3GPP TDocs (written contributions) at meeting
Meeting: GP-14 - 2003-04-07 to 2003-04-11, Munich
meeting id: GP-14 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
GP‑030455 | - | - | - |
GP‑030456 | - | - | - |
GP‑030457 | - | - | - |
GP‑030458 | - | - | - |
GP‑030459 | LS on Reporting Radio Resource Usage Information for MBMS from UTRAN/GERAN to Core Network and/or to OAM | TitleLS on Reporting Radio Re Usage Information for MBMS from UTRAN/GERAN to Core Network and/or to OAM | - |
GP‑030460 | LS on R99 GPRS Conformance testing within PTCRB. | PTCRB | - |
GP‑030461 | LS on updated WID for emergency call enhancements for IP & PS based calls | CN1 | - |
GP‑030462 | LS on GSM phase 2 network errors | CN1 | - |
GP‑030463 | Liaison statement on error handling in Pre-R99 networks | TSG CN | - |
GP‑030464 | LS on GERAN Iu mode impact to UTRAN | TSG RAN WG2 | - |
GP‑030465 | Reply to SA2 LS on Usage of UMTS Bearer Service attribute Maximum SDU size | RAN WG2 | - |
GP‑030466 | LS on Generic UMTS QoS model | SA2 | - |
GP‑030467 | LS on Rel 99 and later Emergency calls in case on UE attached to data only network | SA2 | - |
GP‑030468 | Liaison on DRX parameter | SA2 | - |
GP‑030469 | Reply to Liaison Statement on MBMS Requirements | SA2 | - |
GP‑030470 | Liaison Statement on Minimum UE Capability Required for Supporting MBMS | SA2 | - |
GP‑030471 | Liaison Statement on Functionality for Reporting Radio Resource Usage Information for MBMS from UTRAN/GERAN to Core Network and/or to OAM | TitleLiaison Statement on Functionality for Reporting Radio Re Usage Information for MBMS from UTRAN/GERAN to Core Network and/or to OAM | - |
GP‑030472 | Liaison Statement on Core Network Provision of separate flows for P2P and P2M radio Transmission | SA2 | - |
GP‑030473 | Reply LS on updated WID for emergency call enhancements for IP & PS based calls | SA WG2 | - |
GP‑030474 | LS on early UE handling | - | - |
GP‑030475 | Reply to LS on | TSG SA WG2 | - |
GP‑030476 | Reply LS on “LS on additional parameters in MAP for LCS with GERAN Access” | SA2 | - |
GP‑030477 | Reply LS on security issues regarding Uplink TDOA location method | SA3 | - |
GP‑030478 | LS on double ciphering for MBMS multicast data. | SA3 | - |
GP‑030479 | LS on Design Aspects for Speech recognition framework for automated voice services (SES) | TSG SA WG4 | - |
GP‑030480 | LS on Radio Access Bearer for PS conversational testing | SA 4 | - |
GP‑030481 | Liaison statement on error handling in Pre-R99 networks | TSG CN | - |
GP‑030482 | LS : RE: SIM Application Toolkit Test Specification | TSG-T-WG3 | - |
GP‑030483 | Liaison to 3GPP from AT-F - Proposal for Interconnection between a FSMSC and SMSCs/FSMSCs in other networks | AT-F | - |
GP‑030484 | Corrections of the Peak Throughput Class and Maximum bit rate values for clause 50.5 – Test PDP Context. | Nokia | - |
GP‑030485 | Undo of the approved GERAN#12 changes for clause 51.2.5.1 - Packet access rejection / wait indication. | Nokia | - |
GP‑030486 | Correction of Expected Sequence and Specific Message Content for clause 52.4.1.2 - Network Control measurement reporting / Idle mode / New cell reselection | Nokia | - |
GP‑030487 | Deletion of clause 52.4.2.1.5 - Cell change order procedure / Uplink transfer / Failure cases / REJECT from the new cell and T3176 expiry | Nokia | - |
GP‑030489 | Preventing of T3182 expiry in clause 53.1.1.9 - Acknowledged Mode/ Uplink TBF/ Pre-emptive Transmission Bit Set to '1' | Nokia | - |
GP‑030490 | Addition of Macro for downlink TBF establishment using ACCESS TYPE = "signalling" for section 53.2.2. | Nokia & Setcom | - |
GP‑030491 | Corrections on PACKET UPLINK ACK/NACK transmission timing and removal of T3198 in clause 53.1.1.x - Acknowledged Mode/ Uplink TBF | Nokia | - |
GP‑030492 | Corrections of the Peak Throughput Class and Maximum bit rate values for clause 40.5 – Test PDP Context. | Nokia | - |
GP‑030493 | Correct of NC_REPORTING_PERIOD_I value in step 2 of clause 41.2.7.2 - Single block packet downlink assignment / MS returns to packet idle mode. | Nokia | - |
GP‑030494 | Correction of Expected Sequence and Specific Message Content for clause 42.4.1.2 - Network Control measurement reporting / Idle mode / New cell reselection. | Nokia | - |
GP‑030495 | Deletion of clause 42.4.2.1.5 - Cell change order procedure / Uplink transfer / Failure cases / REJECT from the new cell and T3176 expiry | Nokia | - |
GP‑030497 | Correction of step 5 of Expected Sequence for clause 44.2.3.1.7 - Routing area updating / abnormal cases / change of cell during routing area updating procedure. | Nokia | - |
GP‑030498 | R99 compliance update of clause 44.2.3.2.5 Test Procedure 2 - Combined routing area updating / rejected / roaming not allowed in this location area. | Nokia | - |
GP‑030499 | Clarification to speech codec definitions | Nokia | - |
GP‑030500 | Correction of Applicability column for clause 14.2.4. | Nokia | - |
GP‑030501 | Correction of Test Procedure and Expected Sequence for clause 52.1.2.1.10.2 - Packet Uplink Assignment / Abnormal cases / Expiry of timer T3164. | Nokia | - |
GP‑030502 | Correction of Test Procedure and Expected Sequence for clause 42.1.2.1.10.2 - Packet Uplink Assignment / Abnormal cases / Expiry of timer T3164. | Nokia | - |
GP‑030503 | - | - | - |
GP‑030504 | - | - | - |
GP‑030505 | MBMS GERAN Requirements | Vodafone | - |
GP‑030506 | MBMS Resource Management | TitleMBMS Re Management | - |
GP‑030507 | MBMS Mobility | Vodafone | - |
GP‑030508 | Mapping of the PDTCH/D on PCCCH in case EGPRS | Siemens AG | - |
GP‑030509 | Mapping of the PDTCH/D on PCCCH in case EGPRS | Siemens AG | - |
GP‑030510 | Mapping of the PDTCH/D on PCCCH in case EGPRS | Siemens AG | - |
GP‑030511 | Mapping of the PDTCH/D on PCCCH in case EGPRS | Siemens AG | - |
GP‑030512 | Indication of the MS support of "Modulation based multislot class" | Siemens AG | - |
GP‑030513 | Indication of the MS support of "Modulation based multislot class" | Siemens AG | - |
GP‑030514 | Indication of the MS support of "Modulation based multislot class" | Siemens AG | - |
GP‑030515 | Indication of the MS support of "Modulation based multislot class" | Siemens AG | - |
GP‑030516 | [DRAFT] LS on < Indication of the MS support of "Modulation based multislot class"> | TSG GERAN WG2 | - |
GP‑030517 | Mapping of PFCs onto LLC SAPIs | Siemens AG | - |
