3GPP TDocs (written contributions) at meeting
Meeting: C3-52 - 2009-04-20 to 2009-04-24, Sophia Antipolis
meeting id: C3-52 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
C3‑090451 | Draft Agenda for CT3#52 | CT3 Chair | Approved |
C3‑090452 | Allocation of documents to agenda items (at deadline) | CT3 Chair | Noted |
C3‑090453 | Allocation of documents to agenda items (start of Day1) | CT3 Chair | Noted |
C3‑090454 | Allocation of documents to agenda items (start of Day2) | CT3 Chair | Noted |
C3‑090455 | Allocation of documents to agenda items (start of Day3) | CT3 Chair | Noted |
C3‑090456 | Allocation of documents to agenda items (start of Day4) | CT3 Chair | Noted |
C3‑090457 | Allocation of documents to agenda items (start of Day5) | CT3 Chair | Noted |
C3‑090458 | Allocation of documents to agenda items (end of Day5) | CT3 Chair | Noted |
C3‑090459 | Draft Report from CT3#51 | MCC | Approved |
C3‑090460 | Latest Version of 3GPP Workplan | MCC | Noted |
C3‑090461 | Status of CT3 specifications following CT#43 meeting | MCC | Noted |
C3‑090462 | Meeting Calendar for 2009 | MCC | Noted |
C3‑090463 | Align XML Schema for CW indication | RIM | Revised in C3-090691 |
C3‑090464 | LS on Carrying APN Selection Mode on PMIP | CT4 | Noted |
C3‑090465 | Reply LS to LS on H.248 Profiles for IP-to-IP Gateways | CT4 | Noted |
C3‑090466 | LS on H.248 Profiles for IP-to-IP Gateways | CT4 | Noted |
C3‑090467 | Reply LS on Allocation of Experimental-Result-Codes for S9 protocol | TSG CT WG4 | Noted |
C3‑090468 | LS on new GERAN WI on “Local Call Local Switch” | TSG GERAN | Noted |
C3‑090469 | LS to 3GPP CT3 on improved IMS-CS video interworking with MONA SPC | ITU-T SG 16 | Postponed |
C3‑090470 | LS to 3GPP CT4 on H.248 work items related to 3GPP requirements | ITU-T SG 16 | Noted |
C3‑090471 | Response LS on PGW Charging for PMIP based S5/S8 – “Charging Id” | TSG SA WG2 | Noted |
C3‑090472 | Reply LS on PGW Charging for PMIP based S5/S8 – “Charging ID” | TSG SA WG2 | postponed |
C3‑090473 | Reply LS on Signalling based trace (de)activation to PDN GW when using PMIP based S5/S8 interface | TSG SA WG2 | postponed |
C3‑090474 | Reply LS on Carrying APN Selection Mode on PMIP | TSG SA WG2 | Noted |
C3‑090475 | LS on PGW Charging for PMIP based S5/S8 – “Charging Id” | TSG SA WG5 | Noted |
C3‑090476 | Reply to Reply LS on PGW Charging for PMIP based S5/S8 – “Charging ID” | TSG SA WG5 | Noted |
C3‑090477 | LS on security aspects of new work item "RTTI support in IMS charging" | TSG SA WG5 | Noted |
C3‑090478 | LS on resolution of MBMS for HSPA evolution | TSG SA | Noted |
C3‑090479 | MMTel services on II-NNI | Telecom Italia | Noted |
C3‑090480 | Deferred IPv4 address handling via external Radius/Diameter AAA for PDN type IPv4v6 | Ericsson | Revised in C3-090602 |
C3‑090481 | Brief notes from CT#43 relevant to CT3 | CT3 Chair | Noted |
C3‑090482 | Proposed schedule for CT3#52 | CT3 Chair | Revised in C3-090627 |
C3‑090483 | Priority level for the default bearer | Ericsson | Revised in C3-090637 |
C3‑090484 | QoS negotiation in 3GPP-EPS | Ericsson | Agreed |
C3‑090485 | IMS signalling bearer handling for network initiated bearers | Ericsson | Revised in C3-090638 |
C3‑090486 | Reporting event trigger value to the PCEF when Gxx is used | Ericsson | Revised in C3-090639 |
C3‑090487 | Default EPS bearer QoS handling in S9 | Ericsson | Revised in C3-090650 |
C3‑090488 | Unsuccessful-QoS-validation as Rule-Failure-Code in S9 | Ericsson | Revised in C3-090640 |
C3‑090489 | Extend Rule-Failure-Code AVP with UNSUCCESSFUL-QoS-VALIDATION value | Ericsson | Revised in C3-090641 |
C3‑090490 | Removal of Subsession termination initiated by the HPCRF in Home-Routed case | Ericsson | Withdrawn |
C3‑090491 | Request of Gateway Control Session Termination by PCRF only for case 2a | Ericsson | Withdrawn |
