3GPP TDocs (written contributions) at meeting
Meeting: G2-21b - 2004-10-04 to 2004-10-08, Malta
meeting id: G2-21b (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
G2‑040496 | - | - | - |
G2‑040497 | Correction of SNS PDUs for IP support. | MCC | - |
G2‑040498 | Correction of SNS PDUs for IP support. | MCC | - |
G2‑040499 | Timers for the VGCS uplink control procedure | Hughes Software Systems | - |
G2‑040500 | Timers for the VGCS uplink control procedure | Hughes Software Systems | - |
G2‑040501 | Timers for the VGCS uplink control procedure | Hughes Software Systems | - |
G2‑040502 | Incorrect length of group call reference IE | Hughes Software Systems | - |
G2‑040503 | Incorrect length of group call reference IE | Hughes Software Systems | - |
G2‑040504 | Incorrect length of group call reference IE | Hughes Software Systems | - |
G2‑040505 | Incorrect length of the eMLPP priority IE | Hughes Software Systems | - |
G2‑040506 | Incorrect length of the eMLPP priority IE | Hughes Software Systems | - |
G2‑040507 | Incorrect length of the eMLPP priority IE | Hughes Software Systems | - |
G2‑040508 | Inclusion of PS functionality for U-TDOA location method | Cingular, T-Mobile USA, Andrew Corporation, TruePosition | - |
G2‑040509 | Inclusion of PS functionality for U-TDOA location method | Cingular, T-Mobile USA, Andrew Corporation, TruePosition | - |
G2‑040510 | Introduction of new VGCS/VBS ciphering mechanism | Siemens | - |
G2‑040511 | Introduction of new VGCS/VBS ciphering mechanism | Siemens | - |
G2‑040512 | Clarification of messages used for change of frequency parameters in DTM resource reallocation | - | - |
G2‑040513 | Change to PS Timing Advance behaviour for DTM to Packet Transfer transition | Siemens | - |
G2‑040514 | MS behaviour in DTM resource reallocation during uplink TBF establishment | - | - |
G2‑040515 | - | Source:?[H10] | - |
G2‑040516 | MS behaviour on receiving PACKET CS RELEASE INDICATION message | Siemens | - |
G2‑040517 | Alignment of stage 2 with stage 3 for DTM | Siemens | - |
G2‑040518 | RIM and NACC clean-up | Nortel, Siemens | - |
G2‑040519 | RIM and NACC clean-up | Nortel, Siemens | - |
G2‑040520 | - | - | - |
G2‑040521 | SI3 RIM application for MBMS | Siemens | - |
G2‑040522 | RIM application MBMS data channel | Siemens | - |
G2‑040523 | Use of the MBMS NEIGHBOURING CELL INFORMATION message | Siemens | - |
G2‑040524 | 3GPP TSG GERAN WG2 MBMS Adhoc (Rel-6) Meeting Report | TSG GERAN WG2 Chairman, Diana Edwin | - |
G2‑040525 | Correction of the usage of the Real-Time Integrity field | Alcatel | - |
G2‑040526 | Correction of relation between GSM Reference Frame and GPS TOW to achieve high-accuracy timing assistance for AGPS. | Ericsson | - |
G2‑040527 | Correction of relation between GSM Reference Frame and GPS TOW to achieve high-accuracy timing assistance for AGPS. | Ericsson | - |
G2‑040528 | Correction of relation between GSM Reference Frame and GPS TOW to achieve high-accuracy timing assistance for AGPS. | Ericsson | - |
G2‑040529 | Correction of relation between GSM Reference Frame and GPS TOW to achieve high-accuracy timing assistance for AGPS. | Ericsson | - |
G2‑040530 | Correction of relation between GSM Reference Frame and GPS TOW to achieve high-accuracy timing assistance for AGPS. | Ericsson | - |
G2‑040531 | Positioning Reporting inconsistencies | Ericsson | - |
G2‑040532 | Addition of MBMS session start/stop messages | Ericsson | - |
G2‑040533 | Addition of MBMS NOTIFICATION message | Ericsson | - |
G2‑040534 | Addition of MBMS NOTIFICATION message | Ericsson | - |
G2‑040535 | Addition of MBMS access procedures and MBMS SERVICE REQUEST message | Ericsson | - |