GP‑030518 | Clarification of <3G Measurement parameters> usage | Melco Mobile Communication Europe | - |
GP‑030519 | Clarification of | Melco Mobile Communication Europe | - |
GP‑030520 | Clarification on the usage of Qsearch_P when broadcast on the BCCH | Melco Mobile Communication Europe | - |
GP‑030521 | 42.3.1.2.3Dynamic Allocation / Uplink Transfer / Abnormal / with cell reselection in unacknowledged mode | Melco Mobile Communication Europe | - |
GP‑030522 | TC 42.2.2.8.1 Fixed Allocation / Uplink Transfer / MS requests new resources/ Failure/Packet Access Reject | - | - |
GP‑030523 | 42.2.2.8.2 Fixed Allocation / Uplink Transfer / MS requests new resources/ Failure/Packet Access Reject with WAIT_INDICATION during allocation in progress | - | - |
GP‑030524 | 52.3.1.2.3Dynamic Allocation / Uplink Transfer / Abnormal / with cell reselection in unacknowledged mode | Melco Mobile Communication Europe | - |
GP‑030525 | Removal of close-ended TBFs | Melco Mobile Communication Europe | - |
GP‑030526 | - | - | - |
GP‑030527 | 44.2.5.2.3 – Correction of P-TMSI | Anite Telecoms | - |
GP‑030528 | 51.3.1.3 - Step 13 is incorrect if optional step A12 is executed | Anite Telecoms | - |
GP‑030529 | 42.3.1.1.4 – Allow one Uplink Data Block coded with CS-1 after step 37 | Anite Telecoms | - |
GP‑030530 | 52.3.1.1.4 – Allow one Uplink Data Block coded with MCS 1 after step 37 | Anite Telecoms | - |
GP‑030531 | 20.14 - Implementation of new Test Case | Anite Telecoms | - |
GP‑030532 | 20.6 – Bring 51.010-3 into alignment with 51.010-1 | Anite Telecoms | - |
GP‑030533 | 34.3 - Update Number change in Cell Broadcasting message | Anite Telecoms | - |
GP‑030534 | Change to CCCAP Information Element | Anite Telecoms | - |
GP‑030535 | 40.2.1.1.1 – Missing BandIndicator in SI1 default | Anite Telecoms | - |
GP‑030536 | 53.1.2.7 – Correct handling of ES/Pfield, remove unnecessary constraint | Anite Telecoms | - |
GP‑030537 | 53.2.2.2 - Correction of cause in step 2 of the macro | Anite Telecoms | - |
GP‑030538 | 44.2.1.1.10 - Corrections to step numbering in Expected Sequence | Anite Telecoms | - |
GP‑030539 | 42.3.1.1.9 Correction of Cell Allocation in the first set of Packet System Information Type 2 message | Anite Telecoms | - |
GP‑030540 | 40.2.4.14.2, 40.2.4.14.3 – Illegal values of Gamma in default messages | Anite Telecoms | - |
GP‑030541 | 50.2.4.3 – Illegal values of gamma in default messages. | Anite Telecoms | - |
GP‑030542 | Correction to test PDP context number in initial condition and check in step 7 of expected sequence to 42.3.3.1.2 | Sasken | - |
GP‑030543 | Addition of steps to Expected Sequence of 42.3.3.2.2 to meet the conformance requirements. | Sasken | - |
GP‑030544 | 51.2.3.2 Two message assignment / Failure case | Sasken | - |
GP‑030545 | 51.2.5.2 Packet access rejection/assignment before T3142 expires. | Sasken | - |
GP‑030546 | Test case 52.1.2.1.3.1 to be done in transfer mode. | Sasken | - |
GP‑030547 | Correction to Expected Sequence of 52.1.2.1.9.5 | Sasken | - |
GP‑030548 | Correction to Expected Sequence of test case 52.3.1.1.6 | Sasken | - |
GP‑030549 | Correction to test PDP context number in initial condition and check in expected sequence to 52.3.3.1.2 | Sasken | - |
GP‑030550 | Correction to Expected Sequence of test case 52.3.3.2.2 | Sasken | - |
GP‑030551 | Correction to Expected Sequence of test case 52.3.3.3 | Sasken | - |
GP‑030552 | Correction to Expected Sequence of test case 53.1.1.3 | Sasken | - |
GP‑030553 | Link Quality Measurement Mode being removed from Immediate Assignment message, uplink construction. | Sasken | - |
GP‑030554 | 42.1.2.1.10.2Packet Uplink Assignment / Abnormal cases / Expiry of timer T3164 | Siemens | - |
GP‑030555 | 42.1.2.1.9.2.1Packet Uplink Assignment / Two phase access / Contention resolution / Expiry of timer T3168 | Siemens | - |
GP‑030556 | 52.1.2.1.10.2Packet Uplink Assignment / Abnormal cases / Expiry of timer T3164 | Siemens | - |
GP‑030557 | 52.1.2.1.9.2.1Packet Uplink Assignment / Two phase access / Contention resolution / Expiry of timer T3168 | Siemens | - |
GP‑030558 | 53.1.1.12Acknowledged Mode/ Uplink TBF/ Retransmission/ Split RLC Data Block | Siemens | - |
GP‑030559 | 45.5.1 Change in Step 24: LLC SAPI value must be a reserved value | Siemens AG | - |
GP‑030560 | Numbering mistake in 46.1.2.3.1 Collision of SABM | Siemens AG | - |
GP‑030561 | User Counting in MBMS | QUALCOMM Europe | - |
GP‑030562 | Correction in EOTD Test Case 70.6.2 | Racal Instruments Ltd | - |
GP‑030563 | Correction in EOTD Test Case 70.6.3 | Racal Instruments Ltd | - |
GP‑030564 | Correction in EOTD Test Case 70.6.4 | Racal Instruments Ltd | - |
GP‑030565 | Correction in EOTD Test Case 70.6.5 | Racal Instruments Ltd | - |
GP‑030566 | Correction in EOTD Test Case 70.3.4.1 | Racal Instruments Ltd | - |
GP‑030567 | Uplink TDOA location determination for GSM/GPRS | Cingular Wireless, AWS, SBC Technology Res, Motorola, TruePosition | - |
GP‑030568 | Uplink TDOA location determination for GSM/GPRS, CS domain | Cingular Wireless, AWS, SBC Technology Res, Motorola, TruePosition | - |
GP‑030569 | Uplink TDOA location determination for GSM/GPRS, PS domain | Cingular Wireless, AWS, SBC Technology Res, Motorola, TruePosition | - |
GP‑030570 | Inclusion of U-TDOA location method | Cingular, AT&T Wireless, Grayson, TruePosition | - |
GP‑030571 | Proposed modification of SMLC-BSS signalling for U-TDOA | Cingular, AT&T Wireless, Grayson, TruePosition | - |
GP‑030572 | Signal Quality Tests for AMR | Cingular Wireless | - |
GP‑030573 | CR 51.010-1 Update of testcases of section 52.1 to handle Mobiles using EPCR for signalling procedure | Setcom | - |
GP‑030574 | CR 51.010-1 Testcase 45.2.1.1 Attach initiated by context activation/QoS Offered by Network is the QoS Requested | setcom | - |
GP‑030575 | CR 51.010-1 New testcase added: 45.2.1.3 QoS parameter out of range | setcom | - |
GP‑030576 | CR 51.010-1 New testcase added: 45.2.4.3 Network initiated PDP context activation request for an already activated PDP context (on the MS side) | Setcom | - |
GP‑030577 | CR 51.010-1 New testcase added: 45.4.4 PDP context deactivation initiated by the network / Tear down indicator. | setcom | - |
GP‑030578 | CR 51.010-1 New section added: 45.2.5 Secondary PDP context activation procedures | Setcom | - |
