRAWN |
GP‑111366 | pCR45.860 Complexity reduction of SBPCE2B (revision of GP-111184) | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑111367 | CR 45.005-0474 rev 1 Introduction of VDTS-4 (Rel-9) | Com-Research GmbH | - |
GP‑111368 | CR 45.005-0475 rev 1 Introduction of VDTS-4 (Rel-10) | Com-Research GmbH | - |
GP‑111369 | Collected performance (revision of GP-111288) | WI Rapporteur | - |
GP‑111370 | Draft LS on new GERAN WI on “Service identification for Radio Resource Dynamic Control (To: SA2, CT4) | TSG GERAN | - |
GP‑111371 | pCR45.860 Reference performance for SBPCE2 (revision of GP-111187) | Telefon AB LM Ericsson | - |
GP‑111372 | CR 45.005-0467 rev 1 EVM for AQPKS for Repeater (Rel-9) | Andrew Wireless Systems GmbH | - |
GP‑111373 | CR 45.005-0468 rev 1 EVM for AQPKS for Repeater (Rel-10) | Andrew Wireless Systems GmbH | - |
GP‑111374 | CR 51.026-0017 rev 1 EVM for AQPKS for Repeater (Rel-9) | Andrew Wireless Systems GmbH | - |
GP‑111375 | CR 51.026-0018 rev 1 EVM for AQPKS for Repeater (Rel-10) | Andrew Wireless Systems GmbH | - |
GP‑111376 | Aligning MCBTS testing according to MSR-NC principles (Revision of GP-111212) | Telefon AB LM Ericsson | - |
GP‑111377 | CR 51.021-0219 Aligning MCBTS testing according to MSR-NC principles (Rel-9) | Telefon AB LM Ericsson | POSTPONED |
GP‑111378 | CR 51.021-0214 rev 1 Aligning MCBTS testing according to MSR-NC principles (Rel-10) | Telefon AB LM Ericsson | POSTPONED |
GP‑111379 | CR 51.021-0209 rev 1 Correction to conducted spurios emissions test case (Rel-10) | Telefon AB LM Ericsson | - |
GP‑111380 | CR 45.005-0471 rev 1 Interferer signal levels for TIGHTER (Rel-10) | Renesas Mobile Europe Ltd, Com-Research GmbH, Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑111381 | pCR45.860 Impacts on Base Station and Mobile Station for SBPCE2 (revision of GP-111182) | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑111382 | pCR45.860 on USF/PAN multiplexing (revision of GP-111186) | Telefon AB LM Ericsson, ST-Ericsson SA | - |
GP‑111383 | CR 45.008-0552 rev 1 Priority-based reselection: corrections and clarifications (Rel-8) | Research in Motion UK Limited | - |
GP‑111384 | CR 45.008-0553 rev 1 Priority-based reselection: corrections and clarifications (Rel-9) | Research in Motion UK Limited | - |
GP‑111385 | CR 45.008-0554 rev 1 Priority-based reselection: corrections and clarifications (Rel-10) | Research in Motion UK Limited | - |
GP‑111386 | CR 45.008-0550 rev 1 Clarification of requirements for reporting handover measurements for CSG cells (Rel-9) | Research in Motion UK Limited | POSTPONED |
GP‑111387 | CR 45.008-0551 rev 1 Clarification of requirements for reporting handover measurements for CSG cells (Rel-10) | Research in Motion UK Limited | POSTPONED |
GP‑111388 | CR 45.008-0555 rev 1 Measurement reporting limits for CSG cells – removal of brackets (Rel-9) | Research in Motion UK Limited | - |
GP‑111389 | CR 45.008-0556 rev 1 Measurement reporting limits for CSG cells – removal of brackets (Rel-10) | Research in Motion UK Limited | - |
GP‑111390 | Reply LS to “LS on CRs for MSR specifications” (To: TSG RAN, TSG RAN WG4) | TSG GERAN WG1 | - |
GP‑111391 | CR 45.008-0545 rev 1 Clarification for measurement control parameter on SACCH (Rel-8) | Huawei Technologies Co., Ltd. | - |
GP‑111392 | CR 45.008-0546 rev 1 Clarification for measurement control parameter on SACCH (Rel-9) | Huawei Technologies Co., Ltd. | - |