G2‑040536 | Addition of MBMS access | Ericsson | - |
G2‑040537 | BSS Release of MBMS Contex if no data arrives | Ericsson | - |
G2‑040538 | - | - | - |
G2‑040539 | - | Ericsson | - |
G2‑040540 | - | Ericsson | - |
G2‑040541 | - | - | - |
G2‑040542 | - | - | - |
G2‑040543 | - | - | - |
G2‑040544 | - | - | - |
G2‑040545 | - | - | - |
G2‑040546 | Addition of reception of multiple sessions | Ericsson, Nokia, Siemens, Telecom Italia S.p.A., Vodafone | - |
G2‑040547 | Addition of flexible reconfiguration for MBMS_BEARER_ID and MS_ID. | Siemens, Telecom Italia S.p.A. | - |
G2‑040548 | RLC data block usage during change of service demand | Infineon AG, Melco, Nortel Networks, Siemens, STMicroelectronics | - |
G2‑040549 | - | - | - |
G2‑040550 | Packet Handling/Forward SRNS Context | Siemens AG | - |
G2‑040551 | RLC protocol behaviour for MBMS data transfer | Siemens | - |
G2‑040552 | Draft LS on user-specific priorities for MBMS services | GERAN2 | - |
G2‑040553 | - | - | - |
G2‑040554 | - | - | - |
G2‑040555 | PS Paging Co-ordination in MBMS | Vodafone | - |
G2‑040556 | CS MBMS Paging Co-ordination | Vodafone | - |
G2‑040557 | Introduction of Notification Co-ordination for MBMS in GERAN | Vodafone | - |
G2‑040558 | Draft 44.018 CR xxx: Introduction of Notification Co-ordination for MBMS in GERAN | Vodafone | - |
G2‑040559 | Draft 44.060 CR xxx: Introduction of Notification Co-ordination for MBMS in GERAN | Vodafone | - |
G2‑040560 | Draft 48.018 CR xxx: Introduction of Notification Co-ordination for MBMS in GERAN | Vodafone | - |
G2‑040561 | Draft 48.008 CR xxx: Introduction of Notification Co-ordination for MBMS in GERAN | Vodafone | - |
G2‑040562 | - | - | - |
G2‑040563 | - | - | - |
G2‑040564 | - | - | - |
G2‑040565 | - | - | - |
G2‑040566 | - | - | - |
G2‑040567 | - | - | - |
G2‑040568 | - | - | - |
G2‑040569 | - | Nokia | - |
G2‑040570 | Addition of MBMS NEIGHBOUR CELL INFORMATION message | Siemens | - |
G2‑040571 | 43.246 CR xxx: Modification to description of MBMS Channel Release procedure | Vodafone | - |
G2‑040572 | 43.246 CR xxx: MBMS Reception resumption after NAS service interuption. | Vodafone | - |
G2‑040573 | MBMS Session Start Request | Vodafone | - |
G2‑040574 | LS on AS- NAS interaction for MBMS | RAN 2 | - |
G2‑040575 | LS on Removal of A5/2 Algorithm from Specifications | T2 | - |
G2‑040576 | Correction of allowed RRLP GPS reference location shapes for compatibility and consistent operation. | Motorola | - |
G2‑040577 | Correction of allowed RRLP GPS reference location shapes for compatibility and consistent operation. | Motorola | - |
G2‑040578 | Correction of allowed RRLP GPS reference location shapes for compatibility and consistent operation. | Motorola | - |
G2‑040579 | Correction of allowed RRLP GPS reference location shapes for compatibility and consistent operation. | Motorola | - |
G2‑040580 | Addition of flexible reconfiguration for MBMS_BEARER_ID and MS_ID. | Siemens, Telecom Italia S.p.A. | - |
G2‑040581 | Addition of reception of multiple sessions | Ericsson, Nokia, Siemens, Telecom Italia S.p.A., Vodafone | - |
G2‑040582 | LS on user-specific priorities for MBMS services | GERAN2 | - |
G2‑040583 | Introduction of prenotification | Nokia | - |
G2‑040584 | 43.246 CR xxx: Suspension/Resumption of the reception of an MBMS session | Siemens, Vodafone | - |
G2‑040585 | Correction of relation between GSM Reference Frame and GPS TOW to achieve high-accuracy timing assistance for AGPS. | Ericsson | - |
G2‑040586 | Correction of relation between GSM Reference Frame and GPS TOW to achieve high-accuracy timing assistance for AGPS. | Ericsson | - |
G2‑040587 | Correction of relation between GSM Reference Frame and GPS TOW to achieve high-accuracy timing assistance for AGPS. | Ericsson | - |
