The Mobile
Broadband Standard



3GPP active work programme


Click on UID to show list of all TSs and TRs associated with this work item.

Click on WI code to see a list of TSs and TRs specifically resulting from this work item.

Click on the percentage completion to see a list of approved Change Requests associated with this work item.

The "impact" shows an empirical best-guess of which TSs and TRs are likely to be modified as a result of the WI.

Work Items which have been abandoned are greyed out, and the TSG meeting at which they were abandoned is shown in the final column.

UID code title release lead body completion %
done
WID TDoc WID history created date last updated remarks abandoned
380060 IPinterc IP Interconnection of Services Rel-8 C3, S5, S2, S1 2009-03-06

100

SP-080565 history 2007-12-13 2010-08-02 SP#43 completed
380061 - ...Stage 1 for IPinterc Rel-8 S1 2008-03-12

100

SP-080565 history 2007-12-13 2010-08-02 SP#39 completed.
7005 IMS_NNI ...System enhancements for interconnection interfaces between two IMSs Rel-8 C3, S5, S2 2009-03-06

100

SP-080554 history 2006-02-16 2010-08-02 CP#43 completed
360024 - ......Stage 2 for IMS_NNI Rel-8 S2 2007-12-06

100

SP-080554 history 2007-06-22 2010-08-02 SP#38 completed
360011 FBI2-IOPSI ......IMS inter-operator service interconnection interface Rel-8 C3 2009-03-06

100

CP-080578 history 2007-06-20 2010-08-02 CP#43 completed
330011 FBI2-TISP2-CH ......Charging harmonization for NGN between 3GPP and ATIS-TMOC Rel-8 S5 2006-12-07

100

SP-060545 history 2006-10-09 2008-03-03 SP#34 completed
7007 FBI2-TISP2-c1 ......Deleted - Protocol impact of FBI for TISPAN R2 Rel-8 C1 2007-03-15

100

history 2006-02-16 2009-03-24 SP#38 stopped SP-38
7006 FBI2-TISP2-s2 ......Deleted (never approved) - Stage 2 of FBI for TISPAN R2 - Rel 8 Rel-8 S2 2007-11-30

100

history 2006-02-16 2009-03-24 SP#36 stopped SP-36