GP‑111393 | CR 45.008-0547 rev 1 Clarification for measurement control parameter on SACCH (Rel-10) | Huawei Technologies Co., Ltd. | - |
GP‑111394 | Reply LS to “LS on CRs for MSR-NC work item” (To: TSG RAN, TSG RAN WG4) | TSG GERAN WG1 | - |
GP‑111395 | CR 45.008-0542 rev 1 Correction on CSG membership check in idle mode (Rel-8) | Huawei Technologies Co., Ltd. | - |
GP‑111396 | CR 45.008-0543 rev 1 Correction on CSG membership check in idle mode (Rel-9) | Huawei Technologies Co., Ltd. | - |
GP‑111397 | CR 45.008-0544 rev 1 Correction on CSG membership check in idle mode (Rel-10) | Huawei Technologies Co., Ltd. | - |
GP‑111398 | Alternative Solution for SACCH Ciphering and SMS Text protection | ST-Ericsson SA; Telefon AB LM Ericsson | - |
GP‑111399 | Draft 3GPP TR 45.926 V0.1.0 on Solutions for GSM/EDGE BTS Energy Saving | SI Rapporteur | - |
GP‑111400 | TR 45.860 Signal Precoding Enhancements for EGPRS2 DL v0.7.1 | WI rapporteur | - |
GP‑111401 | CR 51.010-1-4633 rev 1 New test case tc 14.20.1 (Rel-9) | ST-Ericsson SA | - |
GP‑111402 | CR 51.010-1-4634 rev 1 New test case tc 14.20.2 (Rel-9) | ST-Ericsson SA | - |
GP‑111403 | CR 51.010-1-4638 rev 1 Addition of new Test case 14.2.34 Reference sensitivity FACCH/H performance (Rel-9) | Renesas Mobile Europe Ltd | - |
GP‑111404 | CR 51.010-1-4636 rev 1 New test case tc 13.1a (Rel-9) | ST-Ericsson SA | - |
GP‑111405 | CR 51.010-1-4637 rev 1 New test case tc 13.2a (Rel-9) | ST-Ericsson SA | - |
GP‑111406 | CR 51.010-2-0710 rev 1 Addition of new RF VAMOS test cases-14.2.28,14.2.29,14.2.30 and 14.2.31 (Rel-9) | Agilent, Bureau Veritas ADT | - |
GP‑111407 | CR 51.010-2-0711 rev 1 Addition of new VAMOS RF tests (Rel-9) | Rohde & Schwarz | - |
GP‑111408 | CR 51.010-2-0712 rev 1 VAMOS Signalling test cases applicability table (Rel-9) | Rohde & Schwarz | - |
GP‑111409 | CR 51.010-2-0717 rev 1 New tests added for Vamos part 2 (Rel-9) | ST-Ericsson SA | - |
GP‑111410 | CR 51.010-1-4635 rev 1 New test case tc 58d.1.1 (Rel-9) | ST-Ericsson SA | - |
GP‑111411 | New WID: Introduction of ER-GSM band | BMWi, Huawei Technologies (UK), Kapsch CarrierCom France S.A.S, Nokia Siemens Networks, Sagemcom SAS | - |
GP‑111412 | CR 51.010-2-0716 rev 1 Addition of new Test case 14.2.34 (Rel-9) | Renesas Mobile Europe Ltd | - |
GP‑111413 | VAMOS Workplan | Research In Motion UK Ltd | - |
GP‑111414 | GERAN3#51 Chair's report | TSG WG GERAN3 Chair | - |
GP‑111415 | Draft GERAN3#51 meeting report | ETSI MCC | - |
GP‑111416 | CR 51.021-0220 Clarification on VAMOS essential conformance (Rel-9) | Nokia Siemens Networks | - |
GP‑111417 | CR 51.021-0221 Clarification on VAMOS essential conformance (Rel-10) | Nokia Siemens Networks | - |
GP‑111418 | TIGHTER - Open Issues at GERAN#51 | Renesas Mobile Europe Ltd, ST-Ericsson SA, Com-Research GmbH | - |
GP‑111419 | TIGHTER – Working Assumptions | WI rapporteur | - |
GP‑111420 | VAMOS II vs VAMOS I MS Performance | Renesas Mobile Europe Ltd, ST-Ericsson SA, Com-Research GmbH, Marvell Switzerland | - |
GP‑111421 | TIGHTER Sheet and Current Values (revision of GP-111294) | WI rapporteur | - |
GP‑111422 | LS on implications of MSR medium range/local area BS class requirements (To: TSG RAN, TSG RAN WG4) | 3GPP TSG GERAN | - |
GP‑111423 | CR 51.021-0202 rev 4 Clarification of the notation used for the minimum spacing between carriers (Rel-9) | Alcatel-Lucent | - |