C3‑090492 | Resource allocation subscription in Rx | Ericsson | Revised in C3-090642 |
C3‑090493 | Extending the value range for the Reservation-priority AVP | Ericsson | Noted |
C3‑090494 | Extending the value range for the Reservation-priority AVP | Ericsson | Revised in C3-090643 |
C3‑090495 | Preventing the use of an Emergency APN for Non-emergency calls | Ericsson | Revised in C3-090722 |
C3‑090496 | Correction on CDIV mapping | LM Ericsson, Nokia Siemens Networks | Agreed |
C3‑090497 | Invalid XML schema bug fix | Ericsson | Agreed |
C3‑090498 | Invalid XML schema bug fix | Ericsson | Agreed |
C3‑090499 | MCID interaction at the II-NNI | Ericsson | Noted |
C3‑090500 | Correction of ACM and CPG sending procedures | Ericsson | Revised in C3-090684 |
C3‑090501 | Correction of ACM and CPG sending procedures | Ericsson | Revised in C3-090685 |
C3‑090502 | Authorization of early media | Ericsson | Revised in C3-090692 |
C3‑090503 | Specification re-structuring | Ericsson | Revised in C3-090678 |
C3‑090504 | Supporting of Media control (including Transco ding) in IBCF | Ericsson | Noted |
C3‑090505 | Use case for media handling | Ericsson | Revised in C3-090679 |
C3‑090506 | Use of E.164 number at the II-NNI | LM Ericsson,Telecom Italia, | Revised in C3-09 |
C3‑090507 | Corrections on 3GPP-User-Location-Info and 3GPP-RAT-Type VSAs | Ericsson | Revised in C3-090611 |
C3‑090508 | Codec negotiation when interworking with BICC based CS CN | Ericsson | Revised in C3-090617 |
C3‑090509 | Codec negotiation when interworking with BICC based network | Ericsson | Revised in C3-090615 |
C3‑090510 | Codec negotiation when interworking with BICC based network | Ericsson | Revised in C3-090616 |
C3‑090511 | Corrections on Cause Values | Ericsson | Revised in C3-090693 |
C3‑090512 | Correction to SIP headers table | Ericsson | Revised in C3-090690 |
C3‑090513 | MCID interaction at the II-NNI | Ericsson | Revised in C3-090688 |
C3‑090514 | Stage 2 requirements / use cases for CS-IBCF / CS-TrGW | Ericsson | Revised in C3-090621 |
C3‑090515 | Missing MONA procedures in stage 2 | LM Ericsson; Nokia Siemens Networks | Agreed |
C3‑090516 | Corrections to IM-IBCF / CS-TrGW non-call related procedures | Ericsson | Revised in C3-090681 |
C3‑090517 | ICS impact on PCC | Nokia Siemens Networks | Revised in C3-090623 |
C3‑090518 | ICS impact on PCC | Nokia Siemens Networks | Revised in C3-090624 |
C3‑090519 | QoS per QCI | Nokia Siemens Networks | Agreed |
C3‑090520 | QoS per APN, etc. | Nokia Siemens Networks | Revised in C3-090626 |
C3‑090521 | QoS per QCI | Nokia Siemens Networks | Revised in C3-090625 |
C3‑090522 | Discussion on PCRF Restoration | NEC | Noted |
C3‑090523 | Ix protocol specified in Rel-9 | Nokia Siemens Networks | Agreed |
C3‑090524 | Forwarding IP packets without modification through TrGW? | Nokia Siemens Networks | Noted |
C3‑090525 | IP Address and Port Conversion | Nokia Siemens Networks | Revised in C3-090682 |
C3‑090526 | Source IP Address and Port Filtering | Nokia Siemens Networks | Revised in C3-090683 |
C3‑090527 | Handling of RTCP Streams | Nokia Siemens Networks | Postponed |
C3‑090528 | Renumbering of duplicated table 17c | Nokia Siemens Networks | Revised in C3-090686 |
C3‑090529 | I-MGCF procedures for MCID mapping | Nokia Siemens Networks | Revised in C3-090687 |
C3‑090530 | Support interworking of Call Forwarding information | Alcatel-Lucent | postponed |
C3‑090531 | Summary of diversion issues | Alcatel-Lucent / Keith Drage | Noted |
C3‑090532 | New WID on Support for IMS Emergency Calls over GPRS and EPS | Alcatel-Lucent | Revised in C3-09 |
C3‑090533 | BBERF Support for HO/BBERF Relocation Indication | Alcatel-Lucent, Orange | Revised in C3-090706 |
C3‑090534 | Handling Multiple BBERF - BBERF Reclassification | Alcatel-Lucent, Orange | Revised in C3-090628 |
