The 5G Standard

3GPP Specification Change Requests

Go to spec numbering scheme page

Back to series index

Back to spec details

Go to current work plan


3GPP Specification Change Request records for: 05.10

CR no. rev cat Release CR written to vers new vers CR title TSG meeting TSG doc TSG status source WG meeting WG doc WG status cover date work item remarks database record created
A004 - B R96 4.8.0 5.0.0 Addition of ASCI features smg-18 336/96 approved SMG2 - 35/96 agreed 1996‑03‑08 ASCI -
A011 1 B R97 5.1.0 5.2.0 Introduction of the new Timing Advance Procedure for GPRS smg-23 97‑640 approved SMG2 SMG2-23 276/97 agreed 1997‑10‑10 GPRS -
A015 - C R97 6.0.0 6.1.0 GPRS, Missing Timing Advance Updates on PTCCH smg-25 98-0182 approved SMG2 SMG2-25 56/98 agreed 1998‑03‑13 GPRS -
A016 - F R97 6.1.0 6.2.0 Correction to timing advance for GPRS smg-26 98‑0388 approved SMG2 SMG2-26 133/98 agreed 1998‑06‑23 GPRS -
A017 2 F R97 6.2.0 6.3.0 Clarification of packet polling procedure for calculating new TA smg-27 98-0712 approved SMG2 SMG2-27 393/98 agreed 1998‑10‑12 GPRS -
A021 1 F R97 6.3.0 6.4.0 Correction of Timing Advance Procedure smg-28 P‑99‑170 approved SMG2 - 2P99‑054 agreed 1999‑02‑08 GPRS -
A025 - B R98 6.3.0 7.0.0 Synchronisation requirements for the control of the CTS-FP service range smg-28 P‑99‑167 approved SMG2 - 2P99‑104 agreed 1999‑02‑08 CTS -
A027 - F R98 7.0.0 7.1.0 Correction of CTS-FP frequency source correction slope smg-29 P‑99‑489 approved SMG2 - 2‑99‑205 agreed CTS -
A029 1 F R97 6.4.0 6.5.0 Timing advance for access bursts on PTCCH/U smg-29 P‑99‑493 approved SMG2 - 2‑99‑459 agreed GPRS -
A036 1 F R98 7.0.0 7.1.0 Reaction time after contention resolution during one phase access smg-29 P‑99‑493 approved SMG2 - 2‑99‑752 agreed GPRS -
A038 1 B R99 7.1.0 8.0.0 EDGE Compact logical channels smg-30 P‑99‑589 approved SMG2 - 2‑99‑D93 agreed EDGE-Compact see also: 03.64, 04.03, 05.01, 05.02, 05.03
A039 1 C R99 8.0.0 8.1.0 Extended range TA information added in 05.10 smg-30b P-99-805 approved SMG2 - 2‑99‑G43 agreed 1999‑12‑07 GSM_400 -
A040 - F R97 6.5.0 6.6.0 Definition of other reaction times smg-30 P‑99‑573 approved SMG2 - 2‑99‑E12 agreed GPRS -
A041 - A R98 7.1.0 7.2.0 Definition of other reaction times smg-30 P‑99‑573 approved SMG2 - 2‑99‑E12 agreed GPRS -
A042 - A R99 7.1.0 8.0.0 Definition of other reaction times smg-30 P‑99‑573 approved SMG2 - 2‑99‑E12 agreed GPRS -
A043 - B R99 8.0.0 8.1.0 Synchronization of 52-multiframes in EGPRS COMPACT smg-30b P-99-802 approved SMG2 - 2‑99‑J55 agreed 1999‑12‑07 EDGE-Compact -
A047 1 C R98 7.2.0 - LCS Location Measurement Unit Synchronization requirements smg-30b P-99-789 postponed SMG2 - 2‑99‑J46 agreed 1999‑12‑07 LCS -
A047 2 C R98 7.2.0 - BTS Synchronisation, Location Accuracy and LMU update rates smg-31 P‑00‑061 postponed T1P1 - - 2000‑02‑16 LCS -
A048 1 A R99 8.0.0 - LCS Location Measurement Unit Synchronization requirements, mirror to R'98 smg-30b P-99-789 postponed SMG2 - 2‑99‑J47 agreed 1999‑12‑07 LCS -
A048 2 C R99 8.1.0 - BTS Synchronisation, Location Accuracy and LMU update rates smg-31 P‑00‑062 postponed T1P1 - - 2000‑02‑16 LCS -
A049 - B R99 8.0.0 8.1.0 Defining the MS carrier frequency accuracy value for GSM 400 MS smg-30b P-99-805 approved SMG2 - 2‑99‑G45 agreed 1999‑12‑07 GSM_400 -
A050 - B R99 8.1.0 8.2.0 Modifications for 8-PSK smg-31 P‑00‑090 approved SMG2 01/00 2‑00‑062 agreed 2000‑02‑13 EDGE-Layer1 -
A051 - B R99 8.1.0 8.2.0 Timegroup definition removal from 05.10 smg-31 P‑00‑095 approved SMG2 01/00 2‑00‑144 agreed 2000‑02‑13 EDGE-Compact -
A054 - F R99 8.2.0 8.3.0 EGPRS Classic to COMPACT BTS synchronisation smg-31b P-00-216 approved SMG2 S2-35 539/00 agreed 2000‑04‑13 EDGE -