GP‑111424 | CR 51.021-0203 rev 4 Clarification of the notation used for the minimum spacing between carriers (Rel-10) | Alcatel-Lucent | - |
GP‑111425 | Reply LS on extreme temperatures requirements for testing of different devices (To: TSG GERAN WG3, Cc: TSG RAN WG4, TSG RAN WG5) | TSG GERAN WG1 | - |
GP‑111426 | Reply LS on introduction of VAMOS into EN 301 502 (To: ETSI TC MSG) | TSG GERAN WG1 | - |
GP‑111427 | Performance Difference between VAMOS I and VAMOS II (update of GP-111127) | Huawei Technologies Co., Ltd., Telecom Italia S.p.A., China Mobile Com. Corporation, Vodafone (all 3GPP IM) | - |
GP‑111428 | CR 45.005-0482 Reference control channel performance for VAMOS-II MS (Rel-9) | Renesas Mobile Europe, Com-Research GmbH | - |
GP‑111429 | CR 45.005-0483 Reference control channel performance for VAMOS-II MS (Rel-10) | Renesas Mobile Europe, Com-Research GmbH | - |
GP‑111430 | CR 45.008-0552 rev 2 Priority-based reselection: corrections and clarifications (Rel-8) | Research in Motion UK Limited | - |
GP‑111431 | CR 44.060-1485 rev 5: Low Priority NAS Indication for PS Domain (Rel-10) | Telefon AB LM Ericsson, ST-Ericsson, Vodafone Group Plc | - |
GP‑111432 | CR 44.018-0882 rev 8: Implicit Immediate Assignment Reject (Rel-10) | Telefon AB LM Ericsson, ST-Ericsson, Vodafone Group Plc, Renesas Mobile Europe Ltd | - |
GP‑111433 | Working Assumptions for VAMOS Enhancements | ZTE Corporation | - |
GP‑111434 | CR 44.018-0914 rev 3 Priority based reselection: clarifications and corrections (Rel-8) | Research in Motion UK Ltd | - |
GP‑111435 | CR 44.018-0915 rev 2 Priority based reselection: clarifications and corrections (Rel-9) | Research in Motion UK Ltd | - |
GP‑111436 | CR 44.018-0916 rev 2 Priority based reselection: clarifications and corrections (Rel-10) | Research in Motion UK Ltd | - |
GP‑111437 | CR 44.060-1513 rev 1 Priority based reselection: clarifications and corrections (Rel-9) | Research in Motion UK Ltd | - |
GP‑111438 | CR 44.060-1514 rev 1 Priority based reselection: clarifications and corrections (Rel-10) | Research in Motion UK Ltd | - |
GP‑111439 | Reply LS on PLMN and CSG whitelist handling in H(e)NB (To: CT1, SA2, RAN2) | G2 | - |
GP‑111440 | Draft LS on the introduction of FULL-MOCN-GERAN (To: TSG SA, TSG SA WG1, TSG SA WG2, TSG CT WG1) | TSG GERAN | - |
GP‑111441 | CR 45.008-0557 Correction on CSG membership check in connected mode (Rel-9) | Huawei Technologies Co., Ltd. | - |
GP‑111442 | CR 45.008-0558 Correction on CSG membership check in connected mode (Rel-10) | Huawei Technologies Co., Ltd. | - |
GP‑111443 | CR 45.005-0484 VAMOS II performance requirements (Rel-9) | Renesas Mobile Europe Ltd, ST-Ericsson SA, Com-Research GmbH, Marvell Switzerland | - |
GP‑111444 | CR 45.005-0485 VAMOS II performance requirements (Rel-10) | Renesas Mobile Europe Ltd, ST-Ericsson SA, Com-Research GmbH, Marvell Switzerland | - |
GP‑111445 | CR 45.005-0478 rev 1 Uplink receiver performance requirements for VAMOS (Rel-9) | Nokia Siemens Networks, Telefon AB LM Ericsson, Huawei Technologies Co., Ltd. | - |
GP‑111446 | CR 45.005-0479 rev 1 Uplink receiver performance requirements for VAMOS (Rel-10) | Nokia Siemens Networks, Telefon AB LM Ericsson, Huawei Technologies Co., Ltd. | - |
GP‑111447 | CR 51.021-0212 rev 1 Uplink receiver performance requirements for VAMOS (Rel-9) | Nokia Siemens Networks, Telefon AB LM Ericsson, Huawei Technologies Co., Ltd. | - |