C3‑090535 | PCEF Initiated IP CAN Session Modification - BBERF Switchover/Reclassification | Alcatel-Lucent, Orange | Revised in C3-090629 |
C3‑090536 | Handover Procedure and BBERF Reclassification Home Routed R Routed | Alcatel-Lucent, Orange | Withdrawn |
C3‑090537 | Reply LS on IMS-IBCF – TrGW & IMS-ALGCF – IMS-AGW | TSG SA WG2 | Noted |
C3‑090538 | Event Trigger Clarification for IPv6 address change | NTT DOCOMO | Revised in C3-090644 |
C3‑090539 | Missing RAT Type in CC-Answer | NTT DOCOMO | Withdrawn |
C3‑090540 | MBR-GBR relation in Release 8 | Orange | Withdrawn |
C3‑090541 | Operational description of the Inter-IMS Network to Network Interface (II-NNI) WID | Orange | Revised in C3-09 |
C3‑090542 | Error handling in VA procedures | Qualcomm Europe | Revised in C3-090651 |
C3‑090543 | Correction to feature bit definition | Qualcomm Europe, Orange, Bridgewater | Revised in C3-090645 |
C3‑090544 | Correction to feature bit definition | Qualcomm Europe, Orange, Bridgewater | Revised in C3-090646 |
C3‑090545 | Bearer binding procedures update | Qualcomm Europe | Revised in C3-090630 |
C3‑090546 | Additional filter parameters | Qualcomm Europe | Revised in C3-090610 |
C3‑090547 | Charging ID for S2c | Qualcomm Europe | Revised in C3-090622 |
C3‑090548 | General editorial cleanups | Qualcomm Europe | Revised in C3-090652 |
C3‑090549 | Minor technical corrections | Qualcomm Europe | Agreed |
C3‑090550 | Corrections to S9 termination procedures | Qualcomm Europe | Revised in C3-090653 |
C3‑090551 | Corrections to HR procedures | Qualcomm Europe | Agreed |
C3‑090552 | Precedence based on IP-CAN type | Nortel | Revised in C3-090658 |
C3‑090553 | Precedence based on IP-CAN type | Nortel | Revised in C3-090659 |
C3‑090554 | Clarifications on home-routed procedures | Nortel | Revised in C3-090654 |
C3‑090555 | Clarifications on visited-access procedures | Nortel | Revised in C3-090655 |
C3‑090556 | Corrections in multiple BBF procedures | Nortel | Revised in C3-090647 |
C3‑090557 | UE-initiated bearer resource modification procedures over S9 protocol | Nortel | merged with C3-090563 |
C3‑090558 | Correction of Gx CCR Message Format | Camiant | Agreed |
C3‑090559 | Correction to Gxx Experimental-Result-code DIAMETER_BEARER_EVENT | Camiant | Agreed |
C3‑090560 | UE-init Bearer Resource Modification Request | Camiant, Qualcomm Europe | Revised in C3-090609 |
C3‑090561 | 3GPP2 access specific annex including AMBR per APN | Camiant | Revised in C3-090648 |
C3‑090562 | Experimental-Result code for DIAMETER_ERROR_SUBSESSION | Camiant | Agreed |
C3‑090563 | UE-init Bearer Resource Modification Request over S9 | Camiant, Qualcomm Europe | Revised in C3-090656 |
C3‑090564 | UE-init Bearer Resource Modification request(29.212) | Huawei | merged into C3-090609 |
C3‑090565 | Supported BCM during gateway control session establishment | Huawei | Revised in C3-090631 |
C3‑090566 | Clarification of Precedence relation for UE-initiated IP-CAN session modification(R7 29.212) | Huawei | Revised in C3-090660 |
C3‑090567 | Clarification of Precedence relation for UE-initiated IP-CAN session modification(R8 29.212) | Huawei | Revised in C3-090661 |
C3‑090568 | Rx Over S9 (AF in VPLMN) (29.215) | Huawei | Postponed |
C3‑090569 | Missing Step in Gateway Control session Establishment Procedure(29.213) | Huawei | Agreed |
C3‑090570 | Deleting INDICATION_OF_LOSS_OF_BEARER Event(29.214 R7) | Huawei | Revised in C3-090619 |
C3‑090571 | Deleting INDICATION_OF_LOSS_OF_BEARER Event(29.214 R7) | Huawei | Revised in C3-090620 |
C3‑090572 | Alignment of TFT and PCC packet filters in stage3(R7 29.212) | Huawei | Postponed |
C3‑090573 | Alignment of TFT and PCC packet filters in stage3(R8 29.212) | Huawei | merged into C3-09610 |
C3‑090574 | Limited PCC Deployment (29.214) | Huawei | Revised in C3-090657 |
C3‑090575 | Clarification on QoS rules provided during inter-BBERF handovers(29.212) | Huawei | Revised in C3-090649 |