A055 - C R98 7.2.0 7.3.0 BTS Synchronisation, Location Accuracy and LMU update rates smg-31b P-00-218 approved SMG2 S2-35 558/00 agreed 2000‑04‑13 LCS -
A056 - A R99 8.2.0 8.3.0 BTS Synchronisation, Location Accuracy and LMU update rates smg-31b P-00-218 approved SMG2 S2-35 559/00 agreed 2000‑04‑13 LCS -
A058 1 B R99 8.3.0 8.4.0 Class A Dual Transfer Mode (DTM) smg-32 P‑00‑281 approved SMG2 05/00 2‑001166 agreed 2000‑06‑28 GPRS -
A059 - F R99 8.4.0 8.5.0 05.10-A059 Correction of assignment reaction time (R99) GP-01 GP-000105 approved G1 G1-01 GP‑000105 agreed 2000‑09‑18 GPRS -
A060 - F R96 5.2.2 5.3.0 05.10-A060 Removal of GPRS related text (R96) GP-01 GP-000111 approved G1 G1-01 GP‑000111 agreed 2000‑09‑18 TEI -
A061 - B R99 8.4.0 8.5.0 05.10-A061 Addition of the switching requirement for the GSM to UTRAN (R99) GP-01 GP-000220 approved G1 G1-01 GP‑000220 agreed 2000‑09‑18 2G3Ghandover -
A062 - F R96 5.3.0 5.4.0 Corrections to synchronized handover GP-02 GP-000565 approved G1 G1-02 GP‑000565 agreed 2000‑11‑14 TEI -
A063 - A R97 6.6.0 6.7.0 Corrections to synchronized handover GP-02 GP-000566 approved G1 G1-02 GP‑000566 agreed 2000‑11‑14 TEI -
A064 - A R98 7.3.0 7.4.0 Corrections to synchronized handover GP-02 GP-000567 approved G1 G1-02 GP‑000567 agreed 2000‑11‑14 TEI -
A065 - A R99 8.5.0 8.6.0 Corrections to synchronized handover GP-02 GP-000568 approved G1 G1-02 GP‑000568 agreed 2000‑11‑14 TEI -
A066 - F R99 8.5.0 - Reaction time at packet assignment with polling request GP-02 GP-000613 - G1 G1-02 GP‑000613 revised 2000‑11‑14 GPRS -
A066 1 F R99 8.5.0 - Reaction time at packet assignment with polling request GP-02 GP-000807 - G1 G1-02 GP‑000807 revised 2000‑11‑14 GPRS -
A066 2 F R99 8.5.0 8.6.0 Reaction time at packet assignment with polling request GP-02 GP-000903 approved G1 G1-02 GP‑000903 agreed 2000‑11‑14 GPRS -
A067 - - R99 - - Delay requirements for blind handover to UTRAN GP-03 GP-010099 revised Ericsson - - 2001‑01‑31 - -
A067 1 F R99 8.6.1 8.7.0 Delay requirements for blind handover to UTRAN GP-03 GP-010297 approved Ericsson - - 2001‑01‑31 2G3Ghandover -
A068 - - Rel-4 - - Uplink and downlink assignment reaction time GP-03 GP-010141 rejected Motorola - - 2001‑01‑31 - -
A069 - - R99 - - Timing requirements for blind handover 2G->2G GP-03 GP-010382 revised Nortel Networks - - 2001‑01‑31 - -
A069 1 F R99 8.6.1 8.7.0 Timing requirements for blind handover 2G->2G GP-03 GP-010440 approved Nortel Networks - - 2001‑01‑31 2G3Ginterworking -
A071 - - R99 8.7.0 - Initial Assignment reaction time GP-04 GP-010501 revised Siemens G1-4 GP‑010501 - 2001‑04‑06 - -
A071 1 - R99 8.7.0 - Initial Assignment reaction time GP-04 GP-010972 postponed Siemens G1-4 GP‑010972 - 2001‑04‑06 - -
A072 - - R99 8.7.0 - Handover to UTRAN delay GP-04 GP-010582 withdrawn Ericsson G1-4 GP‑010582 - 2001‑04‑06 - -
A073 - - R99 8.7.0 - Updates to GSM UTRAN Handover Interruption Times GP-04 GP-010742 revised Siemens G1-4 GP‑010742 - 2001‑04‑06 - -
A073 1 F R99 8.7.0 8.8.0 Updates to GSM UTRAN Handover Interruption Times GP-04 GP-010835 approved Siemens G1-4 GP‑010835 agreed 2001‑04‑06 2G3Ghandover -
A074 - F R99 8.8.0 - Clarification to Requirements for Synchronization at DTM operation - - - Ericsson G1-08 GP‑020087 revised 2002‑01‑09 Class_A_Dual_Transfer_Mode_(DTM) -
A074 1 F R99 8.8.0 8.9.0 Clarification to Requirements for Synchronization at DTM operation GP-08 GP-020452 approved G1 G1-08 GP‑020452 agreed 2002‑02‑05 Class_A_Dual_Transfer_Mode_(DTM) -
A075 - - R99 - - Correction to inter system handover interruption times GP-10 - - - G1-10 GP‑021759 revised 2002‑06‑28 - -
A075 1 F R99 8.9.0 8.10.0 Correction to inter system handover interruption times GP-10 GP‑021929 approved G1 G1-10 GP‑021929 agreed 2002‑06‑28 2G3Ginterworking -

page generated from database: 2024-04-22 07:58:53