GP‑111448 | CR 51.021-0213 rev 1 Uplink receiver performance requirements for VAMOS (Rel-10) | Nokia Siemens Networks, Telefon AB LM Ericsson, Huawei Technologies Co., Ltd. | - |
GP‑111449 | CR 45.005-0482 rev 1 Reference control channel performance for VAMOS-II MS (Rel-9) | Renesas Mobile Europe, Com-Research GmbH | - |
GP‑111450 | CR 45.005-0483 rev 1 Reference control channel performance for VAMOS-II MS (Rel-10) | Renesas Mobile Europe, Com-Research GmbH | - |
GP‑111451 | CR 45.008-0545 rev 2 Clarification for measurement control parameter on SACCH (Rel-8) | Huawei Technologies Co., Ltd. | - |
GP‑111452 | CR 45.008-0555 rev 2 Measurement reporting limits for CSG cells – removal of brackets (Rel-9) | Research in Motion UK Limited | - |
GP‑111453 | CR 45.008-0556 rev 2 Measurement reporting limits for CSG cells – removal of brackets (Rel-10) | Research in Motion UK Limited | - |
GP‑111454 | CR 45.008-0542 rev 2 Correction on CSG membership check in idle mode (Rel-8) | Huawei Technologies Co., Ltd. | - |
GP‑111455 | CR 45.008-0543 rev 2 Correction on CSG membership check in idle mode (Rel-9) | Huawei Technologies Co., Ltd. | - |
GP‑111456 | CR 45.008-0544 rev 2 Correction on CSG membership check in idle mode (Rel-10) | Huawei Technologies Co., Ltd. | - |
GP‑111457 | CR 45.005-0486 Reference DTX performance requirements for VAMOS-II MS (Rel-9) | Renesas Mobile Europe | - |
GP‑111458 | CR 45.005-0487Reference DTX performance requirements for VAMOS-II MS (Rel-10) | Renesas Mobile Europe | - |
GP‑111459 | Update of WID: Full Support of Multi-Operator Core Network - GERAN (TD GP-110332) | Alcatel-Lucent | - |
GP‑111460 | CR 51.021-0215 rev 2 Reduction of testing effort related to blocking receiver performance and AM suppression for multicarrier BTS equipped with multicarrier receiver (Rel-9) | Nokia Siemens Networks | - |
GP‑111461 | CR 51.021-0216 rev 2 Reduction of testing effort related to blocking receiver performance and AM suppression for multicarrier BTS equipped with multicarrier receiver (Rel-10) | Nokia Siemens Networks | - |
GP‑111462 | CR 45.005-0481 rev 2 Clarification of applicability of requirements for spurious response frequencies for multicarrier receiver (Rel-10) | Nokia Siemens Networks | - |
GP‑111463 | CR 51.021-0217 rev 2 Clarification of applicability of requirements for spurious response frequencies and of the inband blocking requirement for multicarrier receiver (Rel-9) | Nokia Siemens Networks | - |
GP‑111464 | CR 51.021-0218 rev 2 Clarification of applicability of requirements for spurious response frequencies and of the inband blocking requirement for multicarrier receiver (Rel-10) | Nokia Siemens Networks | - |
GP‑111465 | CR 45.008-0545 rev 3 Clarification for measurement control parameter on SACCH (Rel-8) | Huawei Technologies Co., Ltd. | - |
GP‑111466 | CR 45.008-0546 rev 2 Clarification for measurement control parameter on SACCH (Rel-9) | Huawei Technologies Co., Ltd. | - |
GP‑111467 | CR 45.008-0547 rev 2 Clarification for measurement control parameter on SACCH (Rel-10) | Huawei Technologies Co., Ltd. | - |
GP‑111468 | New WID: Introduction of ER-GSM band | BMWi, Huawei Technologies (UK), Kapsch CarrierCom France S.A.S, Nokia Siemens Networks, Sagemcom SAS | - |
GP‑111469 | Draft LS on ER-GSM (To: TSG RAN WG4, Cc: ETSI TC RT, ETSI TC MSG) | TSG GERAN WG1 | - |
GP‑111470 | CR 45.008-0557 rev 1 Correction on CSG membership check in connected mode (Rel-9) | Huawei Technologies Co., Ltd. | - |