C3‑090576 | Add the function of Interworking for supplementary service CAT into TS 29.163 | China Mobile, Huawei | Revised in C3-090694 |
C3‑090577 | Add the function of Interworking for supplementary service CAT into TS 29.235 | China Mobile, Huawei | Revised in C3-090695 |
C3‑090578 | Correction of the procedure for setting of Continuity Indicator in subclause 7.3.3.1.2.2 | CATR;China Telecom Huawei | Revised in C3-090736 |
C3‑090579 | Correction of the procedure for Sending of INVITE in subclause 7.3.3.2.1 | CATR;China Telecom Huawei | Revised in C3-090737 |
C3‑090580 | CT3 aspects of MBMS support in EPS | ZTE, China Mobile,Huawei | Revised in C3-09 |
C3‑090581 | Discussion on Charging ID handling | ZTE | Noted |
C3‑090582 | [DRAFT] Reply LS on Reply LS on PGW Charing for PMIP based S5S8 Charging ID | ZTE | Noted |
C3‑090583 | Including the Default-EPS-Bearer-QoS AVP in S9 subsession AVPs | ZTE | merged with C3-090487 |
C3‑090584 | Delete Event-Report-Indication AVP from S9 | ZTE | Revised in C3-090717 |
C3‑090585 | Correction to the operation on the dynamic PCC rules | ZTE | Agreed |
C3‑090586 | correction of the editorial errors | ZTE | Agreed |
C3‑090587 | Correction to the Tunnel-Information AVP | ZTE | Revised in C3-090746 |
C3‑090588 | Correction to Bearer Control Mode Selection | ZTE | merged with C3-090520 |
C3‑090589 | Cleanup of IP-CAN session termination procedures | ZTE | Revised in C3-090632 |
C3‑090590 | Update of PCRF-initiated gateway control session termination | ZTE | Revised in C3-090633 |
C3‑090591 | Update of IP-CAN session establishment | ZTE | Revised in C3-090634 |
C3‑090592 | Update of gateway control session establishment | ZTE | Revised in C3-090635 |
C3‑090593 | Delete the Editors Note of establishment of Diameter Sessions for Non-roaming cases (Proxy DRA) | ZTE | Agreed |
C3‑090594 | Correction of the Termination of Diameter Sessions for Redirect DRA case procedure | ZTE | Revised in C3-090636 |
C3‑090595 | Correction to the operation on dynamic PCC rules | ZTE | Agreed |
C3‑090596 | IP Packets matching procedures handling | ZTE | Revised in C3-090701 |
C3‑090597 | Correction to the operation on dynamic PCC rules | ZTE | Agreed |
C3‑090598 | IP Packets matching procedures handling | ZTE | Revised in C3-090700 |
C3‑090599 | Mapping between GSM HR codec and SDP parameters | LM Ericsson, Nokia Siemens Networks | Revised in C3-090618 |
C3‑090600 | MBMS enhancements for IP multicast delivery of the UP data | Nokia Siemens Network | Revised in C3-090604 |
C3‑090601 | Response LS on Response LS on PGW Charging for PMIP based S5/S8 – “Charging Id” | TSG SA WG5 | Noted |
C3‑090602 | Deferred IPv4 address handling via external Radius/Diameter AAA for PDN type IPv4v6 | Ericsson | Revised in C3-090697 |
C3‑090603 | TS 29.612, Version 8.0.0 | MCC | Postponed |
C3‑090604 | MBMS enhancements for IP multicast delivery of the UP data | Nokia Siemens Network | Revised in C3-090612 |
C3‑090605 | CT3 Meetings in 2009 | Chairman | Noted |
C3‑090606 | Reply to Reply LS on Allocation of Experimental-Result-Codes for S9 protocol | Camiant | Revised in C3-09 |
C3‑090607 | Reply LS on H.248 work items related to 3GPP requirements from ITU-T SG 16 Q3/16 | NSN | Revised in C3-090767 |
C3‑090608 | LS on Reply LS on security aspects of new work item "RTTI support in IMS charging" | Orange | Revised in C3-090778 |
C3‑090609 | UE-init Bearer Resource Modification Request | Camiant, Qualcomm Europe, Huawei, Nortel, Nokia Siemens NetworksCamiant, Qualcomm Europe, Huawei, Nortel, Nokia Siemens Networks | Revised in C3-090729 |
C3‑090610 | Additional filter parameters | Qualcomm Europe, Huawei | Agreed |
C3‑090611 | Corrections on 3GPP-User-Location-Info and 3GPP-RAT-Type VSAs | Ericsson | Agreed |
C3‑090612 | MBMS enhancements for IP multicast delivery of the UP data | Nokia Siemens Network, Ericsson | Revised in C3-090698 |