GP‑030579 | CR 51.010-1 New section added: 45.3.2 MS initiated PDP context modification | setcom | - |
GP‑030580 | CR 51.010-1 New section added: 34.4.1 Short message service point to point over GPRS. | setcom | - |
GP‑030581 | 46.1.1. Default Conditions | Siemens | - |
GP‑030582 | Sec: 42.4 - Addition of allocation of resource to send Packet Cell Change Failure | - | - |
GP‑030583 | Sec: 52.4 - Addition of allocation of resource to send Packet Cell Change Failure | - | - |
GP‑030584 | Sec: 42.4.2.3.3 – Correction of requirement check | Setcom | - |
GP‑030585 | Sec 51.2.3.8 - Correction to number of Packet Access initiation attempts | Setcom | - |
GP‑030586 | Sec 51.3.1.1 - Introduction of Wait before sending Packet Uplink Ack/Nack | Setcom | - |
GP‑030587 | Sec 51.3.1.2 - Correction to multislot classes checked. | Setcom | - |
GP‑030588 | Sec 51.x and 52.x - Addition of check for EGPRS Packet Channel Request with Access Type 'Signalling' | Setcom & Nokia | - |
GP‑030589 | Sec 52.4.4.2 - Attach procedure need to be completed before sending Packet Measurement order. | Setcom | - |
GP‑030590 | Sec 53.1.1.2 – Correction to BSN check in Step A12 | Setcom | - |
GP‑030591 | Sec 53.1.1.3 - Modification to the usage of Packet Timeslot Reconfigure and window size | Setcom | - |
GP‑030592 | Sec 53.1.1.4 – Correction to verification of BSN sequence in Step 7 | Setcom | - |
GP‑030593 | Sec 53.1.2.12 – Correction to repetitio sequence in Step 4. | Setcom | - |
GP‑030594 | Correction to CV calculation | Setcom | - |
GP‑030595 | Sec 52.8.1.x – Addition of new testcases | Setcom | - |
GP‑030596 | Sec 52.1.2.1.8.x – Addition of new testcases | Setcom | - |
GP‑030597 | Sec 42.1.2.1.8.x – Addition of new testcases | Setcom | - |
GP‑030598 | Sec 51.2.5 – Addition of new testcases to cover Immediate Assignment Reject scenarios. | Setcom | - |
GP‑030599 | New Testcase 53.1.1.24 - Acknowledged Mode/ Uplink TBF/ Interpretation of PBSN | Setcom | - |
GP‑030601 | CR 51.010-1 Section 42.1.2.1.5 Incorrect step reference in step 10 | Rohde & Schwarz | - |
GP‑030602 | CR 51.010-1 Section 42.1.2.1.8.2.2 Inconsistency in expected sequence for two phase access | Rohde & Schwarz | - |
GP‑030603 | CR 51.010-1 Section 42.1.2.2.6 Incorrect initial conditions and PICS reference | Rohde & Schwarz | - |
GP‑030604 | CR 51.010-1 Section 42.3.1.1.6 Uplink TFI missing in specific message contents | Rohde & Schwarz | - |
GP‑030605 | CR 51.010-1 Section 52.1.2.1.5 Incorrect step reference in step 10 | Rohde & Schwarz | - |
GP‑030606 | 51.010-1 Section 52.3.1.1.6 Uplink TFI missing in specific message contents | Rohde & Schwarz | - |
GP‑030607 | CR 51.010-1 Section 53.1.1.13 T3198 replaced by BS_CV_MAX block periods | Rohde & Schwarz | - |
GP‑030608 | CR 51.010-1 Section 53.1.1.17 Consideration of MS reaction time | Rohde & Schwarz | - |
GP‑030609 | CR 51.010-1 Section 53.1.1.18 Consideration of MS reaction time | Rohde & Schwarz | - |
GP‑030610 | - | Siemens | - |
GP‑030611 | - | Siemens | - |
GP‑030612 | - | Siemens | - |
GP‑030613 | MS reporting of radio-access capability in Iu mode | AT&T Wireless Services | - |
GP‑030614 | MS reporting of radio-access capability in Iu mode | AT&T Wireless Services | - |
GP‑030615 | Multi-block allocation for two-phase access | AT&T Wireless Services | - |
GP‑030616 | Correction to DTM Conformance Test in sub-clause 41.3.4.3 | Vodafone Group | - |
GP‑030617 | Correction to DTM Conformance Test in sub-clause 22.11 | Vodafone Group | - |
GP‑030618 | Correction to DTM Conformance Test in sub-clause 44.2.8.2 | Vodafone Group | - |
GP‑030619 | Correction to DTM Conformance Test in sub-clause 47.3.2.2 | Vodafone Group | - |
GP‑030620 | Addition of some DTM test cases to the applicability table. | Vodafone Group | - |
GP‑030621 | CR 051.010 Addition of new testcases section 52.9 | Setcom | - |
GP‑030622 | CR 051.010 testcase 52.1.2.2.5.1 Packet Downlink Assignment / Abnormal cases / incorrect PDCH assignment | Setcom | - |
GP‑030623 | CR 051.010 testcase 42.1.2.2.5.1 Packet Downlink Assignment / Abnormal cases / Incorrect PDCH assignment | Setcom | - |
GP‑030624 | Packet DBPSCH Assignment received before T3170 expires | AT&T Wireless Services | - |
GP‑030625 | Correction of inconsistencies with Cell Bar Qualify 3 parameter | Nokia | - |
GP‑030626 | Correction of inconsistencies with Cell Bar Qualify 3 parameter | Nokia | - |
GP‑030627 | Wrong implementation CR 44.160 042r1 (GP-030308) | Nokia | - |
GP‑030628 | Wrong implementation of CRs to 44.118vs 5.3.0 | Nokia | - |
GP‑030629 | EGPRS Supplementary/Polling (ES/P) Field usage in RLC unacknowledged mode | Alcatel | - |
GP‑030630 | Alignmen on procedures between UTRAN and GERAN Iu mode | Nokia | - |
GP‑030631 | Alignment of Inter-RAT cell reselection and handover procedures between GERAN Iu mode and UTRAN | Nokia | - |
GP‑030632 | Conflicting implementations of CRs 253r1 (GP-022761) and 200r2 (GP-022663) | Nokia | - |
GP‑030633 | Conflicting implementations of CRs 253r1 (GP-022761) and 200r2 (GP-022663) | Nokia | - |
GP‑030634 | Correction to wrong references to PACKET DL ACK/NACK message instead of EGPRS PACKET DL ACK/NACK message | Nokia | - |
GP‑030635 | Clarification / correction of the usage of PACKET PSI / SI STATUS message | Ericsson | - |
GP‑030636 | Correction to wrong references to PACKET DL ACK/NACK message instead of EGPRS PACKET DL ACK/NACK message | Nokia | - |
GP‑030637 | Correction to wrong references to PACKET DL ACK/NACK message instead of EGPRS PACKET DL ACK/NACK message | Nokia | - |
GP‑030638 | Correction of Expected Sequence for clause 52.4.1.3 - Network Control measurement reporting / Downlink transfer / Normal case | Nokia | - |
GP‑030639 | Deletion of test cases 42.4.2.1.5 and 52.4.2.1.5 from Table B.1. | Nokia | - |
GP‑030640 | - | MCC | - |
GP‑030641 | the of TR 21.905 is corrected; | 3GPP TS 44.018 “Radio Re Control protocol”. | - |
GP‑030642 | - | - | - |
GP‑030643 | - | - | - |
GP‑030644 | - | - | - |
GP‑030645 | - | - | - |
GP‑030646 | - | - | - |
GP‑030647 | - | - | - |
GP‑030648 | - | - | - |
GP‑030649 | - | - | - |
GP‑030650 | Corrections and Clarifications on the Usage of Parameters for Measurements and Reporting | Siemens | - |
GP‑030651 | Corrections and Clarifications on the Usage of Parameters for Measurements and Reporting | Siemens | - |