GP‑111471 | CR 45.008-0558 rev 1 Correction on CSG membership check in connected mode (Rel-10) | Huawei Technologies Co., Ltd. | - |
GP‑111472 | TR 45.860 Signal Precoding Enhancements for EGPRS2 DL (Release 11) v1.0.0 | WI rapporteur | - |
GP‑111473 | Draft Outcome of TSG GERAN WG1 meeting # 51, Goteborg, Sweden 30th August to 1st September, 2011 (slides) | Chairman GERAN WG1 | - |
GP‑111474 | Draft Report of TSG GERAN WG1 meeting during TSG GERAN #51, v. 0.0.1 | ETSI MCC | - |
GP‑111475 | 3GPP TSG GERAN Work Plan | Vodafone (all 3GPP IM) | - |
GP‑111476 | VAMOS collected performance v51 | WI rapporteur | - |
GP‑111477 | DRAFT ENHVAMOS TR skeleton v0.1.0 | WI Rapporteur | - |
GP‑111478 | CR 45.008-0552 rev 3 Priority-based reselection: corrections and clarifications (Rel-8) | Research in Motion UK Limited | - |
GP‑111479 | LS on ER-GSM (To: TSG RAN WG4, Cc: ETSI TC RT, ETSI TC MSG) | TSG GERAN WG1 | - |
GP‑111480 | G2 Chairman's overview of the outcome of GERAN WG2 #51 (revised) (slides) | Chairman GERAN WG2 | - |
GP‑111481 | CR 44.018-0915 rev 3 Priority based reselection: clarifications and corrections (Rel-9) | Research in Motion UK Ltd | - |
GP‑111482 | Outcome of G2-51; Chairman's Presentation (slides) | Chairman GERAN WG2 | - |
GP‑111483 | Draft GERAN WG2 #51 Draft Meeting Report | ETSI MCC | - |
GP‑111484 | LS on the introduction of FULL-MOCN-GERAN (To: TSG SA, TSG SA WG1, TSG SA WG2, TSG CT WG1) | TSG GERAN | - |
GP‑111485 | CR 51.021-0215 rev 3 Reduction of testing effort related to blocking receiver performance and AM suppression for multicarrier BTS equipped with multicarrier receiver (Rel-9) | Nokia Siemens Networks | - |
GP‑111486 | CR 51.021-0216 rev 3 Reduction of testing effort related to blocking receiver performance and AM suppression for multicarrier BTS equipped with multicarrier receiver (Rel-10) | Nokia Siemens Networks | - |
GP‑111487 | CR 51.021-0217 rev 3 Clarification of applicability of requirements for spurious response frequencies and of the inband blocking requirement for multicarrier receiver (Rel-9) | Nokia Siemens Networks | - |
GP‑111488 | CR 51.021-0218 rev 3 Clarification of applicability of requirements for spurious response frequencies and of the inband blocking requirement for multicarrier receiver (Rel-10) | Nokia Siemens Networks | - |
GP‑111489 | New WID: Work Item on Service identification for Radio Resource Dynamic Control in GERAN (SIRRDC) (revision of GP-111291) | China Mobile Communications Corporation, HUAWEI Technologies. Co., Ltd., Vodafone Group Plc, Telefon AB LM Ericsson, Nokia Siemens Networks, ZTE Corporation, Alcatel-Lucent, LG Electronics Inc. | - |
GP‑111490 | Draft LS on Service Identification for RRC Improvements in GERAN (To: SA2, CT4, Cc: SA, SA1, CT, RAN) | TSG GERAN | - |
GP‑111491 | LS on Service Identification for RRC Improvements in GERAN (To: SA2, CT4, Cc: SA, SA1, CT, RAN) | TSG GERAN | - |
GP‑111492 | CR 44.060-1512 rev 1 Priority based reselection: clarifications and corrections (Rel-8) | Research in Motion UK Limited | - |
GP‑111493 | CR 44.060-1513 rev 1 Priority based reselection: clarifications and corrections (Rel-9) | Research in Motion UK Limited | - |
GP‑111494 | CR 44.060-1514 rev 1 Priority based reselection: clarifications and corrections (Rel-10) | Research in Motion UK Limited | - |
page generated from database: 2024-03-25 09:25:51