C3‑090613 | CT3 aspects of MBMS support in EPS | ZTE, China Mobile,Huawei | Agreed |
C3‑090614 | Clalification on Alignment of TFT and PCC packet filters in stage2 | Huawei | Revised in C3-090704 |
C3‑090615 | Codec negotiation when interworking with BICC based network | Ericsson | Revised in C3-090772 |
C3‑090616 | Codec negotiation when interworking with BICC based network | Ericsson | Revised in C3-090773 |
C3‑090617 | Codec negotiation when interworking with BICC based CS CN | Ericsson | Revised in C3-090771 |
C3‑090618 | Mapping between GSM HR codec and SDP parameters | LM Ericsson, Nokia Siemens Networks | Agreed |
C3‑090619 | Deleting INDICATION_OF_LOSS_OF_BEARER Event(29.214 R7) | Huawei | Revised in C3-090708 |
C3‑090620 | Deleting INDICATION_OF_LOSS_OF_BEARER Event(29.214 R7) | Huawei | Revised in C3-090709 |
C3‑090621 | Stage 2 requirements / use cases for CS-IBCF / CS-TrGW | Ericsson | Revised in C3-090766 |
C3‑090622 | Charging ID for S2c | Qualcomm Europe | Agreed |
C3‑090623 | ICS impact on PCC | Nokia Siemens Networks | Agreed |
C3‑090624 | ICS impact on PCC | Nokia Siemens Networks | Agreed |
C3‑090625 | QoS per QCI | Nokia Siemens Networks | Agreed |
C3‑090626 | QoS per APN, etc. | Nokia Siemens Networks, ZTE | Revised in C3-090750 |
C3‑090627 | Proposed schedule for CT3#52 | CT3 Chair | Noted |
C3‑090628 | Handling Multiple BBERF - BBERF Reclassification | Alcatel-Lucent, Orange | Revised in C3-090726 |
C3‑090629 | PCEF Initiated IP CAN Session Modification - BBERF Switchover/Reclassification | Alcatel-Lucent, Orange | Revised in C3-090727 |
C3‑090630 | Bearer binding procedures update | Qualcomm Europe | Revised in C3-090718 |
C3‑090631 | Supported BCM during gateway control session establishment | Huawei | Revised in C3-090710 |
C3‑090632 | Cleanup of IP-CAN session termination procedures | ZTE | Revised in C3-090711 |
C3‑090633 | Update of PCRF-initiated gateway control session termination | ZTE | Agreed |
C3‑090634 | Update of IP-CAN session establishment | ZTE | Revised in C3-090712 |
C3‑090635 | Update of gateway control session establishment | ZTE | Revised in C3-090713 |
C3‑090636 | Correction of the Termination of Diameter Sessions for Redirect DRA case procedure | ZTE | Revised in C3-090714 |
C3‑090637 | Priority level for the default bearer | Ericsson | Revised in C3-090715 |
C3‑090638 | IMS signalling bearer handling for network initiated bearers | Ericsson | Agreed |
C3‑090639 | Reporting event trigger value to the PCEF when Gxx is used | Ericsson | Revised in C3-090716 |
C3‑090640 | Unsuccessful-QoS-validation as Rule-Failure-Code in S9 | Ericsson | Revised in C3-090757 |
C3‑090641 | Extend Rule-Failure-Code AVP with UNSUCCESSFUL-QoS-VALIDATION value | Ericsson | Agreed |
C3‑090642 | Resource allocation subscription in Rx | Ericsson | Revised in C3-090719 |
C3‑090643 | Extending the value range for the Reservation-priority AVP | Ericsson | Revised in C3-090735 |
C3‑090644 | Event Trigger Clarification for IPv6 address change | NTT DOCOMO | Revised in C3-090758 |
C3‑090645 | Correction to feature bit definition | Qualcomm Europe, Orange, Bridgewater | Agreed |
C3‑090646 | Correction to feature bit definition | Qualcomm Europe, Orange, Bridgewater | Agreed |
C3‑090647 | Corrections in multiple BBF procedures | Nortel | Agreed |
C3‑090648 | 3GPP2 access specific annex including AMBR per APN | Camiant | Revised in C3-090662 |
C3‑090649 | Clarification on QoS rules provided during inter-BBERF handovers | Huawei | Revised in C3-090745 |
C3‑090650 | Default EPS bearer QoS handling in S9 | Ericsson | Agreed |
C3‑090651 | Error handling in VA procedures | Qualcomm Europe | Agreed |
C3‑090652 | General editorial cleanups | Qualcomm Europe | Agreed |
C3‑090653 | Corrections to S9 termination procedures | Qualcomm Europe | Agreed |