GP‑030652 | Corrections and Clarifications on the Usage of Parameters for Measurements and Reporting | Siemens | - |
GP‑030653 | Corrections and Clarifications on the Usage of Parameters for Measurements and Reporting | Siemens | - |
GP‑030654 | - | - | - |
GP‑030655 | The removal of restriction for indication of either 1800 or 1900 MHz is not stated in the . GERAN 2 found that this is not an essential correction justifying a R99 change. | 5.3.6.3Definition of Radio Re Management Functionality5 | - |
GP‑030656 | Proposed modification of SMLC-BSS signalling for U-TDOA | Cingular, AT&T Wireless, Grayson, TruePosition | - |
GP‑030657 | Modification of applicability table in 51.010-2 due to introduction of new test cases in 51.010-1 | Setcom | - |
GP‑030658 | 26.7.4.5.4.4 Location updating/periodic search of the PLMN in foreign country, when a MS is receiving HPLMN /MS is in automatic mode. | Motorola | - |
GP‑030659 | 26.7.4.5.4.8 “Location updating/periodic search of the HPLMN, when a MS is receiving foreign country’s VPLMN/MS is in automatic mode”. | Motorola | - |
GP‑030660 | GPRS Enhanced Measurement Report (EMR) Test Cases | Motorola | - |
GP‑030661 | - | - | - |
GP‑030662 | - | - | - |
GP‑030663 | Correction to configuration options for network entities supporting Gb/IP | Siemens | - |
GP‑030664 | Correction to configuration options for network entities supporting Gb/IP | Siemens | - |
GP‑030665 | - | - | - |
GP‑030666 | - | - | - |
GP‑030667 | - | - | - |
GP‑030668 | - | - | - |
GP‑030669 | - | - | - |
GP‑030670 | - | - | - |
GP‑030671 | Introduction of the Preservation Feature in GERAN | Siemens | - |
GP‑030672 | - | - | - |
GP‑030673 | - | - | - |
GP‑030674 | Further LLC SAPIs for data transfer | Siemens | - |
GP‑030675 | PFC Release procedure | Siemens AG | - |
GP‑030676 | System Statistics and Interferer Scenarios for SAIC | Motorola | - |
GP‑030677 | CR 51.010-1 Section 51.1.1.2 Check for completeness of ATTACH REQUEST not possible. | Rohde & Schwarz | - |
GP‑030678 | CR 51.010-1 Section 51.1.1.3 BS_PCC_CHANS is not included in PSI1 | Rohde & Schwarz | - |
GP‑030679 | CR 51.010-1 Section 51.1.3 Check in step 5 incorrect for k=2 | Rohde & Schwarz | - |
GP‑030680 | CR 51.010-1 Section 41.1.3 Check in step 5 incorrect for k=2 | Rohde & Schwarz | - |
GP‑030681 | CR 51.010-1 Section 51.1.4.1 Correction of macro parameters (was fixed allocation) | Rohde & Schwarz | - |
GP‑030682 | CR 51.010-1 Section 51.1.5.1.2 Incorrect channel assignment, step reference corrected. | Rohde & Schwarz | - |
GP‑030683 | CR 51.010-1 Section 41.1.5.1.2 Step reference corrected | Rohde & Schwarz | - |
GP‑030684 | CR 51.010-1 Section 51.1.6 Incorrect WAIT_INDICATION in test procedure | Rohde & Schwarz | - |
GP‑030685 | CR 51.010-1 Section 51.2.1.1 Priority level 4 missing in test parameters | Rohde & Schwarz | - |
GP‑030686 | CR 51.010-1 Section 53.1.1.2 Incorrect BSN in optional step A12 | Rohde & Schwarz | - |
GP‑030687 | Channel Configurations using Extended Dynamic Allocation | tion about the needed uplink res, the MAC mode is changed to ‘extended dynamic allocation’. | - |
GP‑030688 | Shift between dynamic and extended dynamic allocation | Ericsson | - |
GP‑030689 | Shift between dynamic and extended dynamic allocation | Ericsson | - |
GP‑030690 | Shift between dynamic and extended dynamic allocation | Ericsson | - |
GP‑030691 | Shift between dynamic and extended dynamic allocation | Ericsson | - |
GP‑030692 | Missing SI15 option in PACKET SI STATUS message | - | - |
GP‑030693 | Missing SI15 option in PACKET SI STATUS message | Ericsson | - |
GP‑030694 | Missing SI15 option in PACKET SI STATUS message | Ericsson | - |
GP‑030695 | Missing SI15 option in PACKET SI STATUS message | Ericsson | - |
GP‑030696 | Missing SI15 option in PACKET SI STATUS message | Ericsson | - |
GP‑030697 | Missing SI15 option in PACKET SI STATUS message | Ericsson | - |
GP‑030698 | Missing SI15 option in PACKET SI STATUS message | Ericsson | - |
GP‑030699 | Enhancement of network controlled cell reselection procedure | Ericsson | - |
GP‑030700 | - | Rapporteur | - |
GP‑030701 | - | - | - |
GP‑030702 | New TC: Network Assisted Cell Change / Expiry of T3206 | Ericsson | - |
GP‑030703 | New TC: Network Assisted Cell Change / No Packet Neighbouring Cell Data and Packet Cell Change Continue | Ericsson | - |
GP‑030704 | New TC: Network Assisted Cell Change / Packet Neighbour Cell Data and Packet Cell Change Continue | Ericsson | - |
GP‑030705 | New TC: Network Assisted Cell Change / Packet Neighbour Cell Data and Packet Cell Change Order | Ericsson | - |
GP‑030706 | New TC: Network Assisted Cell Change / Expiry of T3208 and T3210 | Ericsson | - |
GP‑030707 | New TC: Network Assisted Cell Change / Entering packet idle mode | Ericsson | - |
GP‑030708 | New TC: Network Assisted Cell Change / CCN not supported towards target cell | Ericsson | - |
GP‑030709 | Addition of test cases for Network Assisted Cell Change | Ericsson | - |
GP‑030710 | Addition of PICS/PIXIT statement to clause 46.1.2.7.6 and 46.1.2.6.2 | Ericsson | - |
GP‑030711 | Correction to TC 43.1.1.5 | Ericsson | - |
GP‑030712 | - | - | - |
GP‑030713 | Editorial Corrections to AMR-NB Tests | Cingular Wireless | - |
GP‑030714 | Updates to assign GPRS or EGPRS TBF depending upon the use of CHANNEL REQUEST or EGPRS PACKET CHANNEL REQUEST in clauses 51.2.2.1 | SASKEN | - |
GP‑030715 | Additional Macros to Sec 50 | SASKEN | - |
GP‑030716 | Clarification of BEP_PERIOD | Siemens AG | - |
GP‑030717 | Inclusion of the channel quality report in dependency of the ES/P field | Siemens AG | - |
GP‑030720 | Correction of static AMR sensitivity requirements for TCH/AHS | Ericsson | - |
GP‑030721 | - | - | - |
GP‑030722 | - | - | - |
GP‑030723 | - | - | - |
GP‑030724 | Correction to definition of T3168 in chapter 13 | Siemens | - |
GP‑030725 | Correction to definition of T3168 in chapter 13 | Siemens | - |
GP‑030726 | [ | 6.1Re management procedures8 | - |
GP‑030727 | - | - | - |
GP‑030728 | - | - | - |
GP‑030729 | - | - | - |
GP‑030730 | Paging for MBMS (“In-band” notification) | Siemens | - |
GP‑030731 | - | - | - |
GP‑030732 | - | - | - |
GP‑030733 | - | - | - |
GP‑030734 | Nomination of Niels Peter Skov Andersen as candidate for TSG GERAN Chairman and TSG GERAN WG1 elections | - | - |
GP‑030735 | DL TBF assignment fallback | Nokia | - |