G2‑040588 | Correction of relation between GSM Reference Frame and GPS TOW to achieve high-accuracy timing assistance for AGPS. | Ericsson | - |
G2‑040589 | Correction of relation between GSM Reference Frame and GPS TOW to achieve high-accuracy timing assistance for AGPS. | Ericsson | - |
G2‑040590 | Inclusion of PS functionality for U-TDOA location method | Cingular, T-Mobile USA, Andrew Corporation, TruePosition | - |
G2‑040591 | Correction of the usage of the Real-Time Integrity field | Alcatel | - |
G2‑040592 | RLC data block usage during change of service demand | Infineon AG, Melco, Nortel Networks, Siemens, STMicroelectronics | - |
G2‑040593 | - | Source:?[H10] | - |
G2‑040594 | MS behaviour on receiving PACKET CS RELEASE INDICATION message | Siemens | - |
G2‑040595 | 43.246 CR xxx: Modification to description of MBMS Channel Release procedure | Vodafone | - |
G2‑040596 | RLC protocol behaviour for MBMS data transfer | Siemens | - |
G2‑040597 | - | Ericsson | - |
G2‑040598 | - | NOKIA | - |
G2‑040599 | - | - | - |
G2‑040600 | - | - | - |
G2‑040601 | Introduction of new VGCS/VBS ciphering mechanism | Siemens | - |
G2‑040602 | - | Source:?[H10] | - |
G2‑040603 | Addition of the cause indication whereby an MBMS p-t-m bearer is not established in a cell inside the MBMS ASSIGNMENT message | Ericsson, Nokia, Siemens, Telecom Italia S.p.A., Vodafone | - |
G2‑040604 | Correction of the usage of the Real-Time Integrity field | Alcatel | - |
G2‑040605 | CR 43.246 Use of the MBMS NEIGHBOURING CELL INFORMATION message (Rel-6) | Siemens | - |
G2‑040606 | [Draft] Introduction to GMM of additional parameters for PS Handover | GERAN WG2 | - |
G2‑040607 | 43.246 CR xxx: Suspension/Resumption of the reception of an MBMS session | Siemens, Telecom Italia S.p.A., Vodafone | - |
G2‑040608 | - | - | - |
G2‑040609 | GERAN MBMS work plan | G2 | - |
G2‑040610 | LS on QoS requirements for MBMS services in GERAN | GERAN2 | - |
G2‑040611 | Draft CR 43.246: Introduction of prenotification | Nokia | - |
G2‑040612 | 43.246 CR xxx: Modification to description of MBMS Channel Release procedure | Vodafone | - |
G2‑040613 | [Draft] GERAN Assumptions and Open Issues for MBMS | GERAN WG2 | - |
G2‑040614 | LS on the status of the PS Handover work item | GERAN2 | - |
G2‑040615 | RLC protocol behaviour for MBMS data transfer | Siemens | - |
G2‑040616 | [Draft] GERAN Assumptions and Open Issues for MBMS | GERAN WG2 | - |
G2‑040617 | Correction of the usage of the Real-Time Integrity field | Alcatel | - |
G2‑040618 | Correction of the usage of the Real-Time Integrity field | Alcatel | - |
G2‑040619 | LS on the status of the PS handover WI | G2 | - |
G2‑040620 | LS on introduction to GMM of additional parameters for PS handover | G2 | - |
G2‑040621 | RIM and NACC clean-up | Nortel, Siemens | - |
G2‑040622 | [Draft] GERAN Assumptions and Open Issues for MBMS | GERAN WG2 | - |
G2‑040623 | [Draft] MBMS Paging Co-ordination in GERAN | GERAN WG2 | - |
G2‑040624 | [Draft] LS on ‘Ciphering for Voice Group Call Services’. | GERAN2 | - |
G2‑040625 | Addition of the cause indication whereby an MBMS p-t-m bearer is not established in a cell inside the MBMS ASSIGNMENT message | Ericsson, Nokia, Siemens, Telecom Italia S.p.A., Vodafone | - |
G2‑040626 | 43.246 CR xxx: Modification to description of MBMS Channel Release procedure | Vodafone | - |
G2‑040627 | [Draft] LS on ‘Ciphering for Voice Group Call Services’. | GERAN2 | - |
G2‑040628 | [Draft] GERAN Assumptions and Open Issues for MBMS | GERAN WG2 | - |
G2‑040629 | - | - | - |
G2‑040630 | - | - | - |
page generated from database: 2024-04-22 07:58:53