C3‑090654 | Clarifications on home-routed procedures | Nortel | Agreed |
C3‑090655 | Clarifications on visited-access procedures | Nortel | Revised in C3-090720 |
C3‑090656 | UE-init Bearer Resource Modification Request over S9 | Camiant, Qualcomm Europe, Nortel, Huawei, Nokia Siemens Networks | Agreed |
C3‑090657 | Limited PCC Deployment | Huawei | Revised in C3-090744 |
C3‑090658 | Precedence based on IP-CAN type | Nortel | Revised in C3-090723 |
C3‑090659 | Precedence based on IP-CAN type | Nortel | Revised in C3-090724 |
C3‑090660 | Clarification of Precedence relation for UE-initiated IP-CAN session modification(R7 29.212) | Huawei | Revised in C3-090702 |
C3‑090661 | Clarification of Precedence relation for UE-initiated IP-CAN session modification(R8 29.212) | Huawei | Revised in C3-090703 |
C3‑090662 | 3GPP2 access specific annex including AMBR per APN | Camiant | Agreed |
C3‑090663 | New WID on local call local switching | Vodafone Ericsson,Alcatel-Lucent | Endorsed |
C3‑090664 | Use of E.164 number at the II-NNI | LM Ericsson,Telecom Italia, France Telecom, Deutche Telecom | Agreed |
C3‑090665 | QoS per APN, etc. | Nokia Siemens Networks, ZTE | Agreed |
C3‑090666 | IP Address and Port Conversion | Nokia Siemens Networks | Agreed |
C3‑090667 | Status of CT3 Work Item at CT3#52 | Chairman | Agreed |
C3‑090668 | Ix signalling to support a TrGW not capable of transcoding | NSN | Noted |
C3‑090678 | Specification re-structuring | Ericsson | Agreed |
C3‑090679 | Use case for media handling | Ericsson | Postponed |
C3‑090680 | Ix signalling to support a TrGW not capable of transcoding | NSN | Revised in C3-090749 |
C3‑090681 | Corrections to IM-IBCF / CS-TrGW non-call related procedures | Ericsson | Agreed |
C3‑090682 | IP Address and Port Conversion | Nokia Siemens Networks | Revised in C3-090777 |
C3‑090683 | Source IP Address and Port Filtering | Nokia Siemens Networks | Agreed |
C3‑090684 | Correction of ACM and CPG sending procedures | Ericsson | Revised in C3-090761 |
C3‑090685 | Correction of ACM and CPG sending procedures | Ericsson | Revised in C3-090762 |
C3‑090686 | Renumbering of duplicated table 17c | Nokia Siemens Networks | Agreed |
C3‑090687 | I-MGCF procedures for MCID mapping | Nokia Siemens Networks, LM Ericsson | Agreed |
C3‑090688 | MCID interaction at the II-NNI | Ericsson | Revised in C3-090763 |
C3‑090689 | Use of E.164 number at the II-NNI | LM Ericsson,Telecom Italia, France Telecom, Deutche Telecom | Revised in C3-09 |
C3‑090690 | Correction to SIP headers table | Ericsson | Revised in C3-090765 |
C3‑090691 | Align XML Schema for CW indication | RIM | Revised in C3-090759 |
C3‑090692 | Authorization of early media | Ericsson | Revised in C3-090760 |
C3‑090693 | Corrections on Cause Values | Ericsson | Agreed |
C3‑090694 | Add the function of Interworking for supplementary service CAT into TS 29.163 | China Mobile, Huawei | Postponed |
C3‑090695 | Add the function of Interworking for supplementary service CAT into TS 29.235 | China Mobile, Huawei | Postponed |
C3‑090696 | Operational description of the Inter-IMS Network to Network Interface (II-NNI) WID | Orange | Revised in C3-090774 |
C3‑090697 | Deferred IPv4 address handling via external Radius/Diameter AAA for PDN type IPv4v6 | Ericsson | Revised in C3-090699 |
C3‑090698 | MBMS enhancements for IP multicast delivery of the UP data | Nokia Siemens Network, Ericsson | Agreed |
C3‑090699 | Deferred IPv4 address handling via external Radius/Diameter AAA for PDN type IPv4v6 | Ericsson | Agreed |
C3‑090700 | IP Packets matching procedures handling | ZTE | Revised in C3-090705 |
C3‑090701 | IP Packets matching procedures handling | ZTE | Revised in C3-090707 |
C3‑090702 | Clarification of Precedence relation for UE-initiated IP-CAN session modification(R7 29.212) | Huawei | Revised in C3-090739 |