GP‑030736 | - | - | - |
GP‑030737 | - | - | - |
GP‑030738 | - | - | - |
GP‑030739 | - | Siemens | - |
GP‑030740 | - | - | - |
GP‑030741 | Inclusion of the UE power class (FDD and TDD) in MS RAC | Siemens AG | - |
GP‑030742 | Inclusion of the UE power class (FDD and TDD) in MS RAC | Siemens AG | - |
GP‑030743 | Inclusion of the UE power class (FDD and TDD) in MS RAC | Siemens AG | - |
GP‑030745 | - | - | - |
GP‑030746 | 3GPP TS 11.10-4 v8.2.0: Discussion on the global specification layout and the need to add Macros | Gemplus / ORGA Test Systems | - |
GP‑030747 | Use of unbiased variance in the computation of CV_BEP (R99) | Nortel Networks, Alcatel | - |
GP‑030748 | Use of unbiased variance in the computation of CV_BEP (Rel-4) | Nortel Networks, Alcatel | - |
GP‑030749 | Use of unbiased variance in the computation of CV_BEP (Rel-5) | Nortel Networks, Alcatel | - |
GP‑030750 | Use of unbiased variance in the computation of CV_BEP (Rel-6) | Nortel Networks, Alcatel | - |
GP‑030751 | Clarification on continuous TA procedure | Siemens AG | - |
GP‑030752 | Clarification on continuous TA procedure | Siemens AG | - |
GP‑030753 | Clarification on continuous TA procedure | Siemens AG | - |
GP‑030754 | Clarification on continuous TA procedure | Siemens AG | - |
GP‑030755 | - | Nokia | - |
GP‑030756 | Padding for MCS-8 Retransmissions | Nokia | - |
GP‑030757 | Padding for MCS-8 Retransmissions | Nokia | - |
GP‑030758 | Padding for MCS-8 Retransmissions | Nokia | - |
GP‑030759 | - | Nokia | - |
GP‑030760 | - | Nokia | - |
GP‑030761 | Corrections to RRC connection management procedures | Nokia | - |
GP‑030762 | Corrections to RRC Connection Mobility procedures | Nokia | - |
GP‑030763 | Corrections to Transmission of MS capability information procedures | Nokia | - |
GP‑030764 | Corrections to Radio Bearer Control procedures | Nokia | - |
GP‑030765 | Corrections to signalling connection release indication procedures | Nokia | - |
GP‑030766 | Ciphering mode indication in handover command when handover from GERAN Iu occurs | Nokia | - |
GP‑030767 | Ciphering mode indication in handover command when handover from GERAN Iu occurs | Nokia | - |
GP‑030769 | CR 51.010-1 Section 51.2.x Corrections of PDP context specification in initial conditions | Rohde & Schwarz | - |
GP‑030770 | CR 51.010-1 Section 51.2.2.2 Incorrect reference in section Justification | Rohde & Schwarz | - |
GP‑030771 | CR 51.010-1 Section 51.2.2.3 Items from GPRS mirror CRs missing | Rohde & Schwarz | - |
GP‑030772 | CR 51.010-1 Section 51.2.2.5 Incorrect channel request type referenced | Rohde & Schwarz | - |
GP‑030773 | CR 51.010-1 Section 51.2.3.3 Incorrect description in Test procedure | Rohde & Schwarz | - |
GP‑030774 | CR 51.010-1 Section 14.* Correction in limit checking sections for AMR tests (statistical testing part). | Rohde & Schwarz | - |
GP‑030775 | CR 51.010-1 Section 14.1.6 Accidentially removed from 51.010-1 V5.1.0 | Rohde & Schwarz | - |
GP‑030776 | CR 51.010-1 Section 26.6.3.x BCCH allocation sequence number missing for DCS 1800 and PCS 1900 bands | Rohde & Schwarz | - |
GP‑030777 | CR 51.010-1 Section 26.6.13.1 Ambiguity for test parameter T1 | Rohde & Schwarz | - |
GP‑030779 | CR 51.010-1 Section 40.2.1.1.1 MSCR bit in SI3 must be set for R99 network simulation | Rohde & Schwarz | - |
GP‑030780 | - | Ericsson | - |
GP‑030781 | - | - | - |
GP‑030782 | - | - | - |
GP‑030783 | - | - | - |
GP‑030784 | - | - | - |
GP‑030785 | - | - | - |
GP‑030786 | - | - | - |
GP‑030787 | - | - | - |
GP‑030790 | - | - | - |
GP‑030791 | - | - | - |
GP‑030792 | - | - | - |
GP‑030793 | - | - | - |
GP‑030794 | - | Cingular | - |
GP‑030795 | Transmission of dummy blocks on FACCH, SACCH, SDCCH | Nokia | - |
GP‑030796 | Transmission of dummy blocks on FACCH, SACCH, SDCCH | Nokia | - |
GP‑030797 | Missing MTBF messages in downlink TBF release | Nokia | - |
GP‑030798 | Missing references to MTBF messages | Nokia | - |
GP‑030799 | Missing G-RNTI extension in Packet Control Acknowledgement | Nokia | - |
GP‑030800 | Missing G-RNTI extension in Packet Control Acknowledgement | Nokia | - |
GP‑030801 | Deletion of Iu mode references | Nokia | - |
GP‑030802 | Deletion of Iu mode references | - | - |
GP‑030803 | Size of RLC/MAC Control blocks on FACCH and SDCCH | Nokia | - |
GP‑030804 | Transmission of Handover Access and Physical Information | Nokia | - |
GP‑030805 | Measurement order procedure in MAC-Idle state | Nokia | - |
GP‑030806 | Removal of Fixed Allocation parameters | Nokia | - |
GP‑030807 | SFACCH and SRB 2 in MAC-DTM state | Nokia | - |
GP‑030808 | Packet Mobile TBF status on DBPSCH | Nokia | - |
GP‑030809 | Maximum TBF capacity | Nokia | - |
GP‑030810 | Problem with implementation of CR 024r1 (GP-023160) | Nokia | - |
GP‑030811 | Correction of wrong reference | Nokia | - |
GP‑030812 | - | - | - |
GP‑030813 | - | - | - |
GP‑030814 | - | - | - |
GP‑030815 | - | - | - |
GP‑030816 | - | - | - |
GP‑030817 | - | - | - |
GP‑030818 | Padding for MCS-8 retransmissions | Nokia | - |
GP‑030819 | Padding for MCS-8 retransmissions | Nokia | - |
GP‑030820 | - | - | - |
GP‑030821 | - | - | - |
GP‑030822 | Correction to SBPSCH and SBPSCH/H | Nokia | - |
GP‑030823 | Error handling on LI field and E bit in EGPRS RLC unacknowledged mode. | Alcatel | - |
GP‑030824 | Clarification for downlink power control when PR field is missing in RLC control blocks. | Alcatel | - |
GP‑030825 | Usage of Allocation and Retention Priority in the BSS | Alcatel | - |
GP‑030826 | Usage of Allocation and Retention Priority in the BSS | Alcatel | - |
GP‑030827 | - | - | - |
GP‑030828 | Multiple PCCCH test cases | Alcatel | - |
GP‑030829 | Multiple PCCCH test cases | Alcatel | - |
GP‑030830 | Addition of test case in TS 51.010 S42: Packet Timeslot Reconfigure containing a new Coding Scheme command | Alcatel | - |
GP‑030831 | Addition of test case in TS 51.010 S42: Packet Timeslot Reconfigure containing a new Coding Scheme command. | Alcatel | - |
GP‑030832 | Correction of capability to modify the BA(GPRS) list. | Nokia | - |
GP‑030833 | Correction of capability to modify the BA(GPRS) list. | Nokia | - |
GP‑030834 | Mandatoriness of SI13Alt PBCCH Location parameters in Iu Mode only capable cells. | Nokia | - |
GP‑030835 | Mandatoriness of SI13Alt PBCCH Location parameters in Iu Mode only capable cells. | Nokia | - |