C3‑090703 | Clarification of Precedence relation for UE-initiated IP-CAN session modification(R8 29.212) | Huawei | Revised in C3-090740 |
C3‑090704 | Clalification on Alignment of TFT and PCC packet filters in stage2 | Huawei | Revised in C3-090725 |
C3‑090705 | IP Packets matching procedures handling | ZTE | Agreed |
C3‑090706 | BBERF Support for HO/BBERF Relocation Indication | Alcatel-Lucent, Orange | Postponed |
C3‑090707 | IP Packets matching procedures handling | ZTE | Agreed |
C3‑090708 | Deleting INDICATION_OF_LOSS_OF_BEARER Event | Huawei | Agreed |
C3‑090709 | Deleting INDICATION_OF_LOSS_OF_BEARER Event | Huawei | Agreed |
C3‑090710 | Supported BCM during gateway control session establishment | Huawei | Agreed |
C3‑090711 | Cleanup of IP-CAN session termination procedures | ZTE | Revised in C3-090730 |
C3‑090712 | Update of IP-CAN session establishment | ZTE | Revised in C3-090731 |
C3‑090713 | Update of gateway control session establishment | ZTE | Revised in C3-090732 |
C3‑090714 | Correction of the Termination of Diameter Sessions for Redirect DRA case procedure | ZTE | Agreed |
C3‑090715 | Priority level for the default bearer | Ericsson, Orange | Agreed |
C3‑090716 | Reporting event trigger value to the PCEF when Gxx is used | Ericsson | Revised in C3-090728 |
C3‑090717 | Delete Event-Report-Indication AVP from S9 | ZTE | Agreed |
C3‑090718 | Bearer binding procedures update | Qualcomm Europe | Agreed |
C3‑090719 | Resource allocation subscription in Rx | Ericsson | Revised in C3-090755 |
C3‑090720 | Clarifications on visited-access procedures | Nortel | Agreed |
C3‑090721 | New WID on Support for IMS Emergency Calls over GPRS and EPS | Alcatel-Lucent / Keith Drage | Endorsed |
C3‑090722 | Preventing the use of an Emergency APN for Non-emergency calls | Ericsson | Agreed |
C3‑090723 | Precedence based on IP-CAN type | Nortel | Agreed |
C3‑090724 | Precedence based on IP-CAN type | Nortel | Agreed |
C3‑090725 | Clalification on Alignment of TFT and PCC packet filters in stage2 | Huawei | Approved |
C3‑090726 | Handling Multiple BBERF - BBERF Reclassification | Alcatel-Lucent, Orange | Revised in C3-090733 |
C3‑090727 | PCEF Initiated IP CAN Session Modification - BBERF Switchover/Reclassification | Alcatel-Lucent, Orange | Revised in C3-090734 |
C3‑090728 | Reporting event trigger value to the PCEF when Gxx is used | Ericsson | Agreed |
C3‑090729 | UE-init Bearer Resource Modification Request | Camiant, Qualcomm Europe, Huawei, Nortel, Nokia Siemens Networks | Agreed |
C3‑090730 | Cleanup of IP-CAN session termination procedures | ZTE | Revised in C3-090741 |
C3‑090731 | Update of IP-CAN session establishment | ZTE | Revised in C3-090742 |
C3‑090732 | Update of gateway control session establishment | ZTE | Revised in C3-090743 |
C3‑090733 | Handling Multiple BBERF - BBERF Reclassification | Alcatel-Lucent, Orange | Agreed |
C3‑090734 | PCEF Initiated IP CAN Session Modification - BBERF Switchover/Reclassification | Alcatel-Lucent, Orange | Agreed |
C3‑090735 | Extending the value range for the Reservation-priority AVP | Ericsson | Approved |
C3‑090736 | Correction of the procedure for setting of Continuity Indicator in subclause 7.3.3.1.2.2 | CATR;China Telecom Huawei | Revised in C3-090768 |
C3‑090737 | Correction of the procedure for Sending of INVITE in subclause 7.3.3.2.1 | CATR;China Telecom Huawei | Withdrawn |
C3‑090738 | Reply to Reply LS on Allocation of Experimental-Result-Codes for S9 protocol | Camiant | Approved |
C3‑090739 | Clarification of Precedence relation for UE-initiated IP-CAN session modification(R7 29.212) | Huawei | Revised in C3-090747 |
C3‑090740 | Clarification of Precedence relation for UE-initiated IP-CAN session modification(R8 29.212) | Huawei | Revised in C3-090748 |
C3‑090741 | Cleanup of IP-CAN session termination procedures | ZTE | Revised in C3-090751 |