GP‑030836 | The removal of the incorret text from broadcast procedure. | Nokia | - |
GP‑030837 | Inconsistency of CBQ3. | Nokia | - |
GP‑030838 | Inconsistency of CBQ3. | Nokia | - |
GP‑030839 | Corrections to Security mode control procedure | Nokia | - |
GP‑030840 | Corrections to Handover procedure | Nokia | - |
GP‑030841 | Updating PICS for AMR Signal Quality Test cases | Cingular Wireless | - |
GP‑030842 | - | MCC | - |
GP‑030843 | - | - | - |
GP‑030844 | Following abbreviations are used in figure s T_call = Session duration, T_ra = RAU outage time, v = MS speed. | bitrate | - |
GP‑030845 | Clarification to GPRS cell reselection use in Packet Measurement Order message. | STMicroelectronics | - |
GP‑030846 | - | - | - |
GP‑030847 | CR 51.010-1 42.3.2.1.2 Dynamic Allocation / Uplink Transfer with Downlink TBF establishment / Normal / Multislot capabilities | Setcom | - |
GP‑030848 | CR 51.010-1 52.3.2.1.2 Dynamic Allocation / Uplink Transfer with Downlink TBF establishment / Normal / Multislot capabilities | Setcom | - |
GP‑030849 | Clarification of applicability for different TCH/H –channels in 14.2.4 and 14.4.5 | Nokia | - |
GP‑030850 | Clarification on test procedure of 14.18.6 | Nokia | - |
GP‑030851 | - | Nokia | - |
GP‑030852 | - | Nokia | - |
GP‑030853 | Padding for MCS-8 retransmissions | Nokia | - |
GP‑030854 | - | - | - |
GP‑030855 | CR 51.010-1 Section 20.22.12 C1 value in wrong column | Rohde & Schwarz | - |
GP‑030856 | Modification of test channel for MEAN_BEP accuracy for EPGRS | Ericsson | - |
GP‑030857 | Modification of test channel for MEAN_BEP accuracy for EPGRS | Ericsson | - |
GP‑030858 | Modification of test channel for MEAN_BEP accuracy for EPGRS | Ericsson | - |
GP‑030859 | Modification of test channel for MEAN_BEP accuracy for EPGRS | Ericsson | - |
GP‑030861 | - | - | - |
GP‑030863 | BEP estimation accuracy for EMR. | Nokia | - |
GP‑030864 | Correction of transmitted power level versus time | Nokia | - |
GP‑030865 | Correction of transmitted power level versus time | Nokia | - |
GP‑030866 | Correction of transmitted power level versus time | Nokia | - |
GP‑030867 | Correction of transmitted power level versus time | Nokia | - |
GP‑030868 | Power control modes references removal (Rel-5) | Nortel Networks | - |
GP‑030869 | Power control modes references removal (Rel-6) | Nortel Networks | - |
GP‑030870 | Power control modes references removal | Nortel Networks | - |
GP‑030871 | Power control modes references removal | Nortel Networks | - |
GP‑030872 | Impact of "Early UE handling" work on the GERAN | Vodafone | - |
GP‑030873 | Corrections to Initial Direct Transfer message | Nokia | - |
GP‑030874 | - | Ericsson, Siemens | - |
GP‑030875 | - | Siemens | - |
GP‑030876 | MCS-3 padding for MCS-8 retransmission (R99) | Nortel Networks | - |
GP‑030877 | MCS-3 padding for MCS-8 retransmission (Rel-4) | Nortel Networks | - |
GP‑030878 | MCS-3 padding for MCS-8 retransmission (Rel-5) | Nortel Networks | - |
GP‑030879 | MCS-3 padding for MCS-8 retransmission (Rel-6) | Nortel Networks | - |
GP‑030880 | Clarification on continuous TA procedure | Siemens AG | - |
GP‑030881 | Clarification on continuous TA procedure | Siemens AG | - |
GP‑030882 | Clarification on continuous TA procedure | Siemens AG | - |
GP‑030883 | Clarification on continuous TA procedure | Siemens AG | - |
GP‑030884 | Clarification on continuous TA procedure | Siemens AG | - |
GP‑030885 | - | - | - |
GP‑030886 | Retransmission of Iu mode channel request description during a DL TBF | Nokia | - |
GP‑030887 | - | - | - |
GP‑030888 | - | - | - |
GP‑030889 | Correction of Test Procedure for TC 44.2.1.1.9 | Agere Systems | - |
GP‑030890 | Signal Quality Tests for AMR | Cingular Wireless | - |
GP‑030891 | Corrections for DTM multislot configurations and DTM capability indication. | Nokia | - |
GP‑030892 | Corrections for DTM multislot configurations. | Nokia | - |
GP‑030893 | Corrections for DTM multislot configurations and DTM capability indication. | Nokia | - |
GP‑030894 | Corrections for DTM multislot configurations. | Nokia | - |
GP‑030895 | Corrections for DTM multislot configurations and DTM capability indication. | Nokia | - |
GP‑030896 | Corrections for DTM multislot configurations. | Nokia | - |
GP‑030897 | - | Panasonic | - |
GP‑030898 | Correction to Extended Dynamic Allocation Operation (R99) | Panasonic | - |
GP‑030899 | Correction to Extended Dynamic Allocation Operation (REL-4) | Panasonic | - |
GP‑030902 | - | - | - |
GP‑030903 | Reply LS on Radio Access Bearer for PS conversational testing | CN1 | - |
GP‑030904 | LS on DRX parameters update | CN1 | - |
GP‑030905 | Network Controlled/Assisted Reselection concept | Motorola, S.A.S. | - |
GP‑030906 | - | - | - |
GP‑030907 | - | - | - |
GP‑030908 | Draft Answer to Liaison Statement on Core Network Provision of separate flows for P2P and P2M radio Transmission | GERAN | - |
GP‑030909 | Report from ITU-R Working Party 8F | Cingular Wireless | - |
GP‑030910 | - | Philips | - |
GP‑030911 | - | - | - |
GP‑030912 | Proposed Reply to LS on Generic UMTS QoS model | TSG GERAN | - |
GP‑030913 | [DRAFT] LS on DRX parameter | GERAN2 | - |
GP‑030914 | Reply to LS on double ciphering for MBMS multicast data. | GERAN2 | - |
GP‑030915 | Indication of the MS support of "Modulation based multislot class" | Siemens AG | - |
GP‑030916 | Indication of the MS support of "Modulation based multislot class" | Siemens AG | - |
GP‑030917 | Indication of the MS support of "Modulation based multislot class" | Siemens AG | - |
GP‑030918 | Indication of the MS support of "Modulation based multislot class" | Siemens AG | - |
GP‑030919 | Alternative approach to G2-030265 | QUALCOMM | - |
GP‑030920 | Corrections to RRC connection management procedures | Nokia | - |
GP‑030921 | Corrections to Radio Bearer Control procedures | Nokia | - |
GP‑030922 | Corrections to Security mode control procedure | Nokia | - |
GP‑030923 | [DRAFT] LS on < Mapping of PFCs onto LLC SAPIs > | TSG GERAN WG2 | - |
GP‑030924 | Shift between dynamic and extended dynamic allocation | Ericsson | - |
GP‑030925 | Shift between dynamic and extended dynamic allocation | Ericsson | - |
GP‑030926 | Shift between dynamic and extended dynamic allocation | Ericsson | - |
GP‑030927 | Shift between dynamic and extended dynamic allocation | Ericsson | - |
GP‑030928 | LS on impact of ‘Early UE handling’ on the GERAN | GERAN2 | - |
GP‑030929 | Mapping of PFCs onto LLC SAPIs | Siemens AG | - |
GP‑030930 | DL TBF assignment fallback | Nokia | - |
GP‑030931 | Correction to definition of T3168 in chapter 13 | Siemens | - |
GP‑030932 | Correction to definition of T3168 in chapter 13 | Siemens | - |
GP‑030933 | Transmission of dummy blocks on FACCH, SACCH, SDCCH | Nokia | - |
GP‑030934 | Missing MTBF messages in downlink TBF release | Nokia | - |
GP‑030935 | Missing references to MTBF messages | Nokia | - |
GP‑030936 | Deletion of Iu mode references | - | - |
GP‑030937 | Transmission of Handover Access and Physical Information | Nokia | - |
GP‑030938 | SFACCH and SRB 2 in MAC-DTM state | Nokia | - |
GP‑030939 | Mandatoriness of SI13Alt PBCCH Location parameters in Iu Mode only capable cells. | Nokia | - |
GP‑030940 | Mandatoriness of SI13Alt PBCCH Location parameters in Iu Mode only capable cells. | Nokia | - |
GP‑030941 | 42.3.1.1.4 – Allow one Uplink Data Block coded with CS-1 after step 37 | Anite Telecoms | - |
GP‑030942 | Sec: 52.4 - Addition of allocation of resource to send Packet Cell Change Failure | - | - |
GP‑030944 | Sec 42.1.2.1.8.x – Addition of new testcases | Setcom | - |
GP‑030945 | Multiple PCCCH test cases | Alcatel | - |
GP‑030946 | Addition of test case in TS 51.010 S42: Uplink reallocation, Packet Uplink Assignment containing a new Coding Scheme command | Alcatel | - |
GP‑030947 | 20.14 - Implementation of new Test Case | Anite Telecoms | - |
GP‑030948 | 20.6 – Bring 51.010-3 into alignment with 51.010-1 | Anite Telecoms | - |
GP‑030949 | 34.3 - Update Number change in Cell Broadcasting message | Anite Telecoms | - |
GP‑030950 | Change to CCCAP Information Element | Anite Telecoms | - |
GP‑030951 | 26.7.4.5.4.4 “Location updating/periodic search of the higher priority PLMN, when a MS is receiving foreign country’s VPLMN/MS is in automatic mode”. | Motorola | - |
GP‑030952 | Modification of applicability table in 51.010-2 due to introduction of new test cases in 51.010-1 | Cingular Wireless, Motorola | - |
GP‑030953 | GPRS Enhanced Measurement Report (EMR) Test Cases | Motorola | - |
GP‑030954 | Correction to TC 43.1.1.5 | Ericsson | - |
GP‑030955 | Location updating/periodic search of the HPLMN, when a MS is receiving foreign country’s VPLMN/MS is in automatic mode | Cingular Wireless, Motorola | - |
GP‑030956 | Correct of NC_REPORTING_PERIOD_I value in step 2 of clause 41.2.7.2 - Single block packet downlink assignment / MS returns to packet idle mode. | Nokia | - |
GP‑030957 | 40.2.1.1.1 – Missing BandIndicator in SI1 default | Anite Telecoms | - |
GP‑030958 | CR 51.010-1 Update of testcases of section 52.1 to handle Mobiles using EPCR for signalling procedure | Setcom | - |
GP‑030959 | Sec 51.2.3.8 - Correction to number of Packet Access initiation attempts | Setcom | - |
GP‑030960 | 52.3.1.1.4 – Allow one Uplink Data Block coded with MCS 1 after step 37 | Anite Telecoms | - |
GP‑030961 | CR 51.010-1 Section 51.2.x Corrections of PDP context specification in initial conditions | Rohde & Schwarz | - |
GP‑030962 | Sec 52.4.4.2 - Attach procedure need to be completed before sending Packet Measurement order. | Setcom | - |
GP‑030963 | Sec 52.8.1.x – Addition of new testcases | Setcom | - |
GP‑030964 | Sec 52.1.2.1.8.x – Addition of new testcases | Setcom | - |
GP‑030965 | Correction to DTM Conformance Test in sub-clause 44.2.8.2 | Vodafone Group | - |
GP‑030966 | Addition of some DTM test cases to the applicability table. | Vodafone Group | - |
GP‑030967 | Corrections of the Peak Throughput Class and Maximum bit rate values for clause 50.5 – Test PDP Context. | Nokia | - |
GP‑030968 | Corrections of the Peak Throughput Class and Maximum bit rate values for clause 40.5 – Test PDP Context. | Nokia | - |
GP‑030969 | Correction of step 5 of Expected Sequence for clause 44.2.3.1.7 - Routing area updating / abnormal cases / change of cell during routing area updating procedure. | Nokia | - |
GP‑030970 | Modification of applicability table in 51.010-2 due to introduction of new test cases in 51.010-1 | Setcom | - |
GP‑030971 | [DRAFT] LS on Features outside the Scope of the GCF GPRS Recommended Set | TSG GERAN | - |
GP‑030972 | Corrections for DTM multislot configurations and DTM capability indication. | Nokia | - |
GP‑030973 | Corrections for DTM multislot configurations and DTM capability indication. | Nokia | - |
GP‑030974 | Corrections for DTM multislot configurations and DTM capability indication. | Nokia | - |
GP‑030975 | Mapping of the PDTCH/D on PCCCH in case EGPRS | Siemens AG | - |
GP‑030976 | Use of unbiased variance in the computation of CV_BEP (R99) | Nortel Networks, Alcatel | - |
GP‑030977 | Use of unbiased variance in the computation of CV_BEP (Rel-4) | Nortel Networks, Alcatel | - |
GP‑030978 | Use of unbiased variance in the computation of CV_BEP (Rel-5) | Nortel Networks, Alcatel | - |
GP‑030979 | Use of unbiased variance in the computation of CV_BEP (Rel-6) | Nortel Networks, Alcatel | - |
GP‑030980 | Padding for MCS-8 retransmissions | Nokia | - |
GP‑030981 | Padding for MCS-8 retransmissions | Nokia | - |
GP‑030982 | Padding for MCS-8 retransmissions | Nokia | - |
GP‑030983 | MCS-3 padding for MCS-8 retransmission (R99) | Nortel Networks | - |
GP‑030984 | MCS-3 padding for MCS-8 retransmission (Rel-4) | Nortel Networks | - |
GP‑030985 | MCS-3 padding for MCS-8 retransmission (Rel-5) | Nortel Networks | - |
GP‑030986 | MCS-3 padding for MCS-8 retransmission (Rel-6) | Nortel Networks | - |
GP‑030987 | Inclusion of U-TDOA location method | Cingular, AT&T Wireless, Grayson, TruePosition | - |
GP‑030988 | Inconsistency of CBQ3. | Nokia | - |
GP‑030989 | Inconsistency of CBQ3. | Nokia | - |
GP‑030990 | Corrections of Core Specification references for clause 41.1.5.1.2 - RR / Paging / on CCCH for GPRS service / normal paging with IMSI successful. | Nokia | - |
GP‑030991 | Corrections of Core Specification references for clause 51.1.5.1.2 - RR / Paging / on CCCH for EGPRS service / normal paging with IMSI successful. | Nokia | - |
GP‑030992 | New TC: Network Assisted Cell Change / Entering packet idle mode | Ericsson | - |
GP‑030993 | New TC: Network Assisted Cell Change / CCN not supported towards target cell | Ericsson | - |