C3‑090742 | Update of IP-CAN session establishment | ZTE | Revised in C3-090752 |
C3‑090743 | Update of gateway control session establishment | ZTE | Revised in C3-090753 |
C3‑090744 | Limited PCC Deployment | Huawei | Revised in C3-090754 |
C3‑090745 | Clarification on QoS rules provided during inter-BBERF handovers | Huawei | Agreed |
C3‑090746 | Correction to the Tunnel-Information AVP | ZTE | Revised in C3-090756 |
C3‑090747 | Clarification of Precedence relation for UE-initiated IP-CAN session modification(R7 29.212) | Huawei | Agreed |
C3‑090748 | Clarification of Precedence relation for UE-initiated IP-CAN session modification(R8 29.212) | Huawei | Agreed |
C3‑090749 | Ix signalling to support a TrGW not capable of transcoding | NSN | Revised in C3-090668 |
C3‑090750 | QoS per APN, etc. | Nokia Siemens Networks, ZTE | Revised in C3-090665 |
C3‑090751 | Cleanup of IP-CAN session termination procedures | ZTE | Agreed |
C3‑090752 | Update of IP-CAN session establishment | ZTE | Agreed |
C3‑090753 | Update of gateway control session establishment | ZTE | Agreed |
C3‑090754 | Limited PCC Deployment | Huawei | Agreed |
C3‑090755 | Resource allocation subscription in Rx | Ericsson | Agreed |
C3‑090756 | Correction to the Tunnel-Information AVP | ZTE | Postponed |
C3‑090757 | Unsuccessful-QoS-validation as Rule-Failure-Code in S9 | Ericsson | Agreed |
C3‑090758 | Event Trigger Clarification for IPv6 address change | NTT DOCOMO | Withdrawn |
C3‑090759 | Align XML Schema for CW indication | RIM | Agreed |
C3‑090760 | Authorization of early media | Ericsson | Agreed |
C3‑090761 | Correction of ACM and CPG sending procedures | Ericsson | Agreed |
C3‑090762 | Correction of ACM and CPG sending procedures | Ericsson | Agreed |
C3‑090763 | MCID interaction at the II-NNI | Ericsson | Postponed |
C3‑090764 | Use of E.164 number at the II-NNI | LM Ericsson,Telecom Italia, France Telecom, Deutche Telecom | Revised in C3-090775 |
C3‑090765 | Correction to SIP headers table | Ericsson | Revised in C3-090776 |
C3‑090766 | Stage 2 requirements / use cases for CS-IBCF / CS-TrGW | Ericsson | Agreed |
C3‑090767 | Reply LS on H.248 work items related to 3GPP requirements from ITU-T SG 16 Q3/16 | NSN | Approved |
C3‑090768 | Correction of the procedure for setting of Continuity Indicator in subclause 7.3.3.1.2.2 | CATR;China Telecom Huawei | Agreed |
C3‑090769 | Correction of the procedure for setting of Continuity Indicator in subclause 7.3.3.1.2.2 | CATR;China Telecom Huawei | Agreed |
C3‑090770 | Correction of the procedure for setting of Continuity Indicator in subclause 7.3.3.1.2.2 | CATR;China Telecom Huawei | Agreed |
C3‑090771 | Codec negotiation when interworking with BICC based CS CN | Ericsson | Agreed |
C3‑090772 | Codec negotiation when interworking with BICC based network | Ericsson | Agreed |
C3‑090773 | Codec negotiation when interworking with BICC based network | Ericsson | Agreed |
C3‑090774 | Operational description of the Inter-IMS Network to Network Interface (II-NNI) WID | Orange | Revised in C3-090780 |
C3‑090775 | Use of E.164 number at the II-NNI | LM Ericsson,Telecom Italia, France Telecom, Deutche Telecom | Revised in C3-090664 |
C3‑090776 | Correction to SIP headers table | Ericsson | Revised in C3-090779 |
C3‑090777 | IP Address and Port Conversion | Nokia Siemens Networks | Revised in C3-090666 |
C3‑090778 | LS on Reply LS on security aspects of new work item "RTTI support in IMS charging" | Orange | Approved |
C3‑090779 | Correction to SIP headers table | Ericsson | Agreed |
C3‑090780 | Operational description of the Inter-IMS Network to Network Interface (II-NNI) WID | Orange | Agreed |
C3‑090781 | Gxx Application ID | Camiant | Agreed |
C3‑090782 | S9 Application ID | Camiant | Agreed |
C3‑090783 | Status of CT3 Work Item at CT3#52 | Chairman | Revised in C3-090667 |
page generated from database: 2024-07-20 12:15:34