GP‑030994 | Addition of test cases for Network Assisted Cell Change | Ericsson | - |
GP‑030995 | CR 51.010-1 New section added: 34.4 Short message service point to point over GPRS. | setcom | - |
GP‑030996 | 26.7.4.5.4.4 “Location updating/periodic search of the higher priority PLMN, when a MS is receiving foreign country’s VPLMN/MS is in automatic mode”. | Motorola | - |
GP‑030997 | Location updating/periodic search of the HPLMN, when a MS is receiving foreign country’s VPLMN/MS is in automatic mode | Cingular Wireless, Motorola | - |
GP‑030998 | GPRS Enhanced Measurement Report (EMR) Test Cases | Motorola | - |
GP‑030999 | Modification of applicability table in 51.010-2 due to introduction of new test cases in 51.010-1 | Cingular Wireless, Motorola | - |
GP‑031000 | 42.3.1.1.4 – Allow one Uplink Data Block coded with CS-1 after step 37 | Anite Telecoms | - |
GP‑031001 | 42.3.1.1.9 Correction of Cell Allocation in the first set of Packet System Information Type 2 message | Anite Telecoms | - |
GP‑031002 | 51.3.1.3 - Step 13 is incorrect if optional step A12 is executed | Anite Telecoms | - |
GP‑031003 | Correction to check in step 7A of expected sequence to 42.3.3.1.2 | Sasken | - |
GP‑031004 | Sec 42.1.2.1.8.x – Addition of new testcases | Setcom | - |
GP‑031005 | Sec 51.2.3.8 - Correction to number of Packet Access initiation attempts | Setcom | - |
GP‑031006 | LS on SIM Application Tool Test Specification | TSG-GERAN-WG4/5 | - |
GP‑031007 | Sec 52.4.4.2 - Attach procedure need to be completed before sending Packet Measurement order. | Setcom | - |
GP‑031008 | Sec 52.8.1.x – Addition of new testcases | Setcom | - |
GP‑031009 | Sec 52.1.2.1.8.x – Addition of new testcases | Setcom | - |
GP‑031010 | - | - | - |
GP‑031011 | LS of GERAN WG4 progress on the R99 GPRS Workplan. | TSG GERAN | - |
GP‑031012 | Sec: 52.4 - Addition of allocation of resource to send Packet Cell Change Failure | - | - |
GP‑031013 | CR 51.010-2 Incorrect applicabilty for 6 test cases of secion 42.3.1.1.* | Rohde & Schwarz | - |
GP‑031014 | References to 11.10-1 replaced. Reference to 11.10-2 removed. | Gemplus | - |
GP‑031015 | Update PICS for GPRS EMR Test case | Motorola | - |
GP‑031016 | - | Alcatel | - |
GP‑031017 | Addition of test case in TS 51.010 S42: Packet Uplink Assignment containing a new Coding Scheme command. | Alcatel | - |
GP‑031018 | References to 11.10-1 replaced. Reference to 11.10-2 removed. | Gemplus | - |
GP‑031019 | - | Alcatel | - |
GP‑031020 | GPRS Enhanced Measurement Report (EMR) Test Cases | Motorola | - |
GP‑031021 | Multi-block allocation for two-phase access | AT&T Wireless Services | - |
GP‑031022 | - | - | - |
GP‑031023 | Clarification of | Melco Mobile Communication Europe | - |
GP‑031024 | On usage of 3G measurement parameters in SI2Quater | Melco Mobile Communication Europe | - |
GP‑031025 | LS on further discussion on the meaning of the Transfer Delay QoS parameter for Streaming services | GERAN2 | - |
GP‑031026 | PFC Release procedure | Siemens AG | - |
GP‑031027 | Corrections to RRC Connection Mobility procedures | Nokia | - |
GP‑031028 | Enhancement of network controlled cell reselection procedure | Ericsson | - |
GP‑031029 | Clarification to GPRS cell reselection use in Packet Measurement Order message. | STMicroelectronics | - |
GP‑031030 | Usage of Allocation and Retention Priority in the BSS | Alcatel | - |
GP‑031031 | Inclusion of U-TDOA location method | Cingular, AT&T Wireless, Grayson, TruePosition | - |
GP‑031032 | Proposed modification of SMLC-BSS signalling for U-TDOA | Cingular, AT&T Wireless, Grayson, TruePosition | - |
GP‑031033 | - | - | - |
GP‑031034 | [DRAFT] LS on Usage of Allocation and Retention Priority in the BSS | TSG GERAN | - |
GP‑031035 | Clarification of | Melco Mobile Communication Europe | - |
GP‑031036 | Indication of the MS support of "Modulation based multislot class" | Siemens AG | - |
GP‑031037 | Indication of the MS support of "Modulation based multislot class" | Siemens AG | - |
GP‑031038 | Indication of the MS support of "Modulation based multislot class" | Siemens AG | - |
GP‑031039 | [DRAFT] LS on < Indication of the MS support of "Modulation based multislot class"> | TSG GERAN WG2 | - |
GP‑031040 | PFC Release procedure | Siemens AG | - |
GP‑031041 | - | - | - |
GP‑031042 | Liaison Statement on DRX parameter | RAN3 | - |
GP‑031043 | CR 51.010-1 New testcase added: 45.4.4 PDP context deactivation initiated by the network / Tear down indicator. | setcom | - |
GP‑031044 | Modification of applicability table in 51.010-2 due to introduction of new test cases in 51.010-1 | Setcom | - |
GP‑031045 | GPRS Enhanced Measurement Report (EMR) Test Cases | Motorola | - |
GP‑031046 | Update PICS for GPRS EMR Test case | Motorola | - |
GP‑031047 | - | - | - |
GP‑031048 | - | Nokia | - |
GP‑031049 | - | - | - |
GP‑031050 | Update PICS for GPRS EMR Test case | Motorola | - |
GP‑031051 | - | - | - |
GP‑031052 | Ericsson noted an editorial error in the of one of the test cases. | res/ Failure/Packet Access Reject | - |
GP‑031053 | - | - | - |
GP‑031054 | LS on Features outside the Scope of the GCF GPRS Recommended Set | TSG GERAN | - |
GP‑031055 | Clarification for downlink power control when PR field is missing in RLC control blocks. | Alcatel | - |
GP‑031056 | - | Rapporteur | - |
GP‑031057 | - | - | - |
GP‑031058 | Draft Report of TSG GERAN WG1 meeting #14, version 0.0.1 | Secretary TSG GERAN WG1, Paolo Usai | - |
GP‑031059 | Clarification of | Melco Mobile Communication Europe | - |
GP‑031060 | Clarification to GPRS cell reselection use in Packet Measurement Order message. | STMicroelectronics | - |
GP‑031061 | - | - | - |
GP‑031062 | - | - | - |
GP‑031063 | Inclusion of U-TDOA location method | Cingular, AT&T Wireless, Grayson, TruePosition | - |
GP‑031064 | Inclusion of U-TDOA location method | Cingular, AT&T Wireless, Grayson, TruePosition | - |
GP‑031065 | LS on SIM Application Tool Test Specification | TSG-GERAN | - |
GP‑031066 | Draft Answer to Liaison Statement on Core Network Provision of separate flows for P2P and P2M radio Transmission | GERAN | - |
GP‑031067 | Reply to LS on Generic UMTS QoS model | TSG GERAN | - |
GP‑031068 | LS on further discussion on the meaning of the Transfer Delay QoS parameter for Streaming services | GERAN2 | - |
GP‑031069 | - | Rapporteur | - |
page generated from database: 2024-03-25 